Attachment 5 668-18-109_Project Drawings 1 of 6.pdf
PDF 9 MB Posted
- Solicitation number
- 36C26024R0009
About this file
This package includes construction drawings and specifications for a project to refurbish and upgrade elevators in Buildings 1 and 27 at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project involves renovating elevator equipment and machine rooms in both buildings, including demolition and installation of new components. The construction is identified as a Type C activity posing high infection control risks, requiring Class III and IV precautions. The drawings depict demolition, new construction, fire safety, and mechanical plans. Specifications address safety requirements and infection control measures. The solicitation number is 36C26024R0009 for this project awarded by the Department of Veterans Affairs.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FR
EE
D O
M W
A Y
A S S
EM
B
LY
S
TR
EE
T
M
EM
O R
IA
L C
IR
C
LE
WELLESLEY AVE
IN
D
EP
EN
D
EN
C E
D R
IV
E
INDEPENDENCE DRIVE
RESERVE ROAD
PA
R K
IN
G L
O T
"A
PA
R K
IN
G L
O T
"B
PA
R K
IN
G L
O T
"C
PA
R K
IN
G L
O T
"E
PA
RK
IN
G
LO
T
"L
PA
RK
IN
G
L O
T "D
PA
R K
IN
G
LO
T "J
PA
R K
IN
G L
O T
"H
PA
RK
IN
G
L O
T "G
PA
RK
IN
G
LO
T
"K
PA
R K
IN
G
LO
T "F
14a
16 3 2
6a
6 5
25 15
1e
41 30
G-001
ECMK
COVER SHEET
N/A
REFURBISH AND UPGRADE ELEVATORS IN BLDG 1 & 27
MANN-GRANDSTAFF VA MEDICAL CENTER - SPOKANE, WA
4815 North Assembly St. Spokane, Washington 99205-6197
Project Number: 668-18-109
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
2 VICINITY PLAN & CAMPUS MAP
NOT TO SCALE1 LOCATION PLAN
NOT TO SCALE
MANN-GRANDSTAFF VA
MEDICAL CENTER - SPOKANE WA
MANN-GRANDSTAFF VA MEDICAL CENTER
BUILDINGS WITHIN
SCOPE OF THIS PROJECT
ElenaCortez Image
G-002
ECMK
DRAWING INDEX &
PROJECT TEAM
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N/A
DRAWING INDEX
PROJECT TEAM
Spees Design Build 625 First Ave #301 Seattle WA, 98104 Mark Kartchner, P.E.
Cell: 509.688.4215 Email:markk@speesdb.com
PLUMBING/HVAC
Spees Design Build 625 First Ave #301 Seattle WA, 98104 Richard McPhee Cell: 770.557.4296 Email: RichardM@speesdb.com
AE PROJECT
MANAGER
Mann-Grandstaff VA Medical Center 4815 N. Assembly Street Spokane, WA 99205
OWNER
Spees Design Build 625 First Ave #301 Seattle WA, 98104 Ryan Litzko Cell: 208.691.0853 Email: ryanl@speesdb.com
ELECTRICAL/SPECIAL SYSTEMS
Spees Design Build 625 First Ave #301 Seattle WA, 98104 Matt King, Architect Cell: 206.257.8785 Email: mattk@speesdb.com
ARCHITECT
PAGE # SHEET # SHEET NAME
GENERAL
1 G-001 COVER SHEET
2 G-002 DRAWING INDEX & PROJECT TEAM
3 G-003 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
4 GC101 BUILDING 1 - BASEMENT FLOOR - ICRA FLOOR PLANS
5 GC102 BUILDING 1 - FIRST FLOOR - ICRA FLOOR PLANS
6 GC103 BUILDING 1 - SECOND FLOOR - ICRA FLOOR PLANS
7 GC104 BUILDING 1 - THIRD FLOOR - ICRA FLOOR PLANS
8 GC105 BUILDING 1 - FOURTH FLOOR - ICRA FLOOR PLANS
9 GC106 BUILDING 1 - FIFTH FLOOR - ICRA FLOOR PLANS
10 GC107 BUILDING 1 - SIXTH FLOOR - ICRA FLOOR PLANS
11 GC108 BUILDING 1 - SEVENTH FLOOR - ICRA FLOOR PLANS
12 GC109 BUILDING 1 - EIGHTH FLOOR - ICRA FLOOR PLANS
13 GC110 BUILDING 1 - NINTH FLOOR & MACHINE ROOM - ICRA FLOOR PLANS
14 GC111 BUILDING 27 - BASEMENT - ICRA FLOOR PLAN (DEDUCTIVE BID ALTERNATE)
15 GC112 BUILDING 27 -FIRST FLOOR - ICRA FLOOR PLAN (DEDUCTIVE BID ALTERNATE)
16 GC113 BUILDING 27 - SECOND FLOOR - ICRA FLOOR PLAN (DEDUCTIVE BID ALTERNATE)
17 LS101 BUILDING 1 - BASEMENT FLOOR - FIRE SAFETY PLAN
18 LS102 BUILDING 1 - FIRST FLOOR - FIRE SAFETY PLAN
19 LS103 BUILDING 1 - SECOND FLOOR - FIRE SAFETY PLAN
20 LS104 BUILDING 1 - THIRD FLOOR - FIRE SAFETY PLAN
21 LS105 BUILDING 1 - FOURTH & FIFTH FLOORS - FIRE SAFETY PLANS
22 LS106 BUILDING 1 - SIXTH & SEVENTH FLOORS - FIRE SAFETY PLANS
23 LS107 BUILDING 1 - EIGHTH, NINTH FLOORS & MACHINE ROOM - FIRE SAFETY PLANS
24 LS108 BUILDING 27 - BASEMENT - FIRE SAFETY PLAN (DEDUCTIVE BID ALTERNATE)
25 LS109 BUILDING 27 - FIRST FLOOR - FIRE SAFETY PLAN (DEDUCTIVE BID ALTERNATE)
26 LS110 BUILDING 27 - SECOND FLOOR - FIRE SAFETY PLAN (DEDUCTIVE BID ALTERNATE)
ARCHITECTURAL
27 AD100 BUILDING 1 - BASEMENT FLOOR - DEMOLITION PLANS
28 AD101 BUILDING 1 - FIRST FLOOR - DEMOLITION PLANS
29 AD102 BUILDING 1 - SECOND FLOOR - DEMOLITION PLANS
30 AD103 BUILDING 1 - THIRD FLOOR - DEMOLITION PLANS
31 AD104 BUILDING 1 - FOURTH FLOOR- DEMOLITION PLANS
32 AD105 BUILDING 1 - FIFTH FLOOR- DEMOLITION PLANS
33 AD106 BUILDING 1 - SIXTH FLOOR - DEMOLITION PLANS
34 AD107 BUILDING 1 - SEVENTH FLOOR - DEMOLITION PLANS
35 AD108 BUILDING 1 - EIGHTH FLOOR - DEMOLITION PLANS
36 AD109 BUILDING 1 - NINTH FLOOR - DEMOLITION PLAN
37 AD110 BUILDING 1 - ELEVATOR MACHINE ROOM - DEMOLITION PLANS
38 AD111 BUILDING 27 - BASEMENT FLOOR- DEMOLITION PLANS (DEDUCTIVE BID ALTERNATE)
39 AD112 BUILDING 27 - FIRST FLOOR - DEMOLITION PLANS (DEDUCTIVE BID ALTERNATE)
40 AD113 BUILDING 27 - SECOND FLOOR - DEMOLITION PLANS (DEDUCTIVE BID ALTERNATE)
41 A-100 BUILDING 1 - BASEMENT FLOOR - PLANS
42 A-101 BUILDING 1- FIRST FLOOR - PLANS
43 A-102 BUILDING 1 - SECOND FLOOR - PLANS
44 A-103 BUILDING 1 - THIRD FLOOR - PLANS
45 A-104 BUILDING 1 - FOURTH FLOOR - PLANS
46 A-105 BUILDING 1 - FIFTH FLOOR - PLANS
47 A-106 BUILDING 1 - SIXTH FLOOR - PLANS
48 A-107 BUILDING 1 - SEVENTH FLOOR - PLANS
49 A-108 BUILDING 1 - EIGHTH FLOOR - PLANS
50 A-109 BUILDING 1 - NINTH FLOOR - PLAN - WALL FINISH
51 A-110 BUILDING 1 - ELEVATOR MACHINE ROOM - PLANS
52 A-111 BUILDING 27 - BASEMENT FLOOR PLANS (DEDUCTIVE BID ALTERNATE)
53 A-112 BUILDING 27 - FIRST FLOOR PLANS (DEDUCTIVE BID ALTERNATE)
54 A-113 BUILDING 27 - SECOND FLOOR PLANS (DEDUCTIVE BID ALTERNATE)
55 A-121 BUILDING 1 - ROOF PLAN
56 A-122 BUILDING 27 - ROOF PLAN (DEDUCTIVE BID ALTERNATE)
57 A-201 BUILDING 1 - ELEVATOR ELEVATIONS
58 A-202 BUILDING 1 - INTERIOR ELEVATIONS
59 A-203 BUILDING 27 - ELEVATOR ELEVATIONS (DEDUCTIVE BID ALTERNATE)
60 A-401 BUILDING 1 - ENLARGED PLANS
61 A-402 BUILDING 27 - ELEVATOR CAB - ENLARGED FLOOR PLANS (DEDUCTIVE BID ALTERNATE)
62 A-601 BUILDING 1 - FINISH SCHEDULES, WALL SECTIONS & DETAILS
63 A-602 BUILDING 1 - DOOR SCHEDULE, TYPES AND DETAILS
PAGE # SHEET # SHEET NAME
STRUCTURAL
64 S-001 GENERAL NOTES
65 S-002 GENERAL NOTES
66 S-003 SPECIAL INSPECTIONS
67 S-101 BUILDING 1 BASEMENT FLOOR PLAN
68 S-102 BUILDING 1 - FIRST THRU EIGHT FLOOR PLAN
69 S-110 BUILDING 1 - NINTH FLOOR PLAN
70 S-111 BUILDING 1 - MACHINE ROOM FLOOR PLAN
71 S-113 BUILDING 27 BASEMENT FLOOR PLAN (DEDUCTIVE BID ALTERNATE)
72 S-114 BUILDING 27 - FIRST FLOOR PLAN (DEDUCTIVE BID ALTERNATE)
73 S-115 BUILDING 27 - SECOND FLOOR AND MAIN ROOF PLAN (DEDUCTIVE BID ALTERNATE)
74 S-116 BUILDING 27 - HIGH ROOF PLAN (DEDUCTIVE BID ALTERNATE)
75 S-501 BUILDING 1 DETAILS
76 S-502 BUILDING 27 DETAILS (DEDUCTIVE BID ALTERNATE)
MECHANICAL
77 M-001 MECHANICAL: LEGENDS & SYMBOLS
78 MD100 BLDG 1 SIXTH FLOOR PLAN MECHANICAL DEMO
79 MD101 BLDG 1 MACHINE ROOM FLOOR PLAN MECHANICAL DEMO
80 MD102 BLDG 1 ROOF FLOOR PLAN MECHANICAL DEMO
81 MH101 BLDG 1 SIXTH FLOOR PLAN MECHANICAL
82 MH102 BLDG 1 NINTH FLOOR PLAN MECHANICAL
83 MH103 BLDG 1 MACHINE ROOM FLOOR PLAN MECHANICAL
84 MH104 BLDG 27 BASEMENT FLOOR PLAN MECHANICAL DEDUCTIVE BID ALTERNATE
85 MH105 BLDG 27 FIRST FLOOR PLAN MECHANICAL DEDUCTIVE BID ALTERNATE
86 MH106 BLDG 27 ROOF PLAN MECHANICAL DEDUCTIVE BID ALTERNATE
87 M-501 MECHANICAL: BLDG 1 DETAILS
88 M-502 MECHANICAL: BLDG 27 DETAILS DEDUCTIVE BID ALTERNATE
89 M-601 MECHANICAL: BLDG 1 SCHEDULES
90 M-602 MECHANICAL: BLDG 27 SCHEDULES DEDUCTIVE BID ALTERNATE
91 M-901 MECHANICAL: BLDG 1 CONTROL DIAGRAMS
92 M-902 MECHANICAL: BLDG 27 CONTROL DIAGRAMS DEDUCTIVE BID ALTERNATE
93 FD101 BLDG 1 MACHINE ROOM DEMO FLOOR PLAN FIRE SPRINKLER
94 FX101 BLDG 1 MACHINE ROOM FLOOR PLAN FIRE SPRINKLER
95 FX102 BLDG 27 BASEMENT FLOOR PLAN FIRE SPRINKLER DEDUCTIVE BID ALTERNATE
PLUMBING
96 P-001 PLUMBING NOTES & LEGENDS
97 P-101 BLDG 1 BASEMENT FLOOR PLAN PLUMBING
98 P-102 BLDG 27 - FOUNDATION FLOOR PLAN PLUMBING DEDUCTIVE BID ALTERNATE
99 P-103 BLDG 27 BASEMENT FLOOR PLAN PLUMBING DEDUCTIVE BID ALTERNATE
100 P-501 BLDG 1 PLUMBING DETAILS
101 P-502 BLDG 27 PLUMBING DETAILS DEDUCTIVE BID ALTERNATE
102 P-601 BLDG 1 PLUMBING SCHEDULES
103 P-602 BLDG 27 PLUMBING SCHEDULES DEDUCTIVE BID ALTERNATE
ELECTRICAL
104 E-001 GENERAL NOTES, ABBREVIATIONS AND LEGENDS
105 ED101-1 BUILDING 1 - BASEMENT FLOOR: ELECTRICAL DEMOLITION PLAN
106 ED101-2 BUILDING 1 - BASEMENT FLOOR: ELECTRICAL DEMOLITION PLAN
107 ED102 BUILDING 1 - FIRST FLOOR: ELECTRICAL DEMOLITION PLAN
108 ED103 BUILDING 1 - SECOND FLOOR: ELECTRICAL DEMOLITION PLAN
109 ED104 BUILDING 1 - THIRD FLOOR: ELECTRICAL DEMOLITION PLAN
110 ED105 BUILDING 1 - FOURTH FLOOR: ELECTRICAL DEMOLITION PLAN
111 ED106 BUILDING 1 - FIFTH FLOOR: ELECTRICAL DEMOLITION PLAN
112 ED107 BUILDING 1 - SIXTH FLOOR: ELECTRICAL DEMOLITION PLAN
113 ED108 BUILDING 1 - SEVENTH FLOOR: ELECTRICAL DEMOLITION PLAN
114 ED109 BUILDING 1 - EIGHTH FLOOR: ELECTRICAL DEMOLITION PLAN
115 ED110 BUILDING 1 - NINTH FLOOR: ELECTRICAL DEMOLITION PLAN
116 ED111 BUILDING 1 - MACHINE ROOM: ELECTRICAL DEMOLITION PLAN
117 ED112
BUILDING 27 - BASEMENT FLOOR: ELECTRICAL DEMOLITION PLAN (DEDUCTIVE BID
ALTERNATE)
118 ED113 BUILDING 27 - FIRST FLOOR: ELECTRICAL DEMOLITION PLAN (DEDUCTIVE BID ALTERNATE)
119 ED114
BUILDING 27 - SECOND FLOOR: ELECTRICAL DEMOLITION PLAN (DEDUCTIVE BID
ALTERNATE)
120 EP101-1 BUILDING 1 - BASEMENT FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN
121 EP101-2 BUILDING 1 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN
122 EP102 BUILDING 1 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN
123 EP103 BUILDING 1 - SECOND FLOOR: POWER AND SPECIAL SYSTEMS PLAN
124 EP104 BUILDING 1 - THIRD FLOOR: POWER AND SPECIAL SYSTEMS PLAN
125 EP105 BUILDING 1 - FOURTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
126 EP106 BUILDING 1 - FIFTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
PAGE # SHEET # SHEET NAME
127 EP107 BUILDING 1 - SIXTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
128 EP108 BUILDING 1 - SEVENTH FLOOR: POWER AND SPECIAL SYSTEMS PLAN
129 EP109 BUILDING 1 - EIGHT FLOOR: POWER AND SPECIAL SYSTEMS PLAN
130 EP110 BUILDING 1 - NINTH FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN
131 EP111 BUILDING 1 - MACHINE ROOM: POWER AND SPECIAL SYSTEMS PLAN
132 EP112
BUILDING 27 - BASEMENT FLOOR: POWER AND SPECIAL SYSTEMS PLAN (DEDUCTIVE BID
ALTERNATE)
133 EP113
BUILDING 27 - FIRST FLOOR: POWER AND SPECIAL SYSTEMS PLAN (DEDUCTIVE BID
ALTERNATE)
134 EP114
BUILDING 27 - SECOND FLOOR: POWER, LIGHTING, AND SPECIAL SYSTEMS PLAN
(DEDUCTIVE BID ALTERNATE)
135 EL111 BUILDING 1 - MACHINE ROOM: LIGHTING PLAN
136 E-501 ELECTRICAL DETAILS
137 E-601 BUILDING 1 - EXISTING PARTIAL ONE-LINE DIAGRAM
138 E-602 BUILDING 1 - REVISED PARTIAL ONE-LINE DIAGRAM
139 E-603 BUILDING 1 - ELECTRICAL LOAD SCHEDULES
140 E-604 BUILDING 1 - ELECTRICAL SCHEDULES
141 E-605 BUILDING 27 - EXISTING ONE-LINE DIAGRAM (DEDUCTIVE BID ALTERNATE)
142 E-606 BUILDING 27 - REVISED ONE-LINE DIAGRAM (DEDUCTIVE BID ALTERNATE)
143 E-607 BUILDING 27 - ELECTRICAL SCHEDULES (DEDUCTIVE BID ALTERNATE)
DCI Engineers 707 W 2nd Ave Spokane WA, 99201 Dylan Larson Cell: 509.227.6937 Email: dlarson@dci-engineers.com
STRUCTURAL
Lerch Bates 19515 North Creek Parkway, #304 Bothell WA, 98011 Carl Cary Cell: 425.213.9932 Email: Carl.Cary@LerchBates.com
ELEVATOR
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N/A
HIDDEN ABV OR BLW
NEGATIVE AIR MACHINE
TACKY CONSTRUCTION
WALK-OFF MATS
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO
DRAWINGS AND SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWING PLANS IN THE CASE OF ANY CONFLICTING
INFORMATION. VERIFY AND RESOLVE CONFLICTS WITH VA COR AND ARCHITECT BEFORE
PROCEEDING.
3. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL ENSURE ALL WORK IS DONE IN
CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATIONS. RELEVANT
CODES INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOW:
A. 2021 INTERNATIONAL BUILDING CODE
B. 2021 INTERNATIONAL MECHANICAL CODE
C. 2021 INTERNATIONAL PLUMBING CODE
D. 2021 NFPA 101
E. 2021 NFPA 99
F. 2020 NFPA 70 & 70E
G. 2019 NFPA 13
4. THE INFECTION CONTROL CLASSIFICATION FOR THIS PROJECT IS III/IV. USE 6 MIL
VISQUEEN SHEETING AS INFECTION CONTROL BARRIERS FOR SHORT-TERM PROJECTS THAT
WILL GENERATE MINIMAL DUST. THESE SHOULD BE COMPLETELY AIRTIGHT AND SEALED
FROM CEILING TO FLOOR WITH OVERLAPPING CURTAINS. HOLES, TEARS, OR OTHER
PERFORATIONS REPAIRED PROMPTLY WITH TAPE. A PORTABLE, INDUSTRIAL GRADE HEPA
FILTER EXHAUST FAN ON CONTINUOUS OPERATION IS NEEDED WITHIN THE CONTAINED
AREA, WITH THE FILTERED AIR EXHAUSTED TO THE OUTSIDE OF THE WORK ZONE. PHASING
AND BARRIER LOCATIONS TO BE COORDINATED WITH VA, CONTRACTOR, AND ARCHITECT
PRIOR TO COMMENCING WORK.
5. ALL WORK SHALL BE PERFORMED IN A NEAT AND WORKMANLIKE MANNER WITHIN STANDARD
OF CARE FOR PROFESSION. PROJECT DOCUMENTATION MAY INDICATE WORK OR STANDARDS
WHICH EXCEED CODE MINIMUMS. SPECIFICATIONS AND PLAN DRAWINGS ARE TO BE TAKEN
TOGETHER AND UNDERSTOOD AS ONE. THOROUGHLY AND COMPLETELY CLEAN THE
CONSTRUCTION ZONE BEFORE THE CONSTRUCTION BARRIERS ARE REMOVED.
6. DISCREPANCIES OR OMISSIONS BETWEEN EXISTING CONDITIONS AND PROJECT
DOCUMENTATION SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND ARCHITECT
PRIOR TO BID OR WORK.
7. ALL COMPONENTS, DEVICES, MATERIALS, AND UTILIZATION EQUIPMENT FURNISHED OR
PROVIDED UNDER THIS SECTION SHALL BE NEW AND ORIGINAL, LISTED AND LABELED TO
U.L. OR EQUIVALENT FOR ITS INTENDED PURPOSE, SUITABLE FOR ITS USE AND SHALL BE
INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR WRITTEN INSTRUCTIONS,
OPERATE PER DESIGN INTENT, BE UNDAMAGED AND HAVE MANUFACTURER'S FULL
WARRANTY IN EFFECT AT THE DATE OF FINAL ACCEPTANCE OF THIS WORK.
8. BY THE ACT OF SUBMITTING A BID THE CONTRACTOR SHALL BE DEEMED TO HAVE EXAMINED
THE SITE, ALL CONSTRUCTION DOCUMENTS, IDENTIFIED HAZARDS PRESENT AND TO HAVE
ACCEPTED GENERAL AND EXISTING CONDITIONS AND INCLUDED ALLOWANCES IN THE BID.
9. PATCHING SHALL BE OF THE SAME MATERIALS AND MATCH ADJACENT FINISHES; FINISH
SAMPLES TO BE SUBMITTED TO THE VA COR AND THE ARCHITECT FOR APPROVAL.
CONTRACTOR SHALL COMPLY WITH VA DUST & INFECTION CONTROL RISK FOR
CONSTRUCTION & RENOVATION; AT MINIMUM, REFER TO AND COMPLY WITH ASHE DEFINED
"TYPE A" INSPECTION AND NON-INVASIVE ACTIVITIES; "TYPE B" SMALL SCALE, SHORT
DURATION ACTIVITIES WHICH CREATE MINIMAL DUST.
10. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH
EXISTING CONDITIONS, LOCATIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A
BID.
11. THE CONTRACTOR SHALL CHECK AND FIELD VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS
AND THE DRAWINGS AND SPECIFICATIONS SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE VA COR AND THE ARCHITECT.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PRODUCT TYPES AND QUANTITIES
DURING SITE WALK THROUGH WITH THE COR, BEFORE PURCHASING ANY MATERIALS,
EQUIPMENT, PRODUCTS OR LABOR.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH
ALL INSTALLERS TO ENSURE COMPLIANCE TO THE DRAWINGS AND SPECIFICATIONS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING A CONSTRUCTION SCHEDULE. THE
PLAN WILL BE REVIEWED AND APPROVED BY THE VA COR PRIOR TO BEGINNING WORK.
15. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL
INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS
INDICATED. DO NOT SCALE DRAWINGS. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN
THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS. ALL VERTICAL HEIGHTS INDICATED
ARE FROM THE FINISH FLOOR ELEVATION UNLESS OTHERWISE NOTED.
16. SEE ABOVE FOR ARCHITECTURAL SYMBOLS & ABBREVIATIONS.
17. SEE SHEET G-002 FOR DRAWING INDEX.
18. ALL WORK IS "NEW" WORK USING "NEW" MATERIALS UNLESS IT IS LABELED AS EXISTING.
19. FURNISH ALL PRODUCTS TO COMPLY WITH VA STANDARDS.
20. ELEVATOR EQUIPMENT SHOWN IN DRAWINGS ARE FOR REFERENCE PURPOSES ONLY AND
WILL BE DEPENDANT ON THE ELEVATOR MANUFACTURER'S DESIGN DURING CONSTRUCTION.
AB
ABV
ADJ
A/E
AFF
AGG
ALT
ALUM
APPROX
ARCH
ASPH
A/V
BARR
BATH
BRKT
BLDG
BLK
BLKG
BLW
BM
BMTU
BRNG
BOC
BOS
BO
BTM
BRC
CAB
CLG
CTR
CLR
CO
COL
COMP
CONC
CMU
CONN
CONST
CONT
COR
CJ
CS
COORD
CORR
DEMO
DIA
DC
DIM
DN
DR
DBL
DTL
DWG
E
EA
ELEV
ELEC
EOC
EOP
EQ
EQUIP
ES
EX(IST)
EXP
EJ
ETS
EXT
FA
FD
FE(C)
FF
FFB
FFL
FIN
FLASH
FLR
FLOUR
FNDN
FOC
FOF
FOS
FP
FRM
FT
FTG
FUR
FURN
GA
GALV
GC
GMU
GLB
GB/GWB
GFGI
GOVT
GYP
HDWE
HDR
HT
HM
HORZ
HR
ICRA
INCL
INST
ID
INSUL
INT
JT
KV
LAM
LAV
LT
MAT
MAX
MECH
MFR
MIN
MISC
MTL
MOD
N/A
NOM
N
NTS
NO.
O.C.
OFCI
OFOI
OPNG
OPP
OVHD
P
PR
PNL
PTN(S)
PVMT
P.C.
PRFB
PT
PL
PLYWD
PLAM
PS
QTY
RAD
REF
REINF
REQ
REQ'D
REQ'MT
RESIL
REV
RM
RO
S
SCHED
SECT
SF
SHG
SHT(G)
SIM
SM
SPEC
SQ
SS
STDG
STL
STOR
STRUCT
SUSP
SV
SYS
THK
THRESH
TOC
TOS
TPH
T&G
TRANS
TS
TYP
UON
VA
VAR
VB
VERT
VIF
W
WT
W/
W/O
WD
WDW
WP
WH
WR
WT
AND
ANGLE
AT
CENTERLINE
DEGREES
NUMBER
ANCHOR BOLT
ABOVE
ADJACENT
ARCHITECT/ENGINEER
ABOVE FINISH FLOOR
AGGREGATE
ALTERNATE
ALUMINUM
APPROXIMATELY
ARCHITECT(URAL)
ASPHALT
AUDIO / VIDEO
BARRIER
BATHROOM
BRACKET
BUILDING
BLOCK
BLOCKING
BELOW
BEAM
BONE MARROW TRANSPLANT UNIT
BEARING
BOTTOM OF CURB
BOTTOM OF SLAB
BOTTOM OF
BOTTOM
BRACE, BRACING
CABINET
CEILING
CENTER
CLEAR
CONTRACTING OFFICER
COLUMN
COMPOSITION
CONCRETE
CONCRETE MASONRY UNIT
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTING OFFICER'S REP.
CONTROL JOINT
CONCRETE SEALER
COORDINATE
CORRIDOR
DEMOLISH(ION)
DIAMETER
DIRECT CURRENT
DIMENSION
DOWN
DOOR
DOUBLE
DETAIL
DRAWING(S)
EAST
EACH
ELEVATION
ELECTRIC(AL)
END OF CURB
EDGE OF PAVEMENT
EQUAL
EQUIPMENT
EACH SIDE
EXISTING
EXPANSION
EXPANSION JOINT
EXPOSED TO STRUCTURE
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FIRE EXTINGUISHER (CABINET)
FACTORY FINISH
FINISH FLOOR BREAK
FINISH FLOOR LINE
FINISH(ED)
FLASHING
FLOOR(ING)
FLOURESCENT
FOUNDATION
FACE OF CONCRETE
FACE OF FINISH
FACE OF STUDS
FIRE PROOF
FRAME
FOOT, FEET
FOOTING
FURRING
FURNISHED
GAGE, GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS MASONRY UNIT
GLUE LAMINATED BEAM
GYPSUM WALL BOARD
GOVT FURN. GOVT INSTALLED
GOVERNMENT
GYPSUM
HARDWARE
HEADER
HEIGHT
HOLLOW METAL
HORIZONTAL
HOUR
INFECTIOUS CONTROL RISK
ASSESSMENT
INCLUDE(D,ING)
INSTALL
INSIDE DIAMETER OR DIMENSION
INSULATION
INTERIOR
JOINT
KILOVOLT
LAMINATE(D)
LAVATORY
LIGHT
MATERIAL(S)
MAXIMUM
MECHANIC(AL)
MANUFACTURE(R)
MINIMUM
MISCELLANEOUS
METAL
MODIFIED
NOT APPLICABLE
NOMINAL
NORTH
NOT TO SCALE
NUMBER
ON CENTER(S)
OWNER FURN. CONTRACTOR INST.
OWNER FURN. OWNER INST.
OPENING
OPPOSITE
OVERHEAD
PAINT
PAIR
PANEL
PARTITION(S)
PAVEMENT
PRECAST CONCRETE
PREFABRICATED
PRESSURE TREATED
PLATE
PLYWOOD
PLASTIC LAMINATE
PLASTIC
QUANTITY
RADIUS
REFERENCE
REINFORCE(D,ING)
REQUIRE
REQUIRED
REQUIREMENT
RESILIENT
REVERSE
ROOM
ROUGH OPENING
SOUTH
SCHEDULE
SECTION
SQUARE FEET
SHINGLES
SHEET (SHEATHING)
SIMILAR
SEAM
SPECIFICATION
SQUARE
STAINLESS STEEL
STANDING
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SHEET VINYL
SYSTEM
THICK(NESS)
THRESHOLD
TOP OF CURB
TOP OF SIDEWALK/PAD
TOILET PAPER HOLDER
TONGUE AND GROOVE
TRANSITION
TUBE STEEL
TYPICAL
UNLESS OTHERWISE NOTED
US DEPT. OF VETERANS AFFAIRS
VARIES
VAPOR BARRIER
VERTICAL
VERIFY IN FIELD
WEST
WEIGHT
WITH
WITHOUT
WOOD
WINDOW
WATERPROOF(ING)
WATER HEATER
WATER RESISTANT
WOOD TRIM
PATH OF TRAVEL FOR DEMOLITION DEBRIS
AND NEW EQUIPMENT
BATT INSULATION
ARCHITECTURAL SYMBOLS ABBREVIATIONS
G-003
ECMK
SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES
WINDOW TAG
FIRE SPRINKLER SHUT OFF VALVE
FIRE EXTINGUISHER
2 HOUR FIRE BARRIER
SMOKE PARTITION
GENERAL & ARCHITECTURAL NOTES
KEY NOTE
EXTERIOR ELEVATION FLAG
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
TRUE NORTH ARROW (PROJECT
NORTH DASHED)
HORIZONTAL GRID LINE
VERTICAL GRID LINE
WALL TYPE TAG
DOOR TAG
ELEVATION MARKER
ROOM TAG
CEILING HEIGHT TAG
BATH
INTERIOR ELEVATION FLAG
A-101 1
A-101
A-101
A-101
A
9'-0"
9'-0"
D2 A-512
AutoCAD SHX Text
FEX
R
AM
P D N
U P
2"
2" 2" 2"
GC101
JW/MCMK
BUILDING 1 - BASEMENT FLOOR-
ICRA FLOOR PLANS
1 BASEMENT FLOOR ADJACENCY FLOOR PLAN - BLDG 1
1/16" = 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
DUMPSTER
REFRIGERATION
MISC
STORAGE
MAIN
KITCHEN
RECORDS
KITCHEN
OFFICES
LOADING
BAY
AREA OF
WORK
BUILDING 27
KITCHEN
IT
OFFICES
ENGINEERING
STORAGE
KITCHEN
STORAGE
EMS
OFFICE
CLASS III ICRA NOTES
GENERAL NOTES
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
4 PHASE 3 - BASEMENT FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
3 PHASE 2 - BASEMENT FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N 2 PHASE 1 - BASEMENT FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
- 2
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
REQUIREMENTS.
GC102
JW/MCMK
BUILDING 1 - FIRST FLOOR -
ICRA FLOOR PLANS
1 FIRST FLOOR ADJACENCY FLOOR PLAN - BLDG 1
1/16"= 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
AREA OF WORK
BUILDING 27
PHARMACY
ADMIN
OFFICES
IT
CLOSET
PHARMACY
OFFICES
4 PHASE 3 - FIRST FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
BUILDING 1E
3 PHASE 2 - FIRST FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N 2 PHASE 1 - FIRST FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
- 4
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE. CONTRACTOR TO PROVIDE
TEMPORARY INTERCOM SYSTEM AT ANOTHER ENTRY POINT
FOR HOSPITAL OPERATIONS. COORDINATE WITH VA COR FOR
LOCATION OF ENTRY POINT.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
CLASS III ICRA NOTES
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
REQUIREMENTS.
AutoCAD SHX Text
DN
EXTERIOR
ROOF AREA
GC103
JW/MCMK
BUILDING 1 - SECOND FLOOR -
ICRA FLOOR PLANS
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N1 SECOND FLOOR ADJACENCY FLOOR PLAN - BLDG 1
1/16" = 1'-0"
IMAGING
LAB
AREA OF WORK
NUCLEAR
MEDICINE
IT
CLOSET
EMS
OFFICE
4 PHASE 3 - SECOND FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
CLASS III ICRA NOTES
3 PHASE 2 - SECOND FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N 2 PHASE 1 - SECOND FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
+ 2
1 3
6 2
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
GC104
BUILDING 1 - THIRD FLOOR -
ICRA FLOOR PLANS
1 THIRD FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
INPATIENT
PSYCHIATRIC
OUTPATIENT
EXAM RMS
AREA OF WORK
TOILET
IT
CLOSET
ADMIN
OFFICES
APU
4 PHASE 3 - THIRD FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
CLASS III ICRA NOTES
3 PHASE 2 - THIRD FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
2 PHASE 1 - THIRD FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
+ 1 5
3 4
GENERAL NOTES
SHEET KEYNOTES
1. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
2. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
3. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
4. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
5. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 2
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
III-IV
THIS COMBINATION INVOKES CLASS III ICRA PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
1 FOURTH FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
GC105
JW/MCMK
BUILDING 1 - FOURTH FLOOR -
ICRA FLOOR PLANS
INPATIENT
ROOMS
INPATIENT
ROOMS
AREA OF WORK
IT
CLOSET
ADMIN
OFFICES
CLEAN
LINEN
STORAGE
2 PHASE 1 - FOURTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
3 PHASE 2 - FOURTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N4 PHASE 3 - FOURTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
32 3
GENERAL NOTES
SHEET KEYNOTES
CLASS III ICRA NOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
SP
SD
SD
SPSPSP
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
GC106
JW/MCMK
BUILDING 1 - FIFTH FLOOR -
ICRA FLOOR PLANS
1 FIFTH FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0"
AREA OF WORK
INPATIENT
ROOMS
INPATIENT
ROOMS
IT
CLOSET
EMS
OFFICE
MEDICAL
EQUIPMENT
STORAGE
MEDICAL
OFFICES LOCKER / TOILET
CLEAN
STORAGE
2 PHASE 1 - FIFTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
3 PHASE 2 - FIFTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N4 PHASE 3 - FIFTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
2 3
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
CLASS III ICRA NOTES
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
GC107
JW/MCMK
BUILDING 1 - SIXTH FLOOR -
ICRA FLOOR PLANS
1 SIXTH FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0"
OUTPATIENT
EXAM RMS
SMALL
PROCEDURE
ROOMS
AREA OF
WORK
ADMIN
OFFICES
IT
CLOSET
2 PHASE 1 - SIXTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
CLASS III ICRA NOTES
3 PHASE 2 - SIXTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0"4 PHASE 3 - SIXTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0"
GENERAL NOTES
SHEET KEYNOTES
1. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
2. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
3. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
4. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
5. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 2
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
1 SEVENTH FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0" N
GC108
JW/MCMK
BUILDING 1 - SEVENTH FLOOR -
ICRA FLOOR PLANS
OUTPATIENT
PSYCHIATRY
OUTPATIENT
PSYCHIATRY
AREA OF
WORK
ADMIN
OFFICES
IT CLOSET
TOILET
TOILET
2 PHASE 1 - SEVENTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
CLASS III ICRA NOTES
3 PHASE 2 - SEVENTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N4 PHASE 3 - SEVENTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
2 3
2 6
3 2
4 5
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
GC109
BUILDING 1 - EIGHTH FLOOR -
ICRA FLOOR PLANS
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
1 EIGHTH FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0" N
OPERATING
ROOMS
OPERATING
ROOM
SUPPORT
AREA OF WORK
ENGINEERING
OFFICE/STORAGE
MEDICAL STORAGE
IT CLOSET
MECHANICAL
CLOSET
2 PHASE 1 - EIGHTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0"
CLASS III ICRA NOTES
3 PHASE 2 - EIGHTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0"4 PHASE 3 - EIGHTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0"
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING
ENTIRETY OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA
ARE FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF
NOT, INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM
TOP OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO
CONSTRUCTION SITE. COVER INTAKE/RETURNS WITH PAPER
FLUTED FILTERS, IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS.
5. MAINTAIN CALL BUTTON ACCESSIBILITY OUTSIDE OF ICRA
BARRIERS DURING PHASE 1 AND 2.
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
FS
EQUIPMENT FOR
S3
EQUIPMENT FOR
P1
EQUIPMENT FOR
P2
EQUIPMENT
ARRAY FOR P2
EQUIPMENT
ARRAY FOR S3
EQUIPMENT
ARRAY FOR P1
STACKED
EQUIPMENT
A1000
FS
EQUIPMENT FOR
S3
EQUIPMENT FOR
P1
EQUIPMENT FOR
P2
EQUIPMENT
ARRAY FOR P2
EQUIPMENT
ARRAY FOR S3
EQUIPMENT
ARRAY FOR P1
STACKED
EQUIPMENT
A1000
3 MACHINE ROOM ADAJCENCY FLOOR PLAN
1/16"= 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
N
GC110
JW/MCMK
BUILDING 1 -NINTH FLOOR &
MACHINE ROOM - ICRA FLOOR PLANS
1 NINTH FLOOR ADJACENCY FLOOR PLAN
1/16"= 1'-0"
ACCESS STAIR TO
MACHINE ROOM AREA OF WORK
MECHANICAL
AREA OF WORK
(SOME WORK ON ROOF ASSOCIATED
WITH MECHANICAL)
ROOF
4 ENLARGED MACHINE ROOM ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N 2 ENLARGED NINTH FLOOR ICRA FLOOR PLAN - BLDG 1
1/8" = 1'-0" N
-ANTE -4'
13' CLEAR
ANTE
5 GENERAL NOTES
SHEET KEYNOTES
1. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION. PROVIDE TACKY CONSTRUCTION WALK-OFF
MATS ON ENTRANCE AND EXIT SIDE OF CONSTRUCTION
ACTIVITY ACCESS POINTS
2. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
3. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
4. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
5. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION. DEMOLISH ONCE CONSTRUCTION HAS BEEN
COMPLETED.
CLASS III ICRA NOTES
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS
5. ANTE ROOM IMPLEMENTED TO MAINTAIN PRESSURIZATION
OF BUILDING BETWEEN INTERIOR AND EXTERIOR SPACES.
LEGEND
REFER TO KEYNOTE 2
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
AC-1
GC111
JW/MCMK
BUILDING 27 - BASEMENT -
ICRA FLOOR PLAN
(DEDUCTIVE BID ALTERNATE)
1 BASEMENT FLOOR ADJACENCY FLOOR PLAN
1/16" = 1'-0"
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA
N
AREA OF WORK
ENGINEERING
STORAGE
2 ENLARGED BASEMENT FLOOR ICRA FLOOR PLAN
1/8" = 1'-0" N
GENERAL NOTES
SHEET KEYNOTES
1. DOOR TO REMAIN CLOSED AND SEALED DURING ENTIRETY
OF CONSTRUCTION PHASE.
2. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
3. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
4. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
5. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND ENTRANCE/EXIT TO CONSTRUCTION
SITE. COVER INTAKE/RETURNS WITH PAPER FLUTED FILTERS,
IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
6. LT1 TEMP BARRIER TO REMAIN FOR DURATION OF
CONSTRUCTION PHASE. DEMOLISH ONCE CONSTRUCTION
PHASE HAS BEEN COMPLETED.
CLASS III ICRA NOTES
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS
LEGEND
REFER TO KEYNOTE 3
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <HOSPITAL UNIT> IS HIGH RISK GROUP
THIS COMBINATION INVOKES CLASS III & IV ICRA
PRECAUTIONS
REFER TO SPECIFICATION SECTION 01 35 26 - SAFETY
REQUIREMENTS FOR CLASS III INFECTION CONTROL
WF
CAM FS
SD
WF
SD
FS
CAM
SP
SD
A121
A122 A119
A102
C1-A1
A103
A105S3 P1
P2
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
A/E:
625 First Ave #301 Seattle, WA, 98104
(206) 590 - 2118
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
FOR CONSTRUCTION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
668-18-109
Revisions: Date:
SPEES DESIGN BUILD
REFURBISH AND UPGRADE
ELEVATORS IN BLDG
1 AND 27
11/16/2021
Mann-Grandstaff VA Medical Center
- Spokane, WA GC112
JW/MCMK
BUILDING 27 - FIRST FLOOR -
ICRA FLOOR PLAN
(DEDUCTIVE BID ALTERNATE)
1 FIRST FLOOR ICRA FLOOR PLAN - BLDG 27
1/16"= 1'-0"
N
EGRESS FROM FURTHEST POINT = 171'-8" (FREIGHT ELEV)
144'-5" (PASSENGER ELEV)
AREA OF WORK
BUILDING 1
MRI
SHEET KEYNOTES
GENERAL NOTES
2 ENLARGED FIRST FLOOR ICRA FLOOR PLAN - BLDG 27
1/8"= 1'-0" N
CLASS III ICRA NOTES
1. DURING CONSTRUCTION, THE ENTIRE UNIT WILL BE
VACATED. DOORS WILL BE SECURED TO EVERYONE BUT
CONSTRUCTION STAFF AND ESSENTIAL VA STAFF.
2. REMOVE EQUIPMENT AND ANY CONSTRUCTION DEBRIS
FROM SPACE USING COVERED SEALED CARTS.
3. SEE SPEC SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
4. MAINTAIN 4'-0" MINIMUM CLEARANCE FOR EGRESS
AROUND ICRA WALLS
1. TEMP ICRA DOOR TO REMAIN IN PLACE FOR ENTIRETY OF
CONSTRUCTION PHASE.PROVIDE TACKY CONSTRUCTION
WALK-OFF MATS ON ENTRANCE AND EXIT SIDE OF
CONSTRUCTION ACTIVITY ACCESS POINTS
2. VERIFY EXISTING WALLS ISOLATING THE WORK AREA ARE
FIRESTOPPED AND GO TO CONCRETE FLOOR ABOVE. IF NOT,
INSTALL FIRESTOPPING AND LT1 TEMP BARRIER FROM TOP
OF EXISTING WALLS TO CONCRETE FLOOR ABOVE.
3. NEGATIVE PRESSURE, ISOLATED CONSTRUCTION ZONE.
4. HEPA ISO CLASS 7 FILTERED NEGATIVE AIR TO BE
MAINTAINED WITHIN CONSTRUCTION AREA. COVER ALL
HOLES, CONDUITS, AND…