Attachment 9 668-18-109_Project Drawings 5 of 6.pdf
PDF 15 MB Posted
- Solicitation number
- 36C26024R0009
About this file
This file attachment is related to a federal contract opportunity to refurbish and upgrade elevators in two buildings at a Veterans Affairs medical center. The solicitation number is 36C26024R0009 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for elevator modernization work at Building 1 and 27. The opportunity type is a solicitation. The attachment appears to include project drawings but the content is not listed. No other details on products, services, pricing, responses dates, or awards are provided in this related file.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A529
A503
A502
A501A500B
C5-A2
A527
S3 P1
P2AREA OF WORK
S
ELV
ELV
AREA OF
WORK
BUILDING 1 - FIFTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP106
BUILDING 1 - FIFTH FLOOR: POWER
AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY
DEVICE LOCATIONS WITH ARCHITECT AND
ELEVATOR MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE CAMERA.
PROVIDE REQUIRED CONNECTIONS FROM
CAMERA TO ETHERNET SWITCH LOCATED
IN ROOM A502.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB 126 OF 143
A600
A633
A637
A604S3 P1
P2
A635
A603
AREAS OF WORK
S
ELV
ELV
KEY NOTES
BUILDING 1 - SIXTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
AREAS OF WORK
EP107
BUILDING 1 - SIXTH FLOOR: POWER
AND SPECIAL SYSTEMS PLAN
EXISTING TELECOM BACKBOARD.
EXISTING DATA RACK.
RELOCATED DIRECT TV EQUIPMENT
AND RACK FROM ELEVATOR MACHINE
ROOM. EXTEND DATA CABLING AND
COAXIAL CABLE AS REQUIRED. OBTAIN
POWER FROM EXISTING ADJACENT
1.5KVA UPS. SEE KEYNOTE "4" ON THIS
SHEET. PROVIDE CORD AND PLUG
SETS AS REQUIRED.
EXISTING UPS TO POWER RELOCATED
DIRECT TV EQUIPMENT. REFERENCE
KEY NOTE "3" ON THIS SHEET AND
SHEET ED111 FOR ADDITIONAL
INFORMATION.
EXISTING NURSE CALL EQUIPMENT.
ELEVATOR LOBBY SURVEILLANCE
CAMERA. PROVIDE REQUIRED
CONNECTIONS FROM CAMERA TO
ETHERNET SWITCH LOCATED IN ROOM
A603.
FAN COIL "FC-1", CEILING MOUNTED.
NEW UNIT POWER REQUIREMENTS (1/8
HP) IS LESS THAN EXISTING UNIT (1/6
HP); UTILIZE EXISTING CIRCUIT
(FEEDER BREAKER, CONDUIT AND
WIRE) FROM PREVIOUS HVAC UNIT;
PROVIDE LOCAL DISCONNECT AS
REQUIRED. REFERENCE DRAWING
ED107 AND MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY
DEVICE LOCATIONS WITH ARCHITECT
AND ELEVATOR MANUFACTURER
PRIOR TO INSTALLATION.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 127 OF 143
A729
S3 P1
P2
S S
AREA OF WORK
ELV
ELV
AREA OF
WORKBUILDING 1 - SEVENTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP108
BUILDING 1 - SEVENTH FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY DEVICE
LOCATIONS WITH ARCHITECT AND
ELEVATOR MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE CAMERA.
PROVIDE REQUIRED CONNECTIONS FROM
CAMERA TO ETHERNET SWITCH LOCATED IN
ROOM A703. REFERENCE KEY PLAN FOR
ROOM HOUSING EQUIPMENT TO BE UTILIZED.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
ROOM A703
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 128 OF 143
A800D
A800
A800AA800C
S3 P1
P2
S
WAP
S
ELV
ELV
AREA OF
WORKBUILDING 1 - EIGHTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP109
BUILDING 1 - EIGHTH FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE
CAMERA. PROVIDE REQUIRED
CONNECTIONS FROM CAMERA TO
ETHERNET SWITCH LOCATED IN ROOM
A800D.
REVISED PANEL "8LS1".
EXISTING SURVEILLANCE NETWORK
SWITCH AND ASSOCIATED PATCH
PANEL PREVIOUSLY LOCATED IN
BUILDING 1 ELEVATOR MACHINE ROOM
SHALL BE RELOCATED HERE (ROOM
A800D); PROVIDE NEW CABLING,
POWER CONNECTION, MOUNTING, AND
APPURTENANCES AS REQUIRED.
PACS CARD READER COMMUNICATION
CABINET; SIZED FOR (4) CARD
READERS. UTILIZE LOCAL EMERGENCY
OR UPS POWERED RECEPTACLE FOR
POWER; EXTEND POWER CONDUIT AND
WIRE AS REQUIRED. EXISTING ACCESS
CONTROL CARD READER CONDUIT AND
WIRING SHALL BE EXTENDED TO NEW
CABINET AS REQUIRED.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
A900
S3 P1
P2
AREA OF WORK
L2 L2
L2
9EQ4-36
9EQ4-36
9EQ4-36
TYP
9EQ4-36
9EQ4-36
9EQ4-36
L1E
8LS1-5
9 9
MM
BUILDING 1 - NINTH FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP110
BUILDING 1 - NINTH FLOOR: POWER,
LIGHTING, AND SPECIAL SYSTEMS
PLAN 1
REVISED PANELBOARD "9EQ4". REFERENCE
ONE-LINE DIAGRAM ON SHEET E-602 FOR
ADDITIONAL INFORMATION.
LUMINAIRE TO BE LOCATED ADJACENT TO
ELEVATOR SHAFT OPENING.
REVISED PANELBOARD "9N1". REFERENCE
LOAD SCHEDULES FOR ADDITIONAL
INFORMATION.
EXISTING MOTOR CONTROL CENTER
"MCC3".
EXISTING PANELBOARD "9EQ2".
REVISED SWITCHBOARD "9EQ1".
LIGHTING IS CIRCUITED FOR CONTINUOUS
24-HOUR OPERATION.
PROVIDE CURRENT SENSORS IN
PANELBOARD WITH ALL REQUIRED
LABELING, CONNECTIONS, AND
APPURTENANCES FOR A FULLY
FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS. SEE
PANEL SCHEDULES AND ONE-LINE DIAGRAM
FOR ADDITIONAL INFORMATION.
HARDWARE SHALL MATCH VA FACILITY
STANDARD: CENTRICA HARDWARE
(CT'S/BRIDGES) AND POWER RADAR
SOFTWARE, REFERENCE SPECIFICATION 25
10 10 FOR ADDITIONAL INFORMATION.
PROVIDE METERING BRIDGE WITH ALL
REQUIRED LABELING, CONNECTIONS, AND
APPURTENANCES FOR A FULLY
FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS.
METER HARDWARE SHALL MATCH VA
FACILITY STANDARD: CENTRICA HARDWARE
(CT'S/BRIDGES) AND POWER RADAR
SOFTWARE, REFERENCE SPECIFICATION
25 10 10 FOR ADDITIONAL INFORMATION.
UTILIZE LOCAL RECEPTACLE TO POWER
METERING BRIDGE. COORDINATE WITH VA
AS REQUIRED FOR FINAL LOCATION.
KEY PLAN
0 1' 2' 4'
Scale: 1/2" = 1'-0"
N
AREA OF
WORK
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
KEY NOTES
SHEET NOTES
1. WHERE ADDITIONAL 0 - 5A CTs ARE
REQUIRED FOR ELECTRICAL POWER
METERING PURPOSES, CONTRACTOR SHALL
PROVIDE ALL REQUIRED CABELING,
JUNCTION BOXES/ENCLOSURES, AND
APPURTENANCES AS REQUIRED FOR A
COMPLETE AND FUNCTIONAL SYSTEM.
EQUIPMENT
FOR S3
EQUIPMENT
FOR P1
EQUIPMENT
FOR P2
EQUIPMENT
ARRAY FOR P2
EQUIPMENT
ARRAY FOR S3
EQUIPMENT
ARRAY FOR P1
A1000
A1001
STACKED
EQUIPMENTDOWN
AREA OF WORK
W
WP
FS
FS
HD
HD
HD
21 18 13
9EQ4-37,39,41
11 12
9EQ4-31,33,35
9EQ1-2,4,6
9N1-2,4
9N-16
9N-16
8LS1-4
9N-16
9N-16
23 TYP
9EQ4-42
8LS1-15
8LS1-13
8LS1-17
EXISTING CONDUIT (SPARE)
8LS1-16
27 TYP
UNISTRUT
CONDUIT
SUPPORT
SM-1
SM-2
SM-3SM-4
SM-4
SM-4
9N1-6
9N1-6
9N1-8
9N1-10
9N1-12
9N1-14
29 29
TSH
8LS1-8
W
FS
FS FS
FS
FS
FS
FS
FS EXISTING FIRE
SPRINKLER, TYP.
HD
HD
HD
HD
J
HD
35 9N1-11
9N1-9
8LS1-18
9N1-13
BUILDING 1 - MACHINE ROOM: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
AREA OF WORK
EP111
BUILDING 1 - MACHINE ROOM:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
0 1' 2' 4'
Scale: 1/2" = 1'-0"
1. ELEVATOR CONNECTION/COMMUNICATION TO GENERATOR SYSTEM IS VIA
EXISTING FIBER-OPTIC CABLES. FIBER OPTIC CABLES SHALL BE EXTENDED AS
REQUIRED TO THE RELOCATED LOCATION OF THE ELEVATOR NETWORK SWITCH.
REFERENCE KEY NOTE 16 ON THIS SHEET FOR ADDITIONAL INFORMATION.
2. SURVEILLANCE CAMERAS SHALL BE CONNECTED TO RELOCATED SURVEILLANCE
ETHERNET NETWORK SWITCH. REFERENCE KEY NOTE 16 FOR ADDITIONAL
INFORMATION.
3. ALL FIRE ALARM DEVICES SHALL BE CONNECTED TO EXISTING FIRE ALARM ZONE.
COORDINATE WITH FIRE ALARM CONTRACTOR AND AHJ FOR ALL FIRE ALARM
SYSTEM REQUIREMENTS.
4. CONDUIT IS DIAGRAMMATICAL AND SHOWN FOR COORDINATION PURPOSES ONLY.
REFERENCE ONE-LINE DIAGRAM ON SHEET E-602 AND BUILDING 1 EQUIPMENT
SCHEDULE ON SHEET E-604 FOR ADDITIONAL CONDUIT AND WIRE INFORMATION.
N
PASSENGER ELEVATOR CAB "P1"
ISOLATION TRANSFORMER AND
CONTROL UNIT.
PASSENGER ELEVATOR CAB "P2"
ISOLATION TRANSFORMER AND
CONTROL UNIT.
SERVICE ELEVATOR "S3" ISOLATION
TRANSFORMER AND CONTROL UNIT.
PASSENGER ELEVATOR "P1" DRIVING
UNIT.
PASSENGER ELEVATOR "P2" DRIVING
UNIT.
SERVICE ELEVATOR "S3" DRIVING UNIT.
AIR HANDLING UNIT "AHU-1000".
(LOCATED ON ROOF).
CONDENSING UNIT "CU-1000".
SUPPLY FAN "SF-1".
ELECTRICAL WALL HEATER "EH-1".
ELEVATOR CONTROL SWITCH "ECS-P1".
ELEVATOR CONTROL SWITCH "ECS-P2".
ELEVATOR CONTROL SWITCH "ECS-S3".
RELOCATED MOTOROLA RADIO
EQUIPMENT (2 MOTOROLA UNITS
STACKED), RADIO REPEATERS, SAT
PHONE, AND ADVANCED ELECTRICAL
METERING SYSTEM. PROVIDE UNISTRUT
RACK WITH STAINLESS-STEEL
FASTENING HARDWARE TO MOUNT
EQUIPMENT.
RELOCATED MOTOROLA RADIO
EQUIPMENT (1 RADIO) AND (1) NEW
1500VA UPS TO POWER ALL RACK
MOUNTED EQUIPMENT NOTED IN KEY
NOTE 14 AND 15. PROVIDE UNISTRUT
RACK WITH STAINLESS STEEL
FASTENING HARDWARE TO MOUNT
EQUIPMENT.
RELOCATED ELEVATOR NETWORK
SWITCH AND RELATED EQUIPMENT.
REFERENCE DETAIL "3" ON DRAWING
ED111 FOR ADDITIONAL INFORMATION
REGARDING ALL RELOCATED
EQUIPMENT. EXTEND AND REROUTE
ALL EXISTING CONDUIT AND
WIRING/CABLING AS REQUIRED.
RELOCATED UPS SHALL PLUG INTO
NEW RECEPTACLE AS SHOWN AND
SHALL PROVIDE POWER TO ALL
EQUIPMENT ON RELOCATED RACK.
PROVIDE UNISTRUT RACK WITH
STAINLESS STEEL FASTENING
HARDWARE TO MOUNT DATA RACK AS
REQUIRED.
EXISTING FEEDER RACEWAYS FOR
ELEVATORS "P1" AND "P2" AND PULL
BOX. EXTEND EXISTING RACEWAYS AS
SHOWN.
EXISTING FEEDER RACEWAY FOR
ELEVATOR "S3". EXTEND EXISTING
RACEWAY TO PULL BOX "PB-S3" AS
REQUIRED.
UNISTRUT RACK, STAINLESS-STEEL.
PROVIDE STAINLESS-STEEL FASTENING
HARDWARE.
EXISTING ANTENNA CABLE.
PULL BOX "PB-S3", NEMA 1, EPOXY
COATED, 36"H X 36"W X 12"D MINIMUM.
PROVIDE WITH LOCKABLE HASP.
EXISTING STORAGE CABINET.
HEAT DETECTOR. LOCATE WITHIN 24"
OF SPRINKLER HEAD.
EXTEND AND ROUTE ALL EXISTING
CONDUIT, WIRING, CABLING,
CONNECTIONS, ETC AS REQUIRED. ALL
EQUIPMENT CONNECTIONS SHALL BE
REROUTED TO AVOID ELEVATOR
MACHINE ROOM.
ELEVATOR CAB DISCONNECT SWITCH.
COORDINATE FINAL INSTALLATION
LOCATION WITH EQUIPMENT VENDOR
AND VA. PROVIDE WITH LOCKOUT
TAGOUT MEANS.
DUCT SMOKE DETECTOR. COORDINATE
WITH MECHANICAL DOCUMENTS FOR
EXACT LOCATION AND CONNECTION
REQUIREMENTS.
DATA PORTS SHALL CONNECT TO
ELEVATOR NETWORK SWITCH; SEE
KEYNOTE 16 ON THIS SHEET.
SUPPLY FAN "SF-1" VFD WITH INTEGRAL
CIRCUIT BREAKER DISCONNECT.
COORDINATE WITH FIRE ALARM
SYSTEM AND MECHANICAL DOCUMENTS
FOR ALL ADDITIONAL REQUIREMENTS.
SNOW-MELT MAT. SEE ARCHITECTURAL
SHEET A-121 FOR ADDITIONAL
INFORMATION.
SNOW-MELT CONTROLLER "SM-CTRL".
PROVIDE 12"W X 12"H X 4"D (MINIMUM
DIMENSIONS) NEMA 1 ENCLOSURE TO
HOUSE THE FOLLOWING COMPONENTS:
TERMINAL BLOCKS, 6-POLE 30-AMP
CONTACTOR, HAND/OFF/AUTO
SELECTOR SWITCH, ON INDICATION
LIGHT (PUSH-TO-TEST). ALL
COMPONENT QUANTITIES SHALL BE
PROVIDED AS REQUIRED. SNOW MELT
CONTROLLER SHALL PROVIDE POWER
AND CONTROL TO ALL SNOW-MELT
RECEPTACLES. WHILE IN HAND: ALL
SNOW-MELT RECEPTACLES RECEIVE
POWER. WHEN IN AUTO: SNOW-MELT
RECEPTACLES SHALL RECEIVE POWER
WHEN THE LOW TEMPERATURE SWITCH
"TSL" SETPOINT IS REACHED.
LOW TEMPERATURE SWITCH "TSL".
PROVIDE PECO #TF115-023, OR EQUAL.
ELEVATOR COMMUNICATION CONDUITS.
PROVIDE (1) 1" C. W/(1) CAT 6A CABLE
AND (1) 12 AWG GND FROM EACH
ELEVATOR CONTROLLER TO THE
ELEVATOR SWITCH AS SHOWN
PROVIDE (6) JUNCTION BOXES
(MINIMUM) AND REQUIRED CONDUIT
AND WIRING FOR ELEVATOR AND FIRE
ALARM SYSTEM INTERFACING.
JUNCTION BOXES SHALL PROVIDE
INTERFACING RECALLS AND
APPURTENANCES REQUIRED TO
PERFORM ALL REQUIRED FUNCTIONS
INCLUDING, BUT NOT LIMITED TO, THE
FOLLOWING: PRIMARY, ALTERNATE,
MACHINE ROOM, HOIST WAY, CAR
VISUAL, AND SHUNT TRIP. COORDINATE
WITH ELEVATOR MANUFACTURER,
INSTALLER, AND AHJ FOR A COMPLETE
AND FULLY FUNCTIONAL SYSTEM AS
REQUIRED.
CAMERAS SHALL BE CONNECTED TO
RELOCATED NETWORK SWITCH IN
ROOM A800D. PROVIDE CONDUIT AND
CABLING AS REQUIRED.
CARD READER WITH KEYPAD. PROVIDE
REQUIRED CONNECTIONS FROM UNIT
TO CORRESPONDING PACS CARD
READER COMMUNICATION CABINET
LOCATED IN ROOM A800D.
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
001A
S0-C1
BC1-27
P4
2 2 2
AREA OF WORK
001A
BC1-27
002 P4
AREA OF
WORK
WAP
LSL-12
HD
S
LSL-22
M
WP 4
EP112
ELV
HP-1
W
L2a
LSL-10
WP
LSL-10
LSL-16
a
L2a
LSL-10
HD
AREA
OF
WORK
EXISTING PAGING
SYSTEM BACKBOARD
EXISTING TELEPHONE
DATA BACKBOARD
FAT
FTT
FA
C P
12 11 10
CRAWLSPACE 023
M
KEY NOTES
ELEVATOR CONTROL SWITCH "ECS-P4".
ELEVATOR 120V CAB DISCONNECT SWITCH.
PROVIDE MEANS FOR LOCKOUT TAG OUT.
ELEVATOR CONTROL UNIT.
SUMP PUMP "SP-1".
AIR CONDITIONER "AC-1". POWERED FROM HP-1;
PROVIDE CONDUIT AND WIRE AS REQUIRED PER
MANUFACTURER REQUIREMENTS.
PROVIDE (1) 6-PAIR TELEPHONE CABLE THROUGH
EXISTING CONDUIT; EXTEND TO EXISTING
TELEPHONE BACKBOARD CONNECTION AS
REQUIRED.
ELEVATOR MAINTENANCE DATA PORT. PROVIDE
CONNECTION TO ELEVATOR NETWORK SWITCH
LOCATED IN ROOM 024.
REVISED PANELBOARD "LSL".
EXISTING PANELBOARD "LL".
EXISTING PANELBOARD "PL".
REVISED PANELBOARD "DP".
SUMP PUMP CONTROLLER. PROVIDE (1) 3/4" C.
WITH (1) CAT 6A CABLE AND 12 AWG GND
EXTENDING TO ROOM 024 BUILDING AUTOMATION
SYSTEM (BAS). REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
SURVEILLANCE CAMERA. PROVIDE REQUIRED
CONNECTIONS TO CORRESPONDING ETHERNET
SWITCH LOCATED IN ROOM 024.
CARD READER WITH KEYPAD. PROVIDE REQUIRED
CONNECTIONS FROM UNIT TO CORRESPONDING
PACS CARD READER COMMUNICATION CABINET
LOCATED IN ROOM 024.
RECEPTACLE POWERED FROM SUMP PUMP
CONTROLLER. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE METERING BRIDGE WITH ALL REQUIRED
LABELING, CONNECTIONS, AND APPURTENANCES
FOR A FULLY FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS. METER
HARDWARE SHALL MATCH VA FACILITY STANDARD:
CENTRICA HARDWARE (CT'S/BRIDGES) AND POWER
RADAR SOFTWARE, REFERENCE SPECIFICATION 25
10 10 FOR ADDITIONAL INFORMATION. UTILIZE
LOCAL RECEPTACLE TO POWER METERING
BRIDGE. COORDINATE WITH VA AS REQUIRED FOR
FINAL LOCATION.
RELOCATE EXISTING HEAT DETECTOR TO BE
WITHIN 24" OF THE SPRINKLER HEAD.
PACS CARD READER COMMUNICATION CABINET;
SIZED FOR (4) CARD READERS. UTILIZE LOCAL
EMERGENCY OR UPS POWERED RECEPTACLE FOR
POWER; EXTEND POWER CONDUIT AND WIRE AS
REQUIRED. EXISTING ACCESS CONTROL CARD
READER CONDUIT AND WIRING SHALL BE
EXTENDED TO NEW CABINET AS REQUIRED.
PROVIDE CURRENT SENSORS IN PANELBOARD
WITH ALL REQUIRED LABELING, CONNECTIONS,
AND APPURTENANCES FOR A FULLY FUNCTIONAL
SYSTEM. INSTALL PER MANUFACTURER
RECOMMENDATIONS. SEE PANEL SCHEDULES AND
ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION. HARDWARE SHALL MATCH VA
FACILITY STANDARD: CENTRICA HARDWARE
(CT'S/BRIDGES) AND POWER RADAR SOFTWARE,
REFERENCE SPECIFICATION 25 10 10 FOR
ADDITIONAL INFORMATION.
HEAT DETECTOR SHALL BE INSTALLED WITHIN 24"
OF EXISTING SPRINKLER HEAD.
EP112
BUILDING 27 - BASEMENT FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
(DEDUCTIVE BID ALTERNATE) 27
KEY PLAN
BUILDING 27 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/4" = 1'-0"
ENLARGED ELEVATOR, MACHINE ROOM AND LOBBY PLAN
Scale: 1/2" = 1'-0"
ENLARGED RM 023 PLAN
Scale: 1/2" = 1'-0"
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY DEVICE
LOCATIONS WITH ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO INSTALLATION.
2. ELEVATOR PIT: LIGHTING AND RECEPTACLES
SHALL MEET NEC.
3. PACS CARD READER COMMUNICATION
CABINET CONNECTS TO THE ENGINEERING
SWITCH. CURRENTLY, THE ENGINEERING
SWITCH IS LOCATED IN ROOM 023. HOWEVER,
THERE IS A CONCURRENT PROJECT WHICH IS
RELOCATING ALL DATA/IT TO ROOM 024.
4. WHERE ADDITIONAL 0-5A CTs ARE REQUIRED
FOR ELECTRICAL POWER METERING
PURPOSES, CONTRACTOR SHALL PROVIDE ALL
REQUIRED CABELING, JUNCTION
BOXES/ENCLOSURES, AND APPURTENANCES
AS REQUIRED FOR A COMPLETE AND
FUNCTIONAL SYSTEM.
DEDUCTIVE BID ALTERNATE
0 1' 2' 4'
Scale: 1/2" = 1'-0"
0 1' 2' 4'
0 2' 4' 8'
Scale: 1/2" = 1'-0"
Scale: 1/4" = 1'-0"
N
N N
AREA OF
WORK
L2 GROUND LEVEL
20A WEATHERPROOF GFCI
RECEPTACLE POWERED
FROM SUMP PUMP
CONTROLLER.
WEATHERPROOF
LIGHT SWITCH
(SEE NOTE 2)
20A WEATHERPROOF GFCI
RECEPTACLE (SEE NOTE 2).
SEE NOTE 2 DETAIL NOTES
1. DETAIL IS INCLUDED TO SHOW GENERAL ELECTRICAL
REQUIREMENTS. COORDINATE EXACT DIMENSIONAL,
LAYOUT, AND PLUMBING EQUIPMENT REQUIREMENTS WITH
PLUMBING AND ARCHITECTURAL DRAWINGS AS REQUIRED.
2. ALL EXISTING LUMINARIES, LIGHT SWITCHES, AND
RECEPTACLES SHALL BE REPLACED AS NOTED IN THIS
DETAIL. EXISTING CONDUCTORS AND RACEWAYS SHALL BE
REUSED FOR REPLACEMENT EQUIPMENT. CONTRACTOR
SHALL FIELD VERIFY EXACT EQUIPMENT LOCATIONS.
SCALE: NTS
ELEVATOR "P4" PIT WITH SUMP PUMP SECTION4
SP-1
" M
IN
FS
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
L2
P4182
S1-C1
1C3-27183
AREA OF WORK
S
WAP
ELV
SHEET NOTES
AREA OF
WORK
BUILDING 27 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN (DEDUCTIVE BID ALTERNATE) Scale: 3/4" = 1'-0"
KEY PLAN
EP113
BUILDING 27 - FIRST FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
(DEDUCTIVE BID ALTERNATE) 27
KEY PLAN
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
DEDUCTIVE BID ALTERNATE
0 1' 2' 3'
Scale: 3/4" = 1'-0"
KEY NOTES
ELEVATOR CAB SURVEILLANCE
CAMERA; CAMERA MUST BE ABLE TO
BE MONITORED VIA SSTV. COORDINATE
FINAL INSTALLED LOCATION AND
CABLING REQUIREMENTS WITH VA AND
ELEVATOR CONTRACTOR.
NN
RM 024
(BASEMENT)
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 133 OF 143
P4
2C1-27
AREA OF WORK
S
S
WAP
3 3
HP-1
LSL-27,29
LSL-27,29
LSL-8
ELV
L2
LSL-8
LSL-13
KEY NOTES
HEAT PUMP "HP-1".
ELEVATOR LOBBY SURVEILLANCE CAMERA.
PROVIDE REQUIRED CONNECTIONS FROM
CAMERA TO ETHERNET SWITCH LOCATED IN
ROOM A203. REFERENCE KEYPLAN FOR
LOCATION OF ROOM HOUSING EQUIPMENT
TO BE UTILIZED.
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY
DEVICE LOCATIONS WITH ARCHITECT
AND ELEVATOR MANUFACTURER PRIOR
TO INSTALLATION.
AREA OF
WORK
BUILDING 27 - SECOND FLOOR: POWER, LIGHTING, AND SYSTEMS PLAN (DEDUCTIVE BID ALTERNATE) Scale: 3/4" = 1'-0"
EP114
BUILDING 27 - SECOND FLOOR: POWER,
LIGHTING, AND SPECIAL SYSTEMS PLAN
(DEDUCTIVE BID ALTERNATE) 27
KEY PLAN
DEDUCTIVE BID ALTERNATE
0 1' 2' 3'
Scale: 3/4" = 1'-0"
NN
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
RM A203
ROOF ACCESS
EQUIPMENT
FOR S3
EQUIPMENT
FOR P1
EQUIPMENT
FOR P2
EQUIPMENT
ARRAY FOR P2
EQUIPMENT
ARRAY FOR S3
EQUIPMENT
ARRAY FOR P1
A1000
A1001
DOWN
AREA OF WORK
L1E
L1Eb
L1bL1Eb
L1bL1E
8LS1-5
8LS1-5
8LS1-5
8LS1-58LS1-5
8LS1-5
X
X
X
L1E
8LS1-5
L1
8LS1-5
L1b
8LS1-5
L1b
8LS1-5
L1b
8LS1-5
L3Ea
8LS1-5
a
L1Eb
8LS1-5
L1Eb
8LS1-5
L1c
8LS1-5
1TYP
c b
KEY NOTES
BUILDING 1 - MACHINE ROOM: LIGHTING PLAN
Scale: 1/2" = 1'-0"
AREA OF WORK
EL111
BUILDING 1 - MACHINE ROOM:
LIGHTING PLAN
ALL NON-SWITCHED LUMINAIRES SHALL BE
CIRCUITED FOR CONTINUOUS 24-HOUR
OPERATION.
KEY PLAN
SHEET NOTES
1. COORDINATE LIGHTING INSTALLATION WITH
ALL EQUIPMENT, DEVICES AND ELECTRICAL
RACEWAYS AS REQUIRED.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 135 OF 143
0" 2'
-0
1'-0" 1'-6"
GRADE
EXISTING
SUMP PIT
EXISTING
CONCRETE
WALL
L2
20A WEATHERPROOF GFCI
RECEPTACLE POWERED FROM
SUMP PUMP CONTROLLER.
20A WEATHERPROOF
GFCI RECEPTACLE
(SEE NOTE 2).
SEE
NOTE 2
SP-1
24"
SCALE: NTS
SCALE: NTSSCALE: NTS
STEEL BEAM
CADWELD CONNECTION TYPE
QW (OR TYPE VN TO WEB OF
LARGE BEAM)
STEEL COLUMN
CADWELD CONNECTION TYPE VV
TO GROUND
EXOTHERMIC WELD
CONNECTION
NO. GBIT14412M-22T OR APPROVED EQUAL, 1/4" x 4" x
12" SOLID COPPER GROUND BAR WITH INSULATORS
AND BRACKETS, AND WITH TWO 25'-0" NO. 2T, #2 AWG
TIN COATED COPPER GROUND CONDUCTORS
#2AWG SOLID
TINNED CU X
25FT LO
NG
ITEM
CONCRETE ENCASED REBAR (UFER)
GROUND RODS (IF WITHOUT GROUND RING)
GROUND RING (WITH OR WITHOUT GROUND RODS AS NOTED)
SIZE
METAL WATER PIPES
OTHER CONNECTIONS AS NOTED ON PLANS
STRUCTURAL STEEL
SPECIAL SYSTEMS GROUNDING BUS BARS
POWER CABLE TRAY, SPECIAL SYSTEMS CABLE TRAY
#3/0
#6
#2
#3/0 #6
#3/0
#2
GAS PIPES
GROUNDING ELECTRODE AND BONDING CONDUCTOR SIZING SCHEDULE
* BY EQUIPMENT MANUFACTURER, PER NEC 250.66
GROUNDING ELECTRODE CONDUCTOR #3/0
ANTENNA MAST TELECOM RACK ENCLOSURES #2
#3/0
MAIN BONDING JUMPER
INTERSYSTEM BONDING BUS BAR
#6 #3/0
#6
1. MAKE CONNECTION TO ALL AVAILABLE ELECTRODES. NOT ALL MAY BE PRESENT.
2. ALL GROUNDING AND BONDING TO BE IN ACCORDANCE WITH THE CURRENT VERSION
OF THE NEC THAT HAS BEEN ACCEPTED FOR USE IN EACH JURISDICTION AND AS
AMENDED BY LOCAL AUTHORITY HAVING JURISDICTION.
3. GROUND RODS TO BE INSTALLED OUTSIDE OF BUILDING ROOF'S DRIP LINE.
DETAIL NOTES
ITEM SIZE
UFER
GROUND
METAL
WATER
PIPES
OTHER
CONNECTIONS
AS NOTED
ON THE
PLANS
STRUCTURAL
STEEL
SPECIAL
SYSTEMS
GROUNDING
BUS
BARS
TELECOM
RACK
SPECIAL
SYSTEMS
CABLE
TRAY
SIZE PER TABLE
BELOW, TYPICAL
BOND AT
LOCATIONS
REQUIRED TO
MAINTAIN
CONTINUITY
GAS
PIPES
GROUND RODS
MINIMUM 6'-0"
OR 20'-0"
SPACING
WHERE
GROUND RING
PROVIDED
GROUND RING
CONDUCTOR WHERE
PROVIDED
NEUTRAL BUSGROUND BUS
MAIN BONDING
JUMPER
POWER
CABLE
TRAY
ANTENNA
MAST
AS SHORT AND
STRAIGHT AS
POSSIBLE
SERVICE EQUIPMENT
GROUNDING ELECTRODE
CONDUCTOR
SERVICE
GROUND BUS
BAR -
CONDUIT CLAMP AND
HANGER - 3' MAX.
FROM BOX TO HANGER
& 8' MAX. SPACING
BETWEEN HANGERS
(TYP.)
STEEL OUTLET BOX - SIZED PER N.E.C. AND
SUPPORTED RIGIDLY FROM STRUCTURE (TYP.).
COVER SHALL BE MARKED WITH CIRCUIT
IDENTIFICATION
CONDUIT (TYP.)
6' MAX. LENGTH
FLEX CONDUIT
W/ (3)#12
CONDUCTORS
INTO FIXTURE
(TYP.)
TYPICAL 2' x
4' LAY-IN
RECESSED
LIGHT
FIXTURE
(TYP.)
SECURE
FIXTURES
TO GRID
WITH CLIPS
PER N.E.C.
(TYP.)
T-BAR LAY-IN
CEILING
SUSPENSION
SYSTEM (TYP.)
PROVIDE
SUPPORT
WIRES TO
STRUCTURE
FOR FIXTURE
SUPPORT, TWO
PER FIXTURE
(TYP.) SEE
SPEC SECTION
265100.
1. DO NOT SUPPORT CONDUIT OR BOX FROM CEILING GRID HANGERS.
DETAIL NOTES JOIST (TYP.)
SCALE: NTS
GENERAL NOTES:
1. MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL
SIDES OF ROOF PENETRATION FROM WALLS, CURBS, AND
OTHER PROJECTIONS TO FACILITATE PROPER FLASHING.
2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR
OVERLAPPED.
3. VERIFY ROOF & STRUCTURAL SYSTEM WITH ARCHITECT.
4. COORDINATE FLASHING INSTALLATION WITH ROOFING
CONTRACTOR TO ENSURE PROPER METHODS & MATERIALS
ARE USED TO MAINTAIN ROOF WARRANTY.
PREFABRICATED RUBBER BOOT
CAP WITH GRADUATED STEPS &
WEATHER-PROOF PRESSURE
SEAL TO COLLAR
SEALANT AT PENETRATION TO
MEMBRANE JUNCTURE BY
ROOFING CONTRACTOR
MULTIPLE MEMBRANE STRIPPING PLIES
FEATHERED AT FIELD OF ROOF BY ROOFING
CONTRACTOR. PRIME FLANGE BEFORE STRIPPING.
PREFABRICATED FORMED 1.52mm (0.06")
THICK ALUMINUM FLASHING ROUND
COLLAR WITH MIN. 76mm (3") WIDE
FLANGE. ATTACH TO ROOF PER
MANUFACTURER'S INSTRUCTIONS
CONDUIT CLAMP. SIZE AS
REQUIRED
BATT INSULATION
ROOF MEMBRANE
WATER CUT-OFF MASTIC
COMPATIBLE WITH ROOF
MEMBRANE
STAINLESS CLAMP, TYP.
9.52mm (3/8") MIN
GALVANIZED THREADED ROD,
TYP.
SEAL-OFF FITTING, TYP.
ROOF
STEEL EXPANSION ANCHOR
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
CONDUIT, TYP.
CONDUIT CLAMP. SIZE AS
REQUIRED
LOCKING SQUARE WASHER &
LOCKNUT
SCALE: 1/2" = 1'-0"
DETAIL NOTES
1. DETAIL IS INCLUDED TO SHOW GENERAL ELECTRICAL
REQUIREMENTS. COORDINATE EXACT DIMENSIONAL,
LAYOUT, AND PLUMBING EQUIPMENT REQUIREMENTS
WITH PLUMBING AND ARCHITECTURAL DRAWINGS AS
REQUIRED.
2. ALL EXISTING LUMINARIES, LIGHT SWITCHES, AND
RECEPTACLES SHALL BE REPLACED AS NOTED IN THIS
DETAIL. EXISTING CONDUCTORS AND RACEWAYS SHALL
BE REUSED FOR REPLACEMENT EQUIPMENT. CONTRACTOR
SHALL FIELD VERIFY EXACT EQUIPMENT LOCATIONS.
E-501
ELECTRICAL DETAILS
FACP
SUPPLY FAN ''SF-1''
(SMOKE CONTROL)
HOISTWAY ELEVATOR
RECALL
SHUNT TRIP
ELEVATOR RECALL
PRIMARY
ELEVATOR RECALL
ALTERNATE
ELEVATOR RECALL
CAR VISUAL RECALL
SIGNAL (HAT)
FA
A REMOTE
ANNUNICATOR
J
JUNCTION BOX FOR 120V
POWER TO SPRINKLER BELL.
SEE PLANS FOR LOCATION IF
REQUIRED.
NOTIFICATION
CIRCUIT
BELL-CKT
NOTIFICATION
CIRCUIT
AUXILIARY POWER
SUPPLY (NAC)
120 VAC
FAN SHUT DOWN
CONTROL
SMOKE, HEAT,
DUCT DETS
PULL STATIONS
DH
DH
120 VAC
MAGNETIC DOOR
HOLDERS
(TYP.)
#12 (TYP.)
F/S
F/S
120 VAC
FIRE/SMOKE
DAMPERS (TYP)
#12 (TYP.)
BATTERIES
120 VAC
TO PHONE
DEMARC BOARD
3/4" C 4-PAIR
TELEPHONE CABLE.
DACT (AUTO DIALER)
NUMBER OF CONDUCTORS
AS REQUIRED FOR
APPLICABLE ZONES
ALARM
CIRCUIT
TAMPER, FLOW SENSORS
SCALE: NTS
1. FIRE ALARM SYSTEM AS SHOWN IS SCHEMATIC ONLY AND DOES NOT INDICATE ALL DEVICES, EQUIPMENT, WIRING. PROVIDE COMPLETE SYSTEM WITH ALL REQUIRED DEVICES AND EQUIPMENT AND SUBMIT ENGINEERED DRAWINGS TO AHJ FOR REVIEW AND APPROVAL.
DETAIL NOTES
LF LF
(TYP.) (TYP.) (TYP.) (TYP.)
LF LF
(TYP.) (TYP.) (TYP.) (TYP.)
LF LF
(TYP.) (TYP.) (TYP.)
(TYP.)
TS
HD FS
TYPICAL RECESSED LIGHTING INSTALLATION3
GROUNDING ELECTRODE AND BONDING SYSTEM1
TYPICAL GROUND BUS BAR FOR
INTERSYSTEM AND SERVICE GROUNDING2
ELEVATOR "S3" PIT WITH SUMP PUMP SECTION7
EP110
TYPICAL FIRE ALARM RISER DIAGRAM6
CONDUIT ROOF PENETRATION DETAIL5
BUILDING STEEL GROUND4
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
MECHANICAL ROOM
ELEVATOR RECALL
File details come from the government source that posted it. Updated .