This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center campus. Work includes electrical upgrades and expansion, HVAC reconfiguration and renovations, data center renovations, communication and fiber infrastructure installation, physical security enhancements, and hazardous material abatement across multiple buildings. The solicitation involves buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and surrounding site work. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA100

BUILDING 1 - ROOM GC11

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE AREA OF DAMAGED NON-ASBESTOS

FLOOR TILES AND UNDERLYING ASBESTOS

BLACK MASTIC TO BARE SUBSTRATE USING

MANUAL MEANS AND CHEMICAL METHODS

FOLLOWING GROSS REMOVAL PROCEDURES

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 215

SF AND 1 ENCLOSURE.

REPAIR DEFECTS TO ASBESTOS PIPE

INSULATION, FITTINGS, AND/OR OPEN JOINTS

WITHIN A NEGATIVE PRESSURE CONTAINMENT.

HEPA VACUUM (PRE-CLEAN) AND APPLY TWO

LAYERS OF COVERING LAG CLOTH OVER

DAMAGE/DEFECTS, 3 ENCLOSURES, 6 DEFECTS

WITHIN EACH ENCLOSURE.

ASBESTOS PIPE INSULATION PRESENT, PROTECT

AS NECESSARY. WHERE DAMAGED AND NOT

KEYNOTED FOR REPAIR, STOP WORK AND

REPORT TO VACOR

ASBESTOS CONTAINING EXTERIOR SURFACING

(STUCCO) PRESENT UNDER NEW EFIS LAYER. DO

NOT DISTURB, PROTECT AS NECESSARY

ASBESTOS CONTAINING FLOOR TILE AND/OR

UNDERLYING ASBESTOS BLACK MASTIC

PRESENT, DO NOT DISTURB, PROTECT AS

NECESSARY.

WHERE PRESENT AT SUBSURFACE FOUNDATION

WALL AND DUCTBANK PENETRATION, REMOVE

ASBESTOS STUCCO USING MANUAL MEANS AND

FOLLOWING GROSS REMOVAL PROCEDURES

WITHIN AN OUTDOOR NEGATIVE PRESSURE

ENCLOSURE. HIGH PRESSURE WATER BLASTING

IS PROHIBITED. EXACT LOCATION AND EXTENTS

TO BE COORDINATED WITH GENERAL

CONTRACTOR, 3 SF AND 1 ENCLOSURE.

INSTALL/ANCHOR UNI STRUT ATTACHMENTS AT

LOCATIONS COORDINATED WITH GENERAL

CONTRACTOR ONTO PLASTER WALL TO

FACILITATE NEW INSTALLATIONS WITHIN A

REGULATED AREA, 6 EACH (54LF)

LBP CONCRETE COLUMNS. DO NOT DISTURB,

PROTECT AS NECESSARY

LBP UPPER PLASTER WALLS. DO NOT DISTURB,

PROTECT AS NECESSARY

LBP PLASTER CEILING AND BEAMS, GRAY OVER

GREEN. DO NOT DISTURB, PROTECT AS

NECESSARY

SCRAPE AND STABILIZE LEAD BASE PAINTED

CONCRETE CEILING AND BEAMS AND 3 FEET OF

UPPER WALLS USING MANUAL MEANS. REMOVE

LBP ENTIRELY IN LOCATIONS REQUIRING

ANCHORS FOR NEW FAN COIL UNITS WITHIN

SAME ROOM. APPLY TWO APPLICATIONS OF

ENCAPSULANT WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 325 SF OF LBP PLASTER CEILING

AND UPPER WALLS, 1 ENCLOSURE.

WHERE NECESSARY, REMOVE LEAD BASED PAINT

FROM CONCRETE CEILING DECK TO FACILITATE

PIPE PENETRATIONS USING MANUAL MEANS

WITH A CHEMICAL STRIPPER USING GLOVE BAG

METHODS WITHIN A REGULATED AREA, 6SF.

REFER TO MECHANICAL DRAWINGS COORDINATE

EXACT LOCATION OF PENETRATIONS AND

EXTENTS WITH THE GENERAL CONTRACTOR.

A1

A2

A3

A4

A5

L2

L2

L3

L2

A3

A5

A3

A5

L2

L2

A3

A5

L4

A2

A3

L4

A2

A3

L4

A3

A5

A3

A5

A3

A5

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

L2

L3

A1

L2

L3

A6

A6

L1

L2

L3

L4

L5

L6

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GC12

AutoCAD SHX Text

GC11

AutoCAD SHX Text

GC15A

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM CG12

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA101

BUILDING 1 - ROOM 1C102D

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE ASBESTOS FLOOR TILE AND

UNDERLYING ASBESTOS MASTIC USING MANUAL

MEANS AND CHEMICAL METHODS FOLLOWING

GROSS REMOVAL PROCEDURES WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 140 SF FLOOR

TILES AND MASTIC AND 1 ENCLOSURE.

REMOVE NON-ASBESTOS EFIS SIDING WITH

CLEAN CUT AND THEN UNDERLYING ASBESTOS

STUCCO TO ALLOW FOR MINI-SPLIT TUBING AND

POWER USING MANUAL MEANS AND FOLLOWING

GROSS REMOVAL PROCEDURES WITHIN A

NEGATIVE PRESSURE MINI-ENCLOSURE. EXACT

LOCATION AND EXTENTS TO BE COORDINATED

WITH GENERAL CONTRACTOR, 1 SF AND 1

ENCLOSURE.

LEAD CONTAINING WOOD WINDOW ASSEMBLY

COMPONENTS. DO NOT DISTURB, PROTECT AS

NECESSARY

LBP PLASTER CEILING. DO NOT DISTURB,

PROTECT AS NECESSARY

WHERE NECESSARY, REMOVE LEAD BASED PAINT

FROM CONCRETE CEILING DECK TO FACILITATE

PIPE PENETRATIONS USING MANUAL MEANS

WITH A CHEMICAL STRIPPER USING GLOVE BAG

METHODS WITHIN A REGULATED AREA, 3SF.

REFER TO MECHANICAL DRAWINGS COORDINATE

EXACT LOCATION OF PENETRATIONS AND

EXTENTS WITH THE GENERAL CONTRACTOR.

REMOVE LEAD BASED PAINT ON CEILING DECK

TO FACILITATE INSTALLATION OF NEW SPLIT UNIT

USING APPROVED CHEMICAL STRIPPER WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE. 4SF

COORDINATE EXACT LOCATION OF PENETRATION

AND EXTENTS WITH THE GENERAL CONTRACTOR.

A1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A2

L1

L2

L3

L4

A1

L4

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM C102D

C102D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA102

BUILDING 1 - ROOM 1W01

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE ASBESTOS FLOOR TILE AND

UNDERLYING ASBESTOS MASTIC USING MANUAL

MEANS AND CHEMICAL METHODS FOLLOWING

GROSS REMOVAL PROCEDURES WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 100 SF FLOOR

TILES AND MASTIC AND 1 ENCLOSURE.

SCRAPE AND STABILIZE LBP ON PLASTER CEILING

USING MANUAL MEANS. REMOVE LBP ENTIRELY

IN LOCATIONS REQUIRING ANCHORS FOR NEW

FAN COIL UNITS WITHIN SAME ROOM. APPLY TWO

APPLICATIONS OF ENCAPSULANT WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 100 SF

PLASTER CEILING AND 1 ENCLOSURE.

SCRAPE AND STABILIZE LBP ON PLASTER WALLS

USING MANUAL MEANS AND APPLY TWO

APPLICATIONS OF ENCAPSULANT WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 230 SF

PLASTER WALLS.

LEAD BASED PAINT ON GRILL IN CHASE, PROTECT

AS NECESSARY

A1

L1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

L2

L3

A1

L1

L2

L3

L2

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM 1W01

1W01

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA103

BUILDING 1 - ROOM 1E15

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO) PRESENT UNDER

NEW EFIS LAYER. WHERE NECESSARY, REMOVE NON-ASBESTOS EFIS

SIDING WITH CLEAN CUT AND THEN UNDERLYING ASBESTOS STUCCO TO

ALLOW FOR MINI-SPLIT TUBING AND POWER USING MANUAL MEANS AND

FOLLOWING GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE

PRESSURE MINI-ENCLOSURE HIGH PRESSURE WATER BLASTING IS

PROHIBITED. EXACT LOCATION, ELEVATION AND EXTENTS TO BE

COORDINATED WITH GENERAL CONTRACTOR, 1 SF AND 1 ENCLOSURE.

ASBESTOS PIPE INSULATION AND/OR MUDDED FITTINGS PRESENT AT

CHASE LOCATIONS. DO NOT DISTURB, PROTECT AS NECESSARY

FOLLOW EXISTING PATHWAY OF UTILITIES ASSOCIATED WITH EXISTING

MINI-SPLIT. ASBESTOS CONTAINING EXTERIOR STUCCO PRESENT UNDER

NEW EFIS LAYER. DO NOT DISTURB AND PROTECT AS NECESSARY.

SCRAPE AND STABILIZE LEAD BASE PAINTED PLASTER CEILING USING

MANUAL MEANS. REMOVE LBP ENTIRELY IN LOCATIONS REQUIRING

ANCHORS FOR NEW FAN COIL UNITS WITHIN SAME ROOM. APPLY TWO

APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 220 SF OF LBP PLASTER CEILING.

LEAD CONTAINING 10" PIPE. DO NOT DISTURB, PROTECT AS NECESSARY

LEAD CONTAINING WOOD WINDOW ASSEMBLY COMPONENTS. DO NOT

DISTURB, PROTECT AS NECESSARY

WHERE NECESSARY, REMOVE LEAD BASED PAINT FROM CONCRETE

CEILING DECK TO FACILITATE PIPE PENETRATIONS USING MANUAL MEANS

WITH A CHEMICAL STRIPPER USING GLOVE BAG METHODS WITHIN A

REGULATED AREA, 3SF. REFER TO MECHANICAL DRAWINGS COORDINATE

EXACT LOCATION OF PENETRATIONS AND EXTENTS WITH THE GENERAL

CONTRACTOR.

REMOVE LEAD BASED PAINT ON CEILING DECK TO FACILITATE

INSTALLATION OF NEW SPLIT UNIT USING APPROVED CHEMICAL STRIPPER

USING GLOVE BAG METHOD. 4SF COORDINATE EXACT LOCATION OF

PENETRATION AND EXTENTS WITH THE GENERAL CONTRACTOR.

A1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A2

A3

L1

L2

L3

L4

L5

A2

A2

L1 A3 L1

A2

L2

L3

A1

L5

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM 1E15

AutoCAD SHX Text H103

AutoCAD SHX Text 1E15

1E18

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA104

BUILDING 1 - ROOM 2C10

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE NON-ASBESTOS PEDESTAL FLOOR WITH ASBESTOS PEDESTAL MASTIC AND

UNDERLYING ASBESTOS FLOOR TILE WITH ASBESTOS MASTIC USING MANUAL

MEANS AND CHEMICAL METHODS FOLLOWING GROSS REMOVAL PROCEDURES

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 500 SF FLOOR TILES AND MASTIC AND

500 SF PEDESTAL FLOOR SYSTEM AND 1 ENCLOSURE.

REMOVE NON-ASBESTOS DRYWALL WALLS AND ASBESTOS PEGBOARD

(ACOUSTICAL TRANSITE) SHEETS USING MANUAL MEANS AND DISMANTLING

METHODS WHILE FOLLOWING GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 850 SF OF PEGBOARD COVERING, 35 LF OF DRYWALL

WALLS AND 1 ENCLOSURE.

REMOVE ASBESTOS CONTAINING CEMENTITIOUS HEAT SHIELD ASSOCIATED TAR

AND/OR FELT PAPER WITHIN STEAM CONVECTOR VOID USING MANUAL MEANS AND

METHODS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE, 16SF.

REMOVE ASBESTOS CONTAINING PIPE INSULATION AND MUDDED FITTINGS IN AREA

BELOW RELATED TO STEAM CONVECTOR BACK TO MAIN USING MANUAL METHODS

WITHIN A NEGATIVE PRESSURE ENCLOSURE UTILIZING GLOVE BAG METHODS.

COORDINATE LOCATION AND EXTENT WITH GENERAL CONTRACTOR. 26LF

INCLUDING 1 FOOT BOTH DIRECTIONS ON MAIN, 1 ENCLOSURE

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO) PRESENT UNDER NEW

EFIS LAYER. DO NOT DISTURB, PROTECT AS NECESSARY

WINDOW ASSEMBLY WITH HIDDEN ASBESTOS CAULKS. DO NOT DISTURB, PROTECT

AS NECESSARY.

ASBESTOS PIPE INSULATION PRESENT, PROTECT AS NECESSARY. MAINTAIN 3 FEET

OF DISTANCE FROM ASBESTOS PIPE INSULATION. IF DAMAGED, STOP WORK AND

REPORT TO COR WHERE OBSERVED.

PRESUMED ASBESTOS CONTAINING ROOF SYSTEM. DO NOT DISTURB, PROTECT AS

NECESSARY.

REMOVE NON-ASBESTOS CEILING GRID AND SCRAPE AND STABILIZE LEAD BASE

PAINTED PLASTER CEILING USING MANUAL MEANS. REMOVE LBP ENTIRELY IN

LOCATIONS REQUIRING ANCHORS FOR NEW FAN COIL UNITS WITHIN SAME ROOM.

APPLY TWO APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 500 SF OF 2'X4' ACT CEILING SYSTEM AND 500 SF OF LBP PLASTER

CEILING.

REMOVE LEAD CONTAINING STEAM CONVECTOR COVER USING MANUAL MEANS AND

METHODS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE

REMOVE LEAD BASED PAINTED STEAM LINES IN AREA BELOW RELATED TO STEAM

CONVECTOR USING MANUAL METHODS WITHIN EXISTING CONTAINMENT. WORK TO

BE CONDUCTED CONCURRENTLY WITH A4. 24LF

WHERE NECESSARY, REMOVE LEAD BASED PAINT FROM CONCRETE CEILING DECK

TO FACILITATE PIPE PENETRATIONS USING MANUAL MEANS WITH A CHEMICAL

STRIPPER USING GLOVE BAG METHODS WITHIN A REGULATED AREA, 6SF. REFER TO

MECHANICAL DRAWINGS COORDINATE EXACT LOCATION OF PENETRATIONS AND

EXTENTS WITH THE GENERAL CONTRACTOR.

REMOVE LEAD BASED PAINT ON CEILING DECK TO FACILITATE INSTALLATION OF

NEW SPLIT UNIT USING APPROVED CHEMICAL STRIPPER WITHIN EXISTING NEGATIVE

PRESSURE CONTAINMENT. 4SF COORDINATE EXACT LOCATION OF PENETRATION

AND EXTENTS WITH THE GENERAL CONTRACTOR.

A1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A2

A3

A4

A5

A6

A7

A8

L1

L2

L3

L4

L5

A1

A2

L1

L1

A4

A5

A2

A3

L2

L5

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM 2C10

AutoCAD SHX Text 2C10

2C09

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA105

BUILDING 1 - ROOM E303 ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE NON-ASBESTOS PEDESTAL FLOOR WITH ASBESTOS PEDESTAL MASTIC AND UNDERLYING

REMNANT ASBESTOS FLOOR TILE MASTIC USING MANUAL MEANS AND CHEMICAL METHODS

FOLLOWING GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE PRESSURE ENCLOSURE, 650 SF

FLOOR TILES MASTIC AND 650 SF PEDESTAL FLOOR SYSTEM AND 1 ENCLOSURE.

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO) PRESENT UNDER NEW EFIS LAYER. DO NOT

DISTURB, PROTECT AS NECESSARY.

REMOVE ASBESTOS CONTAINING 12"X12" FLOOR TILE AND UNDERLYING ASBESTOS CONTAINING

MASTIC. REMOVE SECOND LAYER ASBESTOS CONTAINING 9"X9" FLOOR TILE AND UNDERLYING

ASBESTOS CONTAINING MASTIC TO BARE SUBSTRATE USING MANUAL METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE. 24 SQUARE FEET. 1 ENCLOSURE

REMOVE ASBESTOS CONTAINING POURED FLOORING AND UNDERLYING ASBESTOS BLACK MASTIC TO

BARE SUBSTRATE USING MANUAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE. 300SF

REMOVE ASBESTOS CONTAINING LAB HOOD PANELS USING INTACT MANUAL METHODS WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE. 1 UNIT

REMOVE ASBESTOS CONTAINING COUNTERTOPS INCLUDING SINKS USING MANUAL INTACT METHODS

WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 66 SQUARE FEET, 2 SINKS

REMOVE FAN COIL UNIT WITH ASBESTOS CONTAINING CAULKS USING MANUAL INTACT METHODS

WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 1 UNIT

REMOVE ASBESTOS CONTAINING BLACK TAR FITTING ON CHILLED WATER LINES USING MANUAL

METHODS GLOVE TECHNIQUES WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 2 FITTINGS

ASBESTOS PIPE INSULATION AND/OR MUDDED FITTINGS PRESENT, PROTECT AS NECESSARY. MAINTAIN

3 FEET OF DISTANCE FROM ASBESTOS PIPE INSULATION. IF DAMAGED, STOP WORK AND REPORT TO

VACOR.

ASBESTOS CONTAINING GRAY CAULK ON AIR HANDLING UNIT AND DUCT WORK. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING TRANSITE HEAT SHIELDS AND/OR BLACK TAR PRESENT IN WALL VOIDS OF

HEAT CONVECTOR UNITS ALONG PERIMETER WALLS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS FIRE DOOR AND FRAME SYSTEMS. DO NOT DISTURB, PROTECT AS NECESSARY.

WINDOW ASSEMBLY WITH HIDDEN ASBESTOS CAULKS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING INTERIOR GRAY WINDOW CAULK PRESENT. DO NOT DISTURB, PROTECT AS

NECESSARY.

PRESUMED ASBESTOS CONTAINING ROOF SYSTEM. DO NOT DISTURB, PROTECT AS NECESSARY.

REMOVE LEAD CONTAMINATED CEILING GRID AND SCRAPE AND STABILIZE BROWN LEAD BASE PAINTED

CONCRETE CEILING DECK USING MANUAL MEANS AND APPLY TWO APPLICATIONS OF ENCAPSULANT

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 650 SF OF 2'X4' ACT CEILING SYSTEM AND 650 SF OF LBP

PLASTER CEILING AND 1 ENCLOSURE.

WHERE NECESSARY, REMOVE LEAD BASED PAINT FROM CONCRETE CEILING DECK TO FACILITATE PIPE

PENETRATIONS USING MANUAL MEANS WITH A CHEMICAL STRIPPER USING GLOVE BAG METHODS

WITHIN A REGULATED AREA, 9SF. REFER TO MECHANICAL DRAWINGS COORDINATE EXACT LOCATION

OF PENETRATIONS AND EXTENTS WITH THE GENERAL CONTRACTOR.

SCRAPE AND STABILIZE DETERIORATED LEAD BASED PAINT PLASTER CEILING USING MANUAL

METHODS. REMOVE LBP ENTIRELY IN LOCATIONS REQUIRING ANCHORS FOR NEW FAN COIL UNITS

WITHIN SAME ROOM. APPLY TWO APPLICATIONS OF AN APPROVED ENCAPSULANT WITHIN EXISTING

NEGATIVE PRESSURE ENCLOSURE, 300 SQUARE FEET

REMOVE LEAD BASED PAINT ON CEILING DECK TO FACILITATE INSTALLATION OF NEW SPLIT UNIT USING

APPROVED CHEMICAL STRIPPER WITHIN EXISTING NEGATIVE PRESSURE CONTAINMENT. 4SF

COORDINATE EXACT LOCATION OF PENETRATION AND EXTENTS WITH THE GENERAL CONTRACTOR.

A1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A1

L1

A2

A2

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

A14

A15

L1

L2

L3

L4

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM E303

AutoCAD SHX Text E303

E303A

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA106

BUILDING 1 - ROOM E303 ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

KEY NOTES

REMOVE NON-ASBESTOS PEDESTAL FLOOR WITH ASBESTOS PEDESTAL MASTIC AND UNDERLYING

REMNANT ASBESTOS FLOOR TILE MASTIC USING MANUAL MEANS AND CHEMICAL METHODS

FOLLOWING GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE PRESSURE ENCLOSURE, 650 SF

FLOOR TILES MASTIC AND 650 SF PEDESTAL FLOOR SYSTEM AND 1 ENCLOSURE.

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO) PRESENT UNDER NEW EFIS LAYER. DO NOT

DISTURB, PROTECT AS NECESSARY.

REMOVE ASBESTOS CONTAINING 12"X12" FLOOR TILE AND UNDERLYING ASBESTOS CONTAINING

MASTIC. REMOVE SECOND LAYER ASBESTOS CONTAINING 9"X9" FLOOR TILE AND UNDERLYING

ASBESTOS CONTAINING MASTIC TO BARE SUBSTRATE USING MANUAL METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE. 24 SQUARE FEET. 1 ENCLOSURE

REMOVE ASBESTOS CONTAINING POURED FLOORING AND UNDERLYING ASBESTOS BLACK MASTIC TO

BARE SUBSTRATE USING MANUAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE. 300SF

REMOVE ASBESTOS CONTAINING LAB HOOD PANELS USING INTACT MANUAL METHODS WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE. 1 UNIT

REMOVE ASBESTOS CONTAINING COUNTERTOPS INCLUDING SINKS USING MANUAL INTACT METHODS

WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 66 SQUARE FEET, 2 SINKS

REMOVE FAN COIL UNIT WITH ASBESTOS CONTAINING CAULKS USING MANUAL INTACT METHODS

WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 1 UNIT

REMOVE ASBESTOS CONTAINING BLACK TAR FITTING ON CHILLED WATER LINES USING MANUAL

METHODS GLOVE TECHNIQUES WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE. 2 FITTINGS

ASBESTOS PIPE INSULATION AND/OR MUDDED FITTINGS PRESENT, PROTECT AS NECESSARY. MAINTAIN

3 FEET OF DISTANCE FROM ASBESTOS PIPE INSULATION. IF DAMAGED, STOP WORK AND REPORT TO

VACOR.

ASBESTOS CONTAINING GRAY CAULK ON AIR HANDLING UNIT AND DUCT WORK. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING TRANSITE HEAT SHIELDS AND/OR BLACK TAR PRESENT IN WALL VOIDS OF

HEAT CONVECTOR UNITS ALONG PERIMETER WALLS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS FIRE DOOR AND FRAME SYSTEMS. DO NOT DISTURB, PROTECT AS NECESSARY.

WINDOW ASSEMBLY WITH HIDDEN ASBESTOS CAULKS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING INTERIOR GRAY WINDOW CAULK PRESENT. DO NOT DISTURB, PROTECT AS

NECESSARY.

PRESUMED ASBESTOS CONTAINING ROOF SYSTEM. DO NOT DISTURB, PROTECT AS NECESSARY.

REMOVE LEAD CONTAMINATED CEILING GRID AND SCRAPE AND STABILIZE BROWN LEAD BASE PAINTED

CONCRETE CEILING DECK USING MANUAL MEANS AND APPLY TWO APPLICATIONS OF ENCAPSULANT

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 650 SF OF 2'X4' ACT CEILING SYSTEM AND 650 SF OF LBP

PLASTER CEILING AND 1 ENCLOSURE.

WHERE NECESSARY, REMOVE LEAD BASED PAINT FROM CONCRETE CEILING DECK TO FACILITATE PIPE

PENETRATIONS USING MANUAL MEANS WITH A CHEMICAL STRIPPER USING GLOVE BAG METHODS

WITHIN A REGULATED AREA, 9SF. REFER TO MECHANICAL DRAWINGS COORDINATE EXACT LOCATION

OF PENETRATIONS AND EXTENTS WITH THE GENERAL CONTRACTOR.

SCRAPE AND STABILIZE DETERIORATED LEAD BASED PAINT PLASTER CEILING USING MANUAL

METHODS. REMOVE LBP ENTIRELY IN LOCATIONS REQUIRING ANCHORS FOR NEW FAN COIL UNITS

WITHIN SAME ROOM. APPLY TWO APPLICATIONS OF AN APPROVED ENCAPSULANT WITHIN EXISTING

NEGATIVE PRESSURE ENCLOSURE, 300 SQUARE FEET

REMOVE LEAD BASED PAINT ON CEILING DECK TO FACILITATE INSTALLATION OF NEW SPLIT UNIT USING

APPROVED CHEMICAL STRIPPER WITHIN EXISTING NEGATIVE PRESSURE CONTAINMENT. 4SF

COORDINATE EXACT LOCATION OF PENETRATION AND EXTENTS WITH THE GENERAL CONTRACTOR.

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

A14

A15

L1

L2

L3

L4

A2

A3

A6

A5

L3

A4

L4

A6

A7

A8

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3C14

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 - ROOM E303

3C13

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA107

BUILDING 1 - PENTHOUSE & ROOF

ABATEMENT

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE SPOT LOCATIONS OF ASBESTOS ROOF AND

UNDERLYING MASTICS OR TARS USING MANUAL MEANS AND

CHEMICAL AND OUTDOOR METHODS IN A REGULATED AREA.

COORDINATE SPOT AREAS OF REMOVAL AND EXACT SIZES OF

ROOF PENETRATIONS WITH THE GENERAL CONTRACTOR, 5

ROOF AREAS FOR PIPE, ELECTRIC AND CONDENSER

SUPPORTS, 35 SF TOTAL AND 2 MOBILIZATIONS. USE CLEAR

BRIDGING ENCAPSULANT ON EXPOSED SURFACES.

REMOVE LEAD BASED PAINT ON PENTHOUSE CEILING DECK TO

FACILITATE INSTALLATION OF NEW SPLIT UNIT USING

APPROVED CHEMICAL STRIPPER USING MANUAL METHODS

AND GLOVE BAG TECHNIQUES. 6SF COORDINATE EXACT

LOCATION OF PENETRATION AND EXTENTS WITH THE

GENERAL CONTRACTOR.

A1

A1 A1

A1

L1

L1

L1

L1

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UBUILDING 01 - PENTHOUSE & ROOF

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text 4C02B

AutoCAD SHX Text 4C02A

AutoCAD SHX Text 4C01

AutoCAD SHX Text 4C01B

AutoCAD SHX Text 4C01A

AutoCAD SHX Text 4C02

AutoCAD SHX Text 4C03

AutoCAD SHX Text 4C03A

4C03B

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA108

BUILDING 1 - TSI ABATEMENT - 1

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE CONTAMINATED ACT CEILING TILES, PRE-CLEAN AND REMOVE

ASBESTOS PIPE INSULATION AND MUDDED FITTINGS USING GROSS

REMOVAL PROCEDURES AND GLOVEBAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 70 LF PIPE INSULATION AND 325 SF ACT CEILING

TILES AND 4 ENCLOSURES. .

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION

A1

A1

A1

A1

A1

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GW08

AutoCAD SHX Text

GW04

AutoCAD SHX Text

GW05A

AutoCAD SHX Text

GW05

AutoCAD SHX Text

GW08A

AutoCAD SHX Text

GW04B

AutoCAD SHX Text

GW15

AutoCAD SHX Text

GW13

AutoCAD SHX Text

GW12

AutoCAD SHX Text

GW11

AutoCAD SHX Text

GW10A

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM GW04

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOMS GW10, GW12. & GW13

AutoCAD SHX Text

%%UNOT TO SCALE

GW10

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA109

BUILDING 1 - TSI ABATEMENT - 2

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE CONTAMINATED ACT CEILING TILES, PRE-CLEAN AND REMOVE

ASBESTOS PIPE INSULATION AND MUDDED FITTINGS USING GROSS

REMOVAL PROCEDURES AND GLOVEBAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 30 LF PIPE INSULATION AND 325 SF ACT CEILING

TILES AND 3 ENCLOSURES.

ON NIGHTS AND WEEKENDS, REPAIR MECHANICAL DEFECTS TO

ASBESTOS PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS WITHIN A

NEGATIVE PRESSURE ENCLOSURE. HEPA VACUUM (PRE-CLEAN) AND

APPLY TWO LAYERS OF COVERING LAG CLOTH OVER DAMAGE/DEFECTS,

1 ENCLOSURE, 8 DEFECTS WITHIN EACH ENCLOSURE

ON NIGHTS AND WEEKENDS, REMOVE CONTAMINATED ACT CEILING

TILES, PRE-CLEAN AND REPAIR MECHANICAL DEFECTS TO ASBESTOS

PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS WITHIN A NEGATIVE

PRESSURE ENCLOSURE. HEPA VACUUM (PRE-CLEAN) AND APPLY TWO

LAYERS OF COVERING LAG CLOTH OVER DAMAGE/DEFECTS, 1

ENCLOSURE, 100 SF CEILING TILES AND 8 DEFECTS WITHIN ENCLOSURE.

ON NIGHTS AND WEEKENDS, SCRAPE AND STABILIZE LEAD BASE

PAINTED PLASTER CEILING USING MANUAL MEANS AND APPLY TWO

APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 200 SF OF LBP PLASTER CEILING.

ON NIGHTS AND WEEKENDS, SCRAPE AND STABILIZE LEAD BASE

PAINTED PLASTER CEILING USING MANUAL MEANS AND APPLY TWO

APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 160 SF OF LBP PLASTER CEILING.

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A1

A2

A3

L1

L2

A1

A1

A1

A2

L1

A2

L2

A3

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GC03

AutoCAD SHX Text H006

AutoCAD SHX Text

GC17B

AutoCAD SHX Text

GC17

AutoCAD SHX Text

GC17C

AutoCAD SHX Text

WIRE

AutoCAD SHX Text

CAGE

AutoCAD SHX Text

WIRE

AutoCAD SHX Text

CAGE

AutoCAD SHX Text

GE17

AutoCAD SHX Text

GE16

AutoCAD SHX Text H003

AutoCAD SHX Text

GE34

AutoCAD SHX Text

GE35

AutoCAD SHX Text

GE15

AutoCAD SHX Text

GE14

AutoCAD SHX Text

GE13

AutoCAD SHX Text

GE12

AutoCAD SHX Text

GE07

AutoCAD SHX Text

GE05

AutoCAD SHX Text

GE04

AutoCAD SHX Text

GE02

AutoCAD SHX Text S001

AutoCAD SHX Text

GE01

AutoCAD SHX Text H001

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text H106

AutoCAD SHX Text 1C126A

AutoCAD SHX Text 1C121

AutoCAD SHX Text 1C124

AutoCAD SHX Text 1C123A

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM GC03

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOMS GC17 & GC17C

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOMS H003 & GE02

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM H106

%%UNOT TO SCALE

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA110

BUILDING 1 - TSI ABATEMENT - 3

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE CONTAMINATED ACT CEILING TILES, PRE-CLEAN AND REMOVE

ASBESTOS PIPE INSULATION AND MUDDED FITTINGS USING GROSS

REMOVAL PROCEDURES AND GLOVEBAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 60 LF PIPE INSULATION AND 500 SF ACT CEILING

TILES AND 5 ENCLOSURES.

ON NIGHTS AND WEEKENDS, REMOVE CONTAMINATED ACT CEILING

TILES, PRECLEAN AND REPAIR MECHANICAL DEFECTS TO ASBESTOS

PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS WITHIN A NEGATIVE

PRESSURE ENCLOSURE. HEPA VACUUM (PRE-CLEAN) AND APPLY TWO

LAYERS OF COVERING LAG CLOTH OVER DAMAGE/DEFECTS, 1

ENCLOSURE, 100 SF CEILING TILES AND 8 DEFECTS WITHIN ENCLOSURE.

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A1

A2

A1 A1

A1

A1

A1

A2

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2E09

AutoCAD SHX Text 2E10

AutoCAD SHX Text 2E11

AutoCAD SHX Text 2E12A

AutoCAD SHX Text 2E12

AutoCAD SHX Text 2E13

AutoCAD SHX Text 2E15

AutoCAD SHX Text 2C14

AutoCAD SHX Text 2C13

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM 2C14

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOMS 2E15, 2E13, 2E11, & 2E09

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM H106

AutoCAD SHX Text

%%UNOT TO SCALE

H106

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA111

BUILDING 1 - TSI ABATEMENT - 3

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE CONTAMINATED ACT CEILING TILES, PRE-CLEAN AND REMOVE

ASBESTOS PIPE INSULATION AND MUDDED FITTINGS USING GROSS

REMOVAL PROCEDURES AND GLOVEBAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 40 LF PIPE INSULATION AND 300 SF ACT CEILING

TILES AND 3 ENCLOSURES.

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A1

A1

A1

A1

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2W29D

AutoCAD SHX Text 2E22

AutoCAD SHX Text 2E22A

AutoCAD SHX Text 2E21

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOM 2W29D

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

%%UBUILDING 01 TSI ABATEMENT - ROOMS 2E22 & 2E21

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA020

ENVIRONMENTAL HAZARDS - BUILDING

2 - ROOM G04

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE NON-ASBESTOS EFIS SIDING WITH CLEAN CUT AND THEN

UNDERLYING ASBESTOS STUCCO TO ALLOW FOR MINI-SPLIT

TUBING AND POWER USING MANUAL MEANS AND FOLLOWING

GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE PRESSURE

MINI-ENCLOSURE HIGH PRESSURE WATER BLASTING IS

PROHIBITED. EXACT LOCATION AND EXTENTS TO BE

COORDINATED WITH GENERAL CONTRACTOR, 1 SF AND 1

ENCLOSURE.

DRYWALL WALL WITH ASBESTOS CONTAINING LIGHT BROWN

PENETRATION CAULK ON CEILING SEAM AT JOINING OF DRYWALL

TO DECK, PROTECT AS NECESSARY.

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO)

PRESENT UNDER NEW EFIS LAYER. DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS CONTAINING WHITE DUCT SEAM SEALANT PRESUMED

PRESENT ON ALL DUCT WORK, DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS CONTAINING EXTERIOR LOUVRE SILL SEALANT- BLACK

PRESENT ON ALL EXTERIOR LOUVRES, DO NOT DISTURB, PROTECT

AS NECESSARY

ASBESTOS PIPE INSULATION PRESENT, PROTECT AS NECESSARY.

WHERE PRESENT AT SUBSURFACE FOUNDATION WALL AT

DUCTBANK PENETRATION, REMOVE ASBESTOS STUCCO USING

MANUAL MEANS AND FOLLOWING GROSS REMOVAL PROCEDURES

WITHIN AN OUTDOOR NEGATIVE PRESSURE ENCLOSURE. HIGH

PRESSURE WATER BLASTING IS PROHIBITED. EXACT LOCATION

AND EXTENTS TO BE COORDINATED WITH GENERAL CONTRACTOR,

3 SF AND 1 ENCLOSURE.

NON- LEAD BASED PAINTED DRYWALL WALL, DOOR, AND DOOR

FRAME WITHIN A NEGATIVE PRESSURE ENCLOSURE, 60 SF WALL

AND 1 DOOR SYSTEM. ASBESTOS CAULK PRESENT AT WALL TO

CEILING JOINING, PROTECT AS NECESSARY.

DUCTLESS MINI-SPLIT, CONTROLS, TEPTRAK SENSOR, OUTLETS,

PANELS AND EQUIPMENT MOUNTED ON LBP WALLS. PROTECT AS

NECESSARY.

LEAD BASED PAINT PLASTER WALLS, PROTECT AS NECESSARY.

DELAMINATING LBP PLASTER WALL, PROTECT AS NECESSARY.

WHITE LEAD BASED PAINT ON PLASTER CEILING DECK, PROTECT

AS NECESSARY.

WHITE LEAD BASED PAINT ON PLASTER CEILING DECK, SCRAPE

AND STABALIZE USING MANUAL MEANS AND REMOVE A PAINT

PATCH USING MANUAL AND CHEMICAL MEANS FOR FUTURE PIPE

PENETRATION. REMOVE LBP ENTIRELY IN LOCATIONS REQUIRING

ANCHORS FOR NEW FAN COIL UNITS WITHIN SAME ROOM. APPLY

TWO APPLICATIONS OF ENCAPSULANT, 130 SF LBP CEILING, 4 SF

OF PLASTER AT FUTURE PENETRATIONS AND 1 ENCLOSURE.

PERFORM LBP REMOVAL IN ADJACENT LOCATIONS WITHIN

RESTRICTED AREAS. COORDINATE LOCATIONS AND EXTENTS WITH

GENERAL CONTRACTOR.

LEAD BASED PAINT ON PLASTER WALL, SCRAPE AND STABALIZE

USING MANUAL MEANS AND APPLY TWO APPLICATIONS OF

ENCAPSULANT WITHIN A NEGATIVE PRESSURE ENCLOSURE, 180

SF.

INSTALL/ANCHOR UNI STRUT ATTACHMENTS AT LOCATIONS

COORDINATED WITH GENERAL CONTRACTOR ONTO PLASTER

WALL TO FACILITATE PANEL AND BUS INSTALLATION WITHIN

NEGATIVE PRESSURE ENCLOSURE, 10 EACH (90LF).

LEAD BASED PAINT ON FIRE SPRINKLER LINE, PROTECT AS

NECESSARY.

A1

A2

L1

L4

L3

L1

L5

L3

L4

L2

A2

A2

A3

L7

L8

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM IN ACCORDANCE

WITH SPECIFICATION WITH SUGGESTED TUBING DIRECTION

L9

A2

A3

A4

A5

A6

A7

L1

L2

L3

L4

L5

L6

L7

L8

L9

L6 L6

L6

L6

A1

A6

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G05

AutoCAD SHX Text G04

AutoCAD SHX Text H001

AutoCAD SHX Text G03

AutoCAD SHX Text

%%UROOM G04 - ENVIRONMENTAL HAZARDS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA021

ENVIRONMENTAL HAZARDS - BUILDING

2 - ROOM 111

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM IN ACCORDANCE

WITH SPECIFICATION WITH SUGGESTED TUBING DIRECTION

KEY NOTES

ASBESTOS FLOOR TILE AND MASTIC PRESENT BELOW CARPET, DO

NOT DISTURB, PROTECT AS NECESSARY.

REMOVE NON-ASBESTOS EFIS SIDING WITH CLEAN CUT AND THEN

UNDERLYING ASBESTOS STUCCO TO ALLOW FOR MINI-SPLIT

TUBING AND POWER USING MANUAL MEANS AND FOLLOWING

GROSS REMOVAL PROCEDURES WITHIN A NEGATIVE PRESSURE

MINI-ENCLOSURE HIGH PRESSURE WATER BLASTING IS

PROHIBITED. EXACT LOCATION AND EXTENTS TO BE

COORDINATED WITH GENERAL CONTRACTOR, 3 SF AND 1

ENCLOSURE.

ASBESTOS CONTAINING WHITE DUCT SEAM SEALANT PRESUMED

PRESENT ON ALL DUCT WORK, DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS CONTAINING LIGHT BROWN PENETRATION CAULK

PRESUMED PRESENT AT ALL DRYWALL TO DECK PENETRATIONS,

DO NOT DISTURB, PROTECT AS NECESSARY

ASBESTOS PIPE INSULATION AND/OR MUDDED FITTINGS PRESENT

AT CHASE LOCATIONS. DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS BLACK

MASTIC PRESENT. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING TRANSITE HEAT SHIELDS AND/OR BLACK

TAR PRESENT IN WALL VOIDS OF HEAT CONVECTOR UNITS ALONG

PERIMETER WALLS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING EXTERIOR LOUVRE SILL SEALANT- BLACK

PRESENT ON ALL EXTERIOR LOUVRES, DO NOT DISTURB, PROTECT

AS NECESSARY

REMOVE NON-ASBESTOS CEILING GRID AND SCRAPE AND

STABALIZE LEAD BASE PAINTED PLASTER CEILING USING MANUAL

MEANS AND REMOVE A PAINT PATCH FOR FUTURE PIPE

PENETRATION AND APPLY TWO APPLICATIONS OF ENCAPSULANT

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 290 SF OF 2' X 2' ACT

CEILING SYSTEM, 260 SF LBP PLASTER CEILING AND BEAMS, 1 SF

AT FUTURE PENETRATION AND 1 ENCLOSURE.

REMOVE EXISTING NON ASBESTOS AND LEAD EQUIPMENT (FAN

COIL UNIT, IT JACKS AND OTHER WALL AND CEILING SURFACE

FIXTURES WITHIN NEGATIVE PRESSURE ENCLOSURE.

COORDINATE EXTENTS AND LOCATIONS WITH THE GENERAL

CONTRACTOR.

REMOVE NON LEAD DOOR AND DOOR FRAME LOCATED IN AN LBP

WALL USING MANUAL MEANS WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 1 DOOR SYSTEM

REMOVE WOOD WAINSCOTING AND SCRAPE AND STABALIZE LEAD

BASE PAINTED PLASTER WALLS USING MANUAL MEANS AND APPLY

TWO APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 200 SF OF WOOD WAINSCOTING AND 600

SF LBP PLASTER WALLS.

INSTALL/ANCHOR UNI STRUT ATTACHMENTS AT LOCATIONS

COORDINATED WITH GENERAL CONTRACTOR ONTO PLASTER

WALL TO AND/OR CEILING TO FACILITATE FUTURE FIXTURE

INSTALLATION WITHIN NEGATIVE PRESSURE ENCLOSURE, 15 EACH

(150 LF).

LEAD BASED PAINT WOOD WINDOW COMPONENTS, DO NOT

DISTURB, PROTECT AS NECESSARY

LEAD BASED PAINTED PLASTER WALL, DO NOT DISTURB, PROTECT

AS NECESSARY

REMOVE LBP PAINT PATCHES USING MANUAL AND CHEMICAL

MEANS FOR FUTURE PIPE PENETRATIONS AND APPLY TWO

APPLICATIONS OF ENCAPSULANT, 2 SF OF LBP ON PLASTER

CEILING AT FUTURE PENETRATIONS AND 1 EXISTING ENCLOSURE.

COORDINATE LOCATIONS AND EXTENTS WITH GENERAL

CONTRACTOR.

A1

A2

A3

A4

A5

A6

A7

A8

L1

L2

L3

L4

L5

L6

L7

L6L6 L4

L5

L4

L5

L4

L5

L4

L5

L1

L2

A1

A3

A3

L7

L8

A2

L8

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UROOM 111 - ENVIRONMENTAL HAZARDS

AutoCAD SHX Text

%%UNOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Office of

Construction and Facilities

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

CONSULTANT

INDUSTRIAL HYGIENIST:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

FULLY

SPRINKLERED

Management

RSH

11140 S. TOWNE SQ. STE. 100

ST LOUIS, MO. 63123

(314) 917-0148

HA022

ENVIRONMENTAL HAZARDS - BUILDING

2 - ROOM 209

JR CD

100% CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

REMOVE SINK WITH ASBESTOS SOUNDPROOFING IN WHOLE

USING MANUAL NON-DESTRUCTIVE METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 2 UNITS.

REMOVE NON-ASBESTOS FLOOR TILE AND MASTIC AND

UNDERLYING LAYER OF ASBESTOS 12" X 12" FLOOR TILE, TAR

PAPER AND ASBESTOS MASTIC ON WOOD SUBSTRATE USING

MANUAL MEANS AND CHEMICAL METHODS FOLLOWING GROSS

REMOVAL PROCEDURES WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 110 SF FLOOR TILES AND MASTIC, 2 LAYERS AND 1

ENCLOSURE. POST ASBESTOS CLEARANCE, INSTALL 3/4 INCH

GRADE B PLYWOOD COVER SYSTEM OVER REMAINING ASBESTOS

MASTIC ON ORIGINAL WOOD FLOOR.

ASBESTOS CONTAINING EXTERIOR SURFACING (STUCCO)

PRESENT UNDER NEW EFIS LAYER. DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS BLACK

MASTIC PRESENT. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING WHITE DUCT SEAM SEALANT PRESUMED

PRESENT ON ALL DUCT WORK, DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS CONTAINING LIGHT BROWN PENETRATION CAULK

PRESUMED PRESENT AT ALL DRYWALL TO DECK PENETRATIONS,

DO NOT DISTURB, PROTECT AS NECESSARY

ASBESTOS PIPE INSULATION AND/OR MUDDED FITTINGS PRESENT

AT CHASE LOCATIONS. DO NOT DISTURB, PROTECT AS

NECESSARY

ASBESTOS CONTAINING TRANSITE HEAT SHIELDS AND/OR BLACK

TAR PRESENT IN WALL VOIDS OF HEAT CONVECTOR UNITS ALONG

PERIMETER WALLS. DO NOT DISTURB, PROTECT AS NECESSARY.

ASBESTOS CONTAINING EXTERIOR LOUVRE SILL SEALANT- BLACK

PRESENT ON ALL EXTERIOR LOUVERS, DO NOT DISTURB, PROTECT

AS NECESSARY

REMOVE NON-ASBESTOS CEILING GRID AND SCRAPE AND

STABILIZE LEAD BASE PAINTED PLASTER CEILING USING MANUAL

MEANS AND REMOVE A PAINT PATCH FOR FUTURE PIPE

PENETRATION. REMOVE LBP ENTIRELY IN LOCATIONS REQUIRING

ANCHORS FOR NEW FAN COIL UNITS WITHIN SAME ROOM. APPLY

TWO APPLICATIONS OF ENCAPSULANT WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 120 SF OF 2' X 2' ACT CEILING SYSTEM,

120 SF LBP PLASTER CEILING, 1 SF FOR PENETRATION AND 1

ENCLOSURE.

REMOVE EXISTING NON ASBESTOS CASEWORK AND FIXTURES

MOUNTED ON LBP CEILING AND PERIMETER WALL WITHIN

NEGATIVE PRESSURE ENCLOSURE. COORDINATE EXTENTS AND

LOCATIONS WITH THE GENERAL CONTRACTOR, 55 LF AND 4

FIXTURES. COORDINATE WITH GENERAL CONTRACTOR AND

SALVAGE.

INSTALL/ANCHOR UNI STRUT ATTACHMENTS AT LOCATIONS

COORDINATED WITH GENERAL CONTRACTOR ONTO LBP PLASTER

WALL AND/OR CEILING TO FACILITATE FUTURE FIXTURE

INSTALLATION WITHIN NEGATIVE PRESSURE ENCLOSURE, 2 EACH

(18 LF).

LEAD BASED PAINTED WOOD WINDOW COMPONENTS, DO NOT

DISTURB, PROTECT AS NECESSARY

LEAD BASED PAINTED PLASTER WALL, DO NOT DISTURB, PROTECT

AS NECESSARY

REMOVE LBP PAINT PATCHES USING MANUAL AND CHEMICAL

MEANS FOR FUTURE PIPE PENETRATIONS AND APPLY TWO

APPLICATIONS OF ENCAPSULANT, 2 SF OF LBP ON PLASTER

CEILING AT FUTURE PENETRATIONS AND 1 EXISTING ENCLOSURE.

COORDINATE LOCATIONS AND EXTENTS WITH GENERAL

CONTRACTOR.

A1

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM IN ACCORDANCE

WITH SPECIFICATION WITH SUGGESTED TUBING DIRECTION

A3

L2

A1

L1

L3

A8

A2

A3

A4

A5

A6

A7

A8

A9

L1

L4

L5

A2

L6

A8

L2

L3

L4

L5

L6

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Auto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .