These architectural and engineering drawings depict the renovation and expansion of the Sterile Processing Service (SPS) for the Veterans Affairs Palo Alto Health Care System. The project involves renovating approximately 18,486 square feet in the basement of Building 100, with the primary objectives of modernizing the SPS, improving functional adjacencies, and creating a unidirectional workflow with controlled access for reusable medical devices and staff.

The project is divided into five phases over 720 calendar days, including preparing a temporary modular SPS swing space, deactivating the existing SPS, demolishing the current space, constructing a new SPS, and ultimately demolishing the temporary facilities. Key requirements include maintaining hospital operations with minimal disruption, complying with VA healthcare standards and design guides, implementing infection control measures, and coordinating utility shutdowns. The solicitation seeks a qualified contractor to provide labor, materials, equipment, and supervision for the comprehensive renovation and expansion project.

View the file

Other files

File Type Posted
Attach Amend 0005 RFI BID Responses.pdf PDF
36C26125R0008 0005.docx DOCX document
ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf PDF
ATTACH 3 GeoTech Report 02.02.21.pdf PDF
Attach 1 Amend 0004 SPS - Pre-Bid RFI Responses.pdf PDF
36C26125R0008 0004.docx DOCX document
ATTACH 6 No. 81 - CS106.pdf PDF
ATTACH 4 SECTION 27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.pdf PDF
Attach 2 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
ATTACH 7 - Construction Experience Project Data Sheet.rtf RTF text file
1795.07 - Basement Div. 12 Specifications.pdf PDF
36C26125R0008 0003.docx DOCX document
SIte Visit 12 June 2025 Sign in Roster.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
36C26125R0008 0002.docx DOCX document
Temporary SPS_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part3.pdf PDF
Basement_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part3.pdf PDF
DRAWINGS - BASEMENT SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part1.pdf PDF
DRAWINGS - TEMPORARY SPS_Part5.pdf PDF
DRAWINGS - BASEMENT SPS_Part5.pdf PDF
36C26125R0008 0001.docx DOCX document
DRAWINGS - TEMPORARY SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part1.pdf PDF
DRAWINGS - BASEMENT SPS_Part6.pdf PDF
DRAWINGS - BASEMENT SPS_Part4.pdf PDF
ATTACHMENT AA SPS - Specifications.pdf PDF
ATTACH CC PART 1.pdf PDF
ATTACH BB DRAWINGS Part 2.pdf PDF
ATTACH DD SPS SWING SPACE.pdf PDF
ATTACH CC PART 2.pdf PDF
ATTACH BB DRAWINGS PART 1.pdf PDF
36C26125R0008.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Attachment H Wage Determination CA20250018 Dtd 3.21.25.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment B - EMR Sheet.docx DOCX document
36C26125R0008.docx DOCX document
Attachment F - Client Authorization Letter.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
ATTACH DD SPS - Swing Space Drawings.pdf PDF
ATTACH BB - SPS - Drawings_Part1.pdf PDF
Attachment A - Request for Information.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16 15 14 13 12 11

B

C

D

E

F

A

AE-501

TYP CART WASHER

BELOW

AE-501

TYP

AE-501

TYP

AE-501

TYP

CJ

CJ

CJ

REF MFR

REF MFR

KEY PLAN

BLDG 100

AREA OF WORK

BASEMENT OUTLINE

EXIT LIGHT

2' x 2' ACOUSTICAL CEILING

GYPSUM BOARD CEILING

2 x 2 RELOCATED EXISTING LIGHT

FIXTURE, REF: ELECTRICAL

SMOKE DETECTOR

CEILING HEIGHT,

ABOVE FINISH FLOOR

RECESSED CAN LIGHT

REF: ELECTRICAL

2 x 4 RECESSED LIGHT FIXTURE, REF: ELECTRICAL

00'-00"

EXISTING CEILING TO REMAIN

REFLECTED CEILING PLAN LEGEND

2' x 4' ACOUSTICAL CEILING

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXHAUST AIR GRILLE

ACCESS DOOR

SUSPENDED LIGHT FIXTURE

REF: ELECTRICAL

NOT IN SCOPE

CONTROL JOINT

FIRE SPRINKLER,

REF. FIRE PROTECTION

SPEAKER,

REF. ELECTRICAL

SECURITY CAMERA,

REF. TECHNOLOGY

ACCESS PANEL

REF. MECH

OCCUPANCY SENSOR,

REF. ELECTRICAL

2 x 4 SURFACE MOUNTED LIGHT

FIXTURE, REF: ELECTRICAL

1. ALL SURFACES OF FURRDOWNS TO BE PAINTED, MATCH ADJACENT WALL FINISH COLOR,

SEE FINISH SCHEDULE

2. PROVIDE HOLD DOWN CLIPS AT VESTIBULES AND AREA NEAR EGRESS DOORS.

3. ALL CEILINGS TO BE INSTALLED AT 9' - 0" UNLESS NOTED OTHERWISE.

4. INSTALL ACOUSTICAL CEILINGS IN ACCORDANCE WITH ASTM E580/E580M-14.

5. INSTALL GYPSUM BOARD CEILINGS, CEILING FRAMING AND CEILING ITEMS IN ACCORDANCE WITH

ASCE 7-10, SEISMIC CATEGORY D.

GENERAL REFLECTED CEILING PLAN NOTES

1/8" = 1'-0"

16 15 14 13 12 11

C

D

E

F

A

EQ

EQ

EQ EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

3'- 9"

EQ EQ

EQ EQ

EQ

EQ8'-0" 8'-0" 10'-0" 8'-0" 8'-0" 4'-9"

8'- 0"

8'- 0"

5'- 0"

3'- 0"

4'-0" 5'-6" 5'-6"

3'- 9"

'-0

3'-10"

6'- 0"

6'- 0"

6'- 0"

4'- 0"

6'-0"

EQ

EQ

EQ

2'-

9"

EQ EQ

EQ

EQ

5'-2 1/2"

8'-0" 8'-0" 8'-0" 11'-2"

EQ EQ

EQ

EQ

4'-0" 4'-0"

EQ EQ

EQ

EQ

3'- 6"

3'- 6"

5'-4 1/2"

4'- 9"4'-0" 8'-0" 8'-0" 8'-0"

EQ

EQ

AE-401

AE-401

1'-9"

EQ

EQ

CE

NT

ER

OF

T

ILE

EQ EQ

EQ

EQ

EQ EQ

AE-401

EQ EQ

EQ

EQ

EQ

EQ

4'- 6"

3'-6" 5'-0"

5'- 4"

33'-9" PER MFR REQ CLEARANCE

5'-0"5'-0"

EQ

EQ

5'-0"5'-0" EQ EQ EQ

4'-6"2'-0"

EQ

EQ

EQ

EQ

EQ

CART WASHER

BELOW

ALIGN

1'-1"

AL

IG

N

EQ

EQ

5'-0" EQ EQ EQ

EQ EQ

EQ

EQ

EQ

EQ

EQ EQ EQ EQ

EQ

EQ

ALIGN

EQ

EQ

EQ EQ

3'- 9"

EQ

EQ

EQ EQ

1. ALL SURFACES OF FURRDOWNS TO BE PAINTED, MATCH ADJACENT WALL FINISH COLOR,

SEE FINISH SCHEDULE

2. PROVIDE HOLD DOWN CLIPS AT VESTIBULES AND AREA NEAR EGRESS DOORS.

3. ALL CEILINGS TO BE INSTALLED AT 9' - 0" UNLESS NOTED OTHERWISE.

4. INSTALL ACOUSTICAL CEILINGS IN ACCORDANCE WITH ASTM E580/E580M-14.

5. INSTALL GYPSUM BOARD CEILINGS, CEILING FRAMING AND CEILING ITEMS IN ACCORDANCE WITH

ASCE 7-10, SEISMIC CATEGORY D.

GENERAL REFLECTED CEILING PLAN NOTES

EXIT LIGHT

2' x 2' ACOUSTICAL CEILING

GYPSUM BOARD CEILING

2 x 2 RELOCATED EXISTING LIGHT

FIXTURE, REF: ELECTRICAL

SMOKE DETECTOR

CEILING HEIGHT,

ABOVE FINISH FLOOR

RECESSED CAN LIGHT

REF: ELECTRICAL

2 x 4 RECESSED LIGHT FIXTURE, REF: ELECTRICAL

00'-00"

EXISTING CEILING TO REMAIN

REFLECTED CEILING PLAN LEGEND

2' x 4' ACOUSTICAL CEILING

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXHAUST AIR GRILLE

ACCESS DOOR

SUSPENDED LIGHT FIXTURE

REF: ELECTRICAL

NOT IN SCOPE

CONTROL JOINT

FIRE SPRINKLER,

REF. FIRE PROTECTION

SPEAKER,

REF. ELECTRICAL

SECURITY CAMERA,

REF. TECHNOLOGY

ACCESS PANEL

REF. MECH

OCCUPANCY SENSOR,

REF. ELECTRICAL

2 x 4 SURFACE MOUNTED LIGHT

FIXTURE, REF: ELECTRICAL

KEY PLAN

BLDG 100

AREA OF WORK

BASEMENT OUTLINE

UP

16 15 14 13 12

B

C

D

E

F

A

DOCK AREA

AQ-805

AQ-805

AQ-805

AQ-805

AQ-806

AQ-802

AQ-806

AQ-802

AQ-804

AQ-804

AQ-803

AQ-803

AQ-806

AQ-807

INSTALLATION

CLEARANCE

1. ALL DOOR FRAMES TO BE LOCATED 4" FROM OUTSIDE OF FRAME TO FINISH FACE OF ADJACENT

WALL UNLESS NOTED OTHERWISE.

2. ALL WALLS ARE TYPE C3 PARTITIONS UNLESS OTHERWISE NOTED. REFER TO PARTITION TYPE

SHEET FOR WALL TYPES.

3. REFER TO DOOR & WINDOW SCHEDULES SHEET (100-AE601) FOR DOOR AND WINDOW INFORMATION.

4. ALL WALLS ARE DIMENSIONED TO CENTERLINE OF METAL STUD, UNLESS NOTED OTHERWISE.

5. BLOCK OUT SLAB FOR PENETRATIONS SHALL BE 2" LARGER THAN DUCT SIZE TO ALLOW TOLERANCE

FOR DUCT PASSAGE AND FIRE SAFING. COORDINATE WITH MEP FOR DUCT SIZES.

6. FURR AROUND ALL COLUMN PROTRUSIONS AS NEEDED UNLESS NOTED OTHERWISE.

7. CONTRACTOR TO VERIFY ALL EQUIPMENT QUANTITY REQUIREMENTS.

GENERAL PLAN NOTES

KEY PLAN

BLDG 100

AREA OF WORK

BASEMENT OUTLINE

15 14

D

E

EXIST STAFF

LOUNGE

EB-358

EXIST HAC

EB-336

EXIST CARTLIFT

MACH RM

C-2.0

S3185

A5080 F0505 A5135

M2600

M2080

A5075

AQ-802

F0225

F0225 F0225

F0225

F0795

A5075

NIS

A5145 A5210 A5220F3065

F3200

M0515

R7250

K4665

16 15 14

B

C

A

HAC

EB-300A

CLEAN SUPPLY

STORAGE ROOM

EB-300

M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

A5135 F0505

M2080

M2600

M2055 M2055

M2055 M2055

M2055

M2055

F0275

M1801 M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2055

EQUIPMENT

STORAGE

EB-316F

SCS OFFICE

EB-316D

SCS OPEN OFFICE

EB-316E

M2055 M2055 M2055 M2055 M2055 M2055 M2055 M2055M2055 M2055 M2055 M2055 M2055 M2055

A5080 A5075

AQ-802 7

M1801 F0275

F0275 M1801

M1801

F0275

E0120 F0275

M1801

F2000

F2000

F2000

F2000

F0420

F0420

F0420

F0420

A1015

A1015

F0420

A1015

A5145

F0205

A5145 A5145 A5145 A5145

AQ-802

8A1015

F3200

F3200 A1015

E0120

E0120

M1801

E0120

AQ-802 9

A1015

M1801 F0275

E0120

F2000

M1840

A5080

A5075

K4665

R7250

2'-

1/2

1'-

/2" 3'-

2"

1'-6" 1'-6" 3'-0"

(PT1)

(VSB)

1'-6"1'-6"

(SSM)

(PLAM)

(PLAM)

F0225 F0225

F0225 F0795

M0515 F3065

(PT1)

(RB2)

6'- 0"

(PLAM)

(SS)

R7250

F0225 F0225

F0225

A5210

A5145

A5220

F0795 F3065

M0515 F3200

(PT1)

(RB2)

5'- 0"

1'-0"4'-0"

A5145

11'-10 5/8" F.V.

3'-8" 3'-4 1/2" 9 1/4"4'-0"

8'- 0"

1'- 0"

SC

HE

D.

DI

M.

SCHED. DIM.

AE-511

AE-511

M1801

F0275 E0120

M1801 F0275

F0275 M1801

F0275 M1801

A A A A

(PT1)

(RB1)

(RB1)

3'- 6"

A1015

F0420

A5145 A5145

A1015 A1015

F2000

(PT1)

A5145 A5145

CJ CJ

EQ EQ EQ EQ

F2000

E0120 E0120

F2000 E0120 A1015

F0275

E0120 F2000

F0275 A1015

M2055 M2055

(VSB)

(WP)

(VSB)

7'- 0"

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED

EQUIPMENT SCHEDULE

1/4" = 1'-0"

1/4" = 1'-0"

3/8" = 1'-0"3/8" = 1'-0" 3/8" = 1'-0"3/8" = 1'-0"

3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"

14 13

C

CLEAN WORKROOM

INSTRUMENT SET

ASSEMBLY

EB-312

PREPARATION AND

ASSEMBLY

EB-312B

AQ-803

7 5

F0230 F0230

E0135 E0135

E0135 E0135

F0230

F0230

F2000

F2000

M1801

M1801

M1801

M1801

AQ-803

S2

S2

U0019

CE050CE050CE050

F0410

M1825

A1015

F3050

U0000 U0000 U0000 U0000

A5080 A5077 A5075

S0955 S0955 S0955

F0230 F0230

E0135 E0135

E0135 E0135

F0230

F0230

F2000

F2000

M1801

M1801

M1801

M1801

F3200

M0515 A5210

A5077

M1830 M1830

CE050

C

D

STERILIZATION AREA

LOW TEMP

EB-314

STEAM

STERILIZATION

EB-314B

AQ-803

S0595

S0595

S0535

S0595

S0535

S0535

S0595 S0595 S0595

S5505 S5505 S5505

STEAM STERILE

STORAGE

EB-314C

S0105

S5505

M1801 F0230

F0230

E0135

E0135

F2000

S2630

M1801

(PT2)

(SS)

(EPX)

4'- 0"

(PT2)

(CG1) (CG1)

E0135

S0955

A5080 A5077

A5075

F0230 M1801

M1801 F0230

U0000

(PT2) (PT2)

(SS)(SS)

(EPX)(EPX)

4'- 0"

4'- 0"

4'- 0"

(CG1)(CG1)

E0135

S0955 S0955 S0955 U0019

(SS)

(EPX)

HEIGHT/WIDTH OF EQUIPMENT

PLUS MANUFACTURERS

RECOMMENDED CLEARANCES

EQ EQ EQ3'-8"

S0535

S0595 S0595 S0595

S0535 S0535

(EPX)

(SS)

(EPX)

(SS)

EQUIPMENT ACCESS PANEL

5'-6" 5'-6"

EQ EQ

HEIGHT/WIDTH OF EQUIPMENT

PLUS MANUFACTURERS

RECOMMENDED CLEARANCES

S5505 S5505 S5505

(SS)

(EPX)

(PT2)

(SS)

(EPX)

4'- 0"

(CG1)

S5505 S0105

S0105

S5505

2'-1"2'-6"

S2630S2630

U0019

CT050

A1015

CE050

4'- 0"

(PT2)

(PT2)

(SS)

(EPX) (EPX)

(SS)

(CG1)

M0515

CE050

U0002U0002U0002

CT050

U0002

CT050

CE050

CE050

CE050

F3200

F3050

M1825 M1830

F0410

CT050

A1015

U0000 U0000 U0000U0000

2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"

3'- 0"

2'- 0"

3'- 2"

4'-0"4'-0"4'-0"

4'- 0"

(SS)

(SS)

(PT2)

4'- 6"

7'- 0"

(EXP)

CJ

M1830

U0002 U0002 U0002 U0002 U0002 U0002

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED

1/4" = 1'-0"1/4" = 1'-0"

EQUIPMENT SCHEDULE

3/8" = 1'-0"

3/8" = 1'-0"

3/8" = 1'-0"

3/8" = 1'-0" 3/8" = 1'-0" 3/8" = 1'-0"

3/8" = 1'-0"

14 13

E

DECONTAMINATION

WORK AREA

EB-320B

VESTIBULE

EB-C30

EXISTING CORRIDOR

EB-C03

AQ-804

M1803

M1803

A1195

A1195

F2020

M3072

A5080 A5077 A5075

A5080 A5077 A5075

A1195

F2700

A5075 A5077 A5080

F2020

S2640

S2635

S2635

F2700

A5108

F2700

A1014

F3200 M1801

M1801

M1801 M1803

K1910 M0515 A5210

M1803

M3072

F2020 A1195 F2020

(SS)

(EPX)

(SS)

(EPX)

(PT2)

6'- 0"

4'- 0"

A5077 A5075 A5080

(SSM)

M1801

(CG3)

M1803

M1801

(CG1)

(CG1)

F2700 F2700

A1195

A5080 A5077 A5075

F2020 S2635

6'- 0"

(SS)

(PT2)

(EPX)

(CG1)

F3200

M1803

F2700 A1195

4'- 0"

(PT2)

(SS)

(EPX)

7'- 0"M1801

5'- 6"

M0515

6'- 0"

A5080 A5077

A5075 A5108

A1195 S2640

(SS)

(EPX)

F2020

(SS)

(SSM)

F2700

(CG3)

(CG3)

14 13

D

DECONTAMINATION

EB-320

AQ-804

S1905

S0955 S0955 S0955U0019

AUTOMATED CART

WASHER

EB-338

S3185

S2615

A5077 A5075

TBD

A5080

U1195

HLD ALCOVE

EB-322C

U0001

S0955S0955S0955

U0019 S1905

S3185

(SS)

(EPX)

(SS)

(EPX)

TBD

EQ EQ EQ3'-8" 3'-8"

HEIGHT/WIDTH OF EQUIPMENT

PLUS MANUFACTURERS

RECOMENDED CLEARANCES

EXISTING CART LIFT

2'-

/4"

S1905

(SS)

(EPX)

(PT2)

(SS)

(EPX)

6'- 0"

CJ CJ

S2615 U0001

U1195

A5075 A5077

A5080

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED

EQUIPMENT SCHEDULE

1/4" = 1'-0"

3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"

3/8" = 1'-0"

1/4" = 1'-0"

E

LOCKER/CHANGING

FEMALE

EB-330

TLT STAFF FEMALE

EB-330A

AQ-805

AQ-805

A1030

A1030

A1030 A1030

A1030 A1030 A1030

A1030 A1030

F2000

A1080

A5109

A1067

A5082

A5075

A5145

A5200

F2010

A5090

F3200

A1030 A1030

A1030 A1030 A1030 A1030 A1030

REFER SPEC

P3200

D

LOCKER/CHANGING

MALE

EB-332

EXISTING TELE

CLOSET

FB-SC1

TLT STAFF MALE

EB-332A

AQ-805

AQ-805

F2000

A1030 A1030 A1030 A1030 A1030 A1030 A1030

A1030 A1030 A1030

A1080

A5109

A5075

F2010 A5145

A1067

A5200 A5082

F3200REFER SPEC

A1030

A1030

A1030

A1030

A1030

A1030

A1030

(CT1)

(EPX)

A5109 A1067

A5075

A5082

A1030 A1030 A1030

A1030

A1080

(PT2)

(EPX)

(PT2)

(EPX)

CJ CJ

ADA BENCH

4'-0"

6'- 0"

1'-0" 1'-0" 1'-0"

ADAADAADA

A1030 A1030 A1030 A1030 A1030 A1030 A1030

(PT2)

(EPX) (EPX)

(PT2)

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

A1030

A1030 A1030 A1030 A1030 A1030

A1030 A1030 A1030 A1030

(PT2)

(EPX)

ADAADA

6'- 0"

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

A5109

(CT1)

(EPX)

A1067

A5200 A5075

A5082

ANTE/PPE

EB-322B

AQ-805 10

A5160

M2035 A5077 U0038 F2020

F0205

A5145 A5145

(PT2)

(EXP)

(SS)

F0205 F2020

U0038

A5077

A5145 A5160

ANTE

EB-322A

TOILET/SHOWER

EB-318

AQ-805

AQ-805

AQ-805

M2035

F2020 A5080 A5075

A5077

A5110

A5030

A5109

A5110

A5077

A5082 A5075

A5170

A5145 A5205

A5200 A5090

A5109

F2010

A1090

A5145 A5145

F0205

A5160

A1090

(EPX)

(PT2)

M2035

A5160

A5145 A5145

(PT2)

(EPX)

CJ CJ

A5077 A5080

F2020

A5075

A1090

F0205

(CT2)

(CT2)

F2010

A5082 A5075 A5077

A5090

A5109 A1090

(CT1)

(CT2)

A5170 A5110

A5030

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED

1/4" = 1'-0"1/4" = 1'-0"

EQUIPMENT SCHEDULE

3/8" = 1'-0" 3/8" = 1'-0" 3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"

1/4" = 1'-0"

3/8" = 1'-0"

1/4" = 1'-0"

3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"

E

EXIST TEAM ROOM

EB-362

CLERICAL

WORKSTATION

EB-360

EXIST STERILE SPS

CHIEF

EB-370

EXISTING SPS

ASSISTANT CHIEF

EB-368

F0420

E0123

E0123

F0420

E0123 F0420

F0420

E0120

E0120 F0420

F2000

F0205 F0205

M1840 F0275F0275

F0275

F0275

F0275

F0205

F0275

F0205

F0420

F2000

F2000 F0420

F3200

F3200

A5145

A5145 A5145

M1801

A1015 F3200

M1801 F2000

M1801

A1015

F2000

M1801

A1015

F2000 M1801 A1015

F2000

M1801 A1015

F0275

A1015

M1801

E0090

A1015

AQ-806

AQ-806

AQ-806

AQ-806 6

E0090

A5145

C

D

BREAKOUT/BULK

STORAGE

EB-350

M2105 M2115

F0775 F2700

M1801

U0038

M1840

AQ-806

F0420 F3200

F3200

F0275 F0275

M1801 M1801 M1840

F0420 F2000

F0420 F2000

A1015 A1015

(PT3)

(RB1)

EQEQ

F0420

E0123

E0123

E0123

F0420

F0420 F0275 F2000

F0275

F2000

F2000

F0275

F3200

(RB1)

(PT1)

F0420 F2000

E0090 F0275

F0205

M1801 A1015

A5145

(PT2)

(RB1)

(PT2)

(RB1)

CJ CJ

F0420

E0090 F0275

F0205

M1801 A1015

(PT1)

(RB1)

F3200

U0038 M1801 F2700 M1840 F0775

F3200

(PT1)

(WP)

(VSB)

F0420

(CG1)

3'- 6"

13 12

B

UPH01

UPH01

M8910

STERILE STORAGE

EB-316

M8910

F3200

M8910

M8910

M8910

UPH01

UPH01

UPH01

U0000 U0000

U0000 U0000

M1803 M1801

U0000

U0000

U0000

U0000

M2055

AQ-806

9 M8910

M1803 M1801

UPH01UPH01

M8910 M8910

U0000

F3200

EQ EQ

(PT2)

(SS)

(EPX)

4'- 0"

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED

1/4" = 1'-0"

1/4" = 1'-0"

EQUIPMENT SCHEDULE

3/8" = 1'-0" 3/8" = 1'-0"3/8" = 1'-0"3/8" = 1'-0"

3/8" = 1'-0"

1/4" = 1'-0"

E

M2055M2055

M8910

M8910

M8910

F0280

E0120 M1801

M1810

F2020

F3050

F3025

F3050

F3050

F3025

U0000

AQ-8072 DISPATCH

EB-356

EXIST DISPATCH

EB-356B

M7300

F3050 F3025

F3050 F3050

F3025

F2020

F0280

M1810

(VSB)

(WP)

(PT2)

(CG1)

(WP)

(VSB)

E0120

(PT2)

4'- 0"

4'- 0"

M1801

PLUMBING

EQUIPMENT LEGEND

A

B

D

E

F

G

I

CODE

HOT AND COLD WATER

COLD WATER AND DRAIN

COLD AND HOT WATER AND DRAIN

COLD, HOT, AND TREATED WATER AND DRAIN

DRAIN ONLY

ELECTRICAL

120 VOLT, CONVENTIONAL OUTLET

120 VOLT, SPECIAL OUTLET

SPECIAL ELECTRICAL REQUIREMENTS

208/220 VOLT, 3 PHASE

MEDICAL GAS

M --

MISC GAS

STEAM--

MISC

-- AIR, HIGH PRESSURE (85 PSIG) MAX -- --

VENT TO ATMOSPHERE

EARTH, GROUND AND

WALL/CEILING SUPPORT REQUIRED1/4" = 1'-0"

EQUIPMENT SCHEDULE

16 15 14 13 12 11 10

C

D

E

A

EXIST TEL

EB-TC2

EXIST ELEC

EB-EC2

EXIST STAFF

LOUNGE

EB-358

EXIST HAC

EB-336

EXIST CARTLIFT

MACH RM

C-2.0

EXISTING SPS

ASSISTANT CHIEF

EB-368

EXIST STERILE SPS

CHIEF

EB-370

CLERICAL

WORKSTATION

EB-360

EXIST TEAM ROOM

EB-362

EXIST DISPATCH

EB-356B

EXIST CART LIFT 2

F1-269

EXIST CART LIFT 1

F1-271

EXISTING CORRIDOR

EB-C03

STERILE STORAGE

EB-316

STAIRWAY

F1-257

BREAKOUT/BULK

STORAGE

EB-350

DISPATCH

EB-356

ANTE

EB-322A

TOILET/SHOWER

EB-318

ANTE/PPE

EB-322B

LOCKER/CHANGING

FEMALE

EB-330

LOCKER/CHANGING

MALE

EB-332

EXISTING TELE

CLOSET

FB-SC1

CLEAN SUPPLY

STORAGE ROOM

EB-300

DECONTAMINATION

EB-320

PREPARATION AND

ASSEMBLY

EB-312B

CORRIDOR

EB-322

VESTIBULE

EB-C30

CORRIDOR

FB-C04

EQUIPMENT TEST

EB-340A

AUTOMATED CART

WASHER

EB-338

TLT STAFF FEMALE

EB-330A

TLT STAFF MALE

EB-332A

DECONTAMINATION

WORK AREA

EB-320B

CLEAN WORKROOM

INSTRUMENT SET

ASSEMBLY

EB-312

STERILIZATION AREA

LOW TEMP

EB-314

STEAM

STERILIZATION

EB-314B

HAC

EB-300A

CORRIDOR

EB-300C

ELEC

EB-300G

SCS OFFICE

EB-316D

SCS OPEN OFFICE

EB-316E

EQUIPMENT

STORAGE

EB-316F

STEAM STERILE

STORAGE

EB-314C

HLD ALCOVE

EB-322C

ROOM SIGN

EYE WASH SIGN

RESTROOM SIGN

EMERGENCY SHOWER SIGN

STAIR SIGN

SIGNAGE LEGEND

PERSONNEL ONLY SIGN

B A

C

/8"

1"5/8

1/4

3/4"

3/4

5/8

3/8

/2"

9"

D

E

F

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT 1/16" SECOND SURFACE TO MATCH COLOR (MP03849

INERTE GRAY) OR (BM HC-166 KENDALL CHARCOAL). DO NOT PAINT EDGES

B. ROWMARK TEACTILE COPY PIPPED INTO A WITH MINIMUM 1/32" RELIEF. COLOR TO MATCH (ROWMARK 3X1-201,WHITE).

TYPEFACE IS HELVETICA BOLD CONDENSED

C. CLEAR ACRYLIC BEAD BRAILLE.

D. 1/4" X 3/8" SOLID ALUMINUM PLATE WITH #4 HORIZONTAL BRUSHED FINISH AND MATTE CLEAR COAT.

E. SCREENPRINTED COPY. COLOR TO MATCH (BM 2134-30 IRON MOUNTAIN)/ TYPEFACE IS HELVETICA BOLD CONDENSED.

F. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND SURFACE TO MATCH (MP32071 WHITE WONDER)

(BM I-04 DECORATOR'S WHITE). DO NOT PAINT EDGES

NOTE: 1/16" THICK BLACK ACRYLIC BACKER PANEL

XX-###

ROOM NAME

NAME

NAME

3/4"

CONT.

CONT.

B A

/4"

/8"

1/4

3/4"

5/8

3/4

3/4

/2"

9"

D

E

F

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT 1/16" SECOND SURFACE TO MATCH COLOR C-1

(MP03849 INERTE GRAY) OR (BM HC-166 KENDALL CHARCOAL).

B. SCREENPRINTED COPY, COLOR TO MATCH(MP32071 WHITE WONDER) (BM I-04 DECORATOR'S WHITE).

TYPEFACE IS HELVETICA BOLD CONDENSED.

C. CLEAR ACRYLIC BEAD BRAILLE.

D. 1/4" X 3/8" SOLID ALUMINUM PLATE WITH #4 HORIZONTAL BRUSHED FINISH AND MATTE CLEAR COAT.

E. ROWMARK TACTILE GRAPHICS AND COPY TIPPED INTO PANEL WITH MINIMUM 1/32" RELIEF.. COLOR TO MATCH

(BM 2134-30 IRON MOUNTAIN). TYPEFACE IS HELVETICA BOLD CONDENSED. ISA SYMBOL TO BE DISPLAYED

WHERE APPLICABLE. SELECT GRAPHIC (MALE OR FEMALE) ACCORDINGLY.

F. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND SURFACE TO MATCH (MP32071 WHITE

WONDER) (BM I-04 DECORATOR'S WHITE).

XX-###

GENDER

/8"

C

/8"

3/4 "3/8

3/4

E

B

A

9"

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND

SURFACE TO MATCH (MP32071 WHITE WONDER) (BM I-04 DECORATOR'S WHITE).

B. COPY SCREENPRINTED TO MATCH (MP03849 INERTE GRAY) (BM HC-166

KENDALL CHARCOAL). TYPEFACE TO BE HELVETICA BOLD.

9"

EMERGENCY EYE

WASH B

A

9"

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND SURFACE TO MATCH

(MP32071 WHITE WONDER) (BM I-04 DECORATOR'S WHITE).

B. COPY SCREENPRINTED TO MATCH (MP03849 INERTE GRAY) (BM HC-166 KENDALL CHARCOAL).

TYPEFACE TO BE HELVETICA BOLD.

9"

EMERGENCY

SHOWER

B

A

9"

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND SURFACE

TO MATCH (MP32071 WHITE WONDER) (BM I-04 DECORATOR'S WHITE).

B. COPY SCREENPRINTED TO MATCH (MP03849 INERTE GRAY) (BM HC-166 KENDALL

CHARCOAL). TYPEFACE TO BE HELVETICA BOLD.

9"

STAIR (#)

Keep Door Closed

3/4

3/4

3/8

3/4

3/8

3/4

3/8

3/4

1/2

LEVEL B

3/4"

3/4

5/8

EXIT

STAIR UP

B

A. A. 3/16" ACRYLIC P95 COLORLESS ACRYLIC SIGN PANEL. PAINT SECOND SURFACE

TO MATCH (MP32071 WHITE WONDER) (BM I-04 DECORATOR'S WHITE).

B. COPY SCREENPRINTED TO MATCH (MP03849 INERTE GRAY) (BM HC-166 KENDALL

CHARCOAL). TYPEFACE TO BE HELVETICA BOLD.

B

A

9"

9"

1/2

4" 1/4

3/4

1/4

3/4

1/4

3/4

1/4

3/4

1/2

SPS Personnel

DO NOT

ENTER

Beyond This Point.

Area Under Surveillance

1/8" = 1'-0"

BASEMENT ROOM SIGNAGE

C-2.0 EXIST CARTLIFT MACH RM MECHANICAL ROOM

EB-300 CLEAN SUPPLY STORAGE ROOM CLEAN SUPPLY STORAGE ROOM

EB-300A HAC HOUSEKEEPING CLOSET

EB-300C CORRIDOR --

EB-300G ELEC ELECTRICAL CLOSET

EB-312 CLEAN WORKROOM INSTRUMENT SET ASSEMBLY --

EB-312B PREPARATION AND ASSEMBLY PREPARATION AND ASSEMBLY ROOM

EB-314 STERILIZATION AREA LOW TEMP --

EB-314B STEAM STERILIZATION --

EB-314C STEAM STERILE STORAGE STEAM STERILE STORAGE

EB-316 STERILE STORAGE STERILE STORAGE ROOM

EB-316D SCS OFFICE SCS OFFICE

EB-316E SCS OPEN OFFICE SCS OFFICE

EB-316F EQUIPMENT STORAGE EQUIPTMENT/STORAGE ROOM

EB-318 TOILET/SHOWER ANTE/SHOWER ROOM

EB-320 DECONTAMINATION DECONTAMINATION ROOM

EB-320B DECONTAMINATION WORK AREA --

EB-322 CORRIDOR --

EB-322A ANTE ANTE ROOM

EB-322B ANTE/PPE ANTI/ PPE ROOM

EB-322C HLD ALCOVE --

EB-330 LOCKER/CHANGING FEMALE FEMALE LOCKER ROOM

EB-330A TLT STAFF FEMALE WOMEN

EB-332 LOCKER/CHANGING MALE MALE LOCKER ROOM

EB-332A TLT STAFF MALE MEN

EB-336 EXIST HAC HOUSEKEEPING CLOSET

EB-338 AUTOMATED CART WASHER --

EB-340A EQUIPMENT TEST --

EB-350 BREAKOUT/BULK STORAGE BREAKOUT/BULK STORAGE ROOM

EB-356 DISPATCH DISPATCH ROOM

EB-358 EXIST STAFF LOUNGE LOUNGE

EB-360 CLERICAL WORKSTATION SPS OFFICE

EB-362 EXIST TEAM ROOM SPS OFFICE

EB-368 EXISTING SPS ASSISTANT CHIEF SPS ASSISTANT CHEIF

EB-370 EXIST STERILE SPS CHIEF SPS CHIEF

EB-C30 VESTIBULE DECONTAMINATION ROOM

EB-EC2 EXIST ELEC ELECTRICAL CLOSET

EB-TC2 EXIST TEL TELECOM CLOSET

F1-269 EXIST CART LIFT 2 --

F1-271 EXIST CART LIFT 1 --

FB-C04 CORRIDOR --

FB-SC1 EXISTING TELE CLOSET TELECOM CLOSET

3" = 1'-0" 3" = 1'-0" 3" = 1'-0" 3" = 1'-0"3" = 1'-0" 3" = 1'-0"

ALL SIGNAGE TO BE MOUNTED PER ADA GUIDELINES

640-23-108

FCO

FCOFCO

640-23-108

File details come from the government source that posted it. Updated .