The file is a Construction Experience Project Data Sheet and Past Performance Questionnaire for a federal contract opportunity to renovate and expand the Sterile Processing Service (SPS) at the Veterans Affairs Palo Alto Health Care System. The project involves an 18,486 square foot renovation of the SPS in Building 100, with a total construction period of 720 calendar days, including the creation of a temporary swing space to maintain operational continuity. The solicitation (Solicitation Number: 36C26125R0008) seeks a qualified contractor to provide comprehensive construction services, with evaluation factors prioritized as past performance, corporate project experience, construction management, technical approach, personnel experience, schedule, and cost.
The project aims to modernize the SPS to meet VA Design Guide requirements, improve functional adjacencies, and create unidirectional workflow with controlled access for reusable medical devices. The contract includes multiple construction phases: preparing swing space, activating temporary SPS, deactivating existing SPS, demolition, constructing new SPS, and final demobilization. Key technical requirements include maintaining hospital operations with minimal disruption, implementing infection control measures, coordinating utility shutdowns, and adhering to safety protocols. The site is located at 3801 Miranda Avenue, Palo Alto, California, with a site visit scheduled for June 12, 2025, at 1:00 PM.
Text of this file
ATTACHMENT D
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET – OFFEROR
36C26125R0008 This form is to be completed by the Offeror. Submit (one per project) in order to provide supporting project information for Factor 2, Experience. Only projects that are within the project description parameters of the solicitation will be considered relevant. Submit no less than three (3) and no more than (5) projects.
Project No. (check one):
- 1
- 2
- 3
- 4
- 5 Contractor:
1. Offeror Name:
Firm who performed the work:
Performed this work as: Prime Contractor Subcontractor Joint Venture Other (explain):
| If subcontractor, name of prime: | Phone #: | ||
| If the firm who performed this project differs from | Joint Venture Partner | Subsidiary | |
| the Offeror proposing on this contract, identify the | Partner | Satellite Office | |
| firm’s relationship to the Offeror: | Subcontractor | Predecessor Company Parent Company | Other: |
Explain how this firm will have meaningful involvement in the performance of the contract:
Construction Contract:
2. Contract/Project No.: Delivery/Task Order Number:
Title:
Location:
3. Award Date (mm/dd/yy):
Completion Date (mm/dd/yy):
Award Amount: $ Final Price: $ file_0.wmf
| This is the: | total project | subcontract price |
| 4. | Type of Contract: | Design-Build. If D-B, design firm was: |
| (check one) | Design-Bid-Build |
Customer:
5. Name: Point of Contact Name/Title: POC Phone Number: POC Email Address:
Project Description:
6. Type of Work (check all that apply): New Construction Renovation Repair
7. Provide a detailed description of the project and the relevancy to the project requirements of this RFP:
9. Percentage of work your firm self-performed (see definition): % Provide a detailed description of the work your firm self-performed on this project.
8. If project is design-build, provide a detailed description of the design effort:
file_1.wmf
Note: Form may be expanded.
EXHIBIT “B”
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION
1. Contractor Information
| Firm Name: | CAGE Code: |
| Address: | DUNs Number: |
Phone Number:
Email Address:
| Point of Contact: | Contact Phone Number: | |||
| 2. Work Performed as: | Prime Contractor | Sub Contractor | Joint Venture | Other (Explain) Percent of project work performed: |
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION
5. Client Information Name: Title:
Phone Number: Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
Exhibit “B” – PPQ, Page 1 of 4 (Rev 12/11) ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE file_2.wmf
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been NO significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
Exhibit “B” – PPQ, Page 2 of 4
Contractor Information (Firm Name):
Client Information (Name):
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E
VG
S M U N
b) Ability to meet quality standards specified for technical performance
VG
S M
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
VG
S M
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
VG
S
M
2. SCHEDULE/TIMELINESS OF PERFORMANCE
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
VG
S
M
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
VG
S M
3. CUSTOMER SATISFACTION
a) To what extent were the end users satisfied with the project?
VG
S M
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
VG
S
M
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
VG
S M
d) Overall customer satisfaction
VG
S M
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force
VG
S M
b) Ability to hire, apply, and retain a qualified workforce to this effort
VG
S M
c) Government Property Control
VG
S M
d) Knowledge/expertise demonstrated by contractor personnel
VG
S M
e) Utilization of Small Business concerns
VG
S M
f) Ability to simultaneously manage multiple projects with multiple disciplines
VG
S M
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
VG
S M
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
VG
S M
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)
VG
S M
Exhibit “B” – PPQ, Page 3 of 4
Contractor Information (Firm Name):
Client Information (Name):
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
E
VG
S M U
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
VG
S
M
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the user’s rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E
VG
S
M
U
N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E
VG
S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E
VG
S
M
U
N
b) Compliance with contractual terms/provisions (explain if specific issues) E
VG
S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
d) In summary, provide an overall rating for the work performed by this contractor.
E
VG
S M U
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
Exhibit “B” – PPQ, Page 4 of 4
EXHIBIT “C”
OFFEROR TEAM COMPOSITION AND MANAGEMENT
N40080-20-R-5255 Use this form to provide information regarding the primary members, composition, and management of the proposed team for Subfactor 4, TECHNICAL QUALIFIATIONS OF PROPOSED STAFFING. If Offeror is a partnership (e.g., JV, Mentor-Protégé), list each partner as a separate team member. If the experience of an entity is being claimed in Factor 2, that entity must be identified and described on this Exhibit. Modify form as necessary to include all primary construction and primary design team members. PLEASE NOTE – “TEAM MEMBER” MEANS A COMPANY, LLC, ETC., NOT AN INDIVIDUAL PERSON. Do not include information for individuals. Do not exceed two (2) pages. IF YOUR PROPOSAL IS BASED ON 100% IN-HOUSE LABOR (I.E. NO SUBCONTRACTORS OR CONSULTANTS), WRITE “NOT APPLICABLE.”
Team Member 1 Name:
Location:
DUNS:
Contractual relationship to the team:
Describe team member role, responsibilities, and meaningful involvement in performance of the contract:
If located outside of Virginia, explain how entity will have meaningful involvement from a remote location.
Team Member 2 Name:
Location:
DUNS:
Contractual relationship to the team:
Describe team member role, responsibilities, and meaningful involvement in performance of the contract:
If located outside of Virginia, explain how entity will have meaningful involvement from a remote location.
Team Member 3 Name:
Location:
DUNS:
Contractual relationship to the team:
Describe team member role, responsibilities, and meaningful involvement in performance of the contract:
If located outside of Virginia, explain how entity will have meaningful involvement from a remote location.
Team Member 4 Name:
Location:
DUNS:
Contractual relationship to the team:
Describe team member role, responsibilities, and meaningful involvement in performance of the contract:
If located outside of Virginia, explain how entity will have meaningful involvement from a remote location.
Team Member 5 Name:
Location:
DUNS:
Contractual relationship to the team:
Describe team member role, responsibilities, and meaningful involvement in performance of the contract:
If located outside of Virginia, explain how entity will have meaningful involvement from a remote location.
Discuss the rationale for proposing this team arrangement:
Note: Form may be expanded.
EXHIBIT “D” SAFETY DATA SHEET
N40080-20-R-5255 This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.
Joint Venture (JV) or Partnership: Complete Blocks 1 through 8 for each contractor who is part of the JV or partnership. Only one safety narrative (Block 9) is required.
1. Offeror Name:
Name of JV partner providing the information below (if applicable):
Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
2. Experience Modification Rate (EMR):
3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:
3b. Explain any negative EMR trends:
3c. If you do not have an EMR for a given year, state so here and explain why:
4. Insurance Carrier Information:
Insurance Carrier Name:
Agent’s name:
Phone No.:
Email:
5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.
6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:
6b. Explain any negative DART Rate trends:
6c. If you do not have a DART Rate for a given year, state so here and explain why:
Note: Form may be expanded.
EXHIBIT “D” (continuation) SAFETY NARRATIVE N40080-20-R-5255
7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate
Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.
8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:
8b. Explain any negative TRC Rate trends:
8c. If you do not have a TRC Rate for a given year, state so here and explain why:
EXHIBIT “D” (continuation) SAFETY NARRATIVE N40080-20-R-5255
9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:
Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:
Note: Form may be expanded up to the page limit specified in the RFP.
EXHIBIT “D” (continuation) SAFETY NARRATIVE N40080-20-R-5255
9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed/and or all subcontractor levels:
Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps:
REQUEST FOR INFORMATION (RFI)
N40080-20-R-5255 The Government does not intend to respond to inquiries submitted after the RFI due date shown in the solicitation. Please submit questions to Deidre Parker by email at deidre.parker@navy.mil.
Firm Name:
POC:
Address:
file_3.wmf
Phone Number:
Email Address:
QUESTION IS REGARDING:
Section of the RFP:
Paragraph:
Page Number:
QUESTION:
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .