Attachment C - Key Personnel Evaluation.docx

DOCX document 19 KB Posted

Attached to
Z2AZ--Renovation & Expansion of SPS | NRM 640-23-108
Solicitation number
36C26125R0008
Issued by

About this file

Attachment C is a Key Personnel Evaluation template for a Veterans Affairs Palo Alto Healthcare System (VAPAHCS) renovation project (Solicitation Number 36C26125R0008). The document requires detailed biographical and project experience information for five key personnel roles: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager.

The template mandates comprehensive documentation for each key personnel, including employment history, educational background, professional registrations, training courses, project experience, and roles. Candidates must provide details on up to five projects completed within the past six years, specifying contract numbers, titles, amounts, dates, roles, and work descriptions. The evaluation aims to assess the qualifications and relevant experience of personnel proposed for the Sterile Processing Supply (SPS) renovation and expansion project, which involves an 18,486 square foot renovation at the VA Palo Alto Healthcare System location.

View the file

Other files

File Type Posted
Attach Amend 0005 RFI BID Responses.pdf PDF
36C26125R0008 0005.docx DOCX document
ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf PDF
ATTACH 3 GeoTech Report 02.02.21.pdf PDF
Attach 1 Amend 0004 SPS - Pre-Bid RFI Responses.pdf PDF
36C26125R0008 0004.docx DOCX document
ATTACH 7 - Construction Experience Project Data Sheet.rtf RTF text file
ATTACH 6 No. 81 - CS106.pdf PDF
ATTACH 4 SECTION 27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.pdf PDF
Attach 2 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
1795.07 - Basement Div. 12 Specifications.pdf PDF
36C26125R0008 0003.docx DOCX document
SIte Visit 12 June 2025 Sign in Roster.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
36C26125R0008 0002.docx DOCX document
Basement_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part3.pdf PDF
DRAWINGS - BASEMENT SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part1.pdf PDF
Temporary SPS_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part3.pdf PDF
DRAWINGS - TEMPORARY SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part1.pdf PDF
DRAWINGS - BASEMENT SPS_Part6.pdf PDF
DRAWINGS - BASEMENT SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part5.pdf PDF
DRAWINGS - BASEMENT SPS_Part5.pdf PDF
36C26125R0008 0001.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
ATTACH BB DRAWINGS Part 2.pdf PDF
ATTACH DD SPS SWING SPACE.pdf PDF
ATTACH CC PART 1.pdf PDF
ATTACH BB DRAWINGS PART 1.pdf PDF
ATTACH CC PART 2.pdf PDF
36C26125R0008.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Attachment H Wage Determination CA20250018 Dtd 3.21.25.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment B - EMR Sheet.docx DOCX document
36C26125R0008.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
ATTACH DD SPS - Swing Space Drawings.pdf PDF
ATTACH CC SPS - Drawings_Part2.pdf PDF
ATTACH BB - SPS - Drawings_Part1.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment F - Client Authorization Letter.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125R0008

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

SPS Renovation 640-23-108

Provide the following information, on separate sheets, to demonstrate the key personnel's experience (one for each: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager).

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 4:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

PROJECT 5:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.

File details come from the government source that posted it. Updated .