Attachment 8 668-18-109_Project Drawings 4 of 6.pdf

PDF 15 MB Posted

Attached to
Y1DA--CON-NRM 668-18-109 Refurbish and Upgrade Elevators in Bldg 1 and 27
Solicitation number
36C26024R0009
Issued by

About this file

This file attachment relates to a federal contract solicitation for elevator refurbishment and upgrades. The solicitation number is 36C26024R0009 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for work at Building 1 and 27. The solicitation seeks bids to refurbish and upgrade elevators, as depicted in the attached project drawings, with a response due date unspecified. Key details include the federal agency issuing the solicitation, the buildings and types of work involved, and that project drawings are provided to inform bid responses.

View the file

Other files

File Type Posted
Wage Determination 1.19.24.pdf PDF
36C26024R0009 0006.pdf PDF
36C26024R0009 0005.pdf PDF
Wage Determination 1.5.24.pdf PDF
Wage Determination 12.22.23.pdf PDF
36C26024R0009 0004.pdf PDF
36C26024R0009 0003.pdf PDF
36C26024R0009 0002.pdf PDF
36C26024R0009 0001.pdf PDF
WD 11.24.23.pdf PDF
668-18-109_Pre Bid Site Walk Sign In Sheet_2023.12.03.pdf PDF
Attachment 17 Security Requirements.pdf PDF
Attachment 18 Contractor Rules of Behavior.pdf PDF
Attachment 4 668-18-109_Supplement to SPEC 01 00 00 Part 1-6-I.pdf PDF
Attachment 10 668-18-109_Project Drawings 6 of 6.pdf PDF
Attachment 15 Wage Determination 11.17.23.pdf PDF
Attachment 2 668-18-109_Project Specifications 1 of 2_R1.pdf PDF
Attachment 5 668-18-109_Project Drawings 1 of 6.pdf PDF
Attachment 13 668-18-109_Lead Sampling Report.pdf PDF
Attachment 6 668-18-109_Project Drawings 2 of 6.pdf PDF
Attachment 19 Calculation of Self Performed Work REV 1.pdf PDF
36C26024R0009.pdf PDF
Attachment 7 668-18-109_Project Drawings 3 of 6.pdf PDF
Attachment 12 668-18-109_Limited Asbestos Good Faith Survey - Addendum 1.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 3 668-18-109_Project Specifications 2 of 2_R1.pdf PDF
Attachment 1 668-18-109_SOW-CON_2023-08-15.pdf PDF
Attachment 11 668-18-109_Limited Asbestos Good Faith Survey.pdf PDF
Attachment 9 668-18-109_Project Drawings 5 of 6.pdf PDF
Attachment 14 668-18-109_DWG Clarification Document_2023-06-22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQUIPMENT

FOR S3

EQUIPMENT

FOR P1

EQUIPMENT

FOR P2

EQUIPMENT

ARRAY FOR P2

EQUIPMENT

ARRAY FOR S3

EQUIPMENT

ARRAY FOR P1

P1

S3

P2

S3 P2 P1

6 5

S3P2P1

DOWN

AREA OF

WORK

S

25 TYP

TYP.

14 27

KEY NOTES

EXISTING SHUNT TRIP PUSHBUTTON

CONTROLS FOR ELEVATORS "P1", "P2", AND

"S3" TO BE DEMOLISHED.

EXISTING 120V ELEVATOR CAB

DISCONNECTS FOR ELEVATORS "P1", "P2",

AND "S3" TO BE DEMOLISHED.

EXISTING SERVICE ELEVATOR "S3"

DISCONNECT TO BE DEMOLISHED.

EXISTING PASSENGER ELEVATOR "P2"

DISCONNECT TO BE DEMOLISHED.

EXISTING PASSENGER ELEVATOR "P1"

DISCONNECT TO BE DEMOLISHED.

EXISTING PANELBOARD USED AS A

PULLBOX TO BE DEMOLISHED.

EXISTING ELEVATOR SHUNT TRIP CIRCUIT

BREAKERS TO BE DEMOLISHED.

EXISTING PASSENGER ELEVATOR "P1"

ISOLATION TRANSFORMER AND CONTROL

UNIT TO BE DEMOLISHED. EXISTING

CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE IN BASEMENT; EXISTING

RACEWAYS AND BOXES TO BE REUSED AS

APPLICABLE.

EXISTING PASSENGER ELEVATOR "P1"

DRIVER UNIT AND ASSOCIATED RACEWAYS

AND CONDUCTORS TO BE DEMOLISHED.

EXISTING PASSENGER ELEVATOR "P2"

ISOLATION TRANSFORMER AND CONTROL

UNIT TO BE DEMOLISHED. EXISTING

CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE IN BASEMENT; EXISTING

RACEWAYS AND BOXES TO BE REUSED AS

APPLICABLE.

EXISTING PASSENGER ELEVATOR "P2"

DRIVER UNIT AND ASSOCIATED RACEWAYS

AND CONDUCTORS TO BE DEMOLISHED.

EXISTING SERVICE ELEVATOR "S3"

ISOLATION TRANSFORMER AND CONTROL

UNIT TO BE DEMOLISHED. EXISTING

CONDUCTORS TO BE DEMOLISHED BACK

TO SOURCE; EXISTING RACEWAYS AND

BOXES TO BE REUSED WHERE

APPLICABLE.

EXISTING SERVICE ELEVATOR "S3" DRIVER

UNIT AND ASSOCIATED RACEWAYS AND

CONDUCTORS TO BE DEMOLISHED.

EXISTING MECHANICAL EQUIPMENT,

DUCTWORK AND LOUVER TO BE

DEMOLISHED. EXISTING CONDUCTORS TO

BE DEMOLISHED BACK TO SOURCE;

EXISTING CONDUIT TO BE REUSED WHERE

APPLICABLE. REFERENCE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

EXISTING ELEVATOR NETWORK SWITCH,

RELATED EQUIPMENT, AND PORTION OF

DATA RACK TO BE RELOCATED ON SAME

FLOOR. REFERENCE DETAIL '3' ON THIS

SHEET FOR ADDITIONAL INFORMATION

REGARDING SPECIFIC EQUIPMENT AND

DRAWING EP111 FOR ADDITIONAL

INFORMATION REGARDING RELOCATION.

EXISTING DIRECT TV EQUIPMENT AND

RACK TO BE RELOCATED TO ROOM A635.

REFERENCE DRAWING EP107 FOR

ADDITIONAL INFORMATION.

EXISTING MOTOROLA RADIO EQUIPMENT,

RADIO REPEATERS, SAT PHONE, AND

ADVANCED ELECTRICAL METERING

SYSTEM TO BE RELOCATED ON SAME

FLOOR. REFERENCE DRAWING EP111 FOR

ADDITIONAL INFORMATION REGARDING

RELOCATION.

EXISTING STORAGE CABINET TO REMAIN.

EXISTING JUNCTION BOX TO BE

DEMOLISHED.

EXISTING FIRE ALARM JUNCTION BOX

HOUSING SHUNT TRIP RELAYS TO BE

DEMOLISHED.

EXISTING FEEDER RACEWAYS FOR

ELEVATORS "P1" AND "P2" AND PULL BOX

TO REMAIN FOR REUSE. EXISTING

CONDUCTORS TO BE DEMOLISHED BACK

TO SOURCE.

EXISTING FEEDER RACEWAY FOR

ELEVATOR "S3" TO REMAIN FOR REUSE.

EXISTING CONDUCTORS TO BE

DEMOLISHED BACK TO SOURCE.

EXISTING ABANDONED CONDUIT AND

JUNCTION BOX TO BE DEMOLISHED.

CONDUIT EXTENDING TO BELOW FLOORS

SHALL REMAIN; CAP AND MARK AS SPARE.

EXISTING ANTENNA CABLE TO REMAIN.

ALL EXISTING FIRE ALARM DEVICES TO BE

DEMOLISHED. CONTRACTOR TO FIELD

VERIFY EXACT QUANTITY AND LOCATIONS.

EXISTING LIGHTING, SWITCHES, AND

ASSOCIATED CONDUIT AND WIRE TO BE

DEMOLISHED.

ONCE MECHANICAL UNITS SERVING

ELEVATOR MACHINE ROOM HAVE BEEN

DE-ENERGIZED FOR DEMOLITION,

CONTRACTOR SHALL UTILIZE EXISTING

PANELBOARD "9EQ4" TO POWER

TEMPORARY PORTABLE AC UNIT.

CONTRACTOR SHALL PROVIDE OCPDs, DISCONNECTS, AND CABLING AS

REQUIRED. COORDINATE WITH

MECHANICAL DRAWINGS AS REQUIRED.

EXISTING SURVEILLANCE NETWORK

SWITCH AND ASSOCIATED PATCH PANEL

TO BE RELOCATED TO ROOM A800D WITH

NEW CABELING AS REQUIRED. REFERENCE

DETAIL '3' ON THIS SHEET FOR ADDITIONAL

EXISTING EQUIPMENT INFORMATION AND

SHEET EP109 FOR ROOM A800D LOCATION.

SHEET NOTES

1. COORDINATE REMOVAL OF ELECTRICAL

AND LOW-VOLTAGE EQUIPMENT WITH

PHASING OF CONSTRUCTION.

2. CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL FIELD INVESTIGATION,

VERIFICATION, AND DEMOLITION

REQUIRED FOR ALL NON-ELEVATOR

RELATED EQUIPMENT, RACEWAYS, AND

CONDUCTORS UNLESS OTHERWISE

NOTED; CONDUCTORS SHALL BE

DEMOLISHED BACK TO SOURCE.

3. NOT ALL RACEWAYS SHOWN FOR

CLARITY.

4. DEMOLISH ALL EXISTING RECEPTACLES

LOCATED IN THIS SPACE. DEMOLISH

PORTIONS OF RACEWAYS AS REQUIRED

TO EXTEND TO NEW DESTINATION; ALL

CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE.

5. ALL NON-ELEVATOR RELATED

EQUIPMENT SHALL BE DEMOLISHED OR

RELOCATED FROM ELEVATOR

MECHANICAL ROOM.

BUILDING 1 - MACHINE ROOM: ELECTRICAL DEMOLITION PLAN

Scale: 1/2" = 1'-0"

AREA OF WORK

ED111

BUILDING 1 - MACHINE ROOM:

ELECTRICAL DEMOLITION PLAN

DATA/TV/RADIO EQUIPMENT RACK PHOTO DETAIL

Not to scale

ENLARGED DATA/TV EQUIPMENT RACK PHOTO DETAIL

Not to scale

KEY PLAN

EXISTING

FIBER-OPTIC

PATCH PANEL

-15

EXISTING

ELEVATOR

NETWORK

SWITCH

EXISTING

SURVEILLANCE

NETWORK SWITCH

EXISTING PATCH

PANEL (CURRENTLY

UTILIZED FOR

SURVEILLANCE

CAMERAS)

EXISTING SURGE

PROTECTIVE DEVICE

EXISTING 1.5KVA UPS

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

001A

S0-C1

BC1-27

P4

G U

TT

ER

AREA OF WORK

AREA OF WORK

001A

002 P4

G U

TT

ER

AREA OF

WORK

WAP

HD

S

AREA

OF

WORK

EXISTING

PAGING

SYSTEM

BACKBOARD

EXISTING

TELEPHONE

DATA

BACKBOARD

FAT

FTT

FA

C P

12 11 10

KEY NOTES

EXISTING ELEVATOR DISCONNECT, SHUNT

TRIP CIRCUIT BREAKER, AND GUTTER TO

BE DEMOLISHED.

EXISTING ELEVATOR 120V SHUNT TRIP

CIRCUIT BREAKER TO BE DEMOLISHED.

EXISTING ELEVATOR CAB LIGHTING AND

RECEPTACLE CIRCUIT BREAKER TO BE

DEMOLISHED.

EXISTING HYDRAULIC ELEVATOR

CONTROLLER AND ALL ASSOCIATED

CONDUIT AND WIRE TO BE DEMOLISHED.

EXISTING ELEVATOR TELEPHONE CONDUIT

TO REMAIN. DEMOLISH EXISTING

TELEPHONE CONDUCTORS.

EXISTING ELEVATOR CAB "P4 TO BE

REPLACED. ALL ASSOCIATED CONDUCTORS

AND FIELD DEVICES SHALL BE DEMOLISHED

BACK TO ITS SOURCE.

EXISTING ELEVATOR EMERGENCY POWER

SOURCE PANEL TO BE DEMOLISHED.

EXISTING LUMINAIRES, FIRE ALARM

DEVICES, CAMERAS, AND ANY OTHER

ELECTRICAL EQUIPMENT LOCATED IN

ELEVATOR LOBBY AREA OF WORK SHALL

BE PROTECTED IN PLACE OR REMOVED

AND REINSTALLED AFTER COMPLETION OF

ARCHITECTURAL WORK AS REQUIRED.

REFERENCE ARCHITECTURAL DRAWINGS

FOR MORE INFORMATION.

EXISTING PANELBOARD "DP" TO BE

REVISED TO PROVIDE LSIG ELEVATOR

FEEDER CIRCUIT BREAKER. REFERENCE

ONE-LINE DIAGRAMS ON DRAWINGS E-605

AND E-606 FOR ADDITIONAL INFORMATION.

EXISTING LIFE SAFETY PANELBOARD "LSL"

TO BE REVISED. REFERENCE ASSOCIATED

PANEL SCHEDULES ON DRAWING E-607 FOR

ADDITIONAL INFORMATION.

EXISTING NORMAL POWER LIGHTING

PANELBOARD "LL".

EXISTING NORMAL POWER PANELBOARD

"PL".

EXISTING 2-1/2" CONDUIT FEEDING

ELEVATOR EQUIPMENT TO REMAIN FOR

REUSE. EXISTING CONDUCTORS TO BE

DEMOLISHED BACK TO SOURCE.

EXISTING ELEVATOR PIT LIGHTING TO BE

REPLACED WITH NEW LIGHTING.

REFERENCE SHEET EP112 FOR ADDITIONAL

INFORMATION.

EXISTING CARD READER COMMUNICATION

CABINET TO BE DEMOLISHED AND

REPLACED. DEMOLISH CONDUIT AND WIRE

ASSOCIATED WITH CABINET. CONDUIT AND

WIRE ASSOCIATED WITH EXISTING CARD

READERS SHALL BE PRESERVED FOR

REUSE WITH NEW CABINET.

SHEET NOTES

1. ALL CONDUIT SHOWN IS

DIAGRAMMATICAL. CONTRACTOR

SHALL FIELD VERIFY EXACT ROUTING

AS REQUIRED.

2. CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING ELEVATOR LOBBY

LUMINAIRES, ELEVATOR PIT LIGHTING

AND EQUIPMENT, AND FIELD DEVICES

AS REQUIRED.

3. PACS CARD READER COMMUNICATION

CABINET CONNECTS TO THE

ENGINEERING SWITCH. CURRENTLY,

THE ENGINEERING SWITCH IS LOCATED

IN ROOM 023. HOWEVER, THERE IS A

CONCURRENT PROJECT WHICH IS

RELOCATING ALL DATA/IT TO ROOM 024.

AREA OF

WORK

BUILDING 27 - BASEMENT FLOOR: ELECTRICAL DEMOLITION PLAN

Scale: 1/4" = 1'-0"

ED112

BUILDING 27 - BASEMENT FLOOR:

ELECTRICAL DEMOLITION PLAN

(DEDUCTIVE BID ALTERNATE)

KEY PLAN

ENLARGED ELEVATOR, MACHINE ROOM AND LOBBY DEMOLITION PLAN

Scale: 1/2" = 1'-0"

ENLARGED RM 023 DEMOLITION PLAN

Scale: 1/2" = 1'-0"

DEDUCTIVE BID ALTERNATE

0 1' 2' 4'

Scale: 1/2" = 1'-0"

0 1' 2' 4'

0 2' 4' 8'

Scale: 1/2" = 1'-0"

Scale: 1/4" = 1'-0"

NNNN

NN

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

P4182

S1-C1

1C3-27183

AREA OF WORK

S

WAP

KEY NOTES

EXISTING ELEVATOR CAB "P4 TO BE

REPLACED. ALL ASSOCIATED

CONDUCTORS AND FIELD DEVICES

SHALL BE DEMOLISHED BACK TO ITS

SOURCE.

EXISTING LUMINAIRES, FIRE ALARM

DEVICES, CAMERAS, AND ANY OTHER

ELECTRICAL EQUIPMENT LOCATED IN

ELEVATOR LOBBY AREA OF WORK

SHALL BE PROTECTED IN PLACE OR

REMOVED AND REINSTALLED AFTER

COMPLETION OF ARCHITECTURAL

WORK AS REQUIRED. REFERENCE

ARCHITECTURAL DRAWINGS FOR MORE

INFORMATION.

SHEET NOTES

AREA OF

WORK

BUILDING 27 - FIRST FLOOR: ELECTRICAL DEMOLITION PLAN

Scale: 3/4" = 1'-0"

ED113

BUILDING 27 - FIRST FLOOR:

ELECTRICAL DEMOLITION PLAN

(DEDUCTIVE BID ALTERNATE) 27

KEY PLAN

1. REFERENCE ARCHITECTURAL

DRAWINGS AND ELEVATOR

SPECIFICATIONS FOR ADDITIONAL

DEMOLITION INFORMATION.

2. CONTRACTOR SHALL FIELD VERIFY

ALL EXISTING ELEVATOR LOBBY

LUMINAIRES AND FIELD DEVICES

AS REQUIRED.

DEDUCTIVE BID ALTERNATE

0 1' 2' 3'

SCALE: 3/4" = 1'-0"

NN

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB 118 OF 143

P4

2C1-27

AREA OF WORK

S

S

WAP

3 3

KEY NOTES

EXISTING ELEVATOR CAB "P4 TO BE

REPLACED. ALL ASSOCIATED

CONDUCTORS AND FIELD DEVICES

SHALL BE DEMOLISHED BACK TO ITS

SOURCE.

EXISTING LUMINAIRES, FIRE ALARM

DEVICES, CAMERAS, AND ANY OTHER

ELECTRICAL EQUIPMENT LOCATED IN

ELEVATOR LOBBY AREA OF WORK

SHALL BE PROTECTED IN PLACE OR

REMOVED AND REINSTALLED AFTER

COMPLETION OF ARCHITECTURAL

WORK AS REQUIRED. REFERENCE

ARCHITECTURAL DRAWINGS FOR MORE

INFORMATION.

SHEET NOTES

AREA OF

WORK

BUILDING 27 - SECOND FLOOR: ELECTRICAL DEMOLITION PLAN

Scale: 3/4" = 1'-0"

ED114

BUILDING 27 - SECOND FLOOR:

ELECTRICAL DEMOLITION PLAN

(DEDUCTIVE BID ALTERNATE) 27

KEY PLAN

1. REFERENCE ARCHITECTURAL

DRAWINGS AND ELEVATOR

SPECIFICATIONS FOR ADDITIONAL

DEMOLITION INFORMATION.

2. CONTRACTOR SHALL FIELD VERIFY

ALL EXISTING ELEVATOR LOBBY

LUMINAIRES AND FIELD DEVICES

AS REQUIRED.

DEDUCTIVE BID ALTERNATE

0 1' 2' 3'

Scale: 3/4" = 1'-0"

NN

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 119 OF 143

CB-A2S3 P1

P2

AREA OF WORK

S

S

L2

L2

L2

M

WP

WP

ELV

ELV

4N3-9

4N3-9

4N3-9

4N3-9

WP

4N3-9

E-501

BEQ4-3

BEQ4-7

KEY NOTES

SUMP PUMP "SP-1".

ELEVATOR MAINTENANCE DATA PORT.

PROVIDE CONNECTION TO ELEVATOR

NETWORK SWITCH LOCATED IN ROOM

A1000; REFERENCE DRAWING EP111 FOR

ADDITIONAL INFORMATION.

PROVIDE METERING BRIDGE FOR SUMP

PUMP PANEL AT PANEL BEQ4 WITH ALL

REQUIRED LABELING, CONNECTIONS, AND

APPURTENANCES FOR A FULLY

FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS.

METER HARDWARE SHALL MATCH VA

FACILITY STANDARD: CENTRICA

HARDWARE (CT'S/BRIDGES) AND POWER

RADAR SOFTWARE, REFERENCE

SPECIFICATION 25 10 10 FOR ADDITIONAL

INFORMATION. UTILIZE LOCAL

RECEPTACLE TO POWER METERING

BRIDGE. COORDINATE WITH VA AS

REQUIRED FOR FINAL LOCATION.

SUMP PUMP CONTROLLER/ALARM.

CONTROLLER PROVIDES POWER TO SUMP

PUMP RECEPTACLE. PROVIDE (1) 3/4"C.

WITH (1) CAT 6A CABLE AND 12 AWG GND

EXTENDING TO ROOM D008M BUILDING

AUTOMATION SYSTEM (BAS). REFERENCE

MECHANICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

BUILDING 1 - BASEMENT FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

AREA OF

WORK

EP101-1

BUILDING 1 - BASEMENT FLOOR:

POWER, LIGHTING, AND SPECIAL

SYSTEMS PLAN 1

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR LOBBY

DEVICE LOCATIONS WITH ARCHITECT

AND ELEVATOR MANUFACTURER PRIOR

TO INSTALLATION.

2. ELEVATOR PIT: LIGHTING AND

RECEPTACLES SHALL MEET NEC.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N

ROOM

D008M

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 120 OF 143

EQ-3

EQ-1

TRANSFORMER

RECT.

JB

AHU

SPACE TAKEN UP BY

EXISTING MECH/ELECT

EQUIPMENT

PANEL BEQ1

XFMRXRAYA

XFMRXRAYB

CEILING

MOUNTED

PULL BOX

B016

B014B

B014A

B005

B014 B012

B010

B008

BATT

UPS1

MIB

SW

BD

'A'

AREA OF

WORK

UPS

UPS

KEY NOTES

REVISED PANELBOARD "EQ-3". REFERENCE

ONE-LINE DIAGRAMS ON DRAWINGS E-601

AND E-602 FOR ADDITIONAL INFORMATION.

REVISED PANELBOARD "EQ-1". REFERENCE

ONE-LINE DIAGRAMS ON DRAWINGS E-601

AND E-602 FOR ADDITIONAL INFORMATION.

REVISED SWITCHBOARD "SWBD-A".

REFERENCE ONE-LINE DIAGRAMS ON

DRAWINGS E-601 AND E-602 FOR

ADDITIONAL INFORMATION.

PROVIDE METERING BRIDGE WITH ALL

REQUIRED LABELING, CONNECTIONS, AND

APPURTENANCES FOR A FULLY

FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS.

METER HARDWARE SHALL MATCH VA

FACILITY STANDARD: CENTRICA HARDWARE

(CT'S/BRIDGES) AND POWER RADAR

SOFTWARE, REFERENCE SPECIFICATION

25 10 10 FOR ADDITIONAL INFORMATION.

UTILIZE LOCAL RECEPTACLE TO POWER

METERING BRIDGE. COORDINATE WITH VA

AS REQUIRED FOR FINAL LOCATION.

PROVIDE CURRENT SENSORS IN

PANELBOARD WITH ALL REQUIRED

LABELING, CONNECTIONS, AND

APPURTENANCES FOR A FULLY

FUNCTIONAL SYSTEM. INSTALL PER

MANUFACTURER RECOMMENDATIONS. SEE

PANEL SCHEDULES AND ONE-LINE DIAGRAM

FOR ADDITIONAL INFORMATION.

HARDWARE SHALL MATCH VA FACILITY

STANDARD: CENTRICA HARDWARE

(CT'S/BRIDGES) AND POWER RADAR

SOFTWARE, REFERENCE SPECIFICATION 25

10 10 FOR ADDITIONAL INFORMATION.

BUILDING 1 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/4" = 1'-0"

EP101-2

BUILDING 1 - BASEMENT FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

AREAS

OF WORK

KEY PLAN

0 2' 4' 8'

Scale: 1/4" = 1'-0"

NN

SHEET NOTES

1. SWITCHBOARD 'A' IS NOT LOCATED AT THE

SAME ELEVATION AS ROOM B010.

SWITCHBOARD 'A' IS LOCATED AT GROUND

LEVEL, WHILE ROOM B010 IS LOCATED IN

THE BASEMENT OF THE BUILDING, BELOW

GROUND LEVEL.

2. WHERE ADDITIONAL 0 - 5A CTs ARE

REQUIRED FOR ELECTRICAL POWER

METERING PURPOSES, CONTRACTOR

SHALL PROVIDE ALL REQUIRED CABELING,

JUNCTION BOXES/ENCLOSURES, AND

APPURTENANCES AS REQUIRED FOR A

COMPLETE AND FUNCTIONAL SYSTEM.

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

M

M

A119 A103

A119

A105S3 P1

P2

AREA OF WORK

S

ELV

ELV

AREA OF

WORK

BUILDING 1 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP102

BUILDING 1 - FIRST FLOOR: POWER

AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE

CAMERA. PROVIDE REQUIRED

CONNECTIONS FROM CAMERA TO

ETHERNET SWITCH LOCATED IN ROOM

A105.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA

LRL/WNM JPS/FEB

ELEVATOR CAB SURVEILLANCE

CAMERA; CAMERA MUST BE ABLE TO

BE MONITORED VIA SSTV. COORDINATE

FINAL INSTALLED LOCATION AND

CABLING REQUIREMENTS WITH VA AND

ELEVATOR CONTRACTOR.

A211

A237

A212 A235

S3 P1

P2

AREA OF WORK

S

S

ELV

ELV

AREA OF

WORK

BUILDING 1 - SECOND FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP103

BUILDING 1 - SECOND FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

0 1' 2' 4'

Scale: 1/2" = 1'-0" N0 1' 2' 4'

Scale: 1/2" = 1'-0" N

RM A203

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 123 OF 143

A303

A-331 A302

S3 P1

P2

AREA OF WORK

S

WAP

ELVELV

THIRD FLOOR - BUILDING 1: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

AREA OF

WORK

EP104

BUILDING 1 - THIRD FLOOR: POWER

AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE

CAMERA. PROVIDE REQUIRED

CONNECTIONS FROM CAMERA TO

ETHERNET SWITCH LOCATED IN ROOM

A302.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 124 OF 143

A405

A401A425 C4-A2

A423

A402

S3 P1

P2

AREA OF WORK

SELV

ELV

AREA OF

WORK

BUILDING 1 - FOURTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN

Scale: 1/2" = 1'-0"

EP105

BUILDING 1 - FOURTH FLOOR:

POWER AND SPECIAL SYSTEMS PLAN

KEY PLAN

SHEET NOTES

1. COORDINATE ALL ELEVATOR

LOBBY DEVICE LOCATIONS WITH

ARCHITECT AND ELEVATOR

MANUFACTURER PRIOR TO

INSTALLATION.

KEY NOTES

ELEVATOR LOBBY SURVEILLANCE

CAMERA. PROVIDE REQUIRED

CONNECTIONS FROM CAMERA TO

ETHERNET SWITCH LOCATED IN ROOM

A402.

0 1' 2' 4'

Scale: 1/2" = 1'-0" N

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

LRL/WNM JPS/FEB 125 OF 143

File details come from the government source that posted it. Updated .