The documents are technical drawings and life safety plans for a Veterans Affairs Palo Alto Healthcare System project involving the renovation and expansion of the Sterile Processing Department (SPS) in Building 100. The project includes constructing temporary modular buildings and swing spaces to maintain operational continuity during renovation, with a total project duration of 720 calendar days.
The drawings detail the life safety requirements, egress paths, plumbing fixture counts, and temporary building layouts for the SPS renovation. Key elements include creating separate spaces for Sterile Processing Service (SPS) and Supply Chain Service (SCS), establishing unidirectional workflow with controlled access for soiled and clean Reusable Medical Devices (RMD), and maintaining hospital operations throughout the construction process. The project will involve multiple phases, including preparing temporary spaces, deactivating existing SPS, renovating the main SPS area, and ultimately demolishing temporary facilities.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT BLOCKING
FOR ALL WALL MOUNTED ACCESSORIES, FIXTURES, AND EQUIPMENT.
SUPPORT BRACKETS TO BE PLACED AT ALL OPEN COUNTERTOPS -
18"-24" ON CENTER.
2. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER FINISHED
FLOOR TO THE OPERABLE PART OF THE FIXTURE.
3. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR FIXTURE
TYPES USED IN THIS PROJECT.
4. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE, BACKING
TO BE PROVIDED AS SHIM FOR FLUSH APPLICATION. SHIM TO MATCH
SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
TOILET ROOM TURNING
RADIUS
DRINKING
FOUNTAINPAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
M
A X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
3' -4
M
A X
17 MIN
2' -4
/4
M
IN
3' -0
M
A X
1'-5 1/2" MIN
WALL
3' -0
M
A X
4' -0
M
A X
1'-6" MIN
7 1/2" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-6"
CLEAR FLOOR
5'-0"
CLEAR FLOOR
4'-8"
3'-0" MIN
2' -9
1'-0"
3'-6" MIN 1'-0"
4'-6" MIN
1' -5
1' -7
M
IN
2' -9
WALLWALL
4' -0
/4
M
A X
WALL HOOK
7' -6
CLOCK
WALL
FFE
4' -0
M
A X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
60"
W A
LL
H
U N
G W
.C
*5 6"
30"
30"
HANDRAILS AND
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN
M
IN
FRONT APPROACH,
PUSH SIDE
*4 2"
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
M
IN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER
FEASIBLE, AND TO PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2018 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• NFPA 101 LIFE SAFETY CODE (MOST RECENT CODES APPLY) (SEE NOTES BELOW)
• 2018 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• 2015 INTERNATIONAL PLUMBING CODE (IPC)
• 2019 ASME BOILER AND PRESSURE VESSEL CODE
• 2007 ASME CODE FOR PRESSURE PIPING
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• 2016 MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN
INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2006 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL
BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
• 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
3. THE CODES AND STANDARDS LISTED ABOVE ARE PART OF THE ORIGINAL DESIGN OF THE SPS RENOVATION AND EXPANSION PROJECT. THE TEMPORARY SPS LOCATED IN THE ED LOT USES MORE UP TO DATE CODES AND STANDARDS AS THEY WERE PART OF A CONTRACT MODIFICATION EXECUTED AT A LATER DATE. THESE CODES AND STANDARDS ARE LISTED ON THE TEMPORARY SPS LIFE SAFETY SHEETS AND AS APPLICABLE THROUGHOUT THE DRAWINGS AND
SPECS.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: PALO ALTO, CALIFORNIA / SANTA CLARA COUNTY
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3C
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (TABLE 5.5-3):
ROOFS: REQUIRED: DESIGNED:
INSULATION ABOVE DECK R-25 c.i. EXISTING
METAL BUILDINGS: R-10 + R-19 FC EXISTING
ATTIC AND OTHER: R-38 EXISTING
WALLS, ABOVE GRADE
MASS: R-7.6 c.i. EXISTING METAL BUILDING: R-0 + R-9.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-5 c.i. EXISTING
WOOD-FRAMED AND OTHER: R-13 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: NR EXISTING
FLOORS
MASS: R-10 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: NR EXISTING
HEATED SLABS: R-15 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.42 EXISTING
OPERABLE: U-0.54 EXISTING
ENTRANCE DOOR: U-0.68 EXISTING
SKYLIGHT, 0% TO 3% OF ROOF, U-FACTOR
ALL TYPES: U-0.55 EXISTING
DEFINITIONS
c.i. = CONTINUOUS INSULATION
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 7 DAYS IN ADVANCE
OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME
OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS
OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS
PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR.
MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS
AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT
THE OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND
APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL
OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL
CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER.
INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES
OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION
MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO
THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL
OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION
SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
GENERAL NOTES
AREA NAME
150 SF
AE-101
A101
SIM
00000
00.0
AE-101
1 1
A101
LEVEL NAME
00'-00"
00'-00"
4B
3A
FIBERGLASS BATT INSULATION
ROOM NAME
000A
150 SF
/1 A101 X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
AMT AMOUNT
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR COLOR
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED / CONTRACTOR INSTALLED
CSWK CASEWORK
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EQ EQUAL
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
G
GR FL GROUND FLOOR
H
HDW HARDWARE
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HORIZ HORIZONTAL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LOC LOCATION
LT LIGHT
LVR LOUVER
M
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORIG ORIGINAL
P
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PL PROPERTY LINE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PWR POWER
Q
QTY QUANTITY
R
RCP REFLECTED CEILING PLAN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RFG ROOFING
RM ROOM
RO ROUGH OPENING
S
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
STD STANDARD
STOR STORAGE
T
TEL TELEPHONE
TEMP TEMPORARY
TFF TOP OF FINISH FLOOR
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VV VA PROVIDED / VA INSTALLED
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
X
X BRACE CROSS BRACE
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
*48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE
@ ADA DRINKING
FOUNTAIN
MINERAL WOOL INSULATION
EXPANDED POLYSTYRENE INSULATION
POLYISOCYANURATE INSULATION
SPRAY-APPLIED CLOSED CELL INSULATION
SPRAY-APPLIED CLOSED CELL INSULATION
CONCRETE / PRECAST CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY UNIT
STONE / CAST STONE
GYPSUM BOARD
EXTERIOR SHEATHING BOARD
PLYWOOD
*59" FOR FLOOR
MOUNTED W.C.
T O
B .O
R
E F
LE
C
T
IV
E
S U
R F
A C
E
1"
M
IN 39"- 41"
7" - 9"
3"
1' -6
M
IN
3' -6
M
A X
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
5' -0
M
A X
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH KS COA NO. A-930 EXP. 12/31/2025
ENG KS COA. NO. E-2586 EXP. 12/31/2025
CIVIL/STRUCTURAL ENGR
H2B. INC.
1225 N LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
MEP / TECH ENGR
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
9442 N. CAPITAL OF TEXAS HWY, STE 325
AUSTIN, TX 78759
(512) 346-8700
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
/2
/2
:3
:1
P
M
GENERAL INFORMATION
NSM 02 OF 72AJS
BID DOCUMENTS
RENOVATION AND EXPANSION OF SPS
05/30/2025
640-23-108
PALO ALTO VA MC
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
GI001
B100
SPUR #: 1795.07No. REVISION DESCRIPTION DATE
1 ASI 1 05.30.2025
WH
FD
FD
FD
1355 SF
CORRIDOR
102869 SF
ENTRY
F E
C
F E
C
1a
1b 1c
TRAVEL DIST. = 85'-0"
TRAVEL DIST. = 180'-9"
TRAVEL DIST. = 171'-8"
1.04
1.04
584 SF
CLEAN STORAGE
M-100
172 SF
WORKSTATION
M-100B
83 SF
OFFICE SPS CHIEF
M-101
119 SF
MANUAL CART WASH
M-102
61 SF
HAC
M-104
77 SF
TOILET FEMALE
M-108
86 SF
LOCKER FEMALE
M-107
77 SF
TOILET MALE
M-105
D O
O R
ACTUAL
CAPACITY
D O
O R
ACTUAL
CAPACITY
360 239 SF
CORRIDOR
M-103
107 SF
LOCKER MALE
M-106
119 SF
MANUAL CART WASH
M-102
123 SF
BIN ASSEMBLY
M-100A
77 SF
TOILET FEMALE
M-108
1.06
1d
T R
A V
E L
D
IS
T
'-6
F E
C
D O
O R
ACTUAL
CAPACITY
D O
O R
ACTUAL
CAPACITY
D O
O R
ACTUAL
CAPACITY
3469 SF
TEMPORARY CLEAN
SUPPLY STORAGE
MODULAR BUILDING
M-200
FEC 1
FEC FIRE EXTINGUISHER CABINET
EGRESS PATH TO BUILDING EXIT
EGRESS PATH STARTING POINT
EXIT LIGHT / SIGN
BUILDING EXIT / DIRECTION TO EXIT
OCCUPANT LOAD
BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE
SPRINKLER SYSTEM THROUGHOUT PER NFPA 13
CONSTRUCTION TYPE: (TABLE A.8.2.1.2): TYPE V (000)
FIRE RESISTANCE RATINGS (TABLE A.8.2.1.2):
• COLUMNS: 0 HR
• BEAM, GIRDERS, TRUSSES: 0 HR
• FLOOR/CEILING ASSEMBLIES: 0 HR
• ROOF/CEILING ASSEMBLIES: 0 HR
• EXTERIOR NON-BEARING WALLS: 0 HR
• INTERIOR NON-BEARING WALLS: 0 HR
FIRE-RESISTIVE REQUIREMENTS:
• NONCOMBUSTIBLE MATERIALS FOR STRUCTURAL
FRAME, FLOORS, ROOF DECK, EXTERIOR NON-BEARING
WALLS, INTERIOR NON-BEARING WALLS
• CORRIDORS: NO RATING REQUIRED (38.3.6.1.3)
CHAPTER 38: NEW BUSINESS OCCUPANCY
OCCUPANT LOADS (TABLE 7.3.1.2):
• ASSEMBLY = 15 SF / PERSON
• BUSINESS = 150 SF / PERSON
• BUSINESS, CONCENTRATED = 50 SF / PERSON
• STORAGE = 500 SF / PERSON
DEAD END CORRIDOR MAX DISTANCE: 50' (38.2.5.3.1)
MAXIMUM COMMON PATH OF TRAVEL: 100' (38.2.5.2.2)
MAXIMUM TRAVEL DISTANCE: 300' (38.2.6.3)
ALL EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM
YIELDING 34" CLEAR EXIT WIDTH.
• 32" MINIMUM DOOR LEAF WIDTH
(NFPA 101-2024 7.2.1.2)
• 0.2"/PERSON (NFPA 101-2024 TABLE 7.3.3.1)
SMOKE COMPARTMENTALIZATION:
• NOT REQUIRED / NOT PROVIDED FOR
BUSINESS OCCUPANCIES.
FIRE ALARM SYSTEM:
• REQUIRED / PROVIDED.
STANDPIPES:
• NOT REQUIRED / NOT PROVIDED.
LIFE SAFETY REQUIREMENTS - NFPA 101-2024 EDITION
LIFE SAFETY LEGEND
KEY PLAN
RADIOLOGY BUILDING
BUILDING 100
BUILDING 102
BUILDING 05
TEMP.
MODULAR
OFFICE
TEMP. SPS
T E
M P
. S P
S
N
TEMP.
MODULAR
STORAGE
CORRIDOR
FIRE - 1 HOUR
PARTITION LEGEND
EXISTING PARTITION TO REMAIN IN PLACE
NEW NON-RATED WALL
EXISTING FIRE - 1 HOUR
TO REMAIN IN PLACE
MALE FEMALE
REQUIRED
WATER CLOSET LAVATORY
SHOWER
MODULAR BLDG PLUMBING FIXTURE COUNT SCHEDULE1
DRINKING
FOUNTAIN2 OTHER
- 1 SERVICE SINK
UNISEX MALE FEMALE UNISEX
PROVIDED 1 1 2 0 1 SERVICE SINK- 1 1 -
1 1 - 1 1 -
1. CALCULATIONS BASED ON MODULAR BUILDING INCLUDING 1,723 SF BUSINESS OCCUPANCY. FIXTURE COUNT
INCLUDES FIXTURES IN ROOMS M-105 AND M-108
2. PER IBC 2024, SMALL OCCUPANCIES (UNDER 15) DO NOT REQUIRE A DRINKING FOUNTAIN
1439 SF
SCS STORAGE
TRAILER
M-300
T R
A V
E L
D
IS
T
'-5
1e th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH KS COA NO. A-930 EXP. 12/31/2025
ENG KS COA. NO. E-2586 EXP. 12/31/2025
CIVIL/STRUCTURAL ENGR
H2B. INC.
1225 N LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
MEP / TECH ENGR
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
9442 N. CAPITAL OF TEXAS HWY, STE 325
AUSTIN, TX 78759
(512) 346-8700
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
/2
/2
:3
:2
P
M
TEMPORARY BUILDING LIFE SAFETY
PLANS
NSM 03 OF 72AJS
BID DOCUMENTS
RENOVATION AND EXPANSION OF SPS
05/30/2025
640-23-108
PALO ALTO VA MC
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
GI013
B100
SPUR #: 1795.07
N
1/8" = 1'-0"
SPS TRAILERS AND TEMPORARY BUILDINGS - LIFE SAFETY PLAN1
MODULAR ROOM SCHEDULE
ROOM NUMBER ROOM NAME ROOM AREA
101 ENTRY 869 SF
102 CORRIDOR 1355 SF
M-100 CLEAN STORAGE 584 SF
M-100A BIN ASSEMBLY 124 SF
M-100B WORKSTATION 171 SF
M-101 OFFICE, SPS CHIEF 83 SF
M-102 MANUAL BIN WASH 117 SF
M-103 CORRIDOR 239 SF
M-104 HAC 62 SF
M-105 TOILET MALE 66 SF
M-106 LOCKER MALE 107 SF
M-107 LOCKER FEMALE 105 SF
M-108 TOILET FEMALE 65 SF
M-200 TEMPORARY CLEAN SUPPLY STORAGE MODULAR BUILDING 3469 SF
M-300 SCS STORAGE TRAILER 1439 SF
OCCUPANT LOAD CALCULATIONS - MODULAR BUILDING
NUMBER ROOM NAME OCCUPANCY AREA SF / OCC. LOAD
M-100 CLEAN STORAGE STORAGE 584 SF 150 SF 4
M-100A BIN ASSEMBLY BUSINESS 124 SF 150 SF 1
M-100B WORKSTATION BUSINESS 171 SF 150 SF 2
M-101 OFFICE, SPS CHIEF BUSINESS 83 SF 150 SF 1
M-102 MANUAL BIN WASH BUSINESS 117 SF 150 SF 1
M-103 CORRIDOR BUSINESS 239 SF 150 SF 2
M-104 HAC BUSINESS 62 SF 150 SF 1
M-105 TOILET MALE BUSINESS 66 SF 150 SF 0
M-106 LOCKER MALE BUSINESS 107 SF 150 SF 1
M-107 LOCKER FEMALE BUSINESS 105 SF 150 SF 1
M-108 TOILET FEMALE BUSINESS 65 SF 150 SF 0
TOTAL OCCUPANT LOAD: 14
KEYNOTE LEGEND
1.04 PRE-FABRICATED TEMPORARY SPS TRAILER LAYOUT TO FOLLOW ALL CODE REQUIREMENTS, INCLUDING BUT NOT LIMITED TO MAX TRAVEL DISTANCE, MINUMUM PLUMBING FIXTURE COUNT, AND MINIMUM
EGRESS DOOR WIDTH. SHOP DRAWINGS TO BE PROVIDED TO A/E FOR REVIEW.
1.06 FIRE SEPARATION BETWEEN EXISTING BUILDING AND TEMPORARY STRUCTURE NOT REQUIRED AS THEY
ARE OF THE SAME CONSTRUCTION TYPE.
LIFE SAFETY TRAVEL DISTANCES (TEMPORARY BUILDING)
DESCRIPTION MARK LS TRAVEL DISTANCE
TRAVEL DISTANCE 1a 171' - 8"
TRAVEL DISTANCE 1b 180' - 9"
TRAVEL DISTANCE 1c 85' - 0"
TRAVEL DISTANCE 1d 69' - 9"
TRAVEL DISTANCE 1e 65' - 5"
KEYNOTE LEGEND
1.04 PRE-FABRICATED TEMPORARY SPS TRAILER LAYOUT TO FOLLOW ALL CODE REQUIREMENTS, INCLUDING BUT NOT LIMITED TO MAX TRAVEL DISTANCE, MINUMUM PLUMBING FIXTURE COUNT, AND MINIMUM
EGRESS DOOR WIDTH. SHOP DRAWINGS TO BE PROVIDED TO A/E FOR REVIEW.
1.06 FIRE SEPARATION BETWEEN EXISTING BUILDING AND TEMPORARY STRUCTURE NOT REQUIRED AS THEY
ARE OF THE SAME CONSTRUCTION TYPE.
OCCUPANT LOAD CALCULATIONS - MODULAR STORAGE
NUMBER ROOM NAME OCCUPANCY AREA SF / OCC. LOAD
M-200 TEMPORARY CLEAN SUPPLY STORAGE
MODULAR BUILDING
STORAGE 3469 SF 500 7
M-300 SCS STORAGE TRAILER STORAGE 1439 SF 500 3
TOTAL OCCUPANT LOAD: 10
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER
FEASIBLE, AND TO PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• NFPA 101 LIFE SAFETY CODE (MOST RECENT CODES APPLY) (SEE NOTES BELOW)
• 2024 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2024 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2023 NATIONAL ELECTRICAL CODE (NEC)
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2023 ASME BOILER AND PRESSURE VESSEL CODE
• 2024 ASME CODE FOR PRESSURE PIPING
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2025 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• 2023 MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN
INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2006 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL
BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
• 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODES STANDARDS AND EXECUTIVE ORDERS
No. REVISION DESCRIPTION DATE
N
1/8" = 1'-0"
LOADING DOCK - LIFE SAFETY PLAN2
B L D G
B L D G
W H
F D
F D
F D
RMD PATH
R M
D P
A T
H
RMD PATH
R M
D P
A T
H
1.05
S P
S T
R A
IL
E
R N
O .1
SPS TRAILER NO.2
TEMPORARY
MODULAR BUILDING
TEMPORARY
SPS TRAILER
STORAGE UNITS
1.05
PLAN LEGEND
PATH FOR DIRTY RMD CARTS TO THE TEMPORARY SPS TRAILERS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH KS COA NO. A-930 EXP. 12/31/2025
ENG KS COA. NO. E-2586 EXP. 12/31/2025
CIVIL/STRUCTURAL ENGR
H2B. INC.
1225 N LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
MEP / TECH ENGR
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
9442 N. CAPITAL OF TEXAS HWY, STE 325
AUSTIN, TX 78759
(512) 346-8700
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
/2
/2
:3
:2
P
M
RMD PATH PLAN
NSM 04 OF 72AJS
BID DOCUMENTS
RENOVATION AND EXPANSION OF SPS
05/30/2025
640-23-108
PALO ALTO VA MC
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
GI014
B100
SPUR #: 1795.07
1" = 20'-0"
BLDG 100 - LEVEL 3 - REFERENCE PLAN2
1" = 20'-0"
BLDG 100 - LEVEL 1 - REFERENCE PLAN1N
N
RMD PATH
RMD PATH
RMD PATH
R M
D P
A T
H
KEYNOTE LEGEND
1.05 ELEVATOR S4 TO BE DESIGNATED AS ONLY FOR USE FOR THE RMD CART TRANSFERS. GC TO INSTALL
CARD READER TO CONTROL ACCESS TO ELEVATOR TO AUTHORIZED STAFF ONLY.
No. REVISION DESCRIPTION DATE
| Sheets |
| GI001 - GENERAL INFORMATION |
| GI013 - TEMPORARY BUILDING LIFE SAFETY PLANS |
| GI014 - RMD PATH PLAN |