Attachment 8 668-18-109_Project Drawings 4 of 6.pdf
PDF 15 MB Posted
- Solicitation number
- 36C26024R0009
About this file
This file attachment relates to a federal contract solicitation for elevator refurbishment and upgrades. The solicitation number is 36C26024R0009 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for work at Building 1 and 27. The solicitation seeks bids to refurbish and upgrade elevators, as depicted in the attached project drawings, with a response due date unspecified. Key details include the federal agency issuing the solicitation, the buildings and types of work involved, and that project drawings are provided to inform bid responses.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT
FOR S3
EQUIPMENT
FOR P1
EQUIPMENT
FOR P2
EQUIPMENT
ARRAY FOR P2
EQUIPMENT
ARRAY FOR S3
EQUIPMENT
ARRAY FOR P1
P1
S3
P2
S3 P2 P1
6 5
S3P2P1
DOWN
AREA OF
WORK
S
25 TYP
TYP.
14 27
KEY NOTES
EXISTING SHUNT TRIP PUSHBUTTON
CONTROLS FOR ELEVATORS "P1", "P2", AND
"S3" TO BE DEMOLISHED.
EXISTING 120V ELEVATOR CAB
DISCONNECTS FOR ELEVATORS "P1", "P2",
AND "S3" TO BE DEMOLISHED.
EXISTING SERVICE ELEVATOR "S3"
DISCONNECT TO BE DEMOLISHED.
EXISTING PASSENGER ELEVATOR "P2"
DISCONNECT TO BE DEMOLISHED.
EXISTING PASSENGER ELEVATOR "P1"
DISCONNECT TO BE DEMOLISHED.
EXISTING PANELBOARD USED AS A
PULLBOX TO BE DEMOLISHED.
EXISTING ELEVATOR SHUNT TRIP CIRCUIT
BREAKERS TO BE DEMOLISHED.
EXISTING PASSENGER ELEVATOR "P1"
ISOLATION TRANSFORMER AND CONTROL
UNIT TO BE DEMOLISHED. EXISTING
CONDUCTORS SHALL BE DEMOLISHED
BACK TO SOURCE IN BASEMENT; EXISTING
RACEWAYS AND BOXES TO BE REUSED AS
APPLICABLE.
EXISTING PASSENGER ELEVATOR "P1"
DRIVER UNIT AND ASSOCIATED RACEWAYS
AND CONDUCTORS TO BE DEMOLISHED.
EXISTING PASSENGER ELEVATOR "P2"
ISOLATION TRANSFORMER AND CONTROL
UNIT TO BE DEMOLISHED. EXISTING
CONDUCTORS SHALL BE DEMOLISHED
BACK TO SOURCE IN BASEMENT; EXISTING
RACEWAYS AND BOXES TO BE REUSED AS
APPLICABLE.
EXISTING PASSENGER ELEVATOR "P2"
DRIVER UNIT AND ASSOCIATED RACEWAYS
AND CONDUCTORS TO BE DEMOLISHED.
EXISTING SERVICE ELEVATOR "S3"
ISOLATION TRANSFORMER AND CONTROL
UNIT TO BE DEMOLISHED. EXISTING
CONDUCTORS TO BE DEMOLISHED BACK
TO SOURCE; EXISTING RACEWAYS AND
BOXES TO BE REUSED WHERE
APPLICABLE.
EXISTING SERVICE ELEVATOR "S3" DRIVER
UNIT AND ASSOCIATED RACEWAYS AND
CONDUCTORS TO BE DEMOLISHED.
EXISTING MECHANICAL EQUIPMENT,
DUCTWORK AND LOUVER TO BE
DEMOLISHED. EXISTING CONDUCTORS TO
BE DEMOLISHED BACK TO SOURCE;
EXISTING CONDUIT TO BE REUSED WHERE
APPLICABLE. REFERENCE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING ELEVATOR NETWORK SWITCH,
RELATED EQUIPMENT, AND PORTION OF
DATA RACK TO BE RELOCATED ON SAME
FLOOR. REFERENCE DETAIL '3' ON THIS
SHEET FOR ADDITIONAL INFORMATION
REGARDING SPECIFIC EQUIPMENT AND
DRAWING EP111 FOR ADDITIONAL
INFORMATION REGARDING RELOCATION.
EXISTING DIRECT TV EQUIPMENT AND
RACK TO BE RELOCATED TO ROOM A635.
REFERENCE DRAWING EP107 FOR
ADDITIONAL INFORMATION.
EXISTING MOTOROLA RADIO EQUIPMENT,
RADIO REPEATERS, SAT PHONE, AND
ADVANCED ELECTRICAL METERING
SYSTEM TO BE RELOCATED ON SAME
FLOOR. REFERENCE DRAWING EP111 FOR
ADDITIONAL INFORMATION REGARDING
RELOCATION.
EXISTING STORAGE CABINET TO REMAIN.
EXISTING JUNCTION BOX TO BE
DEMOLISHED.
EXISTING FIRE ALARM JUNCTION BOX
HOUSING SHUNT TRIP RELAYS TO BE
DEMOLISHED.
EXISTING FEEDER RACEWAYS FOR
ELEVATORS "P1" AND "P2" AND PULL BOX
TO REMAIN FOR REUSE. EXISTING
CONDUCTORS TO BE DEMOLISHED BACK
TO SOURCE.
EXISTING FEEDER RACEWAY FOR
ELEVATOR "S3" TO REMAIN FOR REUSE.
EXISTING CONDUCTORS TO BE
DEMOLISHED BACK TO SOURCE.
EXISTING ABANDONED CONDUIT AND
JUNCTION BOX TO BE DEMOLISHED.
CONDUIT EXTENDING TO BELOW FLOORS
SHALL REMAIN; CAP AND MARK AS SPARE.
EXISTING ANTENNA CABLE TO REMAIN.
ALL EXISTING FIRE ALARM DEVICES TO BE
DEMOLISHED. CONTRACTOR TO FIELD
VERIFY EXACT QUANTITY AND LOCATIONS.
EXISTING LIGHTING, SWITCHES, AND
ASSOCIATED CONDUIT AND WIRE TO BE
DEMOLISHED.
ONCE MECHANICAL UNITS SERVING
ELEVATOR MACHINE ROOM HAVE BEEN
DE-ENERGIZED FOR DEMOLITION,
CONTRACTOR SHALL UTILIZE EXISTING
PANELBOARD "9EQ4" TO POWER
TEMPORARY PORTABLE AC UNIT.
CONTRACTOR SHALL PROVIDE OCPDs, DISCONNECTS, AND CABLING AS
REQUIRED. COORDINATE WITH
MECHANICAL DRAWINGS AS REQUIRED.
EXISTING SURVEILLANCE NETWORK
SWITCH AND ASSOCIATED PATCH PANEL
TO BE RELOCATED TO ROOM A800D WITH
NEW CABELING AS REQUIRED. REFERENCE
DETAIL '3' ON THIS SHEET FOR ADDITIONAL
EXISTING EQUIPMENT INFORMATION AND
SHEET EP109 FOR ROOM A800D LOCATION.
SHEET NOTES
1. COORDINATE REMOVAL OF ELECTRICAL
AND LOW-VOLTAGE EQUIPMENT WITH
PHASING OF CONSTRUCTION.
2. CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL FIELD INVESTIGATION,
VERIFICATION, AND DEMOLITION
REQUIRED FOR ALL NON-ELEVATOR
RELATED EQUIPMENT, RACEWAYS, AND
CONDUCTORS UNLESS OTHERWISE
NOTED; CONDUCTORS SHALL BE
DEMOLISHED BACK TO SOURCE.
3. NOT ALL RACEWAYS SHOWN FOR
CLARITY.
4. DEMOLISH ALL EXISTING RECEPTACLES
LOCATED IN THIS SPACE. DEMOLISH
PORTIONS OF RACEWAYS AS REQUIRED
TO EXTEND TO NEW DESTINATION; ALL
CONDUCTORS SHALL BE DEMOLISHED
BACK TO SOURCE.
5. ALL NON-ELEVATOR RELATED
EQUIPMENT SHALL BE DEMOLISHED OR
RELOCATED FROM ELEVATOR
MECHANICAL ROOM.
BUILDING 1 - MACHINE ROOM: ELECTRICAL DEMOLITION PLAN
Scale: 1/2" = 1'-0"
AREA OF WORK
ED111
BUILDING 1 - MACHINE ROOM:
ELECTRICAL DEMOLITION PLAN
DATA/TV/RADIO EQUIPMENT RACK PHOTO DETAIL
Not to scale
ENLARGED DATA/TV EQUIPMENT RACK PHOTO DETAIL
Not to scale
KEY PLAN
EXISTING
FIBER-OPTIC
PATCH PANEL
-15
EXISTING
ELEVATOR
NETWORK
SWITCH
EXISTING
SURVEILLANCE
NETWORK SWITCH
EXISTING PATCH
PANEL (CURRENTLY
UTILIZED FOR
SURVEILLANCE
CAMERAS)
EXISTING SURGE
PROTECTIVE DEVICE
EXISTING 1.5KVA UPS
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
001A
S0-C1
BC1-27
P4
G U
TT
ER
AREA OF WORK
AREA OF WORK
001A
002 P4
G U
TT
ER
AREA OF
WORK
WAP
HD
S
AREA
OF
WORK
EXISTING
PAGING
SYSTEM
BACKBOARD
EXISTING
TELEPHONE
DATA
BACKBOARD
FAT
FTT
FA
C P
12 11 10
KEY NOTES
EXISTING ELEVATOR DISCONNECT, SHUNT
TRIP CIRCUIT BREAKER, AND GUTTER TO
BE DEMOLISHED.
EXISTING ELEVATOR 120V SHUNT TRIP
CIRCUIT BREAKER TO BE DEMOLISHED.
EXISTING ELEVATOR CAB LIGHTING AND
RECEPTACLE CIRCUIT BREAKER TO BE
DEMOLISHED.
EXISTING HYDRAULIC ELEVATOR
CONTROLLER AND ALL ASSOCIATED
CONDUIT AND WIRE TO BE DEMOLISHED.
EXISTING ELEVATOR TELEPHONE CONDUIT
TO REMAIN. DEMOLISH EXISTING
TELEPHONE CONDUCTORS.
EXISTING ELEVATOR CAB "P4 TO BE
REPLACED. ALL ASSOCIATED CONDUCTORS
AND FIELD DEVICES SHALL BE DEMOLISHED
BACK TO ITS SOURCE.
EXISTING ELEVATOR EMERGENCY POWER
SOURCE PANEL TO BE DEMOLISHED.
EXISTING LUMINAIRES, FIRE ALARM
DEVICES, CAMERAS, AND ANY OTHER
ELECTRICAL EQUIPMENT LOCATED IN
ELEVATOR LOBBY AREA OF WORK SHALL
BE PROTECTED IN PLACE OR REMOVED
AND REINSTALLED AFTER COMPLETION OF
ARCHITECTURAL WORK AS REQUIRED.
REFERENCE ARCHITECTURAL DRAWINGS
FOR MORE INFORMATION.
EXISTING PANELBOARD "DP" TO BE
REVISED TO PROVIDE LSIG ELEVATOR
FEEDER CIRCUIT BREAKER. REFERENCE
ONE-LINE DIAGRAMS ON DRAWINGS E-605
AND E-606 FOR ADDITIONAL INFORMATION.
EXISTING LIFE SAFETY PANELBOARD "LSL"
TO BE REVISED. REFERENCE ASSOCIATED
PANEL SCHEDULES ON DRAWING E-607 FOR
ADDITIONAL INFORMATION.
EXISTING NORMAL POWER LIGHTING
PANELBOARD "LL".
EXISTING NORMAL POWER PANELBOARD
"PL".
EXISTING 2-1/2" CONDUIT FEEDING
ELEVATOR EQUIPMENT TO REMAIN FOR
REUSE. EXISTING CONDUCTORS TO BE
DEMOLISHED BACK TO SOURCE.
EXISTING ELEVATOR PIT LIGHTING TO BE
REPLACED WITH NEW LIGHTING.
REFERENCE SHEET EP112 FOR ADDITIONAL
INFORMATION.
EXISTING CARD READER COMMUNICATION
CABINET TO BE DEMOLISHED AND
REPLACED. DEMOLISH CONDUIT AND WIRE
ASSOCIATED WITH CABINET. CONDUIT AND
WIRE ASSOCIATED WITH EXISTING CARD
READERS SHALL BE PRESERVED FOR
REUSE WITH NEW CABINET.
SHEET NOTES
1. ALL CONDUIT SHOWN IS
DIAGRAMMATICAL. CONTRACTOR
SHALL FIELD VERIFY EXACT ROUTING
AS REQUIRED.
2. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING ELEVATOR LOBBY
LUMINAIRES, ELEVATOR PIT LIGHTING
AND EQUIPMENT, AND FIELD DEVICES
AS REQUIRED.
3. PACS CARD READER COMMUNICATION
CABINET CONNECTS TO THE
ENGINEERING SWITCH. CURRENTLY,
THE ENGINEERING SWITCH IS LOCATED
IN ROOM 023. HOWEVER, THERE IS A
CONCURRENT PROJECT WHICH IS
RELOCATING ALL DATA/IT TO ROOM 024.
AREA OF
WORK
BUILDING 27 - BASEMENT FLOOR: ELECTRICAL DEMOLITION PLAN
Scale: 1/4" = 1'-0"
ED112
BUILDING 27 - BASEMENT FLOOR:
ELECTRICAL DEMOLITION PLAN
(DEDUCTIVE BID ALTERNATE)
KEY PLAN
ENLARGED ELEVATOR, MACHINE ROOM AND LOBBY DEMOLITION PLAN
Scale: 1/2" = 1'-0"
ENLARGED RM 023 DEMOLITION PLAN
Scale: 1/2" = 1'-0"
DEDUCTIVE BID ALTERNATE
0 1' 2' 4'
Scale: 1/2" = 1'-0"
0 1' 2' 4'
0 2' 4' 8'
Scale: 1/2" = 1'-0"
Scale: 1/4" = 1'-0"
NNNN
NN
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
P4182
S1-C1
1C3-27183
AREA OF WORK
S
WAP
KEY NOTES
EXISTING ELEVATOR CAB "P4 TO BE
REPLACED. ALL ASSOCIATED
CONDUCTORS AND FIELD DEVICES
SHALL BE DEMOLISHED BACK TO ITS
SOURCE.
EXISTING LUMINAIRES, FIRE ALARM
DEVICES, CAMERAS, AND ANY OTHER
ELECTRICAL EQUIPMENT LOCATED IN
ELEVATOR LOBBY AREA OF WORK
SHALL BE PROTECTED IN PLACE OR
REMOVED AND REINSTALLED AFTER
COMPLETION OF ARCHITECTURAL
WORK AS REQUIRED. REFERENCE
ARCHITECTURAL DRAWINGS FOR MORE
INFORMATION.
SHEET NOTES
AREA OF
WORK
BUILDING 27 - FIRST FLOOR: ELECTRICAL DEMOLITION PLAN
Scale: 3/4" = 1'-0"
ED113
BUILDING 27 - FIRST FLOOR:
ELECTRICAL DEMOLITION PLAN
(DEDUCTIVE BID ALTERNATE) 27
KEY PLAN
1. REFERENCE ARCHITECTURAL
DRAWINGS AND ELEVATOR
SPECIFICATIONS FOR ADDITIONAL
DEMOLITION INFORMATION.
2. CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING ELEVATOR LOBBY
LUMINAIRES AND FIELD DEVICES
AS REQUIRED.
DEDUCTIVE BID ALTERNATE
0 1' 2' 3'
SCALE: 3/4" = 1'-0"
NN
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB 118 OF 143
P4
2C1-27
AREA OF WORK
S
S
WAP
3 3
KEY NOTES
EXISTING ELEVATOR CAB "P4 TO BE
REPLACED. ALL ASSOCIATED
CONDUCTORS AND FIELD DEVICES
SHALL BE DEMOLISHED BACK TO ITS
SOURCE.
EXISTING LUMINAIRES, FIRE ALARM
DEVICES, CAMERAS, AND ANY OTHER
ELECTRICAL EQUIPMENT LOCATED IN
ELEVATOR LOBBY AREA OF WORK
SHALL BE PROTECTED IN PLACE OR
REMOVED AND REINSTALLED AFTER
COMPLETION OF ARCHITECTURAL
WORK AS REQUIRED. REFERENCE
ARCHITECTURAL DRAWINGS FOR MORE
INFORMATION.
SHEET NOTES
AREA OF
WORK
BUILDING 27 - SECOND FLOOR: ELECTRICAL DEMOLITION PLAN
Scale: 3/4" = 1'-0"
ED114
BUILDING 27 - SECOND FLOOR:
ELECTRICAL DEMOLITION PLAN
(DEDUCTIVE BID ALTERNATE) 27
KEY PLAN
1. REFERENCE ARCHITECTURAL
DRAWINGS AND ELEVATOR
SPECIFICATIONS FOR ADDITIONAL
DEMOLITION INFORMATION.
2. CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING ELEVATOR LOBBY
LUMINAIRES AND FIELD DEVICES
AS REQUIRED.
DEDUCTIVE BID ALTERNATE
0 1' 2' 3'
Scale: 3/4" = 1'-0"
NN
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 119 OF 143
CB-A2S3 P1
P2
AREA OF WORK
S
S
L2
L2
L2
M
WP
WP
ELV
ELV
4N3-9
4N3-9
4N3-9
4N3-9
WP
4N3-9
E-501
BEQ4-3
BEQ4-7
KEY NOTES
SUMP PUMP "SP-1".
ELEVATOR MAINTENANCE DATA PORT.
PROVIDE CONNECTION TO ELEVATOR
NETWORK SWITCH LOCATED IN ROOM
A1000; REFERENCE DRAWING EP111 FOR
ADDITIONAL INFORMATION.
PROVIDE METERING BRIDGE FOR SUMP
PUMP PANEL AT PANEL BEQ4 WITH ALL
REQUIRED LABELING, CONNECTIONS, AND
APPURTENANCES FOR A FULLY
FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS.
METER HARDWARE SHALL MATCH VA
FACILITY STANDARD: CENTRICA
HARDWARE (CT'S/BRIDGES) AND POWER
RADAR SOFTWARE, REFERENCE
SPECIFICATION 25 10 10 FOR ADDITIONAL
INFORMATION. UTILIZE LOCAL
RECEPTACLE TO POWER METERING
BRIDGE. COORDINATE WITH VA AS
REQUIRED FOR FINAL LOCATION.
SUMP PUMP CONTROLLER/ALARM.
CONTROLLER PROVIDES POWER TO SUMP
PUMP RECEPTACLE. PROVIDE (1) 3/4"C.
WITH (1) CAT 6A CABLE AND 12 AWG GND
EXTENDING TO ROOM D008M BUILDING
AUTOMATION SYSTEM (BAS). REFERENCE
MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
BUILDING 1 - BASEMENT FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
AREA OF
WORK
EP101-1
BUILDING 1 - BASEMENT FLOOR:
POWER, LIGHTING, AND SPECIAL
SYSTEMS PLAN 1
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR LOBBY
DEVICE LOCATIONS WITH ARCHITECT
AND ELEVATOR MANUFACTURER PRIOR
TO INSTALLATION.
2. ELEVATOR PIT: LIGHTING AND
RECEPTACLES SHALL MEET NEC.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N
ROOM
D008M
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 120 OF 143
EQ-3
EQ-1
TRANSFORMER
RECT.
JB
AHU
SPACE TAKEN UP BY
EXISTING MECH/ELECT
EQUIPMENT
PANEL BEQ1
XFMRXRAYA
XFMRXRAYB
CEILING
MOUNTED
PULL BOX
B016
B014B
B014A
B005
B014 B012
B010
B008
BATT
UPS1
MIB
SW
BD
'A'
AREA OF
WORK
UPS
UPS
KEY NOTES
REVISED PANELBOARD "EQ-3". REFERENCE
ONE-LINE DIAGRAMS ON DRAWINGS E-601
AND E-602 FOR ADDITIONAL INFORMATION.
REVISED PANELBOARD "EQ-1". REFERENCE
ONE-LINE DIAGRAMS ON DRAWINGS E-601
AND E-602 FOR ADDITIONAL INFORMATION.
REVISED SWITCHBOARD "SWBD-A".
REFERENCE ONE-LINE DIAGRAMS ON
DRAWINGS E-601 AND E-602 FOR
ADDITIONAL INFORMATION.
PROVIDE METERING BRIDGE WITH ALL
REQUIRED LABELING, CONNECTIONS, AND
APPURTENANCES FOR A FULLY
FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS.
METER HARDWARE SHALL MATCH VA
FACILITY STANDARD: CENTRICA HARDWARE
(CT'S/BRIDGES) AND POWER RADAR
SOFTWARE, REFERENCE SPECIFICATION
25 10 10 FOR ADDITIONAL INFORMATION.
UTILIZE LOCAL RECEPTACLE TO POWER
METERING BRIDGE. COORDINATE WITH VA
AS REQUIRED FOR FINAL LOCATION.
PROVIDE CURRENT SENSORS IN
PANELBOARD WITH ALL REQUIRED
LABELING, CONNECTIONS, AND
APPURTENANCES FOR A FULLY
FUNCTIONAL SYSTEM. INSTALL PER
MANUFACTURER RECOMMENDATIONS. SEE
PANEL SCHEDULES AND ONE-LINE DIAGRAM
FOR ADDITIONAL INFORMATION.
HARDWARE SHALL MATCH VA FACILITY
STANDARD: CENTRICA HARDWARE
(CT'S/BRIDGES) AND POWER RADAR
SOFTWARE, REFERENCE SPECIFICATION 25
10 10 FOR ADDITIONAL INFORMATION.
BUILDING 1 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/4" = 1'-0"
EP101-2
BUILDING 1 - BASEMENT FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
AREAS
OF WORK
KEY PLAN
0 2' 4' 8'
Scale: 1/4" = 1'-0"
NN
SHEET NOTES
1. SWITCHBOARD 'A' IS NOT LOCATED AT THE
SAME ELEVATION AS ROOM B010.
SWITCHBOARD 'A' IS LOCATED AT GROUND
LEVEL, WHILE ROOM B010 IS LOCATED IN
THE BASEMENT OF THE BUILDING, BELOW
GROUND LEVEL.
2. WHERE ADDITIONAL 0 - 5A CTs ARE
REQUIRED FOR ELECTRICAL POWER
METERING PURPOSES, CONTRACTOR
SHALL PROVIDE ALL REQUIRED CABELING,
JUNCTION BOXES/ENCLOSURES, AND
APPURTENANCES AS REQUIRED FOR A
COMPLETE AND FUNCTIONAL SYSTEM.
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
M
M
A119 A103
A119
A105S3 P1
P2
AREA OF WORK
S
ELV
ELV
AREA OF
WORK
BUILDING 1 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP102
BUILDING 1 - FIRST FLOOR: POWER
AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE
CAMERA. PROVIDE REQUIRED
CONNECTIONS FROM CAMERA TO
ETHERNET SWITCH LOCATED IN ROOM
A105.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
LRL/WNM JPS/FEB
ELEVATOR CAB SURVEILLANCE
CAMERA; CAMERA MUST BE ABLE TO
BE MONITORED VIA SSTV. COORDINATE
FINAL INSTALLED LOCATION AND
CABLING REQUIREMENTS WITH VA AND
ELEVATOR CONTRACTOR.
A211
A237
A212 A235
S3 P1
P2
AREA OF WORK
S
S
ELV
ELV
AREA OF
WORK
BUILDING 1 - SECOND FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP103
BUILDING 1 - SECOND FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
0 1' 2' 4'
Scale: 1/2" = 1'-0" N0 1' 2' 4'
Scale: 1/2" = 1'-0" N
RM A203
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 123 OF 143
A303
A-331 A302
S3 P1
P2
AREA OF WORK
S
WAP
ELVELV
THIRD FLOOR - BUILDING 1: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
AREA OF
WORK
EP104
BUILDING 1 - THIRD FLOOR: POWER
AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE
CAMERA. PROVIDE REQUIRED
CONNECTIONS FROM CAMERA TO
ETHERNET SWITCH LOCATED IN ROOM
A302.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 124 OF 143
A405
A401A425 C4-A2
A423
A402
S3 P1
P2
AREA OF WORK
SELV
ELV
AREA OF
WORK
BUILDING 1 - FOURTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
Scale: 1/2" = 1'-0"
EP105
BUILDING 1 - FOURTH FLOOR:
POWER AND SPECIAL SYSTEMS PLAN
KEY PLAN
SHEET NOTES
1. COORDINATE ALL ELEVATOR
LOBBY DEVICE LOCATIONS WITH
ARCHITECT AND ELEVATOR
MANUFACTURER PRIOR TO
INSTALLATION.
KEY NOTES
ELEVATOR LOBBY SURVEILLANCE
CAMERA. PROVIDE REQUIRED
CONNECTIONS FROM CAMERA TO
ETHERNET SWITCH LOCATED IN ROOM
A402.
0 1' 2' 4'
Scale: 1/2" = 1'-0" N
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
LRL/WNM JPS/FEB 125 OF 143
File details come from the government source that posted it. Updated .