The document is a Past Performance Questionnaire for Solicitation 36C26125R0008, a VA Palo Alto Healthcare System project to renovate and expand the Sterile Processing Service (SPS). The questionnaire is designed to evaluate contractor performance across seven key areas: quality, schedule/timeliness, customer satisfaction, management/personnel, cost/financial management, safety/security, and general performance. The rating scale ranges from Exceptional to Unsatisfactory, with respondents required to provide detailed ratings and comments for each performance category.

The associated federal contract opportunity involves an 18,486 square foot renovation of the SPS in Building 100, with a project duration of 720 calendar days. The project aims to modernize the SPS, improve functional adjacencies, and create separate spaces for Sterile Processing and Supply Chain Services. Key project constraints include maintaining hospital operations, following infection control measures, and coordinating utility shutdowns. The solicitation will evaluate proposals based on past performance, corporate project experience, construction management, technical approach, personnel experience, schedule, and cost, with the goal of selecting a contractor to provide comprehensive renovation services.

View the file

Other files

File Type Posted
36C26125R0008 0005.docx DOCX document
Attach Amend 0005 RFI BID Responses.pdf PDF
ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf PDF
ATTACH 3 GeoTech Report 02.02.21.pdf PDF
Attach 1 Amend 0004 SPS - Pre-Bid RFI Responses.pdf PDF
36C26125R0008 0004.docx DOCX document
ATTACH 7 - Construction Experience Project Data Sheet.rtf RTF text file
ATTACH 6 No. 81 - CS106.pdf PDF
ATTACH 4 SECTION 27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.pdf PDF
Attach 2 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
1795.07 - Basement Div. 12 Specifications.pdf PDF
36C26125R0008 0003.docx DOCX document
SIte Visit 12 June 2025 Sign in Roster.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
36C26125R0008 0002.docx DOCX document
Temporary SPS_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part3.pdf PDF
DRAWINGS - TEMPORARY SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part1.pdf PDF
DRAWINGS - BASEMENT SPS_Part6.pdf PDF
DRAWINGS - BASEMENT SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part5.pdf PDF
DRAWINGS - BASEMENT SPS_Part5.pdf PDF
36C26125R0008 0001.docx DOCX document
Basement_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part3.pdf PDF
DRAWINGS - BASEMENT SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part1.pdf PDF
ATTACHMENT AA SPS - Specifications.pdf PDF
ATTACH CC PART 1.pdf PDF
ATTACH BB DRAWINGS PART 1.pdf PDF
ATTACH CC PART 2.pdf PDF
ATTACH BB DRAWINGS Part 2.pdf PDF
ATTACH DD SPS SWING SPACE.pdf PDF
36C26125R0008.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
ATTACH DD SPS - Swing Space Drawings.pdf PDF
ATTACH CC SPS - Drawings_Part2.pdf PDF
ATTACH BB - SPS - Drawings_Part1.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment F - Client Authorization Letter.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Attachment H Wage Determination CA20250018 Dtd 3.21.25.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
36C26125R0008.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125R0008 SPS Renovation 640-23-108

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

SPS Renovation VA Palo Alto Healthcare System, Palo Alto, California

The information obtained from this questionnaire will be utilized to evaluate the past performance of offerors submitting proposals in response to the 36C26125R0008, SPS Renovation. The information you provide will be instrumental in allowing the Government to evaluate how well the contractor performed under your contract(s).

a. Please complete all sections of the attached questionnaire. Include your name and title, organizational address, e-mail address, telephone and fax number.

b. Include the contractor’s name, your point of contact (POC,) the title and/or description of the type of work performed the award number, the value of the contract, the award and completion date of the project and the type of award.

c. Use the attached rating scale rate each performance element.

d. Comments are encouraged and would be appreciated. The last page may be used if additional space is needed for comments. Clear handwritten responses are sufficient.

e. Due to time constraints, it is important that the questionnaire be completed and returned by the date proposal is due (July 10, 2025, at 10:00 am Pacific Time). Please e-mail your response with the RFP/RFQ numbers as the subject line and send to charee.harris@va.gov.

Thank you for your time and participation.

PAST PERFORMANCE RATING SCALE

RATING:
DEFINITION:
USAGE:
EXCEPTIONAL
Performance exceeded many contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
An EXCEPTIONAL rating is appropriate when the contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit however could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified
GOOD
Performance exceeded some contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were effective.
A GOOD rating is appropriate when the contractor has successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
SATISFACTORY
Performance met all contractual requirements. The contractual performance of the elements being assessed were accomplished with no more than a few minor problems for which corrective actions taken by the contractor were satisfactory.
A SATISFACTORY rating is appropriate when there were only a few minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified.
MARGINAL
Performance did not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully successful.
A MARGINAL rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
UNSATISFACTORY
Performance did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element contains a serious problem(s) for which the contractor’s corrective actions were ineffective.
An UNSATISFACTORY rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
Neutral/Not Applicable or Unknown
No performance record identifiable within the area of evaluation
Performance was not observed or not applicable to the current effort being reported.

PAST PERFORMANCE QUESTIONNAIRE

NAME OF CONTRACTOR BEING EVALUATED:

CONTRACTOR MAIN POC

CONTRACT NUMBER:

CONTRACT VALUE:

CONTRACTOR PERFORMED WORK AS:
CONTRACT AWARD & COMPLETION DATE:

Prime Contractor Sub- Contractor Key Personnel

PROJECT TITLE AND BRIEF DESCRIPTION OF WORK:

RESPONDENT’S NAME

YOUR ORGANIZATIONAL ADDRESS

PHONE/FAX NO:

E-MAIL:

1. QUALITY:

A. Quality of technical data/report preparation efforts
RATING
E
G
S
M
U
N

Comments:

B. Ability to meet quality standards specified for technical performance
RATING
E
G
S
M
U
N

Comments:

C. Timeliness/effectiveness of contract problem resolution without extensive customer guidance
RATING
E
G
S
M
U
N

Comments:

D. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

A. Compliance with contract delivery/completion schedules including any significant intermediate milestones
RATING
E
G
S
M
U
N

Comments:

B. Rate the contractor’s use of available resources to accomplish tasks
RATING
E
G
S
M
U
N

Comments:

3. CUSTOMER SATISFACTION:

A. To what extent were the end users satisfied with the project?
RATING
E
G
S
M
U
N

Comments:

B. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports and business communication)
RATING
E
G
S
M
U
N

Comments:

C. To what extent was the contractor cooperative, businesslike and concerned with the interests of the customer?
RATING
E
G
S
M
U
N

Comments:

D. Overall customer satisfaction
RATING
E
G
S
M
U
N

Comments:

4. MANAGEMENT/PERSONNEL/LABOR

A. Effectiveness of on-site management, including management of subcontractors, suppliers, materials and/or labor force?
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

B. Ability to hire, apply and retain a qualified workforce to the effort
RATING
E
G
S
M
U
N

Comments:

C. Government Property Control
RATING
E
G
S
M
U
N

Comments:

D. Knowledge/expertise demonstrated by contractor personnel
RATING
E
G
S
M
U
N

Comments:

E. Ability to simultaneously manage multiple projects with multiple disciplines.
RATING
E
G
S
M
U
N

Comments:

F. Ability to assimilate and incorporate changes in requirements or priority, including planning, execution and response to Government changes
RATING
E
G
S
M
U
N

Comments:

G. Effectiveness of overall management (including ability to effectively lead, manage and control the program)
RATING
E
G
S
M
U
N

Comments:

5. COST/FINANCIAL MANAGEMENT

A. Ability to meet the terms and conditions contractually agreed to price(s)?
RATING
E
E
E
E
E
E

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

B. Contractor proposed innovative alternative methods/processes that reduced costs, improved maintainability or other factors that benefited the client.
RATING
E
G
S
M
U
N

Comments:

C. If this is/was a Government cost type contract, please rate the contractor’s timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/budget variance reports, compliance with established budges and avoidance of significant and/or unexplained variances (under runs or overruns)
RATING
E
G
S
M
U
N

Comments:

D. Have there been any indications that the contractor has had any financial problems? If yes please explain below
RATING
Yes
No

Comments:

6. SAFETY/SECURITY:

A. To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

RATING

E
G
S
M
U
N

Comments:

B. Contractor complied with all security requirements for the project and personnel security requirements.
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

7. GENERAL:

A. Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM, or Contracting officer in a timely manner regarding urgent contractual issues.)
RATING
E
G
S
M
U
N

Comments:

B. Compliance with contractual terms/provisions (explain if specific issues)
RATING
E
G
S
M
U
N

Comments:

C. Would you hire or work with this firm again (if no, please explain below)

RATING

Yes
No
D. In summary, provide an overall rating for the work performed by this contractor.
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

File details come from the government source that posted it. Updated .