Attachment 16 Price Breakout.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Y1DA--CON-NRM 668-18-109 Refurbish and Upgrade Elevators in Bldg 1 and 27
Solicitation number
36C26024R0009
Issued by

About this file

This document contains a price schedule breakdown template and instructions for a federal contract solicitation to refurbish and upgrade elevators at two buildings of the Spokane Veterans Affairs Medical Center. The solicitation is identified as number 36C26024R0009 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

The price schedule breakdown template includes line items grouped by Construction Specification Institute divisions and requests pricing for general requirements, mobilization, insurance/bonds, taxes, O&M manuals, overhead, subcontract markups, profit, and other unspecified items. Pricing is fixed for two contract line items for work at each of the two buildings. No response or award dates are included, but the period of performance in days is requested for each line item.

View the file

Other files

File Type Posted
Wage Determination 1.19.24.pdf PDF
36C26024R0009 0006.pdf PDF
36C26024R0009 0005.pdf PDF
Wage Determination 1.5.24.pdf PDF
Wage Determination 12.22.23.pdf PDF
36C26024R0009 0004.pdf PDF
36C26024R0009 0003.pdf PDF
36C26024R0009 0002.pdf PDF
36C26024R0009 0001.pdf PDF
WD 11.24.23.pdf PDF
668-18-109_Pre Bid Site Walk Sign In Sheet_2023.12.03.pdf PDF
Attachment 17 Security Requirements.pdf PDF
Attachment 18 Contractor Rules of Behavior.pdf PDF
Attachment 4 668-18-109_Supplement to SPEC 01 00 00 Part 1-6-I.pdf PDF
Attachment 10 668-18-109_Project Drawings 6 of 6.pdf PDF
Attachment 15 Wage Determination 11.17.23.pdf PDF
Attachment 2 668-18-109_Project Specifications 1 of 2_R1.pdf PDF
Attachment 5 668-18-109_Project Drawings 1 of 6.pdf PDF
Attachment 13 668-18-109_Lead Sampling Report.pdf PDF
Attachment 6 668-18-109_Project Drawings 2 of 6.pdf PDF
Attachment 19 Calculation of Self Performed Work REV 1.pdf PDF
36C26024R0009.pdf PDF
Attachment 7 668-18-109_Project Drawings 3 of 6.pdf PDF
Attachment 12 668-18-109_Limited Asbestos Good Faith Survey - Addendum 1.pdf PDF
Attachment 3 668-18-109_Project Specifications 2 of 2_R1.pdf PDF
Attachment 1 668-18-109_SOW-CON_2023-08-15.pdf PDF
Attachment 8 668-18-109_Project Drawings 4 of 6.pdf PDF
Attachment 11 668-18-109_Limited Asbestos Good Faith Survey.pdf PDF
Attachment 9 668-18-109_Project Drawings 5 of 6.pdf PDF
Attachment 14 668-18-109_DWG Clarification Document_2023-06-22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ-36C26023Q0778

Project Number / Title: 668-18-109 / Refurbish and Upgrade Elevators in Bldg 1 & 27 Project Location: Spokane VAMC Campus

CLIN 0001CLIN 0002
RatesItemItem
PricePrice
Division Item 1 General RequirementsN/A$0.00$0.00
Division Item 2 Existing ConditionsN/A$0.00$0.00
Division Item 3 ConcreteN/A$0.00$0.00
Division Item 4 MasonryN/A$0.00$0.00
Division Item 5 MetalsN/A$0.00$0.00
Division Item 6 Woods, Plastic and CompositesN/A$0.00$0.00
Division Item 7 Thermal and Moisture ProtectionN/A$0.00$0.00
Division Item 8 OpeningsN/A$0.00$0.00
Division Item 9 FinishesN/A$0.00$0.00
Division Item 10 SpecialtiesN/A$0.00$0.00
Division Item 11 EquipmentN/A$0.00$0.00
Division Item 12 FurnishingsN/A$0.00$0.00
Division Item 13 Special ConstructionN/A$0.00$0.00
Division Item 14 Conveying EquipmentN/A$0.00$0.00
Division Item 21 Fire SuppressionN/A$0.00$0.00
Division Item 22 PlumbingN/A$0.00$0.00
Division Item 23 Heating, Ventilating and A/CN/A$0.00$0.00
Division Item 25 Integrated AutomationN/A$0.00$0.00
Division Item 26 ElectricalN/A$0.00$0.00
Division Item 27 CommunicationsN/A$0.00$0.00
Division Item 28 Electronic Safety and SecurityN/A$0.00$0.00
Division Item 31 EarthworkN/A$0.00$0.00
Division Item 32 Exterior ImprovementsN/A$0.00$0.00
Division Item 33 UtilitiesN/A$0.00$0.00
Divisoin Item 34 TransportaionN/A$0.00$0.00
Division Item 35 Waterway and Marine ConstructionN/A$0.00$0.00
Division Item 40 Process IntegrationN/A$0.00$0.00
Division Item 41 Material Process and Handling EquipmentN/A$0.00$0.00
Division Item 42 Process Heating, Cooling, and Drying EquipmentN/A$0.00$0.00
Division Item 43 Process Gas and Liquid Handling, Purification and Storage EquipmentN/A$0.00$0.00
Division Item 44 Pollution and Waste Control EquipmentN/A$0.00$0.00
Division Item 45 Industry Specific Manufacturing EquipmentN/A$0.00$0.00
Division Item 46 Water and Wastewater EquipmentN/A$0.00$0.00
Division Item 48 Electrical Power GenerationN/A$0.00$0.00
SubTotals$0.00$0.00

Period of Performance (FAR 52.211-10) ________ days ________ days

Mobilization / DemobilizationN/A$0.00$0.00
Insurance / BondsN/A$0.00$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00$0.00
O&M Manuals and Red Line DrawingsN/A$0.00$0.00
OverheadRate _______%N/AN/A
Overhead (daily rate)Per Day $0.00N/AN/A
SubContract Mark-UpRate _______%N/AN/A
ProfitRate _______%N/AN/A
SubTotals$0.00$0.00

Other Items not Requested Above (provide itemized list) $0.00 $0.00

CONTRACT TOTALS $0.00 $0.00