Attachment 6 668-18-109_Project Drawings 2 of 6.pdf

PDF 2 MB Posted

Attached to
Y1DA--CON-NRM 668-18-109 Refurbish and Upgrade Elevators in Bldg 1 and 27
Solicitation number
36C26024R0009
Issued by

About this file

This package includes construction documents and drawings for a federal contract opportunity to refurbish and upgrade elevators in Building 1 and 27 at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The solicitation number is 36C26024R0009 and the project involves replacing elevator equipment and modernizing elevator systems in the two buildings. The documents provide specifications for mechanical, electrical, and plumbing work. Schematics illustrate demolition of existing structures and installation of new HVAC, fire protection, and plumbing systems. Product data is included for mechanical equipment such as air handling units, fan coils, and a rooftop unit. Construction details specify scope of work and compliance with applicable building codes.

The opportunity is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The documents contain requirements for the elevator modernization but no information about proposal due dates, award timing, or pricing terms for the federal contract.

View the file

Other files

File Type Posted
Wage Determination 1.19.24.pdf PDF
36C26024R0009 0006.pdf PDF
36C26024R0009 0005.pdf PDF
Wage Determination 1.5.24.pdf PDF
Wage Determination 12.22.23.pdf PDF
36C26024R0009 0004.pdf PDF
36C26024R0009 0003.pdf PDF
36C26024R0009 0002.pdf PDF
36C26024R0009 0001.pdf PDF
WD 11.24.23.pdf PDF
668-18-109_Pre Bid Site Walk Sign In Sheet_2023.12.03.pdf PDF
Attachment 17 Security Requirements.pdf PDF
Attachment 18 Contractor Rules of Behavior.pdf PDF
Attachment 4 668-18-109_Supplement to SPEC 01 00 00 Part 1-6-I.pdf PDF
Attachment 10 668-18-109_Project Drawings 6 of 6.pdf PDF
Attachment 15 Wage Determination 11.17.23.pdf PDF
Attachment 2 668-18-109_Project Specifications 1 of 2_R1.pdf PDF
Attachment 5 668-18-109_Project Drawings 1 of 6.pdf PDF
Attachment 13 668-18-109_Lead Sampling Report.pdf PDF
Attachment 19 Calculation of Self Performed Work REV 1.pdf PDF
36C26024R0009.pdf PDF
Attachment 7 668-18-109_Project Drawings 3 of 6.pdf PDF
Attachment 12 668-18-109_Limited Asbestos Good Faith Survey - Addendum 1.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 3 668-18-109_Project Specifications 2 of 2_R1.pdf PDF
Attachment 1 668-18-109_SOW-CON_2023-08-15.pdf PDF
Attachment 8 668-18-109_Project Drawings 4 of 6.pdf PDF
Attachment 11 668-18-109_Limited Asbestos Good Faith Survey.pdf PDF
Attachment 9 668-18-109_Project Drawings 5 of 6.pdf PDF
Attachment 14 668-18-109_DWG Clarification Document_2023-06-22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC BASIS OF DESIGN

SUMMER OUTDOOR

DESIGN DB (°F) 92 STATE COUNTY CLIMATE ZONE

SUMMER OUTDOOR

DESIGN WB (°F) 65 WASHINGTON SPOKANE 5B

WINTER OUTDOOR

DESIGN DB (°F) 4 DESIGN ALTITUDE 2,364

INDOOR SPACE

SUMMER INDOOR DESIGN CONDITIONS WINTER INDOOR DESIGN CONDITIONS

TEMPERATURE DB

(°F)

RELATIVE HUMIDITY

TEMPERATURE DB

(°F)

RELATIVE HUMIDITY

CONTROL ROOM 75 20-60 70 20-60

ELEVATOR

MACHINE ROOM 75 20-60 70 20-60

AIR FLOW AND PRESSURE RELATION

SPACE

DESIGNATION

MIN.

OCCUPIED/UNOCC.

TOTAL AIR

CHANGES/HR

MIN. OA AIR

CHANGES/HR ROOM AIR ROOM AIR BALANCE

CONTROL ROOM 8 / 4 2 RETURN NEUTRAL

ELEVATOR

MACHINE ROOM 20 / 10 4 RETURN NEUTRAL

DUCTWORK SYMBOLS

ADDITIONAL SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

BACK DRAFT DAMPER

SECTION.)

10X8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

H4

H7

A

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

NECK SIZE (IN)

AIR OUTLET TYPE

AIRFLOW (CFM)

SIZE (IN) OF CONNECTING BRANCH DUCT

ANGLE OF THROW, DOWN FROM HORIZONTAL (°)

AIR OUTLET CALLOUT

26-SF 3

26-TU-I-I

OR

OR

BALL VALVE

CHILLED WATER SUPPLY

CHILLED WATER RETURN

PIPING LEGEND

CHS

CHR

RISE OR DROP IN PIPE

NEW WORK KEY

DEMOLITION KEY

REFRIGERANT LIQUID LINE

REFRIGERANT SUCTION LINE

RL

RS

TEMPERATURE SENSOR OR

THERMOSTAT

T

M MOTORIZED DAMPER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA M-001

SHMK

MECHANICAL:

LEGENDS & SYMBOLS

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text

BDD

AutoCAD SHX Text

FC

AutoCAD SHX Text

FD

AutoCAD SHX Text

VD

AutoCAD SHX Text XxX [X] XXX,XxX,XX°

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING WORK (LIGHT)

AutoCAD SHX Text

NEW WORK (DARK)

AutoCAD SHX Text

CONNECT NEW TO EXISTING

AutoCAD SHX Text

EXISTING WORK (LIGHT)

AutoCAD SHX Text

DEMOLITION (DARK)

AutoCAD SHX Text

POINT OF DEMOLITION

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

1 BLDG 1 SIXTH FLOOR PLAN - MECHANICAL DEMO

0 4'2'

SCALE: 1/4" = 1'-0"

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION WORK

WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO

BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY

OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON THE

PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND

AROUND BUILDING DURING DEMOLITION. PREVENT INJURY TO

PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE

SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY

REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE

BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT

DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM THE UTILITY COMPANY AND/OR

OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT

AS SHOWN, UNLESS NOTED OTHERWISE. COORDINATE WITH

ARCHITECT, AREAS OF DEMOLITION AROUND, ADJACENT, OR

CONNECTED TO EXISTING MECHANICAL EQUIPMENT THAT IS TO

REMAIN.

DEMOLITION SHEET NOTES

REMOVE AND DISPOSE OF EXISTING FAN COIL AND ASSOCIATED

CHILLED WATER COIL, AND CONTROLS. COORDINATE EXTENT OF

DEMOLITION WITH NEW WORK.

REMOVE AND DISPOSE OF EXISTING DUCTWORK AND REGISTERS.

CAP DUCTWORK AT POINT OF BRANCH CONNECTION TO DUCT MAIN

IN HALLWAY. COORDINATE EXTENT OF DEMOLITION WITH NEW

WORK.

DEMO KEYED NOTES

N

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MD100

JWMK

BLDG 1 SIXTH FLOOR PLAN

MECHANICAL DEMO

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

1 BLDG 1 MACHINE ROOM FLOOR PLAN- DEMO

0 4' 8'2'

SCALE: 1/4" = 1'-0"

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION WORK

WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO

BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY

OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON THE

PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND

AROUND BUILDING DURING DEMOLITION. PREVENT INJURY TO

PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE

SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY

REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE

BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT

DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM THE UTILITY COMPANY AND/OR

OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT

AS SHOWN, UNLESS NOTED OTHERWISE. COORDINATE WITH

ARCHITECT, AREAS OF DEMOLITION AROUND, ADJACENT, OR

CONNECTED TO EXISTING MECHANICAL EQUIPMENT THAT IS TO

REMAIN.

DEMOLITION SHEET NOTES

REMOVE AND DISPOSE OF EXISTING AHU-1000 AND ASSOCIATED

CHILLED WATER COIL, DUCTWORK, AND CONTROLS. COORDINATE

EXTENT OF DEMOLITION WITH NEW WORK.

REMOVE AND DISPOSE OF EXISTING DUCTWORK. SEE DETAIL 3 ON

M501 FOR EXTENT OF DEMOLITION.

DEMO KEYED NOTES

1 11

60X48

AHU AND CURB SHALL

BE DEMOED

N

PROVIDE (2) 5 TON OCEANAIRE PAC6012 OR EQUAL FOR INTERMIT

COOLING DURING CONSTRUCTION

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MD101

JWMK

BLDG 1 MACHINE ROOM FLOOR PLAN

MECHANICAL DEMO

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

1 BLDG 1 ROOF FLOOR PLAN- MECHANICAL DEMO

SCALE: 1/4" = 1'-0"

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION WORK

WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO

BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY

OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON THE

PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND

AROUND BUILDING DURING DEMOLITION. PREVENT INJURY TO

PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE

SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY

REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE

BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT

DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM THE UTILITY COMPANY AND/OR

OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT

AS SHOWN, UNLESS NOTED OTHERWISE. COORDINATE WITH

ARCHITECT, AREAS OF DEMOLITION AROUND, ADJACENT, OR

CONNECTED TO EXISTING MECHANICAL EQUIPMENT THAT IS TO

REMAIN.

DEMOLITION SHEET NOTES

REMOVE AND DISPOSE OF EXISTING GRAVITY VENTILATOR AND

DUCTWORK. COORDINATE EXTENT OF DEMOLITION WITH NEW

WORK.

PROVIDE INSULATED CURB CAP.

DEMO KEYED NOTES

DEMO (E) GRAVITY VENTILATOR

LOWER ROOF

LOWER ROOF

DEMO KEYED NOTES

N

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MD102

JWMK

BLDG 1 ROOF FLOOR PLAN

MECHANICAL DEMO

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

1 BLDG 1 SIXTH FLOOR PLAN - MECHANICAL

PROJECT

NORTH

0 4'2'

SCALE: 1/4" = 1'-0"

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL

BE CONCEALED IN A FURRED CHASE OR ABOVE HARD

SUSPENDED CEILING, OR ACOUSTICAL CEILING.

2. ACCESS PANELS IN HARD SUSPENDED CEILING ARE REQUIRED

FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS,

ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED

UNDER THE ARCHITECTURAL SPECIFICATIONS COORDINATE

LOCATION WITH MECHANICAL INSTALLATION AND

DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

3. WALL TYPE EXHAUST REGISTERS NOTED ON DRAWINGS TO BE

INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE

FINISHED FLOOR.

4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

EXACT LOCATIONS OF CEILING DIFFUSERS, AND GRILLES.

5. SEISMIC PROVISIONS REQUIRED - SEE SPECIFICATIONS.

6. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS

OTHERWISE NOTED.

SHEET NOTES

FC

1/2"CHW AND

CHR AND 3/4"

CD LINE TO

CONNECT TO

EXISTING

CHW, CHR, &

3/4" CD LINE

CEILING

FLOOR

2 SECTION VIEW

0 4' 8'2'

SCALE: 1/4" = 1'-0"

CABLE RACKS

FC

DRIP PAN

MOUNT TOP OF

UNIT 6" BELOW

CEILING

2MH101

2MH101

M-501

T

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH101

JWMK

BLDG 1 SIXTH FLOOR PLAN

MECHANICAL

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

S3 P1

P2

PROJECT

NORTH

1 BLDG 1 NINTH FLOOR PLAN - MECHANICAL

0 4'2'

SCALE: 1/4" = 1'-0"

40"X72" EXISTING

PENETRATION IN

ELEVATOR SHAFT

72"X71" EXISTING

PENETRATION IN

ELEVATOR SHAFT

EXISTING PENETRATION

TO REMAIN. SEE DETAIL

3/M5.01.

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH102

JWMK

BLDG 1 NINTH FLOOR PLAN

MECHANICAL

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

A1000

A1001

1 BLDG 1 MACHINE ROOM FLOOR PLAN- MECHANICAL

0 4' 8'2'

SCALE: 1/4" = 1'-0"

AHU

SF

CU

L

M-501

M-501

EH

M-501

(E) 2"CHW AND CHR.

CONNEECT NEW 2" LINE,

ROUTE ALONG BASE OF

WALL AND OUT TO UNIT.

M-501

M-501

M-501

70X34

RS RS RS RS RS RS

RL RL RL RL RL RL

ROUTE NEW DUCT

THROUGH (E) WINDOW

CEILING

FLOOR

MH103

2 SECTION VIEW

0 4' 8'2'

SCALE: 1/4" = 1'-0"

26X20

18[2]1000

(TYP-4)

36X36[1]4000

18[2]1000

(TYP-4)

36X36[1]4000

2"CHW AND CHR ROUTE

ALONG BASE OF WALL AND

OUT TO UNIT.

MH103

26X20

26X20

26X20

M-501

SHEET NOTES

T

UNUSED WINDOW

AREA SHALL BE FLASH

AND SEALED WATER

TIGHT AT WALL

PENETRATION

UNUSED WINDOW

AREA SHALL BE FLASH

AND SEALED WATER

TIGHT AT WALL

PENETRATION

60X48 DN SEE MH102

FOR CONTINUATION

SEE ARCHITECTURAL

DRAWINGS FOR

WINDOW FILL

SEE ARCHITECTURAL

DRAWINGS FOR

WINDOW FILL

M-501

M

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS

ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH VA STANDARD

DESIGN GUIDES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. BALANCE AIR SYSTEMS WITHIN 10% OF CAPACITIES LISTED.

7. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR OR OWNER PRIOR TO ANY CUTTING OF ROOF.

8. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

1-5/8"

REFRIGERATION

SUCTION & 1-1/8"

REFRIGERATION

LIQUID

SF-1 VFD AND SMOKE

CONTROL PANEL

N

MANUAL PULL STATION. SEE ELECTRICAL, TYP.

KEYED NOTES

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH103

JWMK

BLDG 1 MACHINE ROOM FLOOR PLAN

MECHANICAL

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

FS

AutoCAD SHX Text

FS

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

FS

SP

WF

FS

FS

FA

SP

1 BLDG 27 BASEMENT FLOOR PLAN- MECHANICAL

0 4' 8'2'

SCALE: 1/4" = 1'-0"

AC

R S

R S

R S

R S

R L

R L

R L

R L

3/8"REFRIGERATION

SUCTION & 1/4"

REFRIGERATION

LIQUID UP TO HP-1

AC

MH104

MH104

2 SECTION VIEW

0 4' 8'2'

SCALE: 1/4" = 1'-0"

CEILING

FLOOR

MOUNT TOP OF

UNIT 6" BELOW

CEILING

T

SHEET NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS

ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH VA STANDARD

DESIGN GUIDES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. BALANCE AIR SYSTEMS WITHIN 10% OF CAPACITIES LISTED.

7. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR OR OWNER PRIOR TO ANY CUTTING OF ROOF.

8. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

001A

S0-C1, TYP.

BC1-27,

TYP.

002 P4, TYP.

N

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH104

JWMK

BLDG 27 BASEMENT FLOOR PLAN

MECHANICAL

DEDUCTIVE BID ALTERNATE 27

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

1 BLDG 27 FIRST FLOOR PLAN - MECHANICAL

1=1/40 4' 8'2'

SCALE: 1/4" = 1'-0"

SHEET NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS

ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH VA STANDARD

DESIGN GUIDES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. BALANCE AIR SYSTEMS WITHIN 10% OF CAPACITIES LISTED.

7. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR OR OWNER PRIOR TO ANY CUTTING OF ROOF.

8. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

N

R L

R L

R L

R L

R L

R L

R S

R S

R S

R S

R S

R S

RL RL RL RL RL RL RL RL RL RL

RS RS RS RS RS RS RS RS RS RS

3/8"REFRIGERATION

SUCTION & 1/4"

REFRIGERATION

LIQUID UP TO HP-1

3/8"REFRIGERATION

SUCTION & 1/4"

REFRIGERATION

LIQUID DN

R L

R S

R S

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH105

JWMK

BLDG 27 FIRST FLOOR PLAN

MECHANICAL

DEDUCTIVE BID ALTERNATE 27

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

1 BLDG 27 ROOF PLAN- MECHANICAL

SCALE: 1/4" = 1'-0"

HP

3/8" REFRIGERATION

SUCTION & 1/4"

REFRIGERATION

LIQUID DN TO AC-1

IN BASEMENT

M-502

SHEET NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS

ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH VA STANDARD

DESIGN GUIDES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. BALANCE AIR SYSTEMS WITHIN 10% OF CAPACITIES LISTED.

7. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR OR OWNER PRIOR TO ANY CUTTING OF ROOF.

8. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE

DIMENSIONS.

R S

R S

R L

R L

N

STACK PIPING

HORIZONTALLY

THROUGH WALL

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA MH106

JWMK

BLDG 27 ROOF PLAN

MECHANICAL

DEDUCTIVE BID ALTERNATE 27

AREA OF

WORK

KEY PLAN - N.T.S.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

PACKAGED

UNIT

ROUTE CONDENSATE TO

GRADEPROVIDE 12" 14GA

GALVANIZED STEEL CURB.

CONNECT TO STRUCTURE.

1 TOP DISCHARGE AHU MOUNT

NOT TO SCALE

12"

NOTES:

CONTRACTOR SHALL PROVIDE SUPPORT FOR THE DUCTWORK PER SMACNA. BASIS OF DESIGN IS BIG FOOT H

FRAME SET 305MM (12"). EQUIVALENT SUBSTITUTION IS PERMITTED.

1. 12"X12" FOOT PLATES SHALL BE INSTALLED PER MANUFACTURER REQUIREMENTS.

2. DISTANCE BETWEEN SUPPORTS PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE

CHAPTER 6.

3. ALL ROOF SUPPORTS TO BE APPROVED BY STRUCTURAL ENGINEER (DCI).

4. X= H FROM TABLE ON FIGURE 6-4 SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE. UP

T0 24" WIDE = 14", 25"-36" WIDE = 18", 37"-48" WIDE = 24"

5. PER SMACNA HVAC DUCT CONSTRUCTION PROVIDE SUPPORT ON BOTH SIDES OF THE ELBOW

DUCTWORK

ROOF

BIG FOOT H305 OR EQUAL

SECURE DUCTWORK TO FRAME

PER MANUFACTURERS

DIRECTIONS.

2 EXTERIOR ROOF DUCT SUPPORT

NOT TO SCALE

3 SUPPLY FAN DETAIL

NOT TO SCALE

CAULK ALL AROUND

STORM-PROOF LOUVER

1/2" BIRDSCREEN

4 COMBINATION LOUVER DETAIL

NOT TO SCALE

AD

JA

C

EN

T W

AL

L

6" MIN

UNIT HEATER

10" MIN

5 ELECTRIC WALL HEATER DETAIL

NOT TO SCALE

AIRFLOW

AIR VENT, 1/4" BALL VALVE.

INSTALL IN HIGH POINT OF

HEADER OR RETURN PIPE

TO ALLOW COMPLETE VENTING

OR AIR FROM COIL

CAPPED DRAIN, 3/4" BALL

VALVE. INSTALL IN

LOW POINT OF HEADER OR SUPPLY

DRAIN DOWN OF COIL

UNION IN OFFSET

FOR COIL REMOVAL

(TYP.)

P/T TEST PLUG (TYP.)

ISOLATION VALVE (TYP.)

FLOW CONTROL DEVICE

TWO WAY TEMPERATURE

CONTROL VALVE

6 2-WAY WATER COIL

NOT TO SCALE

BASEMENT

1ST FLOOR

2ND FLOOR

(3-8) FLOORS

9TH FLOOR

10TH FLOOR

ROOF

ELEVATOR

PRESSURIZATION

FAN (EPF)

FIRE FIGHTER'S SMOKE

CONTROL PANEL (LOCATION

TO BE APPROVED BY FIRE

CHIEF)

SEE CONTROL DIAGRAM

BUILDING DIAGRAM

SD

SD

SD

SD

SD

SD

ELEVATOR

TRACTION

ELEVATOR

SHAFT

VFD

FLOW

SWITCH

PRESSURE

DIFFERENTIAL

TRANSDUCER

0.1" (MIN.) TO 0.25" (MAX.) POSITIVE PRESSURE TO

BE MAINTAINED IN 1ST FLOOR SHAFT RELATIVE TO

1ST FLOOR LOBBY (WITH BOTH ELEVATOR DOORS

OPEN AND PARKED AT 1ST FLOOR) DURING EPF

ACTIVATION

(E) SMOKE DETECTORS

(BY OTHERS)

7 ELEVATOR PRESSURIZATION

NOT TO SCALE WEATHER PROOF DUCT

PENETRATION THROUGH

(2) (E) 36X60 WINDOW.

SEE ARCHITECTURAL

DRAWINGS FOR DETAIL.

ELEVATOR

TRACTION

ELEVATOR

SHAFT

1"Ø GRADE S THRUBOLT WITH 1"Ø

WASHER TO STRUCTURAL A36 PLATE

(3/16" MIN HOST) 4 ANCHORS PER PLATE.

TOP OF ROOF FINISH

3" ASSUMED ROOFING

THICKNESS

ROOFER WILL SEAL

AROUND LEGS FOR

COMPLETE WATER

PROOF (TYP)

WALL

34X70

PROVIDE FLEX

CONNECTION

MECHANICAL

ROOM FLOOR

PROVIDE BIRD SCREEN

60X484'-6 9 16"

9'- 913 16

6'-9 3 16"

SLR-A-200 OR EQUIVALENT

SPRING ISOLATORS MOUNTED

TO STRUCTURE.

8 CONDENSING UNIT MOUNTING DETAIL

NOT TO SCALE

SLR-A-200 OR EQUIVALENT

SPRING ISOLATORS MOUNTED

TO STRUCTURE.

PROVIDE 12" 14GA

GALVANIZED STEEL CURB.

COOLING COIL

PROVIDE SPRING OR NEOPRENE ISOLATORS AS

SPECIFIED. INSTALLATION PER

FAN MFRS RECOMMENDATIONS.

FAN COIL UNIT

RETURN AIR

9 FAN COIL MOUNTING DETAIL

NOT TO SCALE

SD

(E) SMOKE DETECTORS IN

SHAFT (BY OTHERS)

SD

4" CONCRETE SLAB

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA M-501

JWMK

MECHANICAL:

BLGD 1 DETAILS

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

SECURELY ATTACH CONDENSING

UNIT TO CROSS MEMBER . (4 BOLTS

TOTAL). TWO 1/4"Ø S.S. THRUBOLTS

WITH 5/8" WASHERS AND NUTS

3/8"Ø GRADE S SCREWS OR THRUBOLT

WITH 1"Ø WASHER TO STRUCTURAL

A36 STEEL MEMBERS (3/16" MIN HOST)

4 ANCHORS PER PLATE .

ROOF HOST

STRUCTURE

TOP OF ROOF

FINISH

CROSS MEMBER

USE MIAMI TECH (MTI)

AS14S OR VA APPROVED

SUBSTITUTE.

3" ASSUMED

ROOFING

THICKNESS

ROOFER WILL SEAL

AROUND LEGS FOR

COMPLETE WATER

PROOF (TYP)

(1) 5/16-18

THRUBOLT TO

INTERLOCK

SQUARE TUBING

20" 18"

INSTALL LINE SET PER

MANUFACTURE

RECOMMENDATIONS.

RS AND RL LINES TO

DUCTLESS SPLIT

CONDENSING UNIT

WALL

90° SWEEP

D L S

20 GAGE SHEET METAL PAN AROUND

REFRIGERANT LINES FROM BOTTOM

WALL ANCHOR TO EAVE. PAINT PAN

TO MATCH BUILDING COLOR OF OIL

BASE PAINT . FASTEN SECURELY TO

WALL.

1" COND. DRAIN LINE.

TERMINATE 4" ABOVE

GRADE.

SUPPORT ON WALL WITH 3/8" Ø POWERS CARBON

STEEL WEDGE BOLT CONCRETE ANCHOR WITH 1" Ø

MIN WASHER, 1-1/2" EMBEDMENT AND 6" MIN EDGE

DISTANCE. SUPPORT PIPING EVERY 6' MINIMUM.

4" DIA. HOLE THRU WALL OR SOFFIT

SEAL WEATHER TIGHT

PROVIDE ISOLATION

VALVES ON EACH SIDE

OF BRAIDED FLEXIBLE

REFRIGERANT LINE

MINIMUM 12"

BRAIDED

FLEXIBLE

REFRIGERANT

LINE

1 CONDENSING UNIT ROOF MOUNT SUPPORT DETAIL

NOT TO SCALE

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA M-502

JWMK

MECHANICAL:

BLDG 27 DETAILS

DEDUCTIVE BID ALTERNATE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AIR OUTLET SCHEDULE

TAG MANUFACTURER MODEL NO. SERVICE TYPE MATERIAL MOUNTING BORDER PATTERN

BLADE

SPACING

(INCH)

BLADE

POSITION

BLADE

DEFLECTION NOTES

[1] TITUS 350 RL RETURN GRILLE STEEL SURFACE TYPE 1 FIXED 3/4" FRONT

HORIZONTAL 35° 1, 2, 3

[2] PRICE ND SUPPLY NOZZLE ALUMINUM DUCT - ANGULARLY

ADJUSTABLE N/A N/A N/A -

NOTES:

1. COLOR TO BE MANUFACTURER STANDARD WHITE

2. PROVIDE BALANCING DAMPER IN BRANCH DUCT SERVING AIR OUTLET AT TAKEOFF

FROM TRUNK DUCT. (ADDITIONAL DAMPERS FOR SYSTEM BALANCING ARE SHOWN

ON DRAWINGS)

3. PROVIDE SQUARE TO ROUND ADAPTER AS REQUIRED

4. PROVIDE 24"X24" PAN FOR LAY-IN CEILING INSTALLATION AS REQUIRED (SEE

ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)

5. PROVIDE RETURN GRILLE WITHOUT SCREW HOLES FOR LAY-IN CEILING APPLICATION

(SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION)

6. PROVIDE OPPOSED BLADE DAMPER..

ROOFTOP AC UNIT SCHEDULE

TAG SERVICE MFG MODEL CFM

CFM

(OSA) ESP (") REFRI-

GERANT

DX COOLING CHILLED WATER COIL ELECTRICAL

WEIGHT

LBS. NOTES

NET TOTAL

(MBH)

NET SENS

(MBH)

EAT

(DB)

EAT

(WB)

AMBIENT

(DB) EER

INPUT

(MBH)

SENSIBL

E (MBH) GPM PD EWT LWT

EAT

(DB) LAT (DB) MCA MOCP VOLT PHASE

ELEVATOR

MACHINE

ROOM

DAIKIN OAH011GDCM 4000 400 0.5 410A 119.82 115.59 86 63.5 98 13.0 115.59 115.59 23 1.2 45°F 55°F 86 57.6 24.8 35.0 208 3 2426 1,2,3,4,5,6,7

AHU

SUPPLY FAN SCHEDULE

TAG MFG MODEL SERVICE DRIVE CFM ESP (") FAN

RPM

SONE

LEVEL

MOTOR

NOTES

HP VOLTS PHASE

GREENHECK USF-54 ELEVATOR

SHAFTS MFG 50,000 0.5 579 36 20 208 3 1

SF

NOTES:

1. PROVIDE W/ VFD

NOTES:

1. PROVIDE ECONOMIZER. INTERLOCK W/ RELIEF LOUVER

2. PROVIDE FACTORY ROOF CURB

3. PROVIDE FACTORY DISCONNECT

4. INTERLOCK WITH BMS

5. PROVIDE FACTORY INSTALLED SMOKE DETECTOR IN RETURN DUCT

6. PROVIDE 2 STAGES OF COOLING

7. PROVIDE ULTRA LOW LEAK DAMPERS ON OUTSIDE AIR. MOTORIZED

DAMPERS SHALL HAVE A TESTED MAXIMUM LEAKAGE RATE NOT TO

EXCEED 4 CFM/S

CONDENSING UNIT

TAG LOCATION INTERLOCK

WITH CU MFR MODEL# NOMINAL

TONS WEIGHT EER

ELECTRICAL

NOTES

VOLT PHASE MCA MOCP

ROOF AAON

CFA-009-B-A-2-AC00J 9 1069 13.0 208 3 36 45 1

NOTES:

1. PROVIDE CURB FOR CONDENSING UNIT

CU

AHU

LOUVER SCHEDULE

TAG MANUF. MODEL NO. SERVICE TYPE MATERIAL

AIR FLOW

(CFM)

VELOCITY

(FPM)

PRESS.

DROP

("WC)

SIZE MIN.

FREE

AREA

(SF)

NOTESWIDTH

(INCH)

HEIGHT

(INCH)

DEPTH

(INCH)

RUSKIN ELF375DXH INTAKE COMBINATI

ON ALUMINUM 4000 545 .03 48 42 4 6.67 1, 2, 3, 4

NOTES:

1. PROVIDE 1/2"x1/2" 19 GAUGE ALUMINUM BIRD SCREEN ON INSIDE OF

LOUVER

2. PROVIDE BAKED ENAMEL FINISH OF COLOR SELECTED BY ARCHITECT

FROM MANUFACTURERS STANDARD COLORS.

3. PROVIDE MOTORIZED BACKDRAFT DAMPER WITH 24 VOLT ACTUATOR.

DAMPER SHALL BE LOW LEAKAGE TYPE NOT TO EXCEED 4 CFM/SF

LEAKAGE WHEN TESTED IN ACCORDANCE WITH AMCA 5000 @ 1.0" WC.

4. INTERLOCK WITH AHU-100.

L

ELECTRIC WALL HEATER

TAG MFR/ MODEL # SERVICE CFM

ELECTRICAL

WEIGHT NOTES

KW V/Ø

INDEECO WRI MACHINE ROOM

ENTRY 40 2 208/ 1 - 1, 2EH

NOTES:

1. PROVIDE SURFACE MOUNT KIT.

2. PROVIDE BUILT IN THERMOSTAT.

SHEET NOTES

1. ALL EQUIPMENT WITH MANUFACTURERS NAME AND NUMBER IS THE BASIS OF DESIGN AND

EQUIVALENT APPROVED EQUIPMENT IS ACCEPTABLE

FAN COIL SCHEDULE

TAG MFG MODEL

SUPPLY FAN CHILLED WATER

NOTES

CFM

E.S.P.

("W.C) MCA HP V/Ø

SENSIBLE

CAPCAITY

(MBH)

EAT

(DB)

EAT

(WB)

LAT

(DB)

LAT

(WB)

EWT

(DB)

LWT

(DB)

MAX

PD GPM

DAKINE FCHC204 400 0.3 3.2 1/8 208/1 9.5 80 63.1 56.6 55.0 45 55 2.8 2.1 1, 2, 3, 4

NOTES

FC

1. PROVIDE UNIT WITH INTEGRAL DISCONNECT.

2. PROVIDE UNIT WITH 2-WAY CONTROL VALVE PIPING PACKAGE.

3. PROVIDE UNIT WITH BUILT-IN DRIP PAN.

4. PROVIDE WALL MOUNTED THERMOSTAT THAT INTERLOCKS WITH BMS.

5. PROVIDE SECONDARY DRIP PAN. SEE DETAIL 2/MH101.

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA M-601

JWMK

MECHANICAL:

BLDG 1 SCHEDULES

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

DUCTLESS SPLIT SYSTEM SCHEDULE

HEAT PUMP WALL MOUNTED FAN COIL

NOTES

EQUIP# MFR/ MODEL MODEL #

OPERATING

WEIGHT

(LBS)

SEER/HSPF

UNIT

EQUIP# MFR MODEL # CFM

COOLING BTUH

(SENSIBLE)

HEATING BTUH

(SENSIBLE)

ELECTRICAL

AMB-AIR

(°F) AMPS MOCP V/Ø MCA V/Ø MCA

MITSUBISHI MUZ-HM09NA 73 18 95 9 15 208 /1 MITSUBISHI MSZ-HM09NA 237 9,000 10,900 208 1 1.0 1,2,3,4,5,6,7

HP

NOTES:

1. PROVIDE FACTORY WALL MOUNTING HARDWARE.

2. PROVIDE FACTORY WALL MOUNTED T-STAT TO INTERLOCK WITH BMS

3. PROVIDE SLIDE-IN AIR FILTER.

4. ROUTE CONDENSATE DOWN EXTERIOR OF BUILDING. TERMINATE 18" ABOVE GRADE. COORDINATE ROUTING WITH OWNER AND GENERAL CONTRACTOR.

5. PROVIDE LOW AMBIENT CONTROLS & CRANK CASE HEATER

6. PROVIDE FACTORY BASE SUPPORT ASSEMBLY.

7. PROVIDE FACTORY REFRIGERANT LINE SET.

AC

SHEET NOTES

1. ALL EQUIPMENT WITH MANUFACTURERS NAME AND NUMBER IS THE BASIS OF DESIGN AND

EQUIVALENT APPROVED EQUIPMENT IS ACCEPTABLE

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

A/E:

625 First Ave #301 Seattle, WA, 98104

(206) 590 - 2118

RAY SPEES, PRESIDENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMPCONSULTANT

321 4 5 6 7 8 9 10

668-18-109

Revisions: Date:

SPEES DESIGN BUILD

REFURBISH AND UPGRADE

ELEVATORS IN BLDG

1 AND 27

11/16/2021

Mann-Grandstaff VA Medical Center

- Spokane, WA M-602

JWMK

MECHANICAL:

BLDG 27 SCHEDULES

DEDUCTIVE BID ALTERNATE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

OFF

AUTOON

ELEVATOR

PRESSURIZATION FAN

(EPF) SWITCH

FIRE FIGHTER'S SMOKE CONTROL PANEL

FAN CONTACTOR

24V

ELEV. SHAFT

SMOKE DETECTOR

SD-1

BUILDING SMOKE

ALARMS (BY

OTHERS)

208/3Ø

EPF

FLOW

SWITCH

EPF

AIRFLOW

INDICATOR

LIGHT

VFD

FAN VFD PANEL

PRESSURE

DIFFERENTIAL

TRANSDUCER

2 ELEVATOR PRESSURIZATION CONTROL DIAGRAM

NOT TO SCALE

ROOFTOP UNIT SEQUENCE OF OPERATIONS

COOLING CYCLE:

ON A CALL FOR COOLING THE DDC SYSTEM SHALL START THE FAN AND MODULATE THE OUTSIDE AIR, RETURN AIR, AND RELIEF AIR

DAMPERS TO MINIMUM VENTILATION POSITION.

CHILLED WATER COIL: WHEN FAN IS RUNNING, CHILLED WATER CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN SPACE

TEMPERATURE SET POINT. (2ND STAGE OF COOLING).

DX COOLING: WHEN FAN IS RUNNING AND THE CHILLED WATER SYSTEM IS DISABLED, THE DDC SYSTEM SHALL CYCLE THE DX COOLING

TO MAINTAIN SPACE TEMPERATURE SET POINT. (3RD STAGE OF COOLING).

ECONOMIZER DAMPER CONTROL:

AT OUTSIDE AIR TEMPERATURES BELOW 70°F (ADJUSTABLE) THE DDC SYSTEM MODULATES OUTSIDE-AIR, RELIEF AIR AND RETURN AIR DAMPERS ON THE ECONOMIZER CYCLE (1ST STAGE OF COOLING) TO MAINTAIN SPACE SPACE COOLING SET POINT, IF THE SPACE SET POINT TEMPERATURE IS NOT SATISFIED THE MECHANICAL COOLING SHALL STAGE ON AS INDICATED ABOVE TO MAINTAIN SPACE SET POINT TEMPERATURE. AT OUTSIDE AIR TEMPERATURES ABOVE 70°F (ADJUSTABLE) THE ECONOMIZER DAMPERS SHALL RETURN TO

MINIMUM VENTILATION POSITION.

OUTPUTS

- SPACE TEMPERATURE SET POINT

- SPACE TEMPERATURE

- OUTSIDE AIR TEMPERATURE

- ECONOMIZER STATUS

- SUPPLY FAN STATUS

- Dx COOLING ENABLE

- COOLING COIL ENABLE

DO DX COOLING ENABLE

AO RETURN DAMPER

CONTROLLER

120 VAC

TO OPERATOR'S TERMINAL

POWER & WIRING BY DIV 23.

COORDINATE WITH DIV 26.

DDC

CONTROLLER

ROOFTOP UNIT

SUPPLY FAN ENABLEDO

T1AI SPACE TEMPERATURE

T2AI SUPPLY AIR TEMPERATURE

T3AI OUTSIDE AIR TEMPERATURE

AO RELIEF AIR DAMPER

AO

V-1

CW CONTROL VALVE

2-WAY OR 3-WAY

CONTROL VALVE BY

CONTROL CONTRACTOR

LOUVER ACTUATOR

AO OUTSIDE AIR DAMPER

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .