ATTCH 5 - 38_AE152_FINISH FLOOR PLAN -TEMPORARY BUILDINGS.pdf
PDF 823 KB Posted
- Solicitation number
- 36C26125R0008
About this file
This document is an architectural finish floor plan for temporary buildings associated with a Veterans Affairs (VA) renovation and expansion project at the Palo Alto VA Medical Center. The plan details floor finishes, wall treatments, and base materials for multiple modular and trailer spaces, including entries, corridors, storage areas, offices, lockers, and toilets. Specific floor finishes include sealed concrete (SC), epoxy flooring (EPX), porcelain tile (PORC), carpet tile (CPT), and PVC-free resilient sheet flooring, with corresponding base materials and wall treatments like ceramic tile, paint, and stainless steel wall protection. The floor plan includes a comprehensive finish legend specifying manufacturers, sizes, colors, and collections for each material type, along with general finish notes addressing construction requirements, accessibility standards, and surface preparation.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WH
FD
FD
FD
PORC (PORCELAIN TILE)
EPX (EPOXY FLOORING)
FLOOR FINISH LEGEND
CPT (CARPET TILE)
SC (SEALED CONCRETE)
PVC-FREE RESILIENT SHEET
FLOORING
ABBREVIATION
FLOOR
CPT
EPX
PORC
MATERIAL
CARPET TILE
EPOXY FLOORING AND INTEGRAL BASE
PORCELAIN TILE
MANUFACTURER
SHAW
DURAFLEX
DALTILE
SIZE
24" X 24"
POURED WITH 4" BASE
2" X 2"
SERIES/COLLECTION
RADIANCE EW24 #59361
HYBRI-FLEX EQ ARMOR TOP COAT WITH DUR-AGRIT
KEYSTONES PORCELAIN FLOOR TILE
COLOR
EDAMAME #60309
Q28-21
D014 DESERT GRAY
SCHEDULE FOR FINISHES
SC SEALED CONCRETE
PFR SHAW 6.59' X 65.62' WITH 4" BASE INNATE + IN TANDEM AIR 66104
BASE
CT2
RB1
WALL
CT1
PT1
PT2
PT3
SS
WP
CEILING
ACT1
ACT2
OTHER
CG1
CG2
CG3
ETR
PLAM
SSM
CERAMIC TILE - COVED
RUBBER COVED BASE
CERAMIC TILE
PAINT
EPOXY PAINT
PAINT
STAINLESS STEEL WALL PROTECTION
WALL PROTECTION ASSEMBLY
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE
STAINLESS STEEL CORNER GUARD
VINYL CORNER GUARD
STAINLESS STEEL END WALL CAP
PLASTIC LAMINATE
SOLID SURFACE MATERIAL
DALTILE
TARKETT
DALTILE
SHERWIN WILLIAMS
SHERWIN WILLIAMS
SHERWIN WILLIAMS
CS CONSTRUCTION
SPECIALTIES
CS CONSTRUCTION
SPECIALTIES
ARMSTRONG
ARMSTRONG
WILSONART
DUPONT
CS CONSTRUCTION
SPECIALTIES
CS CONSTRUCTION
SPECIALTIES
CS CONSTRUCTION
SPECIALTIES
4.25" X 13"
4.5"
4" X 12"
VARIES REFER ELEVATIONS
REFER DETAIL 14/AF711
24" X 24"
24" X 24"
FLOOR BASE TO CEILING,
3 1/2" LEG
FLOOR BASE TO 4'-0" AFF
FLOOR BASE TO
CEILING, 3 1/2" LEG
COLOR WHEEL LINEAR - COVE BASE FLAT TOP
TIGHTLOCK - CARPET
COLOR WHEEL LINEAR
PROMAR 200, ZERO VOC, EG-SHEL
PRO-INDUSTRIAL HIGH PERFORMANCE EPOXY, SEMI-GLOSS
PROMAR 200, ZERO VOC, EG-SHEL
16 GAUGE DIAMOND PLATE STAINLESS STEEL TYPE 304
ASSEMBLY: ACROVYN (BCR-40 SERIES, 4" FLAT) + (SHEET, .060") + (BCR-40 SERIES, 4" FLAT)
OPTIMA SQUARE LAY-IN WITH 15"/16" PRELUDE GRID WHITE
ULTIMA HEALTH ZONE SQUARE LAY-IN WITH 15/16" CO-EXTRUDED CLEAN ROOM GRID
EXISTING TO REMAIN
C0-8, SURFACE MOUNTED 16 GUAGE 304 STANLESS STEEL
ACROVYN - SM-20AN SERIES - SHADOWGRAIN TEXTURE
SC0-8, SURFACE MOUNTED 16 GUAGE 304 STANLESS STEEL - END WALL CONDITION
01900 ARCTIC WHITE
55 SILVER GREY WG
01900 ARCTIC WHITE
SW 6070 HERON PLUME
SW 6070 HERON PLUME
SW9138 STARDEW
949 WHITE
WHITE
WHITE
#4 SATIN FINISH
949 WHITE
#4 SATIN FINISH
FUSION MAPLE 7909-60
RICE PAPER - MATTE FINISH
PVC-FREE RESILIENT SHEET FLOORING
AND INTEGRAL BASE
KEY PLAN
RADIOLOGY BUILDING
BUILDING 100
BUILDING 102
BUILDING 05
TEMP.
MODULAR
OFFICE
TEMP. SPS
T E
M P
. S P
S
N
TEMP.
MODULAR
STORAGE
CORRIDOR
869 SF
ENTRY
1355 SF
CORRIDOR
584 SF
CLEAN STORAGE
M-100
123 SF
BIN ASSEMBLY
M-100A
119 SF
MANUAL CART WASH
M-102
83 SF
OFFICE SPS CHIEF
M-101
172 SF
WORKSTATION
M-100B
61 SF
HAC
M-104
239 SF
CORRIDOR
M-103
107 SF
LOCKER MALE
M-106
86 SF
LOCKER FEMALE
M-107
77 SF
TOILET FEMALE
M-108
77 SF
TOILET MALE
M-105
3469 SF
TEMPORARY CLEAN
SUPPLY STORAGE
MODULAR BUILDING
M-200
5.34
5.33
5.32
5.34
5.32
5.33
5.32
5.33
5.34
5.41
5.34
1. ALL UPPER CABINETS TO HAVE 30° SLOPED TOP. (REF: MILLWORK DETAILS)
2. REF FINISH FLOOR PLANS AF701 FOR CORNERGUARD LOCATION AND TYP
3. ALL CONSTRUCTION SHALL CONFORM TO THE AMERICANS WITH DISABILITIES ACT, ACCESSIBILITY GUIDELINES (ADAAG), LOCAL GOVERNING FIRE, SAFETY, AND BUILDING CODES, REQUIREMENTS AND
REGULATIONS, 2015 IBC, ANSI A117.1-2003.
4. ALL DIMENSIONS ARE TO THE FACE OF CONCRETE OR MASONRY, FACE OR CENTERLINE OF STUD WALLS, OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE.
5. ASBESTOS OR ASBESTOS CONTAINING PRODUCTS ARE NOT ALLOWED IN ANY ASPECT OF THIS
CONSTRUCTION.
6. COORDINATE ALL DISCIPLINES AND ALL ASPECTS OF WORK. CONFLICTS AND DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY.
7. ALL CONCRETE SURFACES WHICH RECEIVE A SPECIAL FINISH, FLOOR COVERING, COATINGS, HARDENERS, ETC. SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFIC FINISH MANUFACTURER'S
SPECIFICATIONS AND INSTRUCTIONS. PRIOR TO APPLICATION OF A SPECIAL FINISH, A WRITTEN ACCEPTANCE OF THE SURFACE SHALL BE SUBMITTED TO THE ARCHITECT BY THE GENERAL CONTRACTOR.
8. REFER TO STRUCTURAL FOR RECESSED SLAB LOCATIONS, SLOPED SLABS AND DIMENSIONS.
9. REMOVE ALL FLOOR FINISHES AND ADHESIVES AND STRIP FLOOR DOWN TO EXISTING CONCRETE. PREP
FLOOR FOR INSTALLATION OF NEW FLOOR FINISHES AS SHOWN.
10. SS COLUMN WRAPS TO GO FROM TOP OF BASE TO 4'-0" AFF. ALL CORNERS TO BE BENT.
11. MOVEABLE PARTITION MATERIALS TO BE PLASTIC LAMINATE COLOR TO BE SELECTED BY DESIGNER FROM
MANUFACTURERS OFFERING.
12. DOORS AND FRAMES TO BE PAINED WITH SERWIN WILLIAMS SW6070 HERON PLUME
GENERAL FINISH NOTES
BASIS OF DESIGN: SCHLUTER-
RENO-V - ALUMINUM - BRUSHED
SATIN - SIZED TO ACCEPT TILE
THICKNESS PLUS MORTAR BED
(EPX) EPOXY FLOORING
PREPPED SUBSTRATE
(PORC) PORCELAIN TILE
AND MORTAR BED
SAW CUT
1439 SF
SCS STORAGE
TRAILER
M-300 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH KS COA NO. A-930 EXP. 12/31/2025
ENG KS COA. NO. E-2586 EXP. 12/31/2025
CIVIL/STRUCTURAL ENGR
H2B. INC.
1225 N LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
MEP / TECH ENGR
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
9442 N. CAPITAL OF TEXAS HWY, STE 325
AUSTIN, TX 78759
(512) 346-8700
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
/2
/2
:4
:3
P
M
FINISH FLOOR PLAN - TEMPORARY
BUILDINGS
NSM 38 OF 72AJS
BID DOCUMENTS
RENOVATION AND EXPANSION OF SPS
05/30/2025
640-23-108
PALO ALTO VA MC
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
AE152
B100
SPUR #: 1795.07
ROOM FINISH SCHEDULE (MODULAR)
ROOM # ROOM NAME
ROOM CODE
FLOOR FINISHES WALL FINISHES
CEILING
FLOOR BASE NORTH EAST SOUTH WEST
101 ENTRY SC RB1 PT2 / SS PT2 / SS PT2 / SS PT2 / SS PT2
102 CORRIDOR SC RB1 PT2 / SS PT2 / SS PT2 / SS PT2 / SS PT2
M-100 CLEAN STORAGE SRSE1 EPX EPXB PT2 / SS PT2 / SS PT2 / SS PT2 / SS ACT2
M-100A BIN ASSEMBLY - EPX EPXB PT2 / SS PT2 / SS PT2 / SS PT2 / SS ACT2
M-100B WORKSTATION CSIA1 CPT RB1 PT2 PT2 PT2 PT2 ACT2
M-101 OFFICE, SPS CHIEF OFA09 CPT RB1 PT2 PT2 PT2 PT2 ACT2
M-102 MANUAL BIN WASH CWSH3 EPX EPXB CT1 CT1 CT1 CT1 PT2
M-103 CORRIDOR CSCR1 EPX EPXB PT2 / SS PT2 / SS PT2 / SS PT2 / SS PT2
M-104 HAC JANC2 EPX EPXB PT2 PT2 PT2 PT2 PT2
M-105 TOILET MALE TLTU1 PORC CT2 CT1 CT1 CT1 CT1 PT2
M-106 LOCKER MALE LR002 EPX EPXB PT2 PT2 PT2 PT2 PT2
M-107 LOCKER FEMALE LR002 EPX EPXB PT2 PT2 PT2 PT2 PT2
M-108 TOILET FEMALE TLTU1 PORC CT2 CT1 CT1 CT1 CT1 PT2
M-200 TEMPORARY CLEAN SUPPLY STORAGE MODULAR BUILDING SRS04 PFR PFRB PT2 / SS PT2 / SS PT2 / SS PT2 / SS ACT2
M-300 SCS STORAGE TRAILER SRS04 PFR PFRB PT2 / SS PT2 / SS PT2 / SS PT2 / SS ACT2
N
1/8" = 1'-0"
SPS TRAILERS AND TEMPORARY BUILDINGS - FINISH FLOOR PLAN16" = 1'-0"
TRANSITION DTL - (PORC) TO (EPX)2
No. REVISION DESCRIPTION DATE
N
1/8" = 1'-0"
LOADING DOCK TRAILER - FLOOR FINISH PLAN3
KEYNOTE LEGEND
5.32 METAL PLATFORM
5.33 METAL HANDRAIL AND GUARDRAIL
5.34 METAL STAIR SYSTEM
5.41 METAL RAMP ASSEMBLY WITH ACCESS PANEL TO MANHOLE BELOW
File details come from the government source that posted it. Updated .