DRAWINGS - BASEMENT SPS_Part2.pdf

PDF 11 MB Posted

Attached to
Z2AZ--Renovation & Expansion of SPS | NRM 640-23-108
Solicitation number
36C26125R0008
Issued by

About this file

These files are architectural and engineering drawings for the renovation and expansion of the Sterile Processing Service (SPS) at the VA Palo Alto Healthcare System. The project involves a comprehensive 18,486 square foot renovation of the basement of Building 100, with the goal of modernizing the SPS to meet VA design guidelines. Key project elements include creating separate spaces for Sterile Processing Service (SPS) and Supply Chain Service (SCS), establishing a unidirectional workflow, and implementing controlled access/egress for medical devices and staff.

The project is divided into five phases over 720 calendar days, including preparation of a temporary modular SPS swing space, deactivation of the existing SPS, demolition, construction of the new SPS, and final activation. The drawings specifically show detailed life safety plans, interim construction plans, and renderings of the decontamination area, staff lounge, and preparation and assembly spaces. The project requires careful coordination with hospital operations to minimize disruption, with work primarily scheduled between 7:00 am and 4:30 pm Monday through Friday, excluding federal holidays.

View the file

Other files

File Type Posted
36C26125R0008 0005.docx DOCX document
Attach Amend 0005 RFI BID Responses.pdf PDF
ATTACH 7 - Construction Experience Project Data Sheet.rtf RTF text file
ATTACH 6 No. 81 - CS106.pdf PDF
ATTACH 4 SECTION 27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.pdf PDF
Attach 2 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf PDF
ATTACH 3 GeoTech Report 02.02.21.pdf PDF
Attach 1 Amend 0004 SPS - Pre-Bid RFI Responses.pdf PDF
36C26125R0008 0004.docx DOCX document
36C26125R0008 0003.docx DOCX document
1795.07 - Basement Div. 12 Specifications.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
36C26125R0008 0002.docx DOCX document
SIte Visit 12 June 2025 Sign in Roster.pdf PDF
DRAWINGS - TEMPORARY SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part1.pdf PDF
DRAWINGS - BASEMENT SPS_Part6.pdf PDF
DRAWINGS - BASEMENT SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part5.pdf PDF
DRAWINGS - BASEMENT SPS_Part5.pdf PDF
36C26125R0008 0001.docx DOCX document
Basement_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part3.pdf PDF
DRAWINGS - BASEMENT SPS_Part1.pdf PDF
Temporary SPS_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part3.pdf PDF
ATTACHMENT AA SPS - Specifications.pdf PDF
ATTACH BB DRAWINGS PART 1.pdf PDF
ATTACH CC PART 2.pdf PDF
ATTACH BB DRAWINGS Part 2.pdf PDF
ATTACH DD SPS SWING SPACE.pdf PDF
ATTACH CC PART 1.pdf PDF
36C26125R0008.docx DOCX document
ATTACH DD SPS - Swing Space Drawings.pdf PDF
ATTACH CC SPS - Drawings_Part2.pdf PDF
ATTACH BB - SPS - Drawings_Part1.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment F - Client Authorization Letter.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Attachment H Wage Determination CA20250018 Dtd 3.21.25.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment B - EMR Sheet.docx DOCX document
36C26125R0008.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

4' -0

M

A X

4' -0

M

A X

2' -1

0" M

A X

2' -3

M

IN

1'-6" MIN

1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT BLOCKING

FOR ALL WALL MOUNTED ACCESSORIES, FIXTURES, AND EQUIPMENT.

SUPPORT BRACKETS TO BE PLACED AT ALL OPEN COUNTERTOPS -

18"-24" ON CENTER.

2. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER FINISHED

FLOOR TO THE OPERABLE PART OF THE FIXTURE.

3. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR FIXTURE

TYPES USED IN THIS PROJECT.

4. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE, BACKING

TO BE PROVIDED AS SHIM FOR FLUSH APPLICATION. SHIM TO MATCH

SCHEDULED WALL FINISH.

6" MAX

9" M

IN

SHOWER

TOILET ROOM TURNING

RADIUS

DRINKING

FOUNTAINPAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0

M

A X

WASTE

RECEPTACLE

LAVATORY

WITH MIRROR

ON CENTER

WALL

4' -0

M

A X

SOAP

DISPENSER

2' -1

0" M

A X

3' -4

M

A X

17 MIN

2' -4

/4

M

IN

3' -0

M

A X

1'-5 1/2" MIN

WALL

3' -0

M

A X

4' -0

M

A X

1'-6" MIN

7 1/2" MIN

WALL

LAVATORY

WITH APRON

1' -5

M

A X

1'-6" MIN

URINAL

WALL

1'-6"

CLEAR FLOOR

5'-0"

CLEAR FLOOR

4'-8"

3'-0" MIN

2' -9

1'-0"

3'-6" MIN 1'-0"

4'-6" MIN

1' -5

1' -7

M

IN

2' -9

WALLWALL

4' -0

/4

M

A X

WALL HOOK

7' -6

CLOCK

WALL

FFE

4' -0

M

A X

4' -0

M

A X

TOILET SEAT

COVER

DISPENSER

BABY

CHANGING

STATION

CLEAR FLOOR SPACE

@ WATER CLOSET

60"

W A

LL

H

U N

G W

.C

*5 6"

30"

30"

HANDRAILS AND

BUMPERGUARDS

FIXTURE MOUNTING HEIGHTS AND CLEARANCES

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN

M

IN

FRONT APPROACH,

PUSH SIDE

*4 2"

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

M

IN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER

FEASIBLE, AND TO PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2018 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• NFPA 101 LIFE SAFETY CODE (MOST RECENT CODES APPLY) (SEE NOTES BELOW)

• 2018 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2020 NATIONAL ELECTRICAL CODE (NEC)

• 2015 INTERNATIONAL PLUMBING CODE (IPC)

• 2019 ASME BOILER AND PRESSURE VESSEL CODE

• 2007 ASME CODE FOR PRESSURE PIPING

• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES

• 2019 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• 2016 MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN

INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2006 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL

BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

• 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: PALO ALTO, CALIFORNIA / SANTA CLARA COUNTY

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3C

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (TABLE 5.5-3):

ROOFS: REQUIRED: DESIGNED:

INSULATION ABOVE DECK R-25 c.i. EXISTING

METAL BUILDINGS: R-10 + R-19 FC EXISTING

ATTIC AND OTHER: R-38 EXISTING

WALLS, ABOVE GRADE

MASS: R-7.6 c.i. EXISTING METAL BUILDING: R-0 + R-9.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-5 c.i. EXISTING

WOOD-FRAMED AND OTHER: R-13 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: NR EXISTING

FLOORS

MASS: R-10 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: NR EXISTING

HEATED SLABS: R-15 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.42 EXISTING

OPERABLE: U-0.54 EXISTING

ENTRANCE DOOR: U-0.68 EXISTING

SKYLIGHT, 0% TO 3% OF ROOF, U-FACTOR

ALL TYPES: U-0.55 EXISTING

DEFINITIONS

c.i. = CONTINUOUS INSULATION

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL

CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE

ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY

WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY

DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND

REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED

OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE

OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE

AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,

BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL

DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE

OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION

DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND

OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND

SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL

SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO

THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH

SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 7 DAYS IN ADVANCE

OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME

OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS

OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS

PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR.

MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS

AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT

THE OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND

APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL

OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL

CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER.

INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES

OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION

MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO

THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL

OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION

SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR

DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING

BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE

DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION

DOCUMENTS.

GENERAL NOTES

AREA NAME

150 SF

AE-101

A101

SIM

00000

00.0

AE-101

1 1

A101

LEVEL NAME

00'-00"

00'-00"

4B

3A

FIBERGLASS BATT INSULATION

ROOM NAME

000A

150 SF

/1 A101 X0000

6"

3' -0

M

A X

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

AMT AMOUNT

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR COLOR

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED / CONTRACTOR INSTALLED

CSWK CASEWORK

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EQ EQUAL

EXIST EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

G

GR FL GROUND FLOOR

H

HDW HARDWARE

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HORIZ HORIZONTAL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LOC LOCATION

LT LIGHT

LVR LOUVER

M

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORIG ORIGINAL

P

PA PUBLIC ADDRESS

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PL PROPERTY LINE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PWR POWER

Q

QTY QUANTITY

R

RCP REFLECTED CEILING PLAN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RFG ROOFING

RM ROOM

RO ROUGH OPENING

S

SCHED SCHEDULE

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

STD STANDARD

STOR STORAGE

T

TEL TELEPHONE

TEMP TEMPORARY

TFF TOP OF FINISH FLOOR

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VV VA PROVIDED / VA INSTALLED

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

X

X BRACE CROSS BRACE

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

*48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

BARIATRIC TOILET ROOM

TURNING RADIUS

CLEAR FLOOR SPACE

@ ADA LAVATORY

CLEAR FLOOR SPACE

@ ADA DRINKING

FOUNTAIN

MINERAL WOOL INSULATION

EXPANDED POLYSTYRENE INSULATION

POLYISOCYANURATE INSULATION

SPRAY-APPLIED CLOSED CELL INSULATION

SPRAY-APPLIED CLOSED CELL INSULATION

CONCRETE / PRECAST CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY UNIT

STONE / CAST STONE

GYPSUM BOARD

EXTERIOR SHEATHING BOARD

PLYWOOD

*59" FOR FLOOR

MOUNTED W.C.

T O

B .O

R

E F

LE

C

T

IV

E

S U

R F

A C

E

1"

M

IN 39"- 41"

7" - 9"

3"

1' -6

M

IN

3' -6

M

A X

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

5' -0

M

A X

FIRE EXTINGUISHER

CABINET

WEIGHT < 40LBS

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #Revision: Date:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

STRUCTURAL ENGINEER

GREGORY P. LUTH & ASSOCIATES

3350 SCOTT BOULEVARD, BLDG. 48

SANTA CLARA, CA 95054

(408) 654-0475

MEP / TECHNICAL ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

MEDICAL EQUIPMENT PLANNING

INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

SHEET TITLE

CIVIL ENGINEER

KEIR & WRIGHT

3350 SCOTT BLVD, BLDG22

SANTA CLARA, CA 95051

(405) 727-6665

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

ARCH. REG. NO. C38975

ENGR. REG. NO. M39910

EXPIRES: 05/31/2023

EXPIRES: 06/30/2024

SPUR #: 1795.07

/2

/2

:0

:4

A

M

GI001

GENERAL INFORMATION

ZDL

B100

BGJ

FINAL BID DOCUMENTS

RENOVATION AND EXPANSION OF SPS

03/03/2023

640-23-108

VA PALO ALTO HEALTHCARE SYSTEM

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #Revision: Date:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

STRUCTURAL ENGINEER

GREGORY P. LUTH & ASSOCIATES

3350 SCOTT BOULEVARD, BLDG. 48

SANTA CLARA, CA 95054

(408) 654-0475

MEP / TECHNICAL ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

MEDICAL EQUIPMENT PLANNING

INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

SHEET TITLE

CIVIL ENGINEER

KEIR & WRIGHT

3350 SCOTT BLVD, BLDG22

SANTA CLARA, CA 95051

(405) 727-6665

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

ARCH. REG. NO. C38975

ENGR. REG. NO. M39910

EXPIRES: 05/31/2023

EXPIRES: 06/30/2024

SPUR #: 1795.07

/2

/2

:0

:4

A

M

GI002

RENDERINGS

JLJ

B100

ZDL

FINAL BID DOCUMENTS

RENOVATION AND EXPANSION OF SPS

03/03/2023

640-23-108

VA PALO ALTO HEALTHCARE SYSTEM

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

DECONTAMINATION RENDERING

STAFF LOUNGE RENDERING

PREP AND ASSEMBLY RENDERING

157 SF

EXIST STERILE SPS

CHIEF

EB-370

97 SF

EXISTING SPS

ASSISTANT CHIEF

EB-368

345 SF

CLERICAL

WORKSTATION

EB-360

192 SF

EXIST TEAM ROOM

EB-362

716 SF

BREAKOUT/BULK

STORAGE

EB-350

EXIST REFR WASTE

EXIST NON FLAM GAS

EXIST FLAM GAS

EXIST HAZARDOUS

STORAGE

EXIST EMPTY BARREL

HOLD

EXIST CONTAM

BARREL HOLD

EXIST BIOMED ENGG

SUPPLY RM

133 SF

EXIST DISPATCH

EB-356B

EXIST CARTLIFT

MACH RM

C-2.0

S

F

E X

IS

T

H A

C

E B

-3

187 SF

EXIST STAFF LOUNGE

EB-358

EXIST ELEC

EB-EC2

T R

A V

E L

D

IS

T A

N C

E

TRAVEL DISTANCE = 186'

TRAVEL DISTANCE = 249'

EXIST TEL

EB-TC2

231 SF

LOCKER/CHANGING

FEMALE

EB-330

216 SF

LOCKER/CHANGING

MALE

EB-332

81 SF

ANTE

EB-322A

85 SF

TOILET/SHOWER

EB-318

65 SF

ANTE/PPE

EB-322B

1072 SF

DECONTAMINATION

EB-320

937 SF

PREPARATION AND

ASSEMBLY

EB-312B

1591 SF

STERILE STORAGE

EB-316

2742 SF

CLEAN SUPPLY

STORAGE ROOM

EB-300

EXISTING CORRIDOR

EXISTING CORRIDOR

STAIRWAY

TRAVEL DISTANCE = 173'

658 SF

CLEAN WORKROOM

INSTRUMENT SET

ASSEMBLY

EB-312

52 SF

HAC

EB-300A

TRAVEL DISTANCE = 163'

AUTOMATED CART

WASHER

EB-338

231 SF

STEAM

STERILIZATION

EB-314B

154 SF

STERILIZATION AREA

LOW TEMP

EB-314

726 SF

CORRIDOR

EB-300C

327 SF

EQUIPMENT TEST

EB-340A

EXIST CART LIFT 1

F1-271

EXIST CART LIFT 2

F1-269

547 SF

DISPATCH

EB-356

336 SF

DECONTAMINATION

WORK AREA

EB-320B

56 SF

TLT STAFF MALE

EB-332A

56 SF

TLT STAFF FEMALE

EB-330A

58 SF

VESTIBULE

EB-C30

258 SF

CORRIDOR

EB-322

EXISTING TELE

CLOSET

FB-SC1

F E

C

ELEC

EB-300G

351 SF

SCS OPEN OFFICE

EB-316E

98 SF

SCS OFFICE

EB-316D

190 SF

EQUIPMENT

STORAGE

EB-316F

FEC - 1

891 SF

CORRIDOR

FB-C04

F E

C

FEC - 1

F E

C

F E

C

EXTERIOR

DOCK AREA

T R

A V

E L

D

IS

T A

N C

E

EXTERIOR

DOCK AREA

FEC - 1

A E

D

A E

D

199 SF

STEAM STERILE

STORAGE

EB-314C

93 SF

HLD ALCOVE

EB-322C

FEC - 1

FEC - 1

TRAVEL DISTANCE = 90'

1.02

FIRE - 1 HOUR

PARTITION LEGEND

FEC

AED

FIRE EXTINGUISHER CABINET

SPACE NOT OCCUPIED

EXISTING TO REMAIN

AUTOMATED EXTERNAL DEFIBRILLATOR, GC TO

COORDINATE ROUGH-IN CONDITION WITH VA

PROVIDED EQUIPMENT

EXIT LIGHT / SIGN

EGRESS PATH TO BUILDING EXIT

BUILDING EXIT / DIRECTION TO EXIT

OCCUPANT LOAD

LIFE SAFETY LEGEND

BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC

FIRE SPRINKLER SYSTEM THROUGHOUT PER NFPA 13

CONSTRUCTION TYPE: (TABLE A.8.2.1.2): TYPE II (222)

FIRE RESISTANCE RATINGS (TABLE A.8.2.1.2):

• COLUMNS: 2 HR

• BEAM, GIRDERS, TRUSSES: 2 HR

• FLOOR/CEILING ASSEMBLIES: 2 HR

• ROOF/CEILING ASSEMBLIES: 1 HR

• EXTERIOR NON-BEARING WALLS: 0 HR

• INTERIOR NON-BEARING WALLS: 0 HR

FIRE-RESISTIVE REQUIREMENTS:

• NONCOMBUSTIBLE MATERIALS FOR STRUCTURAL

FRAME, FLOORS, ROOF DECK, EXTERIOR NON-

BEARING WALLS, INTERIOR NON-BEARING WALLS

• CORRIDORS: 30 MINUTE FIRE / SMOKE RATING

(19.3.6.2.2)

• SHAFTS: MINIMUM 1/2 HOUR RATING (8.6.5)

CHAPTER 39: EXISTING BUSINESS OCCUPANCY

OCCUPANT LOADS (TABLE 7.3.1.2):

• ASSEMBLY = 15 SF / PERSON

• BUSINESS = 150 SF / PERSON

• BUSINESS, CONCENTRATED = 50 SF / PERSON

• STORAGE = 500 SF / PERSON

LIFE SAFETY REQUIREMENTS - NFPA 101-2021 EDITION

DEAD END CORRIDOR MAX DISTANCE: 50' (39.2.5.3)

MAXIMUM COMMON PATH OF TRAVEL: 100' (39.2.5.2.1)

MAXIMUM TRAVEL DISTANCE: 300' (39.2.6.3)

ALL EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM

YIELDING 34" CLEAR EXIT WIDTH.

.15"/PERSON (IBC 1005.3.2, EXCEPTION 1) ALLOWS 226

OCCUPANT LOAD PER 36" DOOR MAX.

PROTECTED AREAS:

• STORAGE ROOMS/CLEAN SUPPLY - REQUIRED PER

VA FIRE PROTECTION DESIGN MANUAL 3.1.A AND

PER NFPA 101:18.3.2.1 AND 8.7.

• SMOKE PARTITIONS WITH SPRINKLER PROTECTION,

PROVIDED.

SMOKE COMPARTMENTALIZATION:

• NOT REQUIRED / NOT PROVIDED FOR

BUSINESS OCCUPANCIES.

FIRE ALARM SYSTEM:

• REQUIRED/PROVIDED MANUAL SYSTEM.

STANDPIPES:

• NOT REQUIRED / NOT PROVIDED.

EXISTING PARTITION

TO REMAIN IN PLACE

NEW NON-RATED WALL

EXISTING FIRE - 1 HOUR

TO REMAIN IN PLACE

KEY PLAN

BLDG 100

N

AREA OF WORK

BASEMENT OUTLINE

MALE2 FEMALE

REQUIRED

WATER CLOSET LAVATORY

SHOWER

BASEMENT PLUMBING FIXTURE COUNT SCHEDULE1

PROVIDED

DRINKING

FOUNTAIN3 OTHER

- 1 SERVICE SINK

1 1 1 2 1 SERVICE SINK

1. CALCULATIONS BASED ON ENTIRE BASEMENT AREA INCLUDING 4,247 SF ASSEMBLY OCCUPANCY, 21,047 SF BUSINESS OCCUPANCY, AND 20,903 SF STORAGE OCCUPANCY. FIXTURE COUNT INCLUDES FIXTURES IN ROOMS

GB-105A AND GB-104A

2. #/# FIRST NUMBER INDICATES WATER CLOSETS, SECOND INDICATES URINALS

3. WATER DISPENSERS MAY BE SUBSTITUTED FOR NOT MORE THAN 50% OF THE REQUIRED DRINKING FOUNTAINS

TOTAL

EXISTING 3/3 6 6 2 -

4/3 7 7 1 SERVICE SINK

UNISEX

MALE FEMALE

1 1

5 5

6 6

UNISEX

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #Revision: Date:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

STRUCTURAL ENGINEER

GREGORY P. LUTH & ASSOCIATES

3350 SCOTT BOULEVARD, BLDG. 48

SANTA CLARA, CA 95054

(408) 654-0475

MEP / TECHNICAL ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

MEDICAL EQUIPMENT PLANNING

INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

SHEET TITLE

CIVIL ENGINEER

KEIR & WRIGHT

3350 SCOTT BLVD, BLDG22

SANTA CLARA, CA 95051

(405) 727-6665

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

ARCH. REG. NO. C38975

ENGR. REG. NO. M39910

EXPIRES: 05/31/2023

EXPIRES: 06/30/2024

SPUR #: 1795.07

/2

/2

:0

:4

A

M

GI011

BASEMENT LIFE SAFETY PLAN

ZDL

B100

BGJ

FINAL BID DOCUMENTS

RENOVATION AND EXPANSION OF SPS

03/03/2023

640-23-108

VA PALO ALTO HEALTHCARE SYSTEM

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

N

1/8" = 1'-0"

BASEMENT LIFE SAFETY PLAN1

OCCUPANT LOAD CALCULATIONS

NUMBER ROOM NAME OCCUPANCY AREA SF / OCC. LOAD

EB-300 CLEAN SUPPLY STORAGE ROOM STORAGE 2742 SF 500 SF 6

EB-300A HAC STORAGE 52 SF 500 SF 1

EB-300C CORRIDOR BUSINESS 726 SF 150 SF 6

EB-312 CLEAN WORKROOM INSTRUMENT

SET ASSEMBLY

BUSINESS 658 SF 150 SF 5

EB-312B PREPARATION AND ASSEMBLY BUSINESS 937 SF 150 SF 7

EB-314 STERILIZATION AREA LOW TEMP BUSINESS 154 SF 150 SF 2

EB-314B STEAM STERILIZATION BUSINESS 231 SF 150 SF 3

EB-314C STEAM STERILE STORAGE BUSINESS 199 SF 150 SF 2

EB-316 STERILE STORAGE STORAGE 1591 SF 500 SF 4

EB-316D SCS OFFICE BUSINESS 98 SF 150 SF 1

EB-316E SCS OPEN OFFICE BUSINESS 351 SF 50 SF 8

EB-316F EQUIPMENT STORAGE STORAGE 190 SF 500 SF 1

EB-318 TOILET/SHOWER BUSINESS 85 SF 150 SF 1

EB-320 DECONTAMINATION BUSINESS 1072 SF 150 SF 8

EB-320B DECONTAMINATION WORK AREA BUSINESS 336 SF 150 SF 3

EB-322 CORRIDOR BUSINESS 258 SF 150 SF 2

EB-322A ANTE BUSINESS 81 SF 150 SF 1

EB-322B ANTE/PPE BUSINESS 65 SF 150 SF 1

EB-322C HLD ALCOVE BUSINESS 93 SF 150 SF 1

EB-330 LOCKER/CHANGING FEMALE ASSEMBLY 231 SF 15 NET 16

EB-330A TLT STAFF FEMALE BUSINESS 56 SF 150 SF 1

EB-332 LOCKER/CHANGING MALE ASSEMBLY 216 SF 15 NET 15

EB-332A TLT STAFF MALE BUSINESS 56 SF 150 SF 1

EB-336 EXIST HAC STORAGE 57 SF 500 SF 1

EB-340A EQUIPMENT TEST BUSINESS 327 SF 150 SF 3

EB-350 BREAKOUT/BULK STORAGE STORAGE 716 SF 500 SF 2

EB-356 DISPATCH BUSINESS 547 SF 150 SF 4

EB-356B EXIST DISPATCH BUSINESS 133 SF 150 SF 1

EB-358 EXIST STAFF LOUNGE ASSEMBLY 187 SF 15 NET 13

EB-360 CLERICAL WORKSTATION BUSINESS 345 SF 150 SF 3

EB-362 EXIST TEAM ROOM BUSINESS 192 SF 150 SF 2

EB-368 EXISTING SPS ASSISTANT CHIEF BUSINESS 97 SF 150 SF 1

EB-370 EXIST STERILE SPS CHIEF BUSINESS 157 SF 150 SF 2

EB-C30 VESTIBULE BUSINESS 58 SF 150 SF 1

FB-C04 CORRIDOR BUSINESS 891 SF 150 SF 6

TOTAL OCCUPANT LOAD: 135

EXTERIOR

DOCK AREA

EXTERIOR

DOCK AREA

EXIST CARTS REFR EXIST FRZ

E X

IS

T

C D

IS

H

S T

O R

A G

E

EXIST. CLIN DIET

OFFICE

EXIST. CLIN DIET

OFFICE

EXIST. CLIN DIET

COPY

EXIST. CLIN DIET

OFFICE

EXIST. STTE MGR

OFFICE

EXIST. PATIENT

EFFECTS STORAGE

EXIST. S LN COLL

EXIST. MECH

EXIST. FIRE PUMPS

EXIST. REAGENT

GRADE WATER

EXIST. MECH

EXIST ELEVATOR

EXIST ENERGY CONT

CTR

EXIST HEATING

EQUIP

EXIST. PLUMBING

EQUIP

EXIST. PLUMBING

EQUIP

EXIST. REAGENT

GRADE WATER

EXIST. TRAY TKT

OFFICE

EXIST NON-FOOD

STORAGEE

X

IS

T . D

R Y

F O

O D

S T

O R

A G

E

E X

IS

T

. R E

F R

D A

IR

Y

EXIST. CART RM

EXIST. FREEZER

EXIST. DISHWASH

E X

IS

T

. C C

A R

T D

E P

O T

EXIST. PATIENT TRAY

ASSM

EXIST.

RETHERM/COOK

EXIST. FOOD PROC &

PREP

EXIST. NOUR PREP

EXIST CORRIDOREXIST RCVG

EXIST ELEVATOR

EXIST ELEV LOBBY

E X

IS

T

. C O

R R

ID

O

R

EXIST STAIRWAY

EXIST. CHILLERS

E X

IS

T

C O

R R

ID

O

R

EXIST. UNAS

EXIST. UNAS

EXIST. UNAS

EXIST. UNAS

EXIST. UNAS

EXIST. TELECOM

STORAGE

EXIST SUPERVISOR

OFFICE

EXIST. TEL EQUIP

EXIST. STORAGE

E X

IS

T

. B M

S S

T O

R A

G E

EXIST. PATIENT

DONATIONS

STORAGE

EXISTING CORRIDOR

EXIST. CONFERENCE

EXIST. OFFICE

EXIST. ELEV LOBBY

EXIST. IDF CLOSET

EXIST STAIRWAY

EXIST.

COPIER/STORAGE

E X

IS

T

. T E

C H

O F

F

IC

E

EXIST. SERVER ROOM

EXIST. CUSTOMER

SUPPORT STORAGE

EXIST. XEROX

STORAGE

EXIST. CORRIDOR

E X

IS

T

. E M

S E

Q P

T S

T O

R A

G E

E X

IS

T

. V A

S U

P P

LY

S

T O

R A

G E

E X

IS

T

. E M

S S

U P

E R

V

IS

O R

S W

O R

K S

T A

T

IO

N

E X

IS

T

. N F

S C

H

IE

F O

F C

EXIST. STORAGE

EXIST CLEAN LINEN

EXIST. SHARED

CONF. RM

EXIST. STAFF

LOUNGE

EXIST IT

DEPLOYMENT

STORAGE

EXIST. PHARMACY

CACHE STORAGE

EXIST ELEC RM

EXIST VALUABLE

STORAGE

EXIST. DONATION

STORAGE

EXIST. LAB COATS

AND NEW UNIFORMS

STAGING EXIST. PHARMACY

PART STORAGE

E X

IS

T

. C O

R R

ID

O

R

EXIST. CORRIDOR

CLEAN DONATION

EXIST. CORRIDOR EXIST. STAIR

EXIST. MECHANICAL

EXIST BED STORAGE

EXIST PTS

MECHANICAL RM

EXIST. FEMALE

LOCKERS

EXIST. FEMALE

TOILET AND

SHOWERS

EXIST. MALE TOILET

AND SHOWERS

EXIST. MALE

LOCKERS

EXIST CONTAM

BARREL HOLD

EB-450

EXIST BIOMED ENGG

SUPPLY RM

EB-460

GI011

13.15

FIRE - 1 HOUR

PARTITION LEGEND

FEC

AED

FIRE EXTINGUISHER CABINET

SPACE NOT OCCUPIED

EXISTING TO REMAIN

AUTOMATED EXTERNAL DEFIBRILLATOR, GC TO

COORDINATE ROUGH-IN CONDITION WITH VA

PROVIDED EQUIPMENT

EXIT LIGHT / SIGN

EGRESS PATH TO BUILDING EXIT

BUILDING EXIT / DIRECTION TO EXIT

OCCUPANT LOAD

LIFE SAFETY LEGEND

BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC

FIRE SPRINKLER SYSTEM THROUGHOUT PER NFPA 13

CONSTRUCTION TYPE: (TABLE A.8.2.1.2): TYPE II (222)

FIRE RESISTANCE RATINGS (TABLE A.8.2.1.2):

• COLUMNS: 2 HR

• BEAM, GIRDERS, TRUSSES: 2 HR

• FLOOR/CEILING ASSEMBLIES: 2 HR

• ROOF/CEILING ASSEMBLIES: 1 HR

• EXTERIOR NON-BEARING WALLS: 0 HR

• INTERIOR NON-BEARING WALLS: 0 HR

FIRE-RESISTIVE REQUIREMENTS:

• NONCOMBUSTIBLE MATERIALS FOR STRUCTURAL

FRAME, FLOORS, ROOF DECK, EXTERIOR NON-

BEARING WALLS, INTERIOR NON-BEARING WALLS

• CORRIDORS: 30 MINUTE FIRE / SMOKE RATING

(19.3.6.2.2)

• SHAFTS: MINIMUM 1/2 HOUR RATING (8.6.5)

CHAPTER 39: EXISTING BUSINESS OCCUPANCY

OCCUPANT LOADS (TABLE 7.3.1.2):

• ASSEMBLY = 15 SF / PERSON

• BUSINESS = 150 SF / PERSON

• BUSINESS, CONCENTRATED = 50 SF / PERSON

• STORAGE = 500 SF / PERSON

LIFE SAFETY REQUIREMENTS - NFPA 101-2021 EDITION

DEAD END CORRIDOR MAX DISTANCE: 50' (39.2.5.3)

MAXIMUM COMMON PATH OF TRAVEL: 100' (39.2.5.2.1)

MAXIMUM TRAVEL DISTANCE: 300' (39.2.6.3)

ALL EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM

YIELDING 34" CLEAR EXIT WIDTH.

.15"/PERSON (IBC 1005.3.2, EXCEPTION 1) ALLOWS 226

OCCUPANT LOAD PER 36" DOOR MAX.

PROTECTED AREAS:

• STORAGE ROOMS/CLEAN SUPPLY - REQUIRED PER

VA FIRE PROTECTION DESIGN MANUAL 3.1.A AND

PER NFPA 101:18.3.2.1 AND 8.7.

• SMOKE PARTITIONS WITH SPRINKLER PROTECTION,

PROVIDED.

SMOKE COMPARTMENTALIZATION:

• NOT REQUIRED / NOT PROVIDED FOR

BUSINESS OCCUPANCIES.

FIRE ALARM SYSTEM:

• REQUIRED/PROVIDED MANUAL SYSTEM.

STANDPIPES:

• NOT REQUIRED / NOT PROVIDED.

EXISTING PARTITION

TO REMAIN IN PLACE

NEW NON-RATED WALL

EXISTING FIRE - 1 HOUR

TO REMAIN IN PLACE

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #Revision: Date:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

STRUCTURAL ENGINEER

GREGORY P. LUTH & ASSOCIATES

3350 SCOTT BOULEVARD, BLDG. 48

SANTA CLARA, CA 95054

(408) 654-0475

MEP / TECHNICAL ENGINEER

SPUR DESIGN

2519 MADISON AVE. STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

MEDICAL EQUIPMENT PLANNING

INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

SHEET TITLE

CIVIL ENGINEER

KEIR & WRIGHT

3350 SCOTT BLVD, BLDG22

SANTA CLARA, CA 95051

(405) 727-6665

PHYSICAL SECURITY

FORCE PROTECT SECURITY CONSULTANTS

10901 FRONT BEACH RD, STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

ARCH. REG. NO. C38975

ENGR. REG. NO. M39910

EXPIRES: 05/31/2023

EXPIRES: 06/30/2024

SPUR #: 1795.07

/2

/2

:0

:5

A

M

GI012

INTERIM BASEMENT LIFE SAFETY PLAN

ZDL

B100

JNK

FINAL BID DOCUMENTS

RENOVATION AND EXPANSION OF SPS

03/03/2023

640-23-108

VA PALO ALTO HEALTHCARE SYSTEM

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

N

1" = 20'-0"

INTERIM BASEMENT LIFE SAFETY PLAN1

KEYNOTE LEGEND

13.15 TEMPORARY 36" X 84", 20-MINUTE FIRE RATED DOOR WITH PANIC HARDWARE

03_STRUCTURAL
SG-001 - GENERAL NOTES
SG-002 - SHEET LIST, LEGEND & ABBREVIATIONS
SG-101 - BASEMENT EQUIPMENT PAD PLAN
SG-141 - ROOF PLAN
SG-501 - TYPICAL DETAILS
SG-502 - MEP CONNECTION DETAILS
08_ELECTRICAL
1795.07_E19_andrew - Sheet - E-000 - ELECTRICAL LEGEND
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - E-401 - ENLARGED ELECTRICAL FLOOR PLANS
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - E-501 - ELECTRICAL DETAILS
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - E-601 - ELECTRICAL ONE-LINE DIAGRAM
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - E-602 - ELECTRICAL SCHEDULES
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM
E-602 - ELECTRICAL SCHEDULES
E-603 - PANELBOARD SCHEDULES
ED-100 - ELECTRICAL LIGHTING DEMOLITION BASEMENT FLOOR PLAN
ED-200 - ELECTRICAL POWER DEMOLITION BASEMENT FLOOR PLAN
ED-205 - ELECTRICAL POWER DEMOLITION ROOF PLAN
EL-100 - ELECTRICAL LIGHTING BASEMENT FLOOR PLAN
EP-100 - ELECTRICAL POWER BASEMENT FLOOR PLAN
EP-101 - ELECTRICAL POWER FIRST FLOOR PLAN
EQ-100 - SPS MECHANICAL EQUIPMENT POWER BASEMENT FLOOR PLAN
EQ-105 - SPS MECHANICAL EQUIPMENT POWER ROOF PLAN
ES-101 - ELECTRICAL SITE PLAN - TEMPORARY SPS
ES-401 - MODULAR BUILDING ELECTRICAL AND TECHNOLOGY FLOOR PLANS
ES-601 - MODULAR BUILDING ONE-LINE DIAGRAM AND SCHEDULES
T-000 - TECHNOLOGY LEGEND
T-401 - ENLARGED TECHNOLOGY FLOOR PLANS
T-501 - TECHNOLOGY DETAILS
T-601 - TECHNOLOGY SCHEDULES AND RISER DIAGRAMS
TD-100 - TECHNOLOGY DEMOLITION BASEMENT FLOOR PLAN
TI-100 - PUBLIC ADDRESS BASEMENT FLOOR PLAN
TN-100 - TECHNOLOGY BASEMENT FLOOR PLAN
TY-100 - SECURITY BASEMENT FLOOR PLAN
1795.07_E19_andrew - Sheet - E-603 - PANELBOARD SCHEDULES
Sheets
E-000 - ELECTRICAL LEGEND
E-401 - ENLARGED ELECTRICAL FLOOR PLANS
E-501 - ELECTRICAL DETAILS
E-601 - ELECTRICAL ONE-LINE DIAGRAM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .