Attachment 05_Drawings 07122024 Part 4.pdf
PDF 13 MB Posted
- Attached to
- Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
- Solicitation number
- 36c77624b0025
About this file
This document appears to be Attachment 05_Drawings 07122024 Part 4.pdf, which is associated with the federal contract opportunity Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864). The contract opportunity is for the construction of Electronic Health Record Modernization (EHRM) infrastructure upgrades at the Ann Arbor VA Medical Center, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The attachment likely contains technical drawings or specifications related to the construction requirements for this project. No other key details about the contract opportunity, such as response dates, award information, pricing, or set-asides, can be determined from this attachment alone.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
CAMPUS IMAGE
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
U.S. DEPARTMENT OF VETERANS AFFAIRS
/2
/2
:5
:1
P
M C
U s e rs \a p u lle n \D o c u m e n ts \A
-0
A n n
A rb o r-
E H
R M
S it e
P la n a p u lle n V
D X
T .r v t
GM.001
COVER
1 1ANP
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
EHRM INFRASTRUCTURE UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI 48105
VA PROJECT #: 506-21-705
JAB
EHRM INFRASTRUCTURE
UPGRADES
NAME AND TITLE SIGNATURE
VA SIGNATURE BLOCK
VOLUME 3 OF 4
DRAWING LIST - VOLUME 3 OF 4
GENERAL
GM.001 COVER 1 1
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 66
MP002 PLUMBING GENERAL INFORMATION 2 66
MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 66
1E.MP401 BUILDING 1E, BASEMENT, TELEPHONE SWITCH ROOM CB07 4 66
1E.MP402 BUILDING 1E, BASEMENT, DELTA STACK, TELECOM ROOM DB60A 5 66
1E.MP403 BUILDING 1E, BASEMENT, ECHO STACK, TELECOM ROOM EB60A 6 66
1E.MP411 BUILDING 1E, FIRST FLOOR, DELTA STACK, TELECOM ROOM D178A 7 66
1E.MP412 BUILDING 1E, FIRST FLOOR, ECHO STACK, TELECOM ROOM E178A 8 66
1E.MP413 BUILDING 1E, FIRST FLOOR, TELECOM ROOM L133 9 66
1E.MP431 BUILDING 1E, THIRD FLOOR, DELTA STACK, TELECOM ROOM D312A 10 66
1E.MP432 BUILDING 1E, THIRD FLOOR, ECHO STACK, TELECOM ROOM E321A 11 66
1E.MP451 BUILDING 1E, FIFTH FLOOR, DELTA STACK, TELECOM ROOM D530A 12 66
1E.MP452 BUILDING 1E, FIFTH FLOOR, ECHO STACK, TELECOM ROOM E530A 13 66
1E.MP471 BUILDING 1E, SEVENTH FLOOR, DELTA STACK, TELECOM ROOM D712A 14 66
1E.MP472 BUILDING 1E, SEVENTH FLOOR, ECHO STACK, TELECOM ROOM E718A 15 66
1W.MP401 BUILDING 1W, BASEMENT, ELECTRICAL EQUIPMENT AB00 16 66
1W.MP402 BUILDING 1W, BASEMENT, ALPHA STACK, TELECOM ROOM AB29 17 66
1W.MP403 BUILDING 1W, BASEMENT, BRAVO STACK, TELECOM ROOM BB26 18 66
1W.MP404 BUILDING 1W, BASEMENT, TELECOM ROOM BB94 19 66
1W.MP411 BUILDING 1W, FIRST FLOOR, ALPHA STACK, TELECOM ROOM A149 20 66
1W.MP412 BUILDING 1W, FIRST FLOOR, BRAVO STACK, TELECOM ROOM B143 21 66
1W.MP421 BUILDING 1W, SECOND FLOOR, ALPHA STACK, TELECOM ROOM A237 22 66
1W.MP422 BUILDING 1W, SECOND FLOOR, BRAVO STACK, TELECOM ROOM B231 23 66
1W.MP431 BUILDING 1W, THIRD FLOOR, ALPHA STACK, TELECOM ROOM A339 24 66
1W.MP432 BUILDING 1W, THIRD FLOOR, BRAVO STACK, TELECOM ROOM B310B 25 66
1W.MP441 BUILDING 1W, FOURTH FLOOR, ALPHA STACK, TELECOM ROOM A437 26 66
1W.MP442 BUILDING 1W, FOURTH FLOOR, BRAVO STACK, TELECOM ROOM B432A 27 66
1W.MP451 BUILDING 1W, FIFTH FLOOR, ALPHA STACK, TELECOM ROOM A535 28 66
1W.MP452 BUILDING 1W, FIFTH FLOOR, BRAVO STACK, TELECOM ROOM B525 29 66
1W.MP461 BUILDING 1W, SIXTH FLOOR, ALPHA STACK, TELECOM ROOM A633A 30 66
1W.MP462 BUILDING 1W, SIXTH FLOOR, BRAVO STACK, TELECOM ROOM B618A 31 66
1W.MP471 BUILDING 1W, SEVENTH FLOOR, ALPHA STACK, TELECOM ROOM A753 32 66
1W.MP472 BUILDING 1W, SEVENTH FLOOR, BRAVO STACK, TELECOM ROOM B722A 33 66
1W.MP481 BUILDING 1W, EIGHTH FLOOR, ALPHA STACK, TELECOM ROOM A843A 34 66
1W.MP482 BUILDING 1W, EIGHTH FLOOR, BRAVO STACK, TELECOM ROOM B812 35 66
1W.MP491 BUILDING 1W, NINTH FLOOR, ALPHA STACK, TELECOM ROOM A921A 36 66
28.MP401 BUILDING 28, BASEMENT, FOXTROT STACK, TELECOM ROOM FG86 37 66
28.MP411 BUILDING 28, FIRST FLOOR, MAIN COMPUTER SWITCH ROOM A180 - MECHANICAL 38 66
28.MP412 BUILDING 28, FIRST FLOOR, FOXTROT STACK, TELECOM ROOM F152 39 66
28.MP421 BUILDING 28, SECOND FLOOR, FOXTROT STACK, TELECOM ROOM F224A 40 66
2.MP421 BUILDING 2, FULLER HOUSE, SECOND FLOOR, TELECOM ROOM 210 41 66
3.MP401 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, OVERALL PLAN 42 66
3.MP402 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, TELECOM ROOM 02C 43 66
15.MP401 BUILDING 15, NORTH METER HOUSE, FIRST FLOOR, TELECOM ROOM 15-2 44 66
22.MP401 BUILDING 22, RESEARCH BUILDING, GROUND FLOOR, TELECOM ROOM G12 45 66
22.MP411 BUILDING 22, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 08 46 66
DRAWING LIST - VOLUME 3 OF 4
22.MP421 BUILDING 22, RESEARCH BUILDING, ROOF PLAN 47 66
29.MP411 BUILDING 29, EAST PARKING STRUCTURE, LEVEL A, TELECOM ROOM AA6 48 66
29.MP421 BUILDING 29, EAST PARKING STRUCTURE, LEVEL B, TELECOM ROOM EPS-B2 49 66
30.MP421 BUILDING 30, WEST PARKING STRUCTURE, LEVEL B, TELECOM ROOM WPS-B02 50 66
30.MP441 BUILDING 30, WEST PARKING STRUCTURE, LEVEL D, TELECOM ROOM WPS-D02 51 66
31.MP401 BUILDING 31, RESEARCH BUILDING, BASEMENT, TELECOM ROOM 27 52 66
31.MP411 BUILDING 31, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 117 53 66
31.MP421 BUILDING 31, RESEARCH BUILDING, SECOND FLOOR, TELECOM ROOM 218 54 66
32.MP101 BUILDING 32, ENERGY CENTER , FIRST FLOOR CHILLER ROOM 101 AND ROOF MECHANICAL PLAN 55 66
32.MP401 BUILDING 32, ENERGY CENTER, BASEMENT, TELECOM ROOM 003 56 66
37.MP401 BUILDING 37, ADMINISTRATIVE BUILDING, BASEMENT, TELECOM ROOM 006 57 66
37.MP411 BUILDING 37, ADMINISTRATIVE BUILDING, FIRST FLOOR, TELECOM ROOM 118 58 66
37.MP421 BUILDING 37, ADMINISTRATIVE BUILDING, SECOND FLOOR, TELECOM ROOM 217 59 66
37.MP431 BUILDING 37, ADMINISTRATIVE BUILDING, THIRD FLOOR, TELECOM ROOM 317 60 66
MP501 MECHANICAL AND PLUMBING DETAILS 61 66
MP502 MECHANICAL AND PLUMBING DETAILS 62 66
MP503 CHILLED WATER PIPING SCHEMATIC FOR BUILDINGS 1 EAST, 1 WEST, AND 28 63 66
MP504 MECHANICAL CONTROLS 64 66
MP505 MECHANICAL CONTROLS 65 66
MP601 MECHANICAL SCHEDULES 66 66
DocuSign Envelope ID: F024BA2E-7BBC-4DFF-BDAC-B255F954C023
2/26/2024
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D CONDENSATE DRAIN
DA DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR/VA REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR/VA.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR/VA FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY
GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO
COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER TRADES.
MECHANICAL DEMOLITION GENERAL NOTES
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :3
P
M C
U s e rs
\w s h ip le y \D o c u m e n ts
\M P
F -0
A n n A rb o r-
E H
R M
G e n e ra l_ w s h ip le y .r v t
MP001
MECHANICAL GENERAL INFORMATION
1 66SMH
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
WRS
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH -
ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
PLUMBING SYMBOLS PLUMBING SYMBOLS
ANNOTATION SYMBOLS
PLUMBING SYMBOLS & ABBREVIATIONS
ANNOTATION ABBREVIATIONS 1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING
WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT
NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK
AND WORK OF OTHER TRADES.
PLUMBING DEMOLITION GENERAL NOTES
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH PLUMBING FIXTURE WITH QUICK CLOSING VALVE PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED
ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR/VA 1 WEEK IN ADVANCE.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
PLUMBING GENERAL NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :3
P
M C
U s e rs
\w s h ip le y \D o c u m e n ts
\M P
F -0
A n n A rb o r-
E H
R M
G e n e ra l_ w s h ip le y .r v t
MP002
PLUMBING GENERAL INFORMATION
2 66SMH
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
WRS
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINEFL
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE DRAINDRAIN
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE:
HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILT QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD. PROVIDE GUARD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GUARD.
NOTE:
1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.
2. COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH
INSTALLATION OF THE OBSTRUCTION.
3. PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL
SUPPORTS AS REQUIRED.
4. ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER
EQUIPMENT.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL
ANNULAR SPACE.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
UL-LISTED FIRESTOPPING
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE:
MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS
SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF
WORK.
2. COORDINATE WITH COR/VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE
THE COR/VA THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND
DISPOSED OF.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
1. USE NFPA-13 (2019), CHAPTER 28, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW.
DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION
OF AUTOMATIC SPRINKLER SYSTEM.
2. COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED EDITION). INSTALLATION SHALL COMPLY WITH VA REQUIREMENTS. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.
LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE
HAZARD CLASSIFICATION.
4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA
REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA
STANDARDS.
6. HYDRAULICALLY CALCULATE SPRINKLER IN ACCORDANCE WITH REQUIREMENTS FOR APPROPRIATE HAZARD OCCUPANCY.
PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE WITH
NFPA AND VA REQUIREMENTS.
7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
9. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
10. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.
11. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.
12. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
13. SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A
PROFESSIONAL ENGINEER.
14. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.
15. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
16. FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING TO FLOW
AND TAMPER SWITCHES AS WORK OF DIVISION 26.
17. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.
18. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.
19. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.
LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.
20. LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.
21. CONTRACTOR SHALL ASSESS THE ADEQUACY OF THE EXISTING WATER SUPPLY. PERFORM WATER SUPPLY FLOW TESTING
OF FIRE HYDRANTS AND/OF FIRE PUMP IF NECESSARY.
22. IN AREAS WITH MINOR HEAD RELOCATON DUE TO ROOM LAYOUT CHANGES, THE EXISTING PIPING MAY BE REUSED WITHOUT
HYDRAULIC CALCULATIONS.
FIRE SUPPRESSION GENERAL NOTES
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.
2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR/VA ACCEPTANCE.
INFECTION CONTROL MEASURES
NOTE:
1. ALL EXPOSED PIPING SHALL BE PAINTED RED.
2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS
UNLESS OTHERWISE NOTED.
THREADED
HANGER ROD
SURGE
RESTRAINER
ADJUSTABLE
RING HANGER
BRANCHLINE
AUTO. SPRINKLER FEED
UPRIGHT AUTOMATIC
SPRINKLER, FM APPROVED,
QUICK RESPONSE. PROVIDE GUARD
RISER NIPPLE
REDUCING TEE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4 :3
P
M C
U s e rs
\w s h ip le y \D o c u m e n ts
\M P
F -0
A n n A rb o r-
E H
R M
G e n e ra l_ w s h ip le y .r v t
MP003
FIRE SUPPRESSION GENERAL
INFORMATION
3 66SMH
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
WRS
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL
Scale: No Scale
SEMI-RECESSED PENDENT SPRINKLER DETAIL
Scale: No Scale
UPRIGHT AUTOMATIC SPRINKLER DETAIL
S
S
S
S
S
S
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM 3
G.7
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM
G.7
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM
G.7
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM
G.7
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM 1
G.7
H H.3 H.9 J
0.9
O
CB07
TELEPHONE
SWITCH ROOM
G.7
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:1 :4
P
M C
U s e rs
\w s h ip le y \D o c u m e n ts
\M -0
A n n A rb o r-
E H
R M
B ld g -1
E w s h ip le y .r v t
1E.MP401
BUILDING 1E, BASEMENT, TELEPHONE
SWITCH ROOM CB07
4 66TB/AV
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
WRS
1E
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VA PUBLIC HEALTH SERVICE REQUIREMENTS
AND ENVIRONMENTAL REGULATIONS.
C. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING
DUCTWORK, PIPING OR EQUIPMENT THAT IS
NOT INDICATED FOR DEMOLITION OR IS
DISCOVERED IN THE DEMOLITION PROCESS.
D. UNLESS NOTED OTHERWISE, ALL DIFFUSERS
AND GRILLE RUN-OUTS ARE THE SAME SIZE AS
THE NECK/DUCT CONNECTION SIZE SPECIFIED
IN THE AIR DEVICE SCHEDULE.
E. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
F. SEE ARCHITECTURAL CEILING PLAN FOR
CEILING TYPES AS WELL AS DIFFUSER AND
GRILLE PLACEMENT WITHIN THE CEILING.
G. COORDINATE ALL T-STAT/H-STAT LOCATIONS
WITH ALL OTHER WALL MOUNTED OBJECTS
BEFORE INSTALLATION.
H. PROVIDE ISOLATION BALL VALVES FOR EACH
PIPING BRANCH. LOCATE AS CLOSE TO MAIN
AS POSSIBLE.
I. EXISTING FIRE AND SMOKE ZONES TO BE
MAINTAINED DURING CONSTRUCTION.
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
MECHANICAL EXISTING PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
MECHANICAL PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
PLUMBING EXISTING PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
PLUMBING PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
FIRE SUPRESSION EXISTING PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELEPHONE SWITCH ROOM CB07
FIRE SUPRESSION PLAN
1 NO FIRE SUPPRESSION DEMOLITION WORK
IS ANTICIPATED IN THIS AREA.
2 NO PLUMBING DEMOLITION WORK IS
ANTICIPATED IN THIS AREA.
3 NO MECHANICAL DEMOLITION WORK IS
ANTICIPATED IN THIS AREA.
1 NO NEW FIRE SUPPRESSION WORK IS
ANTICIPATED IN THIS AREA.
2 NO NEW PLUMBING WORK IS ANTICIPATED IN
THIS AREA.
3 NO NEW MECHANICAL WORK IS ANTICIPATED IN
THIS AREA.
F.9 G G.3 H
T
C H S
8.1
8.8
9.7
10x12
7ø
ELEC
DB60B
CORRIDOR
CB-13
12x10
C H R x1
TELECOM
DB60A
F.9 G G.3 H
12x10
T
C H S
8.1
8.8
9.7
C H R
10x12
ELEC
DB60B
TR
DB60A
CORRIDOR
CB-13
1E-FCU-DB60A
7ø
H
C H R
1E-CP-DB60A
CO1" D
1" CHS - UP;
1" CHR - UP
1" D - UP
F.9 G G.3 H
8.1
8.8
9.7
ELEC
DB60B
CORRIDOR
CB-13
TELECOM
DB60A
F.9 G G.3 H
8.1
8.8
9.7
ELEC
DB60B
TR
DB60A
CORRIDOR
CB-13
EXISTING VENT
RISER
F.9 G G.3 H
8.1
8.8
9.7
ELEC
DB60B
CORRIDOR
CB-13
TELECOM
DB60A
F.9 G G.3 H
8.1
8.8
9.7
ELEC
DB60B
TR
DB60A
CORRIDOR
CB-13
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:1 :5
P
M C
U s e rs
\w s h ip le y \D o c u m e n ts
\M -0
A n n A rb o r-
E H
R M
B ld g -1
E w s h ip le y .r v t
1E.MP402
BUILDING 1E, BASEMENT, DELTA
STACK, TELECOM ROOM DB60A
5 66TB/AV
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
WRS
1E
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
MECHANICAL DEMOLITION PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
MECHANICAL PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
PLUMBING DEMOLITION PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
PLUMBING PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
FIRE SUPPRESSION DEMOLITION PLAN
Scale: 3/16" = 1'-0"
BASEMENT, TELECOM DB60A
FIRE SUPPRESSION PLAN
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
NORTH
0 42 8
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VA PUBLIC HEALTH SERVICE REQUIREMENTS
AND ENVIRONMENTAL REGULATIONS.
C. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
D. UNLESS NOTED OTHERWISE, ALL DIFFUSERS
AND GRILLE RUN-OUTS ARE THE SAME SIZE AS
THE NECK/DUCT CONNECTION SIZE SPECIFIED
IN THE AIR DEVICE SCHEDULE.
E. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
F. SEE ARCHITECTURAL CEILING PLAN FOR
CEILING TYPES AS WELL AS DIFFUSER AND
GRILLE PLACEMENT WITHIN THE CEILING.
G. COORDINATE ALL T-STAT/H-STAT LOCATIONS
WITH ALL OTHER WALL MOUNTED OBJECTS
BEFORE INSTALLATION.
H. PROVIDE ISOLATION BALL VALVES FOR EACH
PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS
POSSIBLE.
I. EXISTING FIRE AND SMOKE ZONES TO BE
MAINTAINED DURING CONSTRUCTION.
J. GENERAL CONTRACTOR TO PROVIDE
EQUIVALENT CFM TEMPORARY COOLING FOR
THE DURATION OF TIME THAT THE TR ROOM(S)
ARE WITHOUT PERMANENT COOLING, UNTIL
THE FULL TR STACK HVAC SYSTEM IS
OPERATIONAL, PRODUCING THE REQUIRED
CFM LOADS, AND SIGNED OFF BY THE VA COR.
SEE MECHANICAL DRAWINGS FOR MORE
INFORMATION.
1 REMOVE EXISTING GRILLE AND DUCTWORK TO
LIMITS OF DEMOLITION AND CAP.
2 NO PLUMBING DEMOLITION WORK IS
ANTICIPATED IN THIS AREA.
3 EXISTING FIRE PROTECTION TO REMAIN.
4 REMOVE EXISTING THERMOSTAT.
1 PROVIDE NEW FLOOR MOUNTED FAN COIL UNIT.
CONNECT 1” PIPING TO CHILLED WATER
SUPPLY AND RETURN RISERS AS SHOWN WITH
ISOLATION VALVES.
2 REBALANCE EXISTING TERMINAL UNIT TO 135
CFM SUPPLY AIR.
3 PROVIDE DDC THERMOSTAT TO MAINTAIN
TEMPERATURE SETPOINT. PROVIDE
HUMIDISTAT TO TRANSMIT HUMIDITY TO BAS
FOR MONITORING. T-STAT & HUMIDISTAT TO
ALARM ECC WHEN VALUES EXCEED SETPOINTS.
4 ROUTE CONDENSATE DRAIN TO PUMP. THEN
EXTEND TO THE EXISTING FLOOR DRAIN NEXT
TO AHU.
5 NO NEW PLUMBING WORK IS ANTICIPATED IN
THIS AREA.
6 EXISTING FIRE PROTECTION TO REMAIN.
7 PROVIDE WATER LEAK SENSOR ON FLOOR AND
CONNECT TO THE BAS AND ALARM IF WATER IS
SENSED.
8 PROVIDE AND INSTALL DRIP PAN BELOW FAN
COIL UNIT. SEE DETAIL 9/MP502 FOR MORE
INFORMATION.
9 PROVIDE DRIP PAN BELOW EXISTING PIPING.
SEE DETAIL 12/MP502 FOR MORE INFORMATION.
M.7 N N.4
8.1
8.8
9.7
12x12 x1
MECH
EB60
ELEC
EB60B
CORRIDOR
CB-15
CHS
CHR
ø
10ø
12x10
12x10
T
TELECOM
EB60A
M.7 N N.4
T
12x12
12x10
10ø
6ø
12x10
1" CHR
1" CHS
3/4" D
1E-FCU-EB60A
8.1
8.8
9.7
MECH
EB60
TR
EB60A
ELEC
EB60B
CORRIDOR
CB-15
CHS
CHR
H
1" D
1E-CP-EB60A
CO
1" D
1" D - UP
1" CHS - UP;
1" CHR - UP
M.7 N N.4
8.1
8.8
9.7
MECH
EB60
ELEC
EB60B
CORRIDOR
CB-15
TELECOM
EB60A
M.7 N N.4
8.1
8.8
9.7
MECH
EB60
TR
EB60AELEC
EB60B
CORRIDOR
CB-15
M.7 N N.4
8.1
8.8
9.7
F L
F L
F L F L
FL FLFL
F L F L
MECH
EB60
ELEC
EB60B
CORRIDOR
CB-15
TELECOM
EB60A
M.7 N N.4
8.1
8.8
9.7
F L
F L
FL
F L
F L
FLFL
MECH
EB60
TR
EB60A
ELEC
EB60B
CORRIDOR
CB-15
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .