Attachment 02_Drawings 07122024 Part 1.pdf
PDF 13 MB Posted
- Attached to
- Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
- Solicitation number
- 36c77624b0025
About this file
This document appears to be a set of drawings that are part of Attachment 02 for Solicitation Number 36c77624b0025, titled "Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)". The solicitation is for the construction of Electronic Health Record Modernization (EHRM) infrastructure upgrades at the Ann Arbor VA Medical Center, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation is for a civilian government contract opportunity. No other details about the requirements, pricing, or timeline are provided in this particular document.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
CAMPUS IMAGE
PROJECT LOCATION MAP
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
U.S. DEPARTMENT OF VETERANS AFFAIRS
/2
/2
:4
:5
P
M C
U s e rs \a p u lle n \D o c u m e n ts \A
-0
A n n
A rb o r-
E H
R M
S it e
P la n a p u lle n V
D X
T .r v t
G-001
COVER
1 54ANP
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
EHRM INFRASTRUCTURE UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI 48105
VA PROJECT #: 506-21-705
JAB
EHRM INFRASTRUCTURE
UPGRADES
NAME AND TITLE SIGNATURE
VA SIGNATURE BLOCK
VOLUME 1 OF 4
DocuSign Envelope ID: F024BA2E-7BBC-4DFF-BDAC-B255F954C023
2/26/2024
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL - BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND
CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:
1. NFPA 101, Life Safety Code, 2021
2. International Building Code, 2021
3. International Fire Codes, 2021
4. NFPA 99, Health Care Facilities Code, 2021
5. PG 18-13: VA Barrier Free Design Standard, January 2017
6. Department of Veterans Affairs: Infrastructure Standard for Telecommunication Spaces, v3.1, July 1, 2021
7. Department of Veterans Affairs: OEHRM Site Infrastructure and End User Device (EUD) Requirements, v 2.0 April 15, 2021
8. American with Disabilities Act (ADA) Standards, 2010
9. Department of Veterans Affairs: Fire Protection Design Manual, Eighth Edition – June 1, 2021
10. NFPA 13, Standard for the Installation of Sprinkler Systems, 2022
11. NFPA 75, Standard for the Fire Protection of Information Technology Equipment, 2020
12. PG-18-12, Office of Information & Technology Design Guide – February 2011
13. Infrastructure Standard for Telecommunications Spaces, Version 3.1, July 2021
14. Department of Veterans Affairs: Plumbing Design Manual, May 2021
15. Department of Veterans Affairs: VHA Directive 1061, February 2021
16. International Plumbing Code, 2021
17. Infrastructure Standard for Telecommunications Spaces, Version 3.1, July 2021
18. Department of Veterans Affairs: HVAC Design Manual, March 1, 2022
19. ASHRAE 90.1-2019, Energy Standard for Buildings Except Low-Rise Residential Buildings
20. ASHRAE Standard 170, 2021 (Ventilation of Health Care Facilities)
21. ASHRAE Handbooks, 2021 Fundamentals, 2019 HVAC Applications, 2020 HVAC Systems and Equipment
22. ASME B31.9, Building Services Piping
23. NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2021
24. SMACNA, HVAC Duct Construction Standards, Metal and Flexible
25. SMACNA, HVAC Air Duct Leakage Test Manual
26. Infrastructure Standard for Telecommunications Spaces, Version 3.1, July 2021
27. NFPA 70, National Electrical Code (NEC), 2020
28. NFPA 72, National Fire Alarm and Signaling Code, 2022
29. Illuminating Engineering Society (IES) Lighting Handbook, 10th Edition
30. Department of Veterans Affairs: Electrical Design Manual, December 2019
31. Department of Veterans Affairs: Infrastructure Standard for Telecommunication Spaces, August 2021
32. Department of Veterans Affairs: Electrical Design Manual, 2019 Edition.
33. Department of Veterans Affairs: Office of information & Technology Design Guide, February 2021.
34. Department of Veterans Affairs Design Guide: Infrastructure Standard for Telecommunications Spaces, V3.1, July 2021.
35. Department of Veterans Affairs Fire Protection Design Manual, June 2021 Edition.
36. Department of Veteran Affairs: Physical Security and Resiliency Design Manual October 2020, Revised March 1, 2022.
37. Departments of Veterans Affairs Standard Details and Specifications.
38. ASHRAE 90.1 IP Lighting, 2019 Edition.
39. ANSI/TIA/EIA 568.1 E Commercial Building Telecommunications Cabling Standards, 2020 Edition.
40. ANSI/TIA/EIA 569-E Telecommunications Pathways and Spaces, 2019 Edition.
41. ANSI/TIA 607-D, Telecommunication Bonding and Grounding, 2019 Edition.
42. ANSI/TIA-1179-A Healthcare Facility Telecommunications Infrastructure Standard, 2019 Edition.
43. BICSI, Telecommunications Distribution Methods Manual, 2020-14th Edition.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION.
THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE.
FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS
APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING
JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
/2
/2
:4
:1
P
M C
U s e rs \a p u lle n \D o c u m e n ts \A
-0
A n n
A rb o r-
E H
R M
S it e
P la n a p u lle n V
D X
T .r v t
G-002
SHEET INDEX
2 54ANP
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
JAB
EHRM INFRASTRUCTURE
UPGRADES
DRAWING LIST - VOLUME 1 OF 4
GENERAL
G-001 COVER 1 54
G-002 SHEET INDEX 2 54
G-003 CAMPUS SITE PLAN 3 54
G-004 TELECOMMUNICATION ROOM BUILDING 1 STACK REFERENCE DRAWING 4 54
G-005 ICRA DETAILS AND NOTES 5 54
G-006 ICRA INFORMATION AND TYPICAL CONDITIONS 6 54
G-007 BIOMED AND SECURITY AWARENESS SCHEDULE 7 54
G-008 PROJECT ICRA AND CONTRACTOR WORK HOURS 8 54
1.G-001 BUILDING 1E, 1W, & 28 BASEMENT COVERAGE PLAN 9 54
1.G-002 BUILDING 1E, 1W, & 28 FIRST FLOOR COVERAGE PLAN 10 54
1.G-003 BUILDING 1E, 1W, & 28 SECOND FLOOR COVERAGE PLAN 11 54
1.G-004 BUILDING 1E & 1W THIRD FLOOR COVERAGE PLAN 12 54
1.G-005 BUILDING 1E & 1W FOURTH FLOOR COVERAGE PLAN 13 54
1.G-006 BUILDING 1E & 1W FIFTH FLOOR COVERAGE PLAN 14 54
1.G-007 BUILDING 1E & 1W SIXTH FLOOR COVERAGE PLAN 15 54
1.G-008 BUILDING 1E & 1W SEVENTH FLOOR COVERAGE PLAN 16 54
1.G-009 BUILDING 1E & 1W EIGHT FLOOR COVERAGE PLAN 17 54
1.G-010 BUILDING 1W NINTH FLOOR COVERAGE PLAN 18 54
1.G-101 BUILDING 1E PARTIAL BASEMENT PLAN A 19 54
1.G-102 BUILDING 1E & 1W PARTIAL BASEMENT PLAN B 20 54
1.G-103 BUILDING 1W PARTIAL BASEMENT PLAN C 21 54
1.G-104 BUILDING 1W & 28, PARTIAL BASEMENT PLAN D 22 54
1.G-111 BUILDING 1E PARTIAL FIRST FLOOR PLAN A 23 54
1.G-112 BUILDING 1E & 1W PARTIAL FIRST FLOOR PLAN B 24 54
1.G-113 BUILDING 1W PARTIAL FIRST FLOOR PLAN C 25 54
1.G-114 BUILDING 1W & 28 PARTIAL FIRST FLOOR PLAN D 26 54
1.G-121 BUILDING 1E PARTIAL SECOND FLOOR PLAN A 27 54
1.G-122 BUILDING 1E & 1W PARTIAL SECOND FLOOR PLAN B 28 54
1.G-123 BUILDING 1W PARTIAL SECOND FLOOR PLAN C 29 54
1.G-124 BUILDING 1W & 28 PARTIAL SECOND FLOOR PLAN D 30 54
1.G-131 BUILDING 1E PARTIAL THIRD FLOOR PLAN A 31 54
1.G-132 BUILDING 1E & 1W PARTIAL THIRD FLOOR PLAN B 32 54
1.G-141 BUILDING 1E & 1W PARTIAL FOURTH FLOOR PLAN C 33 54
1.G-151 BUILDING 1E PARTIAL FIFTH FLOOR PLAN A 34 54
1.G-152 BUILDING 1E & 1W PARTIAL FIFTH FLOOR PLAN B & C 35 54
1.G-161 BUILDING 1W PARTIAL SIXTH FLOOR PLAN B & C 36 54
1.G-171 BUILDING 1E PARTIAL SEVENTH FLOOR PLAN A 37 54
1.G-172 BUILDING 1E & 1W PARTIAL SEVENTH FLOOR PLAN B & C 38 54
1.G-181 BUILDING 1E & 1W PARTIAL EIGHTH FLOOR PLAN B & C 39 54
2.G-101 BUILDING 2, BASEMENT, FIRST FLOOR, AND SECOND FLOOR PLAN 40 54
3.G-101 BUILDING 3, BASEMENT FLOOR PLAN 41 54
15.G-111 BUILDING 15, FIRST FLOOR PLAN 42 54
22.G-101 BUILDING 22, GROUND FLOOR PLAN 43 54
22.G-111 BUILDING 22, FIRST FLOOR PLAN 44 54
29.G-101 BUILDING 29, LEVEL A, B, & D FLOOR PLANS 45 54
30.G-101 BUILDING 30, LEVEL B & LEVEL D FLOOR PLAN 46 54
31.G-101 BUILDING 31, BASEMENT FLOOR PLAN 47 54
31.G-111 BUILDING 31, FIRST FLOOR PLAN 48 54
31.G-121 BUILDING 31, SECOND FLOOR PLAN 49 54
32.G-101 BUILDING 32, BASEMENT FLOOR PLAN 50 54
37.G-101 BUILDING 37, BASEMENT FLOOR PLAN 51 54
37.G-111 BUILDING 37, FIRST FLOOR PLAN 52 54
37.G-121 BUILDING 37, SECOND FLOOR PLAN 53 54
37.G-131 BUILDING 37, THIRD FLOOR PLAN 54 54
STRUCTURAL
S-001 STRUCTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 5
S-101 LOW ROOF FRAMING PLAN 2 5
S-102 PLATFORM FRAMING PLAN 3 5
S-201 SECTIONS 4 5
S-301 DETAILS 5 5
##.XX-###
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
GC = GENERAL CONTRACT
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
FLOOR PLANS, ELEVATIONS, DETAILS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
SG = STRUCTURAL GENERAL
SF = STRUCTURAL FRAMING
MG = MECHANICAL GENERAL
MH = MECHANICAL HVAC
PG = PLUMBING MEDICAL GAS
PL = PLUMBING FIXTURES
EG = ELECTRICAL GENERAL
EL = ELECTRICAL LIGHTING
DRAWING INDEX LEGEND
SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
BUILDING NUMBER
SHEET NUMBER
FLOOR NUMBER ON PLAN SHEETS
DRAWING LIST - VOLUME 2 OF 4
GENERAL
GA.001 COVER 1 1
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 62
A-002 UL DETAILS 2 62
A-003 UL DETAILS 3 62
A-004 HVAC HOUSEKEEPING PAD LOCATION PLAN 4 62
1E. A-401 BUILDING 1E, BASEMENT, TELEPHONE SWITCH ROOM CB07 5 62
1E. A-402 BUILDING 1E, BASEMENT, DELTA STACK, TELECOM ROOM DB60A 6 62
1E. A-403 BUILDING 1E, BASEMENT, ECHO STACK, TELECOM ROOM EB60A 7 62
1E. A-411 BUILDING 1E, FIRST FLOOR, DELTA STACK, TELECOM ROOM D178A 8 62
1E. A-412 BUILDING 1E, FIRST FLOOR, ECHO STACK, TELECOM ROOM E178A 9 62
1E. A-413 BUILDING 1E, FIRST FLOOR, TELECOM ROOM L133 10 62
1E. A-431 BUILDING 1E, THIRD FLOOR, DELTA STACK, TELECOM ROOM D312A 11 62
1E. A-432 BUILDING 1E, THIRD FLOOR, ECHO STACK, TELECOM ROOM E321A 12 62
1E. A-451 BUILDING 1E, FIFTH FLOOR, DELTA STACK, TELECOM ROOM D530A 13 62
1E. A-452 BUILDING 1E, FIFTH FLOOR, ECHO STACK, TELECOM ROOM E530A 14 62
1E. A-471 BUILDING 1E, SEVENTH FLOOR, DELTA STACK, TELECOM ROOM D712A 15 62
1E. A-472 BUILDING 1E, SEVENTH FLOOR, ECHO STACK, TELECOM ROOM E718A 16 62
1W. A-401 BUILDING 1W, BASEMENT, ELECTRICAL EQUIPMENT AB00 17 62
1W. A-402 BUILDING 1W, BASEMENT, ALPHA STACK, TELECOM ROOM AB29 18 62
1W. A-403 BUILDING 1W, BASEMENT, BRAVO STACK, TELECOM ROOM BB26 19 62
1W. A-404 BUILDING 1W, BASEMENT, TELECOM ROOM BB94 20 62
1W. A-411 BUILDING 1W, FIRST FLOOR, ALPHA STACK, TELECOM ROOM A149 21 62
1W. A-412 BUILDING 1W, FIRST FLOOR, BRAVO STACK, TELECOM ROOM B143 22 62
1W. A-421 BUILDING 1W, SECOND FLOOR, ALPHA STACK, TELECOM ROOM A237 23 62
1W. A-422 BUILDING 1W, SECOND FLOOR, BRAVO STACK, TELECOM ROOM B231 24 62
1W. A-431 BUILDING 1W, THIRD FLOOR, ALPHA STACK, TELECOM ROOM A339 25 62
1W. A-432 BUILDING 1W, THIRD FLOOR, BRAVO STACK, TELECOM ROOM B310B 26 62
1W. A-441 BUILDING 1W, FOURTH FLOOR, ALPHA STACK, TELECOM ROOM A437 27 62
1W. A-442 BUILDING 1W, FOURTH FLOOR, BRAVO STACK, TELECOM ROOM B432A 28 62
1W. A-451 BUILDING 1W, FIFTH FLOOR, ALPHA STACK, TELECOM ROOM A535 29 62
1W. A-452 BUILDING 1W, FIFTH FLOOR, BRAVO STACK, TELECOM ROOM B525 30 62
1W. A-461 BUILDING 1W, SIXTH FLOOR, ALPHA STACK, TELECOM ROOM A633A 31 62
1W. A-462 BUILDING 1W, SIXTH FLOOR, BRAVO STACK, TELECOM ROOM B618A 32 62
1W. A-471 BUILDING 1W, SEVENTH FLOOR, ALPHA STACK, TELECOM ROOM A753 33 62
1W. A-472 BUILDING 1W, SEVENTH FLOOR, BRAVO STACK, TELECOM ROOM B722A 34 62
1W. A-481 BUILDING 1W, EIGHTH FLOOR, ALPHA STACK, TELECOM ROOM A843A 35 62
1W. A-482 BUILDING 1W, EIGHTH FLOOR, BRAVO STACK, TELECOM ROOM B812 36 62
1W. A-491 BUILDING 1W, NINTH FLOOR, ALPHA STACK, TELECOM ROOM A921A 37 62
28. A-401 BUILDING 28, BASEMENT, FOXTROT STACK, TELECOM ROOM FG86 38 62
28. A-411 BUILDING 28, FIRST FLOOR, MAIN COMPUTER ROOM A180 39 62
28. A-412 BUILDING 28, FIRST FLOOR, FOXTROT STACK, TELECOM ROOM F152 40 62
28. A-421 BUILDING 28, SECOND FLOOR, FOXTROT STACK, TELECOM ROOM F224A 41 62
2. A-421 BUILDING 2, FULLER HOUSE, SECOND FLOOR, TELECOM ROOM 210 42 62
3. A-401 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, TELECOM ROOM 02C 43 62
15. A-401 BUILDING 15, NORTH METER HOUSE, FIRST FLOOR, TELECOM ROOM 15-2 44 62
22. A-401 BUILDING 22, RESEARCH BUILDING, GROUND FLOOR, TELECOM ROOM G12 45 62
22. A-411 BUILDING 22, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 08 46 62
29. A-411 BUILDING 29, EAST PARKING STRUCTURE, LEVEL A, TELECOM ROOM AA6 47 62
29. A-421 BUILDING 29, EAST PARKING STRUCTURE, LEVEL B, TELECOM ROOM EPS-B2 48 62
30. A-421 BUILDING 30, WEST PARKING STRUCTURE, LEVEL B, TELECOM ROOM WPS-B02 49 62
30. A-441 BUILDING 30, WEST PARKING STRUCTURE, LEVEL D, TELECOM ROOM WPS-D02 50 62
31. A-401 BUILDING 31, RESEARCH BUILDING, BASEMENT, TELECOM ROOM 27 51 62
31. A-411 BUILDING 31, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 117 52 62
31. A-421 BUILDING 31, RESEARCH BUILDING, SECOND FLOOR, TELECOM ROOM 218 53 62
32. A-401 BUILDING 32, ENERGY CENTER, BASEMENT, TELECOM ROOM 003 54 62
32. A-431 BUILDING 32, ENERGY CENTER, ROOF PLAN AND PLATFORM 55 62
37. A-401 BUILDING 37, ADMINISTRATIVE BUILDING, BASEMENT, TELECOM ROOM 006 56 62
37. A-411 BUILDING 37, ADMINISTRATIVE BUILDING, FIRST FLOOR, TELECOM ROOM 118 57 62
37. A-421 BUILDING 37, ADMINISTRATIVE BUILDING, SECOND FLOOR, TELECOM ROOM 217 58 62
37. A-431 BUILDING 37, ADMINISTRATIVE BUILDING, THIRD FLOOR, TELECOM ROOM 317 59 62
A-501 PARTITION TYPES AND DETAILS 60 62
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 61 62
A-602 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 62 62
DRAWING LIST - VOLUME 3 OF 4
GENERAL
GM.001 COVER 1 1
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 66
MP002 PLUMBING GENERAL INFORMATION 2 66
MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 66
1E.MP401 BUILDING 1E, BASEMENT, TELEPHONE SWITCH ROOM CB07 4 66
1E.MP402 BUILDING 1E, BASEMENT, DELTA STACK, TELECOM ROOM DB60A 5 66
1E.MP403 BUILDING 1E, BASEMENT, ECHO STACK, TELECOM ROOM EB60A 6 66
1E.MP411 BUILDING 1E, FIRST FLOOR, DELTA STACK, TELECOM ROOM D178A 7 66
1E.MP412 BUILDING 1E, FIRST FLOOR, ECHO STACK, TELECOM ROOM E178A 8 66
1E.MP413 BUILDING 1E, FIRST FLOOR, TELECOM ROOM L133 9 66
1E.MP431 BUILDING 1E, THIRD FLOOR, DELTA STACK, TELECOM ROOM D312A 10 66
1E.MP432 BUILDING 1E, THIRD FLOOR, ECHO STACK, TELECOM ROOM E321A 11 66
1E.MP451 BUILDING 1E, FIFTH FLOOR, DELTA STACK, TELECOM ROOM D530A 12 66
1E.MP452 BUILDING 1E, FIFTH FLOOR, ECHO STACK, TELECOM ROOM E530A 13 66
1E.MP471 BUILDING 1E, SEVENTH FLOOR, DELTA STACK, TELECOM ROOM D712A 14 66
1E.MP472 BUILDING 1E, SEVENTH FLOOR, ECHO STACK, TELECOM ROOM E718A 15 66
1W.MP401 BUILDING 1W, BASEMENT, ELECTRICAL EQUIPMENT AB00 16 66
1W.MP402 BUILDING 1W, BASEMENT, ALPHA STACK, TELECOM ROOM AB29 17 66
1W.MP403 BUILDING 1W, BASEMENT, BRAVO STACK, TELECOM ROOM BB26 18 66
1W.MP404 BUILDING 1W, BASEMENT, TELECOM ROOM BB94 19 66
1W.MP411 BUILDING 1W, FIRST FLOOR, ALPHA STACK, TELECOM ROOM A149 20 66
1W.MP412 BUILDING 1W, FIRST FLOOR, BRAVO STACK, TELECOM ROOM B143 21 66
1W.MP421 BUILDING 1W, SECOND FLOOR, ALPHA STACK, TELECOM ROOM A237 22 66
1W.MP422 BUILDING 1W, SECOND FLOOR, BRAVO STACK, TELECOM ROOM B231 23 66
1W.MP431 BUILDING 1W, THIRD FLOOR, ALPHA STACK, TELECOM ROOM A339 24 66
1W.MP432 BUILDING 1W, THIRD FLOOR, BRAVO STACK, TELECOM ROOM B310B 25 66
1W.MP441 BUILDING 1W, FOURTH FLOOR, ALPHA STACK, TELECOM ROOM A437 26 66
1W.MP442 BUILDING 1W, FOURTH FLOOR, BRAVO STACK, TELECOM ROOM B432A 27 66
1W.MP451 BUILDING 1W, FIFTH FLOOR, ALPHA STACK, TELECOM ROOM A535 28 66
1W.MP452 BUILDING 1W, FIFTH FLOOR, BRAVO STACK, TELECOM ROOM B525 29 66
1W.MP461 BUILDING 1W, SIXTH FLOOR, ALPHA STACK, TELECOM ROOM A633A 30 66
1W.MP462 BUILDING 1W, SIXTH FLOOR, BRAVO STACK, TELECOM ROOM B618A 31 66
1W.MP471 BUILDING 1W, SEVENTH FLOOR, ALPHA STACK, TELECOM ROOM A753 32 66
1W.MP472 BUILDING 1W, SEVENTH FLOOR, BRAVO STACK, TELECOM ROOM B722A 33 66
1W.MP481 BUILDING 1W, EIGHTH FLOOR, ALPHA STACK, TELECOM ROOM A843A 34 66
1W.MP482 BUILDING 1W, EIGHTH FLOOR, BRAVO STACK, TELECOM ROOM B812 35 66
1W.MP491 BUILDING 1W, NINTH FLOOR, ALPHA STACK, TELECOM ROOM A921A 36 66
28.MP401 BUILDING 28, BASEMENT, FOXTROT STACK, TELECOM ROOM FG86 37 66
28.MP411 BUILDING 28, FIRST FLOOR, MAIN COMPUTER SWITCH ROOM A180 - MECHANICAL 38 66
28.MP412 BUILDING 28, FIRST FLOOR, FOXTROT STACK, TELECOM ROOM F152 39 66
28.MP421 BUILDING 28, SECOND FLOOR, FOXTROT STACK, TELECOM ROOM F224A 40 66
2.MP421 BUILDING 2, FULLER HOUSE, SECOND FLOOR, TELECOM ROOM 210 41 66
3.MP401 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, OVERALL PLAN 42 66
3.MP402 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, TELECOM ROOM 02C 43 66
15.MP401 BUILDING 15, NORTH METER HOUSE, FIRST FLOOR, TELECOM ROOM 15-2 44 66
22.MP401 BUILDING 22, RESEARCH BUILDING, GROUND FLOOR, TELECOM ROOM G12 45 66
22.MP411 BUILDING 22, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 08 46 66
22.MP421 BUILDING 22, RESEARCH BUILDING, ROOF PLAN 47 66
29.MP411 BUILDING 29, EAST PARKING STRUCTURE, LEVEL A, TELECOM ROOM AA6 48 66
29.MP421 BUILDING 29, EAST PARKING STRUCTURE, LEVEL B, TELECOM ROOM EPS-B2 49 66
30.MP421 BUILDING 30, WEST PARKING STRUCTURE, LEVEL B, TELECOM ROOM WPS-B02 50 66
30.MP441 BUILDING 30, WEST PARKING STRUCTURE, LEVEL D, TELECOM ROOM WPS-D02 51 66
31.MP401 BUILDING 31, RESEARCH BUILDING, BASEMENT, TELECOM ROOM 27 52 66
31.MP411 BUILDING 31, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 117 53 66
31.MP421 BUILDING 31, RESEARCH BUILDING, SECOND FLOOR, TELECOM ROOM 218 54 66
32.MP101 BUILDING 32, ENERGY CENTER , FIRST FLOOR CHILLER ROOM 101 AND ROOF MECHANICAL PLAN 55 66
32.MP401 BUILDING 32, ENERGY CENTER, BASEMENT, TELECOM ROOM 003 56 66
37.MP401 BUILDING 37, ADMINISTRATIVE BUILDING, BASEMENT, TELECOM ROOM 006 57 66
37.MP411 BUILDING 37, ADMINISTRATIVE BUILDING, FIRST FLOOR, TELECOM ROOM 118 58 66
37.MP421 BUILDING 37, ADMINISTRATIVE BUILDING, SECOND FLOOR, TELECOM ROOM 217 59 66
37.MP431 BUILDING 37, ADMINISTRATIVE BUILDING, THIRD FLOOR, TELECOM ROOM 317 60 66
MP501 MECHANICAL AND PLUMBING DETAILS 61 66
MP502 MECHANICAL AND PLUMBING DETAILS 62 66
MP503 CHILLED WATER PIPING SCHEMATIC FOR BUILDINGS 1 EAST, 1 WEST, AND 28 63 66
MP504 MECHANICAL CONTROLS 64 66
MP505 MECHANICAL CONTROLS 65 66
MP601 MECHANICAL SCHEDULES 66 66
DRAWING LIST - VOLUME 4 OF 4
GENERAL
GE.001 COVER 1 1
ELECTRICAL
ET001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 106
ET002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 106
ET501 TYPICAL TELECOM ROOM DETAILS 3 106
ET502 ELECTRICAL AND TECHNOLOGY DETAILS 4 106
ET503 TECHNOLOGY DETAILS 5 106
ET504 TECHNOLOGY DETAILS 6 106
ET505 ELECTRICAL CHANNEL RACK DETAILS 7 106
ET506 ELECTRICAL AND TECHNOLOGY CHANNEL RACK DETAILS 8 106
ES101 CAMPUS FIBER DISTRIBUTION DIAGRAM 9 106
1E.ET401 BUILDING 1E, BASEMENT, TELEPHONE SWITCH ROOM CB07 10 106
1E.ET402 BUILDING 1E, BASEMENT, DELTA STACK, TELECOM ROOM DB60A 11 106
1E.ET402.A BUILDING 1E, BASEMENT, DELTA STACK, TELECOM ROOM DB60A - ELEVATIONS 12 106
1E.ET403 BUILDING 1E, BASEMENT, ECHO STACK, TELECOM ROOM EB60A 13 106
1E.ET403.A BUILDING 1E, BASEMENT, ECHO STACK, TELECOM ROOM EB60A - ELEVATIONS 14 106
1E.ET411 BUILDING 1E, FIRST FLOOR, DELTA STACK, TELECOM ROOM D178A 15 106
1E.ET411.A BUILDING 1E, FIRST FLOOR, DELTA STACK, TELECOM ROOM D178A - ELEVATIONS 16 106
1E.ET412 BUILDING 1E, FIRST FLOOR, ECHO STACK, TELECOM ROOM E178A 17 106
1E.ET412.A BUILDING 1E, FIRST FLOOR, ECHO STACK, TELECOM ROOM E178A - ELEVATIONS 18 106
1E.ET413 BUILDING 1E, FIRST FLOOR, TELECOM ROOM L133 19 106
1E.ET413.A BUILDING 1E, FIRST FLOOR, TELECOM ROOM L133 - ELEVATIONS 20 106
1E.ET431 BUILDING 1E, THIRD FLOOR, DELTA STACK, TELECOM ROOM D312A 21 106
1E.ET431.A BUILDING 1E, THIRD FLOOR, DELTA STACK, TELECOM ROOM D312A - ELEVATIONS 22 106
1E.ET432 BUILDING 1E, THIRD FLOOR, ECHO STACK, TELECOM ROOM E321A 23 106
1E.ET432.A BUILDING 1E, THIRD FLOOR, ECHO STACK, TELECOM ROOM E321A - ELEVATIONS 24 106
1E.ET451 BUILDING 1E, FIFTH FLOOR, DELTA STACK, TELECOM ROOM D530A 25 106
1E.ET451.A BUILDING 1E, FIFTH FLOOR, DELTA STACK, TELECOM ROOM D530A - ELEVATIONS 26 106
1E.ET452 BUILDING 1E, FIFTH FLOOR, ECHO STACK, TELECOM ROOM E530A 27 106
1E.ET452.A BUILDING 1E, FIFTH FLOOR, ECHO STACK, TELECOM ROOM E530A - ELEVATIONS 28 106
1E.ET471 BUILDING 1E, SEVENTH FLOOR, DELTA STACK, TELECOM ROOM D712A 29 106
1E.ET471.A BUILDING 1E, SEVENTH FLOOR, DELTA STACK, TELECOM ROOM D712A - ELEVATIONS 30 106
1E.ET472 BUILDING 1E, SEVENTH FLOOR, ECHO STACK, TELECOM ROOM E718A 31 106
1E.ET472.A BUILDING 1E, SEVENTH FLOOR, ECHO STACK, TELECOM ROOM E718A - ELEVATIONS 32 106
1W.ET401 BUILDING 1W, BASEMENT ELECTRICAL EQUIPMENT AB00 33 106
1W.ET402 BUILDING 1W, BASEMENT, ALPHA STACK, TELECOM ROOM AB29 34 106
1W.ET403 BUILDING 1W, BASEMENT, BRAVO STACK, TELECOM ROOM BB26 35 106
1W.ET403.A BUILDING 1W, BASEMENT, BRAVO STACK, TELECOM ROOM BB26 - ELEVATIONS 36 106
1W.ET404 BUILDING 1W, BASEMENT, TELECOM ROOM BB94 37 106
1W.ET411 BUILDING 1W, FIRST FLOOR, ALPHA STACK, TELECOM ROOM A149 38 106
1W.ET412 BUILDING 1W, FIRST FLOOR, BRAVO STACK, TELECOM ROOM B143 39 106
1W.ET412.A BUILDING 1W, FIRST FLOOR, BRAVO STACK, TELECOM ROOM B143 - ELEVATIONS 40 106
1W.ET421 BUILDING 1W, SECOND FLOOR, ALPHA STACK, TELECOM ROOM A237 41 106
1W.ET422 BUILDING 1W, SECOND FLOOR, BRAVO STACK, TELECOM ROOM B231 42 106
1W.ET422.A BUILDING 1W, SECOND FLOOR, BRAVO STACK, TELECOM ROOM B231 - ELEVATIONS 43 106
1W.ET431 BUILDING 1W, THIRD FLOOR, ALPHA STACK, TELECOM ROOM A339 44 106
1W.ET432 BUILDING 1W, THIRD FLOOR, BRAVO STACK, TELECOM ROOM B310B 45 106
1W.ET432.A BUILDING 1W, THIRD FLOOR, BRAVO STACK, TELECOM ROOM B310B - ELEVATIONS 46 106
1W.ET441 BUILDING 1W, FOURTH FLOOR, ALPHA STACK, TELECOM ROOM A437 47 106
1W.ET442 BUILDING 1W, FOURTH FLOOR, BRAVO STACK, TELECOM ROOM B432A 48 106
1W.ET442.A BUILDING 1W, FOURTH FLOOR, BRAVO STACK, TELECOM ROOM B432A - ELEVATIONS 49 106
1W.ET451 BUILDING 1W, FIFTH FLOOR, ALPHA STACK, TELECOM ROOM A535 50 106
1W.ET452 BUILDING 1W, FIFTH FLOOR, BRAVO STACK, TELECOM ROOM B525A 51 106
1W.ET452.A BUILDING 1W, FIFTH FLOOR, BRAVO STACK, TELECOM ROOM B525A - ELEVATIONS 52 106
1W.ET461 BUILDING 1W, SIXTH FLOOR, ALPHA STACK, TELECOM ROOM A633A 53 106
1W.ET462 BUILDING 1W, SIXTH FLOOR, BRAVO STACK, TELECOM ROOM B618A 54 106
1W.ET462.A BUILDING 1W, SIXTH FLOOR, BRAVO STACK, TELECOM ROOM B618A - ELEVATIONS 55 106
1W.ET471 BUILDING 1W, SEVENTH FLOOR, ALPHA STACK, TELECOM ROOM A753 56 106
1W.ET472 BUILDING 1W, SEVENTH FLOOR, BRAVO STACK, TELECOM ROOM B722A 57 106
1W.ET472.A BUILDING 1W, SEVENTH FLOOR, BRAVO STACK, TELECOM ROOM B722A - ELEVATIONS 58 106
1W.ET481 BUILDING 1W, EIGHTH FLOOR, ALPHA STACK, TELECOM ROOM A843A 59 106
1W.ET482 BUILDING 1W, EIGHTH FLOOR, BRAVO STACK, TELECOM ROOM B812 60 106
1W.ET482.A BUILDING 1W, EIGHTH FLOOR, BRAVO STACK, TELECOM ROOM B812 - ELEVATIONS 61 106
1W.ET491 BUILDING 1W, NINTH FLOOR, ALPHA STACK, TELECOM ROOM A921A 62 106
28.ET401 BUILDING 28, BASEMENT, FOXTROT STACK, TELECOM ROOM FG86 63 106
28.ET411 BUILDING 28, FIRST FLOOR, MAIN COMPUTER ROOM A180 - POWER 64 106
28.ET414 BUILDING 28, FIRST FLOOR, FOXTROT STACK, TELECOM ROOM F152 65 106
28.ET421 BUILDING 28, SECOND FLOOR, FOXTROT STACK, TELECOM ROOM F224A 66 106
2.ET421 BUILDING 2, FULLER HOUSE, SECOND FLOOR, TELECOM ROOM 210 67 106
3.ET401 BUILDING 3, FACILITY MANAGEMENT & SAFETY, BASEMENT, TELECOM ROOM 02C 68 106
15.ET401 BUILDING 15, NORTH METER HOUSE, FIRST FLOOR, TELECOM ROOM 15-2 69 106
22.ET401 BUILDING 22, RESEARCH BUILDING, GROUND FLOOR, TELECOM ROOM G12 70 106
22.ET411 BUILDING 22, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 08 71 106
22.ET411.A BUILDING 22, RESEARCH BUILDING, ROOF PLAN 72 106
29.ET411 BUILDING 29, EAST PARKING STRUCTURE, LEVEL A, TELECOM ROOM AA6 73 106
29.ET421 BUILDING 29, EAST PARKING STRUCTURE, LEVEL B, TELECOM ROOM EPS-B2 74 106
30.ET421 BUILDING 30, WEST PARKING STRUCTURE, LEVEL B, TELECOM ROOM WPS-B02 75 106
30.ET441 BUILDING 30, WEST PARKING STRUCTURE, LEVEL D, TELECOM ROOM WPS-D02 76 106
31.ET401 BUILDING 31, RESEARCH BUILDING, BASEMENT, TELECOM ROOM 27 77 106
31.ET401.A BUILDING 31, RESEARCH BUILDING, BASEMENT, TELECOM ROOM 27 - ELEVATIONS 78 106
31.ET411 BUILDING 31, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 117 79 106
31.ET411.A BUILDING 31, RESEARCH BUILDING, FIRST FLOOR, TELECOM ROOM 117 - ELEVATIONS 80 106
31.ET421 BUILDING 31, RESEARCH BUILDING, SECOND FLOOR, TELECOM ROOM 218 81 106
31.ET421.A BUILDING 31, RESEARCH BUILDING, SECOND FLOOR, TELECOM ROOM 218 - ELEVATIONS 82 106
32.ET401 BUILDING 32, ENERGY CENTER, BASEMENT, TELECOM ROOM 003 83 106
32.ET401.A BUILDING 32, ENERGY CENTER, BASEMENT, TELECOM ROOM 003 - ELEVATIONS 84 106
32.ET431 BUILDING 32, ENERGY CENTER , FIRST FLOOR CHILLER ROOM 101 AND ROOF ELECTRICAL PLAN 85 106
37.ET401 BUILDING 37, ADMINISTRATIVE BUILDING, BASEMENT, TELECOM ROOM 006 86 106
37.ET401.A BUILDING 37, ADMINISTRATIVE BUILDING, BASEMENT, TELECOM ROOM 006 - ELEVATIONS 87 106
37.ET411 BUILDING 37, ADMINISTRATIVE BUILDING, FIRST FLOOR, TELECOM ROOM 118 88 106
37.ET411.A BUILDING 37, ADMINISTRATIVE BUILDING, FIRST FLOOR, TELECOM ROOM 118 - ELEVATIONS 89 106
37.ET421 BUILDING 37, ADMINISTRATIVE BUILDING, SECOND FLOOR, TELECOM ROOM 217 90 106
37.ET421.A BUILDING 37, ADMINISTRATIVE BUILDING, SECOND FLOOR, TELECOM ROOM 217 - ELEVATIONS 91 106
37.ET431 BUILDING 37, ADMINISTRATIVE BUILDING, THIRD FLOOR, TELECOM ROOM 317 92 106
37.ET431.A BUILDING 37, ADMINISTRATIVE BUILDING, THIRD FLOOR, TELECOM ROOM 317 - ELEVATIONS 93 106
1.ET601 BUILDING 1E, 1W, AND 28 FIBER RISER DIAGRAM 94 106
1.ET602 MECHANICAL EQUIPMENT SCHEDULE AND BUILDING 1E AND 28 ELECTRICAL RISER DIAGRAMS 95 106
1.ET603 BUILDING 1W ELECTRICAL RISER DIAGRAM 96 106
1.ET604 BUILDING 1W EXISTING A STACK PHONE, CODE ONE, PA, PACS RISERS AND PACS PANELS
SCHEDULE
97 106
2.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 98 106
3.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 99 106
15.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 100 106
22.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 101 106
29.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 102 106
30.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 103 106
31.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 104 106
32.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 105 106
37.ET601 MECHANICAL EQUIPMENT SCHEDULE, SINGLE LINE AND FIBER RISER DIAGRAM 106 106
CODE STANDARDS AND EXECUTIVE ORDERS
1W
1E
A
J H
D
G
T9
AMBULANCE
ENTRANCE
DELIVERY
ENTRANCE
FULLER COURT
FULLER COURTFULLER COURT
B O
N
IS
T E
E L
B
LV
D
PATIENT &
VISITOR ENTRY
FULLER R
OAD
FULLER R
OAD
FULLER ROAD
FULLER ROAD
F U
LLE
R
R O
A D
F U
L L E
R R
O A
D
FULLER COURT
B E A L A
V E
G L A
Z
IE
R W
A Y
V A
M E
D
IC
A L C
IR
C
L E
V A
M E
D
IC
A L C
IR
C
L E
CONTRACTOR TRAILER LOCATION, LAY
DOWN AREA, AND DUMPSTER LOCATION.
LOCATION OF THESE FACILITIES WILL BE
DESIGNATED BY THE VA COR. ON SITE
MATERIAL STORAGE IS PROHIBITED.
GC AND ALL SUB-CONTRACTORS ARE
ALLOWED 2 PARKING SPACES TOTAL IN
GARAGE 29. SPACE LOCATION WILL BE
DESIGNATED BY THE VA COR.
COORDINATE WITH 01 00 00.
PROPOSED CRANE LOCATION FOR NEW ROOF TOP
PLATFORM AND COOLER EQUIPMENT
INSTALLATION. CRANE LIFT SHOULD BE
SCHEDULED ON OFF HOURS/WEEKENDS DUE TO
STAFF OCCUPANCY MONDAY THRU FRIDAY. GC TO
INFORM VA COR 14 DAYS PRIOR TO THE START OF
ANY CRANE ACTIVITIES.
1W LIBERTY BUILDING - ORIGINAL HOSPITAL BUILDING
1E FREEDOM BUILDING - CLINICAL ADDITION
2 FULLER HOUSE
3 FACILITY MANAGEMENT & SAFETY
7 GROUNDS GARAGE (NO WORK)
15 NORTH METER HOUSE
22 RESEARCH BUILDING
28 INDEPENDENCE BUILDING
31 RESEARCH BUILDING
32 ENERGY CENTER
35 SOUTH METER HOUSE (NO WORK)
36 FISHER HOUSE (NO WORK)
37 ADMINISTRATIVE BUILDING
T9 ADMINISTRATIVE BUILDING (NO WORK)
29 EAST PARKING STRUCTURE (PATIENT, VISITOR, & STAFF)
30 WEST PARKING STRUCTURE (STAFF ONLY)
A EMERGENCY DEPARTMENT PARKING
B STAFF PARKING LOT
D STAFF PARKING LOT
G STAFF PARKING LOT
H STAFF PARKING LOT
J FISHER HOUSE PARKING LOT
BUILDINGS
PARKING
BUILDING KEY
BUILDINGS THAT ARE
SHADED INDICATE
AREAS OF WORK
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
# 1E, 1W, 2, 3, 15, 22, 28, 29, 30, 31, 32, 37
/6
/2
:2
:5
P M
C U s e rs \a p u lle n \D o c u m e n ts \A
-0
A n n
A rb o r-
E H
R M
S it e
P la n a p u lle n V
D X
T .r v t
G-003
CAMPUS SITE PLAN
3 54ANP
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
JAB
EHRM INFRASTRUCTURE
UPGRADES
Scale: No Scale
CAMPUS SITE PLAN
NORTH
DocuSign Envelope ID: 68E04A76-2CE8-40A7-8DB8-165FE1E5CCB8
3/8/2024
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P
M C
U s e rs \a p u lle n \D o c u m e n ts
\A x o n S it e M o d e l_ a p u lle n V
D X
T .r v t
G-004
TELECOMMUNICATION ROOM
BUILDING 1 STACK REFERENCE
DRAWING
4 54ANP
EHRM INFRASTRUCTURE
UPGRADES
VA ANN ARBOR HEALTHCARE SYSTEM
2215 FULLER ROAD, ANN ARBOR, MI
48105 FEBRUARY 28, 2024
BID DOCUMENTS
506-21-70521-092
JAB
1E, 1W, 28
Scale: No Scale
TELECOMMUNICATION ROOM BUILDING 1 STACK REFERENCE DRAWING
ECHO STACK
DELTA STACKABANDONED CHARLIE STACK
ONCE ALL TECHNOLOGY AND
EQUIPMENT HAS BEEN RELOCATED
FROM THIS ROOM, NO OTHER
INTERIOR IMPROVEMENTS ARE
REQUIRED.
BRAVO STACK
ABANDONDED ALPHA STACK
ONCE ALL TECHNOLOGY AND EQUIPMENT HAS
BEEN RELOCATED FROM THIS ROOM, NO OTHER
INTERIOR IMPROVEMENTS ARE REQUIRED.
ALPHA STACK
FOXTROT STACK
TR L133
TELEPHONE SWITCH ROOM
CB07
TR BB94
BUILDING 1E
BUILDING 28
BUILDING 1W
E718A
E530A
E321A
E178A
EB60A
D712A
D530A
D312A
D178A
DB60A
B812
B722A
B618A
B525
B432A
B310B
B231
B143
BB26
F224A
F152
FG86
A921A
A843A
A753
A633A
A535
A437
A339
A237
A149
AB29
MAIN COMPUTER ROOM
A180
EXISTING DATA
AB23
EXISTING ELECTRICAL
EQUIPMENT AB00
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .