ATTACH 6 No. 81 - CS106.pdf

PDF 629 KB Posted

Attached to
Z2AZ--Renovation & Expansion of SPS | NRM 640-23-108
Solicitation number
36C26125R0008
Issued by

About this file

This document is a utility plan drawing (CS106) for the Veterans Affairs Palo Alto Healthcare System's Sterile Processing Department (SPS) renovation and expansion project. The drawing details utility connections and infrastructure modifications for a comprehensive renovation of Building 100, including new underground and above-grade utility installations such as water lines, sanitary sewer, electrical conduits, telecommunications, and fire alarm systems. Key technical specifications include maintaining minimum utility separation distances, installing underground warning tape, connecting new utilities to existing infrastructure, and coordinating utility work with mechanical and plumbing drawings. The plan includes provisions for temporary modular buildings, utility connections for trailer/mobile units, and careful sequencing to minimize disruption to hospital operations.

View the file

Other files

File Type Posted
36C26125R0008 0005.docx DOCX document
Attach Amend 0005 RFI BID Responses.pdf PDF
ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf PDF
ATTACH 3 GeoTech Report 02.02.21.pdf PDF
Attach 1 Amend 0004 SPS - Pre-Bid RFI Responses.pdf PDF
36C26125R0008 0004.docx DOCX document
ATTACH 7 - Construction Experience Project Data Sheet.rtf RTF text file
ATTACH 4 SECTION 27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS.pdf PDF
Attach 2 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
1795.07 - Basement Div. 12 Specifications.pdf PDF
36C26125R0008 0003.docx DOCX document
SIte Visit 12 June 2025 Sign in Roster.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
36C26125R0008 0002.docx DOCX document
Temporary SPS_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part3.pdf PDF
DRAWINGS - TEMPORARY SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part1.pdf PDF
DRAWINGS - BASEMENT SPS_Part6.pdf PDF
DRAWINGS - BASEMENT SPS_Part4.pdf PDF
DRAWINGS - TEMPORARY SPS_Part5.pdf PDF
DRAWINGS - BASEMENT SPS_Part5.pdf PDF
36C26125R0008 0001.docx DOCX document
Basement_640-23-108_Bid Document Specifications.pdf PDF
DRAWINGS - TEMPORARY SPS_Part3.pdf PDF
DRAWINGS - BASEMENT SPS_Part2.pdf PDF
DRAWINGS - BASEMENT SPS_Part1.pdf PDF
ATTACHMENT AA SPS - Specifications.pdf PDF
ATTACH CC PART 1.pdf PDF
ATTACH BB DRAWINGS PART 1.pdf PDF
ATTACH CC PART 2.pdf PDF
ATTACH BB DRAWINGS Part 2.pdf PDF
ATTACH DD SPS SWING SPACE.pdf PDF
36C26125R0008.docx DOCX document
ATTACHMENT AA SPS - Specifications.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
ATTACH DD SPS - Swing Space Drawings.pdf PDF
ATTACH CC SPS - Drawings_Part2.pdf PDF
ATTACH BB - SPS - Drawings_Part1.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment F - Client Authorization Letter.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Attachment H Wage Determination CA20250018 Dtd 3.21.25.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Attachment B - EMR Sheet.docx DOCX document
36C26125R0008.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

WATER VALVEELEV=99.68'TN ELEV=XX.XX'

SS

ST

W

WATER VALVEELEV=99.35'TN ELEV=XX.XX'

G

TE

99.24'

98.92'98.33'98.33'97.49' 97.41'

.3

9'

97.47'97.71'

G

TE

M

M

SS

SS

ST

SS

ST

SS

SS

SS

CO

SS

SS

MISC

SS

T

W

WATER VALVEELEV=98.34'TN ELEV=XX.XX'

E

IR

UK

E

CB

CB

CB

G G G G G G

EEE

GGGGG

E

M

IRIR

PB

TV

MISC

MISCCO

CO

GTE

E

E

C B

G

TE

CB

E

T

E

G

TEAC

AC

AC

CO

AC

AC

CO

E

MISC

MISC

IR

W

JSSTJH

BID DOCUMENTS

05/30/2025

PALO ALTO VA MC

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

B100

RENOVATION AND

EXPANSION OF SPS

640-23-108 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

PROJECT NUMBERCONSULTANTS:

DRAWING #

VA HEALTH CARE SYSTEM APPROVAL:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH KS COA NO. A-930 EXP. 12/31/2025

ENG KS COA. NO. E-2586 EXP. 12/31/2025

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

DRAWING NUMBER

BUILDING NUMBER

C 90672

HEN.J NIND GOT

C I V I L

RE

G I

ST

ER

ED PROFESSIONAL ENGINEER

STATE OF CA L I FORN IA

OF 75

CIVIL/STRUCTURAL ENGR

H2B. INC.

1225 N LOOP WEST, STE 800

HOUSTON, TX 77008

(713) 864-2900

MEP / TECH ENGR

SPUR DESIGN

2519 MADISON AVE, STE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGR

POOLE FIRE PROTECTION

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

THE INNOVA GROUP

9442 N. CAPITAL OF TEXAS HWY, STE 325

AUSTIN, TX 78759

(512) 346-8700

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, STE 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

BENCHMARK: .

LEGEND: .

REFERENCE TOPOGRAPHIC SURVEY SHEET CS000 FOR

BENCHMARK INFORMATION.

EXISTING FEATURES:

NEW FEATURES:

SCALE: 1" = 10'

0 10' 20'

CS106

UTILITY PLAN

NOTES: .

1. NEW ABOVE-GRADE UTILITIES SHALL BE OF MATERIAL

SPECIFIED BY MEP DRAWINGS. NEW UNDERGROUND FIRE

LINE SHALL BE PVC C900.

2. NEW UNDERGROUND WATER LINE MINIMUM COVER

42-INCHES.

3. MAINTAIN 2-FEET VERTICAL AND 9-FEET HORIZONTAL

BETWEEN WATER AND NON-PRESSURE RATED SANITARY

SEWER. MAINTAIN MINIMUM 9-FEET HORIZONTAL BETWEEN

WATER LINE AND OUTSIDE WALL OF SANITARY SEWER

MANHOLE.

4. COORDINATE THIS PLAN WITH PLUMBING DRAWINGS.

5. CONTRACTOR SHALL INSTALL CONTINUOUS

UNDERGROUND WARNING TAPE 12" DIRECTLY OVER

WATER LINE. WARNING TAPE SHALL BE STANDARD, 4 MIL

POLYETHYLENE, 3-INCH WIDE TAPE, DETECTABLE TYPE,

BLUE WITH BLACK LETTERS AND IMPRINTED WITH "CAUTION

BURIED WATER LINE BELOW".

6. REMOVE EXIST MANHOLE COVER AND REPLACE WITH

MODIFIED EJCO 4000 SERIES (OR EQUAL) TEMPORARY

SAFETY COVER. COVER SHALL ACCEPT 4" SANITARY PIPE

FROM TRAILER.

7. FOR SANITARY SEWER UTILITIES: CONTRACTOR TO

PROVIDE FREESTANDING PIPE SUPPORT AT MAXIMUM 5 FT

ON-CENTER SPACING. RE: DTL 4 / CS200

8. REFERENCE PLUMBING DETAILS FOR MOBILE DOMESTIC

HOT WATER SYSTEM PLUMBING.

9. REFERENCE PLUMBING SHEETS FOR TEMPORARY

MODULAR SANITARY AND DOMESTIC WATER EXTENSIONS.

10. CONTRACTOR TO ROUTE ABOVE-GRADE ELECTRICAL

CONDUIT UNDER CORRIDOR TO PREVENT TRIP HAZARD IN

FRONT OF CORRIDOR STAIRS.

11. REFERENCE DETAILS 6 & 7 ON SHEET CS200 FOR

WATERLINE OFFSET AND WATERLINE BEDDING/BACKFILL.

CONTRACTOR TO POTHOLE ALL EXISTING

UTILITIES NEAR THE PROPOSED FOUNDATIONS

AND NOTIFY THE ENGINEER OF ANY

DISCREPANCIES FROM THE DESIGN DRAWING.

CALL UNDERGROUND SERVICE ALERT (USA) AT

811 AT LEAST 48 HOURS PRIOR TO

EXCAVATION. IN THE EVENT THAT A PUBLIC

UTILITY SERVICE IS DISTURBED OR DAMAGED,

CALL THE CITY OF PALO ALTO UTILITIES 24/7

DISPATCH AT (650) 329- 2579.

UNDERGROUND ELECTRIC LINEUGE

STORM DRAINSD

SANITARY SEWERSS

COMMUNICATION LINECOM

WATER LINEW

CHILLED WATER LINECW

GAS LINEG

NEW UNDERGROUND FIRE ALARM CONDUIT

NEW ABOVE-GRADE COLD WATER

NEW ABOVE-GRADE HOT WATER

NEW ABOVE-GRADE HOT WATER RETURN

NEW UNDERGROUND ELECTRIC

NEW UNDERGROUND TELECOMMUNICATION

KEYED NOTES: .

CONNECT NEW FIRE LINE TO EXIST WATERLINE w/ 10"x6" TS&V

NEW 6"x6"x3" TEE

NEW 6" FIRE LINE

NEW 3" WATERLINE

NEW 45° BEND

CONNECT FIRE LINE TO TRAILER

NEW MOBILE DOMESTIC HOT WATER SYSTEM

NEW 2.5" COLD WATER LINE

NEW 1.5" HOT WATER LINE

NEW 3/4" HOT WATER RETURN LINE

CONNECT COLD WATER LINE TO TRAILER/MOD BLDG

CONNECT HOT WATER LINE TO TRAILER/MOD BLDG

CONNECT NEW SANITARY SEWER TO EXIST MH, SEE NOTE 6

RE: DTL 2 / CS200

NEW 4" SANITARY SEWER

CONNECT SANITARY SEWER TO TEMPORARY BUILDING

RE: MEP

CONNECT FIRE ALARM CONDUITS TO BLDG 102 PANEL

NEW FIRE ALARM CONDUIT

CONNECT FIRE ALARM CONDUIT TO TRAILER

CONNECT TO EXIST UNDERGROUND TELECOM

NEW TELECOM CONDUIT

CONNECT TELECOM TO TRAILER/MOD BLDG

NEW ELECTRICAL CONDUIT

CONNECT ELECTRICAL TO TRAILER/MOD BLDG

NEW TEMPORARY BUILDING FOUNDATION

NEW TEMPORARY GENERATOR TRAILER

EXISTING TRANSFORMER

CONNECT DRAIN TO AIR CONDITIONER, RE: MECH

TEMPORARY 1" DRAIN FOR AIR CONDITIONER, RE: MECH

NEW TRANSFORMER, RE: ELEC

EXISTING FIRE HYDRANT

EXISTING POST INDICATOR VALVE

EXISTING FIRE DEPARTMENT CONNECTION

NEW ABOVE-GRADE SANITARY SEWER

NEW UNDERGROUND WATER LINE

NEW UNDERGROUND ELECTRIC CONDUIT

JessicaSoto Ellipse

JessicaSoto Water Line

JessicaSoto PolyLine

JessicaSoto Ellipse

JessicaSoto Engineer CONNECT NEW FIRE LINE TO EXIST WATERLINE w/ 10"x6" TS&V

JessicaSoto Engineer

NEW 6" FIRELINE

JessicaSoto Engineer

CONNECT FIRELINE TO MODULAR BUILDING,

RE: FX001 FOR RISER DETAIL

File details come from the government source that posted it. Updated .