Attachment 9 668-18-109_Project Drawings 5 of 6.pdf

PDF 15 MB Posted

Attached to
Y1DA--CON-NRM 668-18-109 Refurbish and Upgrade Elevators in Bldg 1 and 27
Solicitation number
36C26024R0009
Issued by

About this file

This file attachment is related to a federal contract opportunity to refurbish and upgrade elevators in two buildings at a Veterans Affairs medical center. The solicitation number is 36C26024R0009 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for elevator modernization work at Building 1 and 27. The opportunity type is a solicitation. The attachment appears to include project drawings but the content is not listed. No other details on products, services, pricing, responses dates, or awards are provided in this related file.

View the file

Other files

File Type Posted
Wage Determination 1.19.24.pdf PDF
36C26024R0009 0006.pdf PDF
36C26024R0009 0005.pdf PDF
Wage Determination 1.5.24.pdf PDF
Wage Determination 12.22.23.pdf PDF
36C26024R0009 0004.pdf PDF
36C26024R0009 0003.pdf PDF
36C26024R0009 0002.pdf PDF
36C26024R0009 0001.pdf PDF
WD 11.24.23.pdf PDF
668-18-109_Pre Bid Site Walk Sign In Sheet_2023.12.03.pdf PDF
Attachment 17 Security Requirements.pdf PDF
Attachment 18 Contractor Rules of Behavior.pdf PDF
Attachment 4 668-18-109_Supplement to SPEC 01 00 00 Part 1-6-I.pdf PDF
Attachment 10 668-18-109_Project Drawings 6 of 6.pdf PDF
Attachment 15 Wage Determination 11.17.23.pdf PDF
Attachment 2 668-18-109_Project Specifications 1 of 2_R1.pdf PDF
Attachment 5 668-18-109_Project Drawings 1 of 6.pdf PDF
Attachment 13 668-18-109_Lead Sampling Report.pdf PDF
Attachment 6 668-18-109_Project Drawings 2 of 6.pdf PDF
Attachment 19 Calculation of Self Performed Work REV 1.pdf PDF
36C26024R0009.pdf PDF
Attachment 7 668-18-109_Project Drawings 3 of 6.pdf PDF
Attachment 12 668-18-109_Limited Asbestos Good Faith Survey - Addendum 1.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 3 668-18-109_Project Specifications 2 of 2_R1.pdf PDF
Attachment 1 668-18-109_SOW-CON_2023-08-15.pdf PDF
Attachment 8 668-18-109_Project Drawings 4 of 6.pdf PDF
Attachment 11 668-18-109_Limited Asbestos Good Faith Survey.pdf PDF
Attachment 14 668-18-109_DWG Clarification Document_2023-06-22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A529

A503

A502

A501A500B

C5-A2

A527

S3 P1

P2AREA OF WORK

S

ELV

ELV

AREA OF

WORK

BUILDING 1 - FIFTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP106

BUILDING 1 - FIFTH FLOOR: POWER

AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY

DEVICE LOCATIONS WITH ARCHITECT AND

ELEVATOR MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE CAMERA.

PROVIDE REQUIRED CONNECTIONS FROM

CAMERA TO ETHERNET SWITCH LOCATED

IN ROOM A502.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB 126 OF 143

A600

A633

A637

A604S3 P1

P2

A635

A603

AREAS OF WORK

S

ELV

ELV

KEY NOTES

BUILDING 1 - SIXTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

AREAS OF WORK

EP107

BUILDING 1 - SIXTH FLOOR: POWER

AND SPECIAL SYSTEMS PLAN

EXISTING TELECOM BACKBOARD.

EXISTING DATA RACK.

RELOCATED DIRECT TV EQUIPMENT

AND RACK FROM ELEVATOR MACHINE

ROOM. EXTEND DATA CABLING AND

COAXIAL CABLE AS REQUIRED. OBTAIN

POWER FROM EXISTING ADJACENT

1.5KVA UPS. SEE KEYNOTE "4" ON THIS

SHEET. PROVIDE CORD AND PLUG

SETS AS REQUIRED.

EXISTING UPS TO POWER RELOCATED

DIRECT TV EQUIPMENT. REFERENCE

KEY NOTE "3" ON THIS SHEET AND

SHEET ED111 FOR ADDITIONAL

INFORMATION.

EXISTING NURSE CALL EQUIPMENT.

ELEVATOR LOBBY SURVEILLANCE

CAMERA. PROVIDE REQUIRED

CONNECTIONS FROM CAMERA TO

ETHERNET SWITCH LOCATED IN ROOM

A603.

FAN COIL "FC-1", CEILING MOUNTED.

NEW UNIT POWER REQUIREMENTS (1/8

HP) IS LESS THAN EXISTING UNIT (1/6

HP); UTILIZE EXISTING CIRCUIT

(FEEDER BREAKER, CONDUIT AND

WIRE) FROM PREVIOUS HVAC UNIT;

PROVIDE LOCAL DISCONNECT AS

REQUIRED. REFERENCE DRAWING

ED107 AND MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY

DEVICE LOCATIONS WITH ARCHITECT

AND ELEVATOR MANUFACTURER

PRIOR TO INSTALLATION.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 127 OF 143

A729

S3 P1

P2

S S

AREA OF WORK

ELV

ELV

AREA OF

WORKBUILDING 1 - SEVENTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP108

BUILDING 1 - SEVENTH FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY DEVICE

LOCATIONS WITH ARCHITECT AND

ELEVATOR MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE CAMERA.

PROVIDE REQUIRED CONNECTIONS FROM

CAMERA TO ETHERNET SWITCH LOCATED IN

ROOM A703. REFERENCE KEY PLAN FOR

ROOM HOUSING EQUIPMENT TO BE UTILIZED.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

ROOM A703

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 128 OF 143

A800D

A800

A800AA800C

S3 P1

P2

S

WAP

S

ELV

ELV

AREA OF

WORKBUILDING 1 - EIGHTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP109

BUILDING 1 - EIGHTH FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE

CAMERA. PROVIDE REQUIRED

CONNECTIONS FROM CAMERA TO

ETHERNET SWITCH LOCATED IN ROOM

A800D.

REVISED PANEL "8LS1".

EXISTING SURVEILLANCE NETWORK

SWITCH AND ASSOCIATED PATCH

PANEL PREVIOUSLY LOCATED IN

BUILDING 1 ELEVATOR MACHINE ROOM

SHALL BE RELOCATED HERE (ROOM

A800D); PROVIDE NEW CABLING,

POWER CONNECTION, MOUNTING, AND

APPURTENANCES AS REQUIRED.

PACS CARD READER COMMUNICATION

CABINET; SIZED FOR (4) CARD

READERS. UTILIZE LOCAL EMERGENCY

OR UPS POWERED RECEPTACLE FOR

POWER; EXTEND POWER CONDUIT AND

WIRE AS REQUIRED. EXISTING ACCESS

CONTROL CARD READER CONDUIT AND

WIRING SHALL BE EXTENDED TO NEW

CABINET AS REQUIRED.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

A900

S3 P1

P2

AREA OF WORK

L2 L2

L2

9EQ4-36

9EQ4-36

9EQ4-36

TYP

9EQ4-36

9EQ4-36

9EQ4-36

L1E

8LS1-5

9 9

MM

BUILDING 1 - NINTH FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP110

BUILDING 1 - NINTH FLOOR: POWER,

LIGHTING, AND SPECIAL SYSTEMS

PLAN 1

REVISED PANELBOARD "9EQ4". REFERENCE

ONE-LINE DIAGRAM ON SHEET E-602 FOR

ADDITIONAL INFORMATION.

LUMINAIRE TO BE LOCATED ADJACENT TO

ELEVATOR SHAFT OPENING.

REVISED PANELBOARD "9N1". REFERENCE

LOAD SCHEDULES FOR ADDITIONAL

INFORMATION.

EXISTING MOTOR CONTROL CENTER

"MCC3".

EXISTING PANELBOARD "9EQ2".

REVISED SWITCHBOARD "9EQ1".

LIGHTING IS CIRCUITED FOR CONTINUOUS

24-HOUR OPERATION.

PROVIDE CURRENT SENSORS IN

PANELBOARD WITH ALL REQUIRED

LABELING, CONNECTIONS, AND

APPURTENANCES FOR A FULLY

FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS. SEE

PANEL SCHEDULES AND ONE-LINE DIAGRAM

FOR ADDITIONAL INFORMATION.

HARDWARE SHALL MATCH VA FACILITY

STANDARD: CENTRICA HARDWARE

(CT'S/BRIDGES) AND POWER RADAR

SOFTWARE, REFERENCE SPECIFICATION 25

10 10 FOR ADDITIONAL INFORMATION.

PROVIDE METERING BRIDGE WITH ALL

REQUIRED LABELING, CONNECTIONS, AND

APPURTENANCES FOR A FULLY

FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS.

METER HARDWARE SHALL MATCH VA

FACILITY STANDARD: CENTRICA HARDWARE

(CT'S/BRIDGES) AND POWER RADAR

SOFTWARE, REFERENCE SPECIFICATION

25 10 10 FOR ADDITIONAL INFORMATION.

UTILIZE LOCAL RECEPTACLE TO POWER

METERING BRIDGE. COORDINATE WITH VA

AS REQUIRED FOR FINAL LOCATION.

KEY PLAN

0 1' 2' 4'

Scale: 1/2" = 1'-0"

N

AREA OF

WORK

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

KEY NOTES

SHEET NOTES

1. WHERE ADDITIONAL 0 - 5A CTs ARE

REQUIRED FOR ELECTRICAL POWER

METERING PURPOSES, CONTRACTOR SHALL

PROVIDE ALL REQUIRED CABELING,

JUNCTION BOXES/ENCLOSURES, AND

APPURTENANCES AS REQUIRED FOR A

COMPLETE AND FUNCTIONAL SYSTEM.

EQUIPMENT

FOR S3

EQUIPMENT

FOR P1

EQUIPMENT

FOR P2

EQUIPMENT

ARRAY FOR P2

EQUIPMENT

ARRAY FOR S3

EQUIPMENT

ARRAY FOR P1

A1000

A1001

STACKED

EQUIPMENTDOWN

AREA OF WORK

W

WP

FS

FS

HD

HD

HD

21 18 13

9EQ4-37,39,41

11 12

9EQ4-31,33,35

9EQ1-2,4,6

9N1-2,4

9N-16

9N-16

8LS1-4

9N-16

9N-16

23 TYP

9EQ4-42

8LS1-15

8LS1-13

8LS1-17

EXISTING CONDUIT (SPARE)

8LS1-16

27 TYP

UNISTRUT

CONDUIT

SUPPORT

SM-1

SM-2

SM-3SM-4

SM-4

SM-4

9N1-6

9N1-6

9N1-8

9N1-10

9N1-12

9N1-14

29 29

TSH

8LS1-8

W

FS

FS FS

FS

FS

FS

FS

FS EXISTING FIRE

SPRINKLER, TYP.

HD

HD

HD

HD

J

HD

35 9N1-11

9N1-9

8LS1-18

9N1-13

BUILDING 1 - MACHINE ROOM: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

AREA OF WORK

EP111

BUILDING 1 - MACHINE ROOM:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

0 1' 2' 4'

Scale: 1/2" = 1'-0"

1. ELEVATOR CONNECTION/COMMUNICATION TO GENERATOR SYSTEM IS VIA

EXISTING FIBER-OPTIC CABLES. FIBER OPTIC CABLES SHALL BE EXTENDED AS

REQUIRED TO THE RELOCATED LOCATION OF THE ELEVATOR NETWORK SWITCH.

REFERENCE KEY NOTE 16 ON THIS SHEET FOR ADDITIONAL INFORMATION.

2. SURVEILLANCE CAMERAS SHALL BE CONNECTED TO RELOCATED SURVEILLANCE

ETHERNET NETWORK SWITCH. REFERENCE KEY NOTE 16 FOR ADDITIONAL

INFORMATION.

3. ALL FIRE ALARM DEVICES SHALL BE CONNECTED TO EXISTING FIRE ALARM ZONE.

COORDINATE WITH FIRE ALARM CONTRACTOR AND AHJ FOR ALL FIRE ALARM

SYSTEM REQUIREMENTS.

4. CONDUIT IS DIAGRAMMATICAL AND SHOWN FOR COORDINATION PURPOSES ONLY.

REFERENCE ONE-LINE DIAGRAM ON SHEET E-602 AND BUILDING 1 EQUIPMENT

SCHEDULE ON SHEET E-604 FOR ADDITIONAL CONDUIT AND WIRE INFORMATION.

N

PASSENGER ELEVATOR CAB "P1"

ISOLATION TRANSFORMER AND

CONTROL UNIT.

PASSENGER ELEVATOR CAB "P2"

ISOLATION TRANSFORMER AND

CONTROL UNIT.

SERVICE ELEVATOR "S3" ISOLATION

TRANSFORMER AND CONTROL UNIT.

PASSENGER ELEVATOR "P1" DRIVING

UNIT.

PASSENGER ELEVATOR "P2" DRIVING

UNIT.

SERVICE ELEVATOR "S3" DRIVING UNIT.

AIR HANDLING UNIT "AHU-1000".

(LOCATED ON ROOF).

CONDENSING UNIT "CU-1000".

SUPPLY FAN "SF-1".

ELECTRICAL WALL HEATER "EH-1".

ELEVATOR CONTROL SWITCH "ECS-P1".

ELEVATOR CONTROL SWITCH "ECS-P2".

ELEVATOR CONTROL SWITCH "ECS-S3".

RELOCATED MOTOROLA RADIO

EQUIPMENT (2 MOTOROLA UNITS

STACKED), RADIO REPEATERS, SAT

PHONE, AND ADVANCED ELECTRICAL

METERING SYSTEM. PROVIDE UNISTRUT

RACK WITH STAINLESS-STEEL

FASTENING HARDWARE TO MOUNT

EQUIPMENT.

RELOCATED MOTOROLA RADIO

EQUIPMENT (1 RADIO) AND (1) NEW

1500VA UPS TO POWER ALL RACK

MOUNTED EQUIPMENT NOTED IN KEY

NOTE 14 AND 15. PROVIDE UNISTRUT

RACK WITH STAINLESS STEEL

FASTENING HARDWARE TO MOUNT

EQUIPMENT.

RELOCATED ELEVATOR NETWORK

SWITCH AND RELATED EQUIPMENT.

REFERENCE DETAIL "3" ON DRAWING

ED111 FOR ADDITIONAL INFORMATION

REGARDING ALL RELOCATED

EQUIPMENT. EXTEND AND REROUTE

ALL EXISTING CONDUIT AND

WIRING/CABLING AS REQUIRED.

RELOCATED UPS SHALL PLUG INTO

NEW RECEPTACLE AS SHOWN AND

SHALL PROVIDE POWER TO ALL

EQUIPMENT ON RELOCATED RACK.

PROVIDE UNISTRUT RACK WITH

STAINLESS STEEL FASTENING

HARDWARE TO MOUNT DATA RACK AS

REQUIRED.

EXISTING FEEDER RACEWAYS FOR

ELEVATORS "P1" AND "P2" AND PULL

BOX. EXTEND EXISTING RACEWAYS AS

SHOWN.

EXISTING FEEDER RACEWAY FOR

ELEVATOR "S3". EXTEND EXISTING

RACEWAY TO PULL BOX "PB-S3" AS

REQUIRED.

UNISTRUT RACK, STAINLESS-STEEL.

PROVIDE STAINLESS-STEEL FASTENING

HARDWARE.

EXISTING ANTENNA CABLE.

PULL BOX "PB-S3", NEMA 1, EPOXY

COATED, 36"H X 36"W X 12"D MINIMUM.

PROVIDE WITH LOCKABLE HASP.

EXISTING STORAGE CABINET.

HEAT DETECTOR. LOCATE WITHIN 24"

OF SPRINKLER HEAD.

EXTEND AND ROUTE ALL EXISTING

CONDUIT, WIRING, CABLING,

CONNECTIONS, ETC AS REQUIRED. ALL

EQUIPMENT CONNECTIONS SHALL BE

REROUTED TO AVOID ELEVATOR

MACHINE ROOM.

ELEVATOR CAB DISCONNECT SWITCH.

COORDINATE FINAL INSTALLATION

LOCATION WITH EQUIPMENT VENDOR

AND VA. PROVIDE WITH LOCKOUT

TAGOUT MEANS.

DUCT SMOKE DETECTOR. COORDINATE

WITH MECHANICAL DOCUMENTS FOR

EXACT LOCATION AND CONNECTION

REQUIREMENTS.

DATA PORTS SHALL CONNECT TO

ELEVATOR NETWORK SWITCH; SEE

KEYNOTE 16 ON THIS SHEET.

SUPPLY FAN "SF-1" VFD WITH INTEGRAL

CIRCUIT BREAKER DISCONNECT.

COORDINATE WITH FIRE ALARM

SYSTEM AND MECHANICAL DOCUMENTS

FOR ALL ADDITIONAL REQUIREMENTS.

SNOW-MELT MAT. SEE ARCHITECTURAL

SHEET A-121 FOR ADDITIONAL

INFORMATION.

SNOW-MELT CONTROLLER "SM-CTRL".

PROVIDE 12"W X 12"H X 4"D (MINIMUM

DIMENSIONS) NEMA 1 ENCLOSURE TO

HOUSE THE FOLLOWING COMPONENTS:

TERMINAL BLOCKS, 6-POLE 30-AMP

CONTACTOR, HAND/OFF/AUTO

SELECTOR SWITCH, ON INDICATION

LIGHT (PUSH-TO-TEST). ALL

COMPONENT QUANTITIES SHALL BE

PROVIDED AS REQUIRED. SNOW MELT

CONTROLLER SHALL PROVIDE POWER

AND CONTROL TO ALL SNOW-MELT

RECEPTACLES. WHILE IN HAND: ALL

SNOW-MELT RECEPTACLES RECEIVE

POWER. WHEN IN AUTO: SNOW-MELT

RECEPTACLES SHALL RECEIVE POWER

WHEN THE LOW TEMPERATURE SWITCH

"TSL" SETPOINT IS REACHED.

LOW TEMPERATURE SWITCH "TSL".

PROVIDE PECO #TF115-023, OR EQUAL.

ELEVATOR COMMUNICATION CONDUITS.

PROVIDE (1) 1" C. W/(1) CAT 6A CABLE

AND (1) 12 AWG GND FROM EACH

ELEVATOR CONTROLLER TO THE

ELEVATOR SWITCH AS SHOWN

PROVIDE (6) JUNCTION BOXES

(MINIMUM) AND REQUIRED CONDUIT

AND WIRING FOR ELEVATOR AND FIRE

ALARM SYSTEM INTERFACING.

JUNCTION BOXES SHALL PROVIDE

INTERFACING RECALLS AND

APPURTENANCES REQUIRED TO

PERFORM ALL REQUIRED FUNCTIONS

INCLUDING, BUT NOT LIMITED TO, THE

FOLLOWING: PRIMARY, ALTERNATE,

MACHINE ROOM, HOIST WAY, CAR

VISUAL, AND SHUNT TRIP. COORDINATE

WITH ELEVATOR MANUFACTURER,

INSTALLER, AND AHJ FOR A COMPLETE

AND FULLY FUNCTIONAL SYSTEM AS

REQUIRED.

CAMERAS SHALL BE CONNECTED TO

RELOCATED NETWORK SWITCH IN

ROOM A800D. PROVIDE CONDUIT AND

CABLING AS REQUIRED.

CARD READER WITH KEYPAD. PROVIDE

REQUIRED CONNECTIONS FROM UNIT

TO CORRESPONDING PACS CARD

READER COMMUNICATION CABINET

LOCATED IN ROOM A800D.

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

001A

S0-C1

BC1-27

P4

2 2 2

AREA OF WORK

001A

BC1-27

002 P4

AREA OF

WORK

WAP

LSL-12

HD

S

LSL-22

M

WP 4

EP112

ELV

HP-1

W

L2a

LSL-10

WP

LSL-10

LSL-16

a

L2a

LSL-10

HD

AREA

OF

WORK

EXISTING PAGING

SYSTEM BACKBOARD

EXISTING TELEPHONE

DATA BACKBOARD

FAT

FTT

FA

C P

12 11 10

CRAWLSPACE 023

M

KEY NOTES

ELEVATOR CONTROL SWITCH "ECS-P4".

ELEVATOR 120V CAB DISCONNECT SWITCH.

PROVIDE MEANS FOR LOCKOUT TAG OUT.

ELEVATOR CONTROL UNIT.

SUMP PUMP "SP-1".

AIR CONDITIONER "AC-1". POWERED FROM HP-1;

PROVIDE CONDUIT AND WIRE AS REQUIRED PER

MANUFACTURER REQUIREMENTS.

PROVIDE (1) 6-PAIR TELEPHONE CABLE THROUGH

EXISTING CONDUIT; EXTEND TO EXISTING

TELEPHONE BACKBOARD CONNECTION AS

REQUIRED.

ELEVATOR MAINTENANCE DATA PORT. PROVIDE

CONNECTION TO ELEVATOR NETWORK SWITCH

LOCATED IN ROOM 024.

REVISED PANELBOARD "LSL".

EXISTING PANELBOARD "LL".

EXISTING PANELBOARD "PL".

REVISED PANELBOARD "DP".

SUMP PUMP CONTROLLER. PROVIDE (1) 3/4" C.

WITH (1) CAT 6A CABLE AND 12 AWG GND

EXTENDING TO ROOM 024 BUILDING AUTOMATION

SYSTEM (BAS). REFERENCE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

SURVEILLANCE CAMERA. PROVIDE REQUIRED

CONNECTIONS TO CORRESPONDING ETHERNET

SWITCH LOCATED IN ROOM 024.

CARD READER WITH KEYPAD. PROVIDE REQUIRED

CONNECTIONS FROM UNIT TO CORRESPONDING

PACS CARD READER COMMUNICATION CABINET

LOCATED IN ROOM 024.

RECEPTACLE POWERED FROM SUMP PUMP

CONTROLLER. REFERENCE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE METERING BRIDGE WITH ALL REQUIRED

LABELING, CONNECTIONS, AND APPURTENANCES

FOR A FULLY FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS. METER

HARDWARE SHALL MATCH VA FACILITY STANDARD:

CENTRICA HARDWARE (CT'S/BRIDGES) AND POWER

RADAR SOFTWARE, REFERENCE SPECIFICATION 25

10 10 FOR ADDITIONAL INFORMATION. UTILIZE

LOCAL RECEPTACLE TO POWER METERING

BRIDGE. COORDINATE WITH VA AS REQUIRED FOR

FINAL LOCATION.

RELOCATE EXISTING HEAT DETECTOR TO BE

WITHIN 24" OF THE SPRINKLER HEAD.

PACS CARD READER COMMUNICATION CABINET;

SIZED FOR (4) CARD READERS. UTILIZE LOCAL

EMERGENCY OR UPS POWERED RECEPTACLE FOR

POWER; EXTEND POWER CONDUIT AND WIRE AS

REQUIRED. EXISTING ACCESS CONTROL CARD

READER CONDUIT AND WIRING SHALL BE

EXTENDED TO NEW CABINET AS REQUIRED.

PROVIDE CURRENT SENSORS IN PANELBOARD

WITH ALL REQUIRED LABELING, CONNECTIONS,

AND APPURTENANCES FOR A FULLY FUNCTIONAL

SYSTEM. INSTALL PER MANUFACTURER

RECOMMENDATIONS. SEE PANEL SCHEDULES AND

ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION. HARDWARE SHALL MATCH VA

FACILITY STANDARD: CENTRICA HARDWARE

(CT'S/BRIDGES) AND POWER RADAR SOFTWARE,

REFERENCE SPECIFICATION 25 10 10 FOR

ADDITIONAL INFORMATION.

HEAT DETECTOR SHALL BE INSTALLED WITHIN 24"

OF EXISTING SPRINKLER HEAD.

EP112

BUILDING 27 - BASEMENT FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

(DEDUCTIVE BID ALTERNATE) 27

KEY PLAN

BUILDING 27 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/4" = 1'-0"

ENLARGED ELEVATOR, MACHINE ROOM AND LOBBY PLAN

Scale: 1/2" = 1'-0"

ENLARGED RM 023 PLAN

Scale: 1/2" = 1'-0"

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY DEVICE

LOCATIONS WITH ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO INSTALLATION.

2. ELEVATOR PIT: LIGHTING AND RECEPTACLES

SHALL MEET NEC.

3. PACS CARD READER COMMUNICATION

CABINET CONNECTS TO THE ENGINEERING

SWITCH. CURRENTLY, THE ENGINEERING

SWITCH IS LOCATED IN ROOM 023. HOWEVER,

THERE IS A CONCURRENT PROJECT WHICH IS

RELOCATING ALL DATA/IT TO ROOM 024.

4. WHERE ADDITIONAL 0-5A CTs ARE REQUIRED

FOR ELECTRICAL POWER METERING

PURPOSES, CONTRACTOR SHALL PROVIDE ALL

REQUIRED CABELING, JUNCTION

BOXES/ENCLOSURES, AND APPURTENANCES

AS REQUIRED FOR A COMPLETE AND

FUNCTIONAL SYSTEM.

DEDUCTIVE BID ALTERNATE

0 1' 2' 4'

Scale: 1/2" = 1'-0"

0 1' 2' 4'

0 2' 4' 8'

Scale: 1/2" = 1'-0"

Scale: 1/4" = 1'-0"

N

N N

AREA OF

WORK

L2 GROUND LEVEL

20A WEATHERPROOF GFCI

RECEPTACLE POWERED

FROM SUMP PUMP

CONTROLLER.

WEATHERPROOF

LIGHT SWITCH

(SEE NOTE 2)

20A WEATHERPROOF GFCI

RECEPTACLE (SEE NOTE 2).

SEE NOTE 2 DETAIL NOTES

1. DETAIL IS INCLUDED TO SHOW GENERAL ELECTRICAL

REQUIREMENTS. COORDINATE EXACT DIMENSIONAL,

LAYOUT, AND PLUMBING EQUIPMENT REQUIREMENTS WITH

PLUMBING AND ARCHITECTURAL DRAWINGS AS REQUIRED.

2. ALL EXISTING LUMINARIES, LIGHT SWITCHES, AND

RECEPTACLES SHALL BE REPLACED AS NOTED IN THIS

DETAIL. EXISTING CONDUCTORS AND RACEWAYS SHALL BE

REUSED FOR REPLACEMENT EQUIPMENT. CONTRACTOR

SHALL FIELD VERIFY EXACT EQUIPMENT LOCATIONS.

SCALE: NTS

ELEVATOR "P4" PIT WITH SUMP PUMP SECTION4

SP-1

" M

IN

FS

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

L2

P4182

S1-C1

1C3-27183

AREA OF WORK

S

WAP

ELV

SHEET NOTES

AREA OF

WORK

BUILDING 27 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN (DEDUCTIVE BID ALTERNATE) Scale: 3/4" = 1'-0"

KEY PLAN

EP113

BUILDING 27 - FIRST FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

(DEDUCTIVE BID ALTERNATE) 27

KEY PLAN

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

DEDUCTIVE BID ALTERNATE

0 1' 2' 3'

Scale: 3/4" = 1'-0"

KEY NOTES

ELEVATOR CAB SURVEILLANCE

CAMERA; CAMERA MUST BE ABLE TO

BE MONITORED VIA SSTV. COORDINATE

FINAL INSTALLED LOCATION AND

CABLING REQUIREMENTS WITH VA AND

ELEVATOR CONTRACTOR.

NN

RM 024

(BASEMENT)

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 133 OF 143

P4

2C1-27

AREA OF WORK

S

S

WAP

3 3

HP-1

LSL-27,29

LSL-27,29

LSL-8

ELV

L2

LSL-8

LSL-13

KEY NOTES

HEAT PUMP "HP-1".

ELEVATOR LOBBY SURVEILLANCE CAMERA.

PROVIDE REQUIRED CONNECTIONS FROM

CAMERA TO ETHERNET SWITCH LOCATED IN

ROOM A203. REFERENCE KEYPLAN FOR

LOCATION OF ROOM HOUSING EQUIPMENT

TO BE UTILIZED.

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY

DEVICE LOCATIONS WITH ARCHITECT

AND ELEVATOR MANUFACTURER PRIOR

TO INSTALLATION.

AREA OF

WORK

BUILDING 27 - SECOND FLOOR: POWER, LIGHTING, AND SYSTEMS PLAN (DEDUCTIVE BID ALTERNATE) Scale: 3/4" = 1'-0"

EP114

BUILDING 27 - SECOND FLOOR: POWER,

LIGHTING, AND SPECIAL SYSTEMS PLAN

(DEDUCTIVE BID ALTERNATE) 27

KEY PLAN

DEDUCTIVE BID ALTERNATE

0 1' 2' 3'

Scale: 3/4" = 1'-0"

NN

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

RM A203

ROOF ACCESS

EQUIPMENT

FOR S3

EQUIPMENT

FOR P1

EQUIPMENT

FOR P2

EQUIPMENT

ARRAY FOR P2

EQUIPMENT

ARRAY FOR S3

EQUIPMENT

ARRAY FOR P1

A1000

A1001

DOWN

AREA OF WORK

L1E

L1Eb

L1bL1Eb

L1bL1E

8LS1-5

8LS1-5

8LS1-5

8LS1-58LS1-5

8LS1-5

X

X

X

L1E

8LS1-5

L1

8LS1-5

L1b

8LS1-5

L1b

8LS1-5

L1b

8LS1-5

L3Ea

8LS1-5

a

L1Eb

8LS1-5

L1Eb

8LS1-5

L1c

8LS1-5

1TYP

c b

KEY NOTES

BUILDING 1 - MACHINE ROOM: LIGHTING PLAN

Scale: 1/2" = 1'-0"

AREA OF WORK

EL111

BUILDING 1 - MACHINE ROOM:

LIGHTING PLAN

ALL NON-SWITCHED LUMINAIRES SHALL BE

CIRCUITED FOR CONTINUOUS 24-HOUR

OPERATION.

KEY PLAN

SHEET NOTES

1. COORDINATE LIGHTING INSTALLATION WITH

ALL EQUIPMENT, DEVICES AND ELECTRICAL

RACEWAYS AS REQUIRED.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 135 OF 143

0" 2'

-0

1'-0" 1'-6"

GRADE

EXISTING

SUMP PIT

EXISTING

CONCRETE

WALL

L2

20A WEATHERPROOF GFCI

RECEPTACLE POWERED FROM

SUMP PUMP CONTROLLER.

20A WEATHERPROOF

GFCI RECEPTACLE

(SEE NOTE 2).

SEE

NOTE 2

SP-1

24"

SCALE: NTS

SCALE: NTSSCALE: NTS

STEEL BEAM

CADWELD CONNECTION TYPE

QW (OR TYPE VN TO WEB OF

LARGE BEAM)

STEEL COLUMN

CADWELD CONNECTION TYPE VV

TO GROUND

EXOTHERMIC WELD

CONNECTION

NO. GBIT14412M-22T OR APPROVED EQUAL, 1/4" x 4" x

12" SOLID COPPER GROUND BAR WITH INSULATORS

AND BRACKETS, AND WITH TWO 25'-0" NO. 2T, #2 AWG

TIN COATED COPPER GROUND CONDUCTORS

#2AWG SOLID

TINNED CU X

25FT LO

NG

ITEM

CONCRETE ENCASED REBAR (UFER)

GROUND RODS (IF WITHOUT GROUND RING)

GROUND RING (WITH OR WITHOUT GROUND RODS AS NOTED)

SIZE

METAL WATER PIPES

OTHER CONNECTIONS AS NOTED ON PLANS

STRUCTURAL STEEL

SPECIAL SYSTEMS GROUNDING BUS BARS

POWER CABLE TRAY, SPECIAL SYSTEMS CABLE TRAY

#3/0

#6

#2

#3/0 #6

#3/0

#2

GAS PIPES

GROUNDING ELECTRODE AND BONDING CONDUCTOR SIZING SCHEDULE

* BY EQUIPMENT MANUFACTURER, PER NEC 250.66

GROUNDING ELECTRODE CONDUCTOR #3/0

ANTENNA MAST TELECOM RACK ENCLOSURES #2

#3/0

MAIN BONDING JUMPER

INTERSYSTEM BONDING BUS BAR

#6 #3/0

#6

1. MAKE CONNECTION TO ALL AVAILABLE ELECTRODES. NOT ALL MAY BE PRESENT.

2. ALL GROUNDING AND BONDING TO BE IN ACCORDANCE WITH THE CURRENT VERSION

OF THE NEC THAT HAS BEEN ACCEPTED FOR USE IN EACH JURISDICTION AND AS

AMENDED BY LOCAL AUTHORITY HAVING JURISDICTION.

3. GROUND RODS TO BE INSTALLED OUTSIDE OF BUILDING ROOF'S DRIP LINE.

DETAIL NOTES

ITEM SIZE

UFER

GROUND

METAL

WATER

PIPES

OTHER

CONNECTIONS

AS NOTED

ON THE

PLANS

STRUCTURAL

STEEL

SPECIAL

SYSTEMS

GROUNDING

BUS

BARS

TELECOM

RACK

SPECIAL

SYSTEMS

CABLE

TRAY

SIZE PER TABLE

BELOW, TYPICAL

BOND AT

LOCATIONS

REQUIRED TO

MAINTAIN

CONTINUITY

GAS

PIPES

GROUND RODS

MINIMUM 6'-0"

OR 20'-0"

SPACING

WHERE

GROUND RING

PROVIDED

GROUND RING

CONDUCTOR WHERE

PROVIDED

NEUTRAL BUSGROUND BUS

MAIN BONDING

JUMPER

POWER

CABLE

TRAY

ANTENNA

MAST

AS SHORT AND

STRAIGHT AS

POSSIBLE

SERVICE EQUIPMENT

GROUNDING ELECTRODE

CONDUCTOR

SERVICE

GROUND BUS

BAR -

CONDUIT CLAMP AND

HANGER - 3' MAX.

FROM BOX TO HANGER

& 8' MAX. SPACING

BETWEEN HANGERS

(TYP.)

STEEL OUTLET BOX - SIZED PER N.E.C. AND

SUPPORTED RIGIDLY FROM STRUCTURE (TYP.).

COVER SHALL BE MARKED WITH CIRCUIT

IDENTIFICATION

CONDUIT (TYP.)

6' MAX. LENGTH

FLEX CONDUIT

W/ (3)#12

CONDUCTORS

INTO FIXTURE

(TYP.)

TYPICAL 2' x

4' LAY-IN

RECESSED

LIGHT

FIXTURE

(TYP.)

SECURE

FIXTURES

TO GRID

WITH CLIPS

PER N.E.C.

(TYP.)

T-BAR LAY-IN

CEILING

SUSPENSION

SYSTEM (TYP.)

PROVIDE

SUPPORT

WIRES TO

STRUCTURE

FOR FIXTURE

SUPPORT, TWO

PER FIXTURE

(TYP.) SEE

SPEC SECTION

265100.

1. DO NOT SUPPORT CONDUIT OR BOX FROM CEILING GRID HANGERS.

DETAIL NOTES JOIST (TYP.)

SCALE: NTS

GENERAL NOTES:

1. MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL

SIDES OF ROOF PENETRATION FROM WALLS, CURBS, AND

OTHER PROJECTIONS TO FACILITATE PROPER FLASHING.

2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR

OVERLAPPED.

3. VERIFY ROOF & STRUCTURAL SYSTEM WITH ARCHITECT.

4. COORDINATE FLASHING INSTALLATION WITH ROOFING

CONTRACTOR TO ENSURE PROPER METHODS & MATERIALS

ARE USED TO MAINTAIN ROOF WARRANTY.

PREFABRICATED RUBBER BOOT

CAP WITH GRADUATED STEPS &

WEATHER-PROOF PRESSURE

SEAL TO COLLAR

SEALANT AT PENETRATION TO

MEMBRANE JUNCTURE BY

ROOFING CONTRACTOR

MULTIPLE MEMBRANE STRIPPING PLIES

FEATHERED AT FIELD OF ROOF BY ROOFING

CONTRACTOR. PRIME FLANGE BEFORE STRIPPING.

PREFABRICATED FORMED 1.52mm (0.06")

THICK ALUMINUM FLASHING ROUND

COLLAR WITH MIN. 76mm (3") WIDE

FLANGE. ATTACH TO ROOF PER

MANUFACTURER'S INSTRUCTIONS

CONDUIT CLAMP. SIZE AS

REQUIRED

BATT INSULATION

ROOF MEMBRANE

WATER CUT-OFF MASTIC

COMPATIBLE WITH ROOF

MEMBRANE

STAINLESS CLAMP, TYP.

9.52mm (3/8") MIN

GALVANIZED THREADED ROD,

TYP.

SEAL-OFF FITTING, TYP.

ROOF

STEEL EXPANSION ANCHOR

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

CONDUIT, TYP.

CONDUIT CLAMP. SIZE AS

REQUIRED

LOCKING SQUARE WASHER &

LOCKNUT

SCALE: 1/2" = 1'-0"

DETAIL NOTES

1. DETAIL IS INCLUDED TO SHOW GENERAL ELECTRICAL

REQUIREMENTS. COORDINATE EXACT DIMENSIONAL,

LAYOUT, AND PLUMBING EQUIPMENT REQUIREMENTS

WITH PLUMBING AND ARCHITECTURAL DRAWINGS AS

REQUIRED.

2. ALL EXISTING LUMINARIES, LIGHT SWITCHES, AND

RECEPTACLES SHALL BE REPLACED AS NOTED IN THIS

DETAIL. EXISTING CONDUCTORS AND RACEWAYS SHALL

BE REUSED FOR REPLACEMENT EQUIPMENT. CONTRACTOR

SHALL FIELD VERIFY EXACT EQUIPMENT LOCATIONS.

E-501

ELECTRICAL DETAILS

FACP

SUPPLY FAN ''SF-1''

(SMOKE CONTROL)

HOISTWAY ELEVATOR

RECALL

SHUNT TRIP

ELEVATOR RECALL

PRIMARY

ELEVATOR RECALL

ALTERNATE

ELEVATOR RECALL

CAR VISUAL RECALL

SIGNAL (HAT)

FA

A REMOTE

ANNUNICATOR

J

JUNCTION BOX FOR 120V

POWER TO SPRINKLER BELL.

SEE PLANS FOR LOCATION IF

REQUIRED.

NOTIFICATION

CIRCUIT

BELL-CKT

NOTIFICATION

CIRCUIT

AUXILIARY POWER

SUPPLY (NAC)

120 VAC

FAN SHUT DOWN

CONTROL

SMOKE, HEAT,

DUCT DETS

PULL STATIONS

DH

DH

120 VAC

MAGNETIC DOOR

HOLDERS

(TYP.)

#12 (TYP.)

F/S

F/S

120 VAC

FIRE/SMOKE

DAMPERS (TYP)

#12 (TYP.)

BATTERIES

120 VAC

TO PHONE

DEMARC BOARD

3/4" C 4-PAIR

TELEPHONE CABLE.

DACT (AUTO DIALER)

NUMBER OF CONDUCTORS

AS REQUIRED FOR

APPLICABLE ZONES

ALARM

CIRCUIT

TAMPER, FLOW SENSORS

SCALE: NTS

1. FIRE ALARM SYSTEM AS SHOWN IS SCHEMATIC ONLY AND DOES NOT INDICATE ALL DEVICES, EQUIPMENT, WIRING. PROVIDE COMPLETE SYSTEM WITH ALL REQUIRED DEVICES AND EQUIPMENT AND SUBMIT ENGINEERED DRAWINGS TO AHJ FOR REVIEW AND APPROVAL.

DETAIL NOTES

LF LF

(TYP.) (TYP.) (TYP.) (TYP.)

LF LF

(TYP.) (TYP.) (TYP.) (TYP.)

LF LF

(TYP.) (TYP.) (TYP.)

(TYP.)

TS

HD FS

TYPICAL RECESSED LIGHTING INSTALLATION3

GROUNDING ELECTRODE AND BONDING SYSTEM1

TYPICAL GROUND BUS BAR FOR

INTERSYSTEM AND SERVICE GROUNDING2

ELEVATOR "S3" PIT WITH SUMP PUMP SECTION7

EP110

TYPICAL FIRE ALARM RISER DIAGRAM6

CONDUIT ROOF PENETRATION DETAIL5

BUILDING STEEL GROUND4

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

MECHANICAL ROOM

ELEVATOR RECALL

File details come from the government source that posted it. Updated .