Attachment 10 - Addendum 1.pdf

PDF 210 KB Posted

Attached to
Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
Solicitation number
36c77624b0025
Issued by

About this file

This document is an Addendum to the Department of Veterans Affairs Ann Arbor EHRM Infrastructure Upgrades project, Contract No. 36C77621C0086. The Addendum provides updates to the drawings, specifications, and other related information. Key details include:

Drawings:

  • Updates to G-003 Scaled Site Plan, 1W.A-491, and A-603 Window Screen Detail
  • Addition of drawing 1E.ET472 which was previously referenced but not included

Specifications:

  • Updates to Sections 00 01 10 Table of Contents, 01 33 23 Shop Drawings, Product Data, and Samples
  • Addition of new Sections 07 54 23 Thermoplastic Polyolefin (TPO) Roofing and 23 63 23 Air-Cooled, Closed-Circuit Fluid Cooler
  • Removal of Section 23 65 00 Cooling Towers
  • Updated Submittal Register

Other Items:

  • Inclusion of Cabling Matrices
  • Responses to pre-bid Requests for Information (RFIs)

View the file

Other files

File Type Posted
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM 10 16 2024.pdf PDF
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM.pdf PDF
IFB 36C77624B0025 Amendment 0005 Asbestos Info.pdf PDF
IFB 36C77624B0025 Amendment 0004.pdf PDF
36C77624B0025 Amendment 0003.pdf PDF
S05 Ann_Arbor CMS_Question_Matrix_V3.xlsx XLSX spreadsheet
Attachment 12 - EHRM Window Screen Details.pdf PDF
Attachment 08 - 075423 TPO Roofing.pdf PDF
Attachment 14 - MS Versions of PDFs.zip ZIP file
Attachment 07 - 013323 Shop Drawings_CA Edits 2.pdf PDF
Attachment 02 - 1E.ET472.pdf PDF
Attachment 06 - 000110 TOC - updated TPO and 236323.pdf PDF
Attachment 11 - CABLE MATRICES.pdf PDF
Attachment 04 - 21-092 SubReg 100 Percent.pdf PDF
Attachment 09 -236323 AirCooledClosedCircuitFluidCooler.pdf PDF
36C77624B0025 0002.docx DOCX document
Attachment 05 - 21-092-Pre-Bid RFIs_AE responses 1.pdf PDF
Attachment 15 - DB WR GD No MI20240100 09062024.pdf PDF
Attachment 03 - 1W.A-491_Addendum 1.pdf PDF
Attachment 01 - Q and A Results Ann Arbor MI.docx DOCX document
Attachment 13 - G-003_Addendum 1.pdf PDF
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.pdf PDF
S04 - Virtual Visit Attendee List - 08 29 2024.docx DOCX document
36C77624B0025 Ammendment 0001.docx DOCX document
S04 -Virtual and Site Visit Agenda - IFB 2024 08 29 2024.doc DOC document
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.docx DOCX document
Attachment 02_Drawings 07122024 Part 1.pdf PDF
Attachment 04_Drawings 07122024 Part 3.pdf PDF
Attachment 11 Division Breakdown Template.xls XLS spreadsheet
Attachment 06_Drawings 07122024 Part 5.pdf PDF
Attachment 05_Drawings 07122024 Part 4.pdf PDF
Attachment 08_Limitations on Subcontracting - Construction.docx DOCX document
Attachment 03_Drawings 07122024 Part 2.pdf PDF
Attachment 07_Drawings 07122024 Part 6.pdf PDF
Attachment 09_JA Ann Arbor Final REDACTED.pdf PDF
Attachment 10 DB Wages General Decision Number MI20240100 07 26 24.pdf PDF
Attachment 01_Specifications Ann Arbor MI.pdf PDF
36C77624B0025_1.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Raleigh | Indianapolis | Fort Collins | Las Vegas | Charlotte | Minneapolis | Wilmington | Nashville www.acg-pa.com

Addendum 1

Date: September 16, 2024

RE: Department of Veteran Affairs Project No.: 506-21-705 Ann Arbor EHRM Infrastructure Upgrades

Project Name: Ann Arbor EHRM Infrastructure Upgrades Contract No.: 36C77621C0086

From: Apogee Consulting Group, Inc.

NOTICE TO CONTRACTOR: The following supplemental instructions are issued as part of the Contract Documents. The work shall be carried out in accordance with the Contract Documents including these clarifications. Any change in Contract Sum or Contract Time must be resolved with the VA before proceeding with the Work in accordance with these instructions.

Drawings:

1. G-003 – Scaled Site Plan

2. 1W.A-491 – Updated per ongoing project

3. 1E.ET472 – was on the index but interdentally not included in the set.

4. A-603 – Window Screen Detail

Specifications:

1. Updated 00 01 10 Table of Contents

2. Updated 01 33 23 Shop Drawings, Product Data, and Samples

3. Added 07 54 23 Thermoplastic Polyolefin (TPO) Roofing

4. Added 23 63 23 Air-Cooled, Closed-Circuit Fluid Cooler

5. Removed 23 65 00 Cooling Towers

6. Updated Submittal Register

Other Items:

1. Cabling Matrices

2. Responses to pre-bid RFIs

–End of Document

File details come from the government source that posted it. Updated .