36C26024R0009 0002.pdf

PDF 118 KB Posted

Attached to
Y1DA--CON-NRM 668-18-109 Refurbish and Upgrade Elevators in Bldg 1 and 27
Solicitation number
36C26024R0009
Issued by

About this file

This document is an amendment to a solicitation for elevator refurbishment and upgrade work at a Veterans Affairs medical center. The amendment extends the offer due date to January 19, 2024, modifies the evaluation criteria for company experience and key personnel, and removes two VAAR clauses. It also provides responses to contractor questions regarding project scope, personnel requirements, and logistics. The solicitation seeks offers from SDVOSB contractors to completely remove and replace all elevator equipment for four elevators in one building, with a project cost estimated between $2 million and $20 million. The amendment clarifies expectations for ongoing elevator service during construction and addresses contractor inquiries about materials, work hours, safety inspections, and other execution details.

View the file

Other files

File Type Posted
Wage Determination 1.19.24.pdf PDF
36C26024R0009 0006.pdf PDF
36C26024R0009 0005.pdf PDF
Wage Determination 1.5.24.pdf PDF
Wage Determination 12.22.23.pdf PDF
36C26024R0009 0004.pdf PDF
36C26024R0009 0003.pdf PDF
36C26024R0009 0001.pdf PDF
WD 11.24.23.pdf PDF
668-18-109_Pre Bid Site Walk Sign In Sheet_2023.12.03.pdf PDF
Attachment 17 Security Requirements.pdf PDF
Attachment 18 Contractor Rules of Behavior.pdf PDF
Attachment 4 668-18-109_Supplement to SPEC 01 00 00 Part 1-6-I.pdf PDF
Attachment 10 668-18-109_Project Drawings 6 of 6.pdf PDF
Attachment 15 Wage Determination 11.17.23.pdf PDF
Attachment 2 668-18-109_Project Specifications 1 of 2_R1.pdf PDF
Attachment 5 668-18-109_Project Drawings 1 of 6.pdf PDF
Attachment 13 668-18-109_Lead Sampling Report.pdf PDF
Attachment 6 668-18-109_Project Drawings 2 of 6.pdf PDF
Attachment 19 Calculation of Self Performed Work REV 1.pdf PDF
36C26024R0009.pdf PDF
Attachment 7 668-18-109_Project Drawings 3 of 6.pdf PDF
Attachment 12 668-18-109_Limited Asbestos Good Faith Survey - Addendum 1.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 3 668-18-109_Project Specifications 2 of 2_R1.pdf PDF
Attachment 1 668-18-109_SOW-CON_2023-08-15.pdf PDF
Attachment 8 668-18-109_Project Drawings 4 of 6.pdf PDF
Attachment 11 668-18-109_Limited Asbestos Good Faith Survey.pdf PDF
Attachment 9 668-18-109_Project Drawings 5 of 6.pdf PDF
Attachment 14 668-18-109_DWG Clarification Document_2023-06-22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 7

12-20-2023

668-18-109

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26024R0009

11-21-2023

X

X

Extended to January 19, 2024 at 12:00 PM Pacific Time.

X 1

Project: 668-18-109 / Refurbish and Upgrade Elevators in Bldg. 1 and 27

See Continuation Page for Amendment details.

All other terms and conditions remain the same.

The POC for this amendment is Taminie Panich, taminie.panich@va.gov

36C26024R0009 002

SF 30 BLOCK 14 CONTINUATION PAGE(S)

It has been determined necessary and in the best interest of the Government to amend solicitation 36C26024R0009 to extend the offer due date from January 5, 2024, to January 19, 2024, amend the Company Experience and Key Personnel Factor and provide questions and answers. The answers to Questions 19 and 20 are forthcoming.

1. Amend to extend offer due date

Offer due date: January 19, 2024

2. Amend Company Experience Evaluation and Key Personnel Factor on 36C26024R0009 pg. 9-11

1. Company Experience: Provide a narrative describing successful completion of at least two projects with government agencies or private firms, where you completed or substantially completed eighty percent (80%) of a construction project that included the installation, repair or replacement of elevator(s) and had a final construction cost between $2,000,000 and $20,000,000. The projects must have been completed within the last 10 years. Offeror should explain how the information provided is relevant to the proposed acquisition and the projects selected should clearly demonstrate the construction capabilities of the Offeror.

Definition of Similar in Magnitude for Company Experience Evaluation and Key Personnel Factor:

A project is similar in magnitude with a final construction cost between $2,000,000 and $20,000,000.

Definition of Similar in Scope for Company Experience and Key Personnel Factor:

A project is similar in scope includes the installation, repair and replacement of elevators.

2. Key Personnel

2.1 Quality Control

2.1.1 Provide a resume for the proposed Contractor Quality Control (CQC) System Manager with minimum of five (5) years’ construction experience within the last ten (10) years on projects that included the installation, repair or replacement of elevator(s) and had a final construction cost between $2,000,000 and $20,000,000. At least one elevator project listed on the resume shall include an elevator with at least six (6) stops. CQC System Manager shall hold a certificate of completion from the Construction Quality Management (CQM) for Construction course.

2.2 Project Superintendent/Alternate

2.2.1 Provide a resume for the proposed project superintendent with minimum of five (5) years’ construction experience within the last ten (10) years performing as a project superintendent on projects that included the installation, repair or replacement of elevator(s) and had a final construction cost between $2,000,000 and $20,000,000.

2.2.2 Provide a resume of the alternate project superintendent alternate with minimum of five (5) years’ construction experience within the last ten (10) years performing as a project superintendent on projects that included the installation, repair or replacement of elevator(s) and had a final construction cost between $2,000,000 and $20,000,000.

2.3 Site Safety and Health Officer (SSHO)

2.3.1 Provide a resume for the proposed SSHO with minimum of five (5) years’ experience within the last ten (10) years on projects that included the installation, repair or replacement of elevator(s) and had a final construction cost between $2,000,000 and $20,000,000. At least one project listed on the resume shall include an elevator with at least six (6) stops.

3. Amend to remove VAAR Clause

VAAR 852.215-70 and VAAR 852.215-71 from the original solicitation.

4. Amend to provide questions and answers.

Questions 1: Will the facility allow for any deducts to be proposed as part of the prime contractor’s bid (i.e. retention of existing rails, sills, entrances, sling, platform, machines, etc.)?

Government response: Contractor shall follow instructions in the solicitation for their proposal.

Question 2: Please confirm that the VA is requesting that a contractor quality control (CQC) system manager, project superintendent, and a site safety and health officer (SSHO) are to always maintain a presence at the site during the project, are to be three (3) separate individuals, and are to be employed by the prime contractor?

Government response: The CQC System Manager is on the site at all times during construction and is employed by the prime contractor. The CQC System Manager can have duties as project superintendent. The SSHO or an equally qualified Designated Representative/alternate is on the site at all times during construction and is employed by the prime contractor. The SSHO shall not have collateral duties.

Question 3: Will any work require contractors to wear bunny suits, foot covers, gloves, hair nets, facial hair nets, and face shields during this project? Will this PPE be provided by the VA?

Government response: Yes. PPE will not be provided by the VA.

Question 4: Can the VA confirm the availability of stock wallpaper, wainscot, flooring, etc., that may be available to the contractor. If no materials are to be provided, and a perfect match cannot be obtained, is it the government’s intent for the contractor to redo all floors, wallpaper, ceiling, etc. within each elevator lobby to ensure continuity?

Government response: Material will not be provided by the VA. VA understands a perfect match may not be possible. It is not the Government’s intent for the contractor to redo all floors, wallpaper, ceiling, etc. within each elevator lobby.

Question 5: Would the VA allow for “noise generating work” to be performed from 4:30pm – 12:00am to allow for employees to work a full shift? The current hours identified are 4:30pm – 9:00pm for all noise generating work during the week.

Government response: No, noise generating work shall follow the requirements in the contract documents.

Question 6: Can the VA confirm whether the Certified Safety Professional (CSP) or Construction Safety and Health Technician (CSHT) that performs random monthly site safety inspections must be an independent third party? (01 35 26 – 14)

Government response: The individual does not need to be an independent third party.

“The CSP or CSHT can be a corporate safety professional…” means the individual can be employed by the contractor but is not a part of the immediate site project team.

Question 7: Can the VA confirm that they require an SIOR based off the language on page 01 45 35 – 03? “In addition to these conditions, the DOR is encouraged to consider using an SIOR on large magnitude or critical projects where this additional level of quality control is affordable.” Furthermore, is there a list of special inspections required on this project?

Government response: Yes, an SIOR is required. Refer to contract documents for special inspections required.

Question 8: Will the prime contractor be responsible for purchasing and administrating construction management software (i.e. Submittal Exchange, Procore, etc.)? (01 33 23 – 03 Section 1.3.A.C)

Government response: From Statement of Work part 3.8.3 “Contractor shall provide a secured File Transfer Protocol (FTP) site to transfer all contract electronic submittals.

The contractor shall send a corresponding email to the COR stating a file is ready for review for each electronic submittal FTP upload. FTP shall be accessible by VA staff using Government Furnished Equipment (GFE).”

Question 9: Specification calls for 2 speed center opening doors which will result in narrow door panels prone to issues with the door opening and closing times required by project specifications. Could 2 speed side slide doors be considered?

Government response: Follow requirements in the contract documents.

Question 10: Can existing 2 year old machines on P1 & P2 cars be retained?

Government response: Follow requirements in the contract documents.

Question 11: Hydraulic jack for elevator P4 is double bottom and doesn’t appear to have any leaks or damage. Could you please provide details on why this couldn’t be retained?

Government response: From Statement of Work part 2.1 “Scope includes the complete removal and replacement of all elevator equipment for elevators P1, P2, S3 and P4 in the elevator hoistway and the elevator machine room.”

Question 12: Block 8 of the SF1442 indicates a hard-copy proposal delivery to Vancouver. Will the Government please consider making this an electronic bid delivery? With a complex project such as this, we could really use every minute up until bid time to make sure we’ve qualified subcontractor proposals, and hard-copy bid delivery will complicate this, especially right after the holidays when a lot of folks are on vacation.

Government response: Yes, please submit your offer via email to taminie.panich@va.gov. In the subject of the email, please state Offer Company Name –

36C26024R0009 email 1 of X if multiple email is necessary due to email restriction on size. We will not accept any hard copies.

Question 13: On solicitation Page 7 of 73, under General Information it states, “The offeror will not be participating in a sealed bid procurement process under this procurement.” Does this mean we should email our proposal to you?

Government response: Correct, please submit your offer to taminie.panich@va.gov.

Question 14: Will the Government please consider extending the bid date a week or two? The current bid date is right after the holidays, when many people are on vacation. We would greatly appreciate any extension you can provide.

Government response: The offer due date has been extended to January 19, 2024 at 12:00 p.m. PST.

Question 15: The Solicitation includes VAAR 852.215-70 Service-Disabled Veteran- Owned and Veteran-Owned Small Business Evaluation Factors (Jan 2023) (Deviation). This clause discusses evaluation for non-SDVOSB firms. As this is a SDVOSB set-aside, please confirm this clause is not applicable to this procurement.

Government response: VAAR 852.215-70 does not apply and has been amended to be completely remove from solicitation.

Question 16: The Solicitation includes VAAR 852.215-71 Evaluation Factor Commitments. As this is a SDVOSB set-aside, and we are not required to propose or subcontract with SDVOSB or VOSB subcontractors, please confirm this clause is not applicable to this procurement.

Government response: VAAR 852.215-71 does not apply and has been amended to be completely remove from solicitation.

Question 17: Attachment 1 SOW, item 3.1 states, “Contractor shall include all provisions required to ensure two of the three elevators in Building 1 (identified as P1, P2 & S3 on the drawings) are operational at all times.” A full demo/replacement of cars P1 and P2 will require both elevators P1 and P2 to be removed from service concurrently for a period of ~24 weeks due to their shared hoistway. Will the VA allow both elevators to be shut down at the same time? If not, has the VA considered a modernization of P1 and P2 rather than full replacement? A modernization would allow more flexibility in only removing one elevator from service at a time.

Government response: Attachment 1 SOW, item 3.1 allows for both elevators P1 and P2 to be shut down each night provided certain conditions are met.

Question 18: Attachment 1, at the top of Page 1 it lists attachments. We do not find the ‘Contractor Qualification Standards_R3’ document. Please provide or advise.

Government response: This document has been removed from the solicitation.

Question 19: Please clarify if all infection control walls (LT1 temp barrier) are to be installed up to the concrete floor above. If so, please provide dimensions from finished floor to concrete floor above for each floor.

Response is forthcoming.

Question 20: Current platform is sized based on space available in hoist way, an increase in size is not possible given the seismic requirements and the existing hoistway. Specification calls for a car operating panel in each return and specifies Elite display which requires 13” of space. With the door opening size specified this is not possible. Available space on each return panel with 2SCO 4’-0” doors is 7.75”. Please provide clarification on car operating panel locations and requirements or confirmation that the hoistway width will be increased.

Response is forthcoming.