Attachment 08 - 075423 TPO Roofing.pdf

PDF 179 KB Posted

Attached to
Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
Solicitation number
36c77624b0025
Issued by

About this file

This document is a technical specification for the repair of an existing thermoplastic polyolefin (TPO) sheet roof system as part of an infrastructure upgrade project at the Ann Arbor VA Healthcare System. The key details are:

The project involves repair of the existing TPO roof system, including preparation of the roof deck, installation of new TPO membrane, base flashing, and accessory materials. The work must comply with performance requirements for load resistance, energy efficiency, and sustainable construction. Specific requirements include achieving a minimum Solar Reflectance Index of 78, as well as limits on volatile organic compound emissions for adhesives and sealants. The installation must also comply with the manufacturer's warranty requirements. Quality assurance measures include field testing of fastener pullout resistance and seam samples. The contractor is required to submit a crane lift plan 28 days prior to any work at Building 32. This specification is part of the bid documents for the overall EHRM Infrastructure Upgrade project at the Ann Arbor VA, Solicitation Number 36c77624b0025.

View the file

Other files

File Type Posted
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM 10 16 2024.pdf PDF
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM.pdf PDF
IFB 36C77624B0025 Amendment 0005 Asbestos Info.pdf PDF
IFB 36C77624B0025 Amendment 0004.pdf PDF
36C77624B0025 Amendment 0003.pdf PDF
S05 Ann_Arbor CMS_Question_Matrix_V3.xlsx XLSX spreadsheet
Attachment 12 - EHRM Window Screen Details.pdf PDF
Attachment 14 - MS Versions of PDFs.zip ZIP file
Attachment 07 - 013323 Shop Drawings_CA Edits 2.pdf PDF
Attachment 02 - 1E.ET472.pdf PDF
Attachment 06 - 000110 TOC - updated TPO and 236323.pdf PDF
Attachment 11 - CABLE MATRICES.pdf PDF
Attachment 04 - 21-092 SubReg 100 Percent.pdf PDF
Attachment 10 - Addendum 1.pdf PDF
Attachment 09 -236323 AirCooledClosedCircuitFluidCooler.pdf PDF
36C77624B0025 0002.docx DOCX document
Attachment 05 - 21-092-Pre-Bid RFIs_AE responses 1.pdf PDF
Attachment 15 - DB WR GD No MI20240100 09062024.pdf PDF
Attachment 03 - 1W.A-491_Addendum 1.pdf PDF
Attachment 01 - Q and A Results Ann Arbor MI.docx DOCX document
Attachment 13 - G-003_Addendum 1.pdf PDF
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.pdf PDF
S04 - Virtual Visit Attendee List - 08 29 2024.docx DOCX document
36C77624B0025 Ammendment 0001.docx DOCX document
S04 -Virtual and Site Visit Agenda - IFB 2024 08 29 2024.doc DOC document
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.docx DOCX document
Attachment 02_Drawings 07122024 Part 1.pdf PDF
Attachment 04_Drawings 07122024 Part 3.pdf PDF
Attachment 11 Division Breakdown Template.xls XLS spreadsheet
Attachment 06_Drawings 07122024 Part 5.pdf PDF
Attachment 05_Drawings 07122024 Part 4.pdf PDF
Attachment 08_Limitations on Subcontracting - Construction.docx DOCX document
Attachment 03_Drawings 07122024 Part 2.pdf PDF
Attachment 07_Drawings 07122024 Part 6.pdf PDF
Attachment 09_JA Ann Arbor Final REDACTED.pdf PDF
Attachment 10 DB Wages General Decision Number MI20240100 07 26 24.pdf PDF
Attachment 01_Specifications Ann Arbor MI.pdf PDF
36C77624B0025_1.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ann Arbor VA Healthcare System February 28, 2024 EHRM Infrastructure Upgrade Bid Documents Ann Arbor, MI, 48105 Project No: 506-21-705 Addendum 01 09/16/2024

07 54 23 - 1

SECTION 07 54 23

THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Repair of existing Thermoplastic Polyolefin (TPO) sheet roofing adhered to roof deck.

1.2 RELATED WORK

A. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS: Non-Flooring

Adhesives and Sealants VOC Limits.

B. Treated wood framing, blocking, and nailers: Section 06 10 00, ROUGH

CARPENTRY

C. Section 07 22 00, ROOF AND DECK INSULATION: Roof Insulation.

D. Sheet metal components and wind uplift requirements for roof-edge design: Section 07 60 00, FLASHING AND SHEET METAL.

E. Equipment supports for new mechanical platform.

F. Miscellaneous items: Section 07 71 00, ROOF SPECIALTIES/

Section 07 72 00, ROOF ACCESSORIES.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standards Institute/Single-Ply Roofing Institute

(ANSI/SPRI):

FX-1-16 ............. Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners.

C. American Society of Civil Engineers/Structural Engineering Institute

(ASCE/SEI):

7-16 ................ Minimum Design Loads for Buildings and Other

Structures.

D. American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE):

90.1-13 ............. Energy Standard for Buildings Except Low-Rise

Residential Buildings.

E. ASTM International (ASTM):

C67-20 .............. Sampling and Testing Brick and Structural Clay

Tile.

C140/C140M-20a ...... Sampling and Testing Concrete Masonry Units and

Related Units.

07 54 23 - 2

C1371-15 ............ Determination of Emittance of Materials Near

Room Temperature Using Portable Emissometers.

C1549-16 ............ Determination of Solar Reflectance Near Ambient

Temperature Using a Portable Solar

Reflectometer.

D1876-08(2015) e1 ... Peel Resistance of Adhesives (T-Peel Test).

D4263-83(2018) ...... Indicating Moisture in Concrete by the Plastic

Sheet Method.

D4434/D4434M-15 ..... Poly (Vinyl Chloride) Sheet Roofing.

D6878/D6878M-13 ..... Thermoplastic Polyolefin Based Sheet Roofing.

E408-13 ............. Total Normal Emittance of Surfaces Using

Inspection-Meter Techniques.

E1918-16 ............ Measuring Solar Reflectance of Horizontal and

Low-Sloped Surfaces in the Field.

E1980-11(2019) ...... Calculating Solar Reflectance Index of

Horizontal and Low-Sloped Opaque Surfaces.

F. Cool Roof Rating Council (CRRC):

1-20 ................ Product Rating Program.

G. National Roofing Contractors Association (NRCA):

Manual-19 ........... The NRCA Roofing Manual: Membrane Roofing

Systems.

H. U.S. Department of Agriculture (USDA):

BioPreferred® Program Catalog.

I. UL LLC (UL):

580-06 .............. Tests for Uplift Resistance of Roof Assemblies.

1897-20 ............. Uplift Tests for Roof Covering Systems.

J. U.S. Department of Commerce National Institute of Standards and Technology (NIST):

DOC PS 1-19 ......... Structural Plywood.

DOC PS 2-18 ......... Performance Standard for Wood-Based

Structural-Use Panels.

K. U.S. Environmental Protection Agency (EPA):

Energy Star ......... ENERGY STAR Program Requirements for Roof

Products Version 3.0.

1.4 PREINSTALLATION MEETINGS

A. Conduct pre-installation meeting at project site minimum 30 days before beginning Work of this section.

07 54 23 - 3

1. Required Participants:

a. Contracting Officer's Representative.

b. Inspection and Testing Agency.

c. Contractor.

d. Installer.

e. Manufacturer's field representative.

f. Other installers responsible for adjacent and intersecting work, including roof deck, flashings, roof penetrations, roof accessories, utility penetrations, rooftop curbs and equipment.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Installation schedule.

b. Installation sequence.

c. Preparatory work.

d. Protection before, during, and after installation.

e. Installation.

f. Terminations.

g. Transitions and connections to other work.

h. Inspecting and testing.

i. Other items affecting successful completion.

j. Pullout test of fasteners.

k. Material storage, including roof deck load limitations.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Roof membrane layout.

2. Roofing membrane fastener pattern and spacing.

3. Roofing membrane seaming and joint details.

4. Roof membrane penetration details.

5. Base flashing and termination details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Minimum fastener pullout resistance.

3. Installation instructions.

07 54 23 - 4

4. Existing Roof Warranty and modifications to the existing Roof

Warranty .

D. Samples: (Match existing materials and color)

1. Roofing Membrane: 150 mm (6 inch) square.

2. Base Flashing: 150 mm (6 inch) square.

3. Fasteners: Each type.

4. Roofing Membrane Seam: 300 mm (12 inches) square.

E. Sustainable Construction Submittals:

1. Solar Reflectance Index (SRI) for roofing membrane.

2. Biobased Content:

a. Show type and quantity for each product.

3. Low Pollutant-Emitting Materials:

a. Show volatile organic compound types and quantities.

4. Energy Star label for roofing membrane.

F. Certificates: Certify products comply with specifications.

1. Fire and windstorm classification.

2. Energy performance requirements.

G. Qualifications: Substantiate qualifications comply with specifications.

1. Installer, including supervisors with project experience list.

2. Manufacturer's field representative with project experience list.

H. Field quality control reports.

I. Temporary protection plan. Include list of proposed temporary materials.

J. Operation and Maintenance Data:

1. Maintenance instructions.

1.6 QUALITY ASSURANCE

A. Installer Qualifications:

1. Approved by roofing system manufacturer as installer for roofing system with specified warranty.

2. Regularly installs specified products.

3. Installed specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

4. Employs full-time supervisors experienced installing specified system and able to communicate with Contracting Officer's

Representative and installer's personnel.

07 54 23 - 5

B. Manufacturer's Field Representative:

1. Manufacturer's full-time technical employee or independent roofing inspector.

2. Individual certified by Roof Consultants Institute as Registered Roof Observer.

1.7 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.8 STORAGE AND HANDLING

A. Comply with NRCA Manual storage and handling requirements.

B. Store products indoors in dry, weathertight facility.

C. Store adhesives according to manufacturer's instructions.

D. Protect products from damage during handling and construction operations.

E. Products stored on the roof deck must not cause permanent deck deflection.

1.9 FIELD CONDITIONS

A. Environment:

1. Product Temperature: Minimum 4 degrees C (40 degrees F) for minimum 48 hours before installation.

2. Weather Limitations: Install roofing only during dry current and forecasted weather conditions.

3. Contractor shall submit a crane lift plan, indicating swing path requirements for Building 32, at least 28 days prior to any crane lift operations.

1.10 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant roofing system against material and manufacturing defects and agree to repair any leak caused by a defect in the roofing system materials or workmanship of the installer.

1. Warranty Period: 10 years.

07 54 23 - 6

PART 2 - PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Roofing System: Thermoplastic Polyolefin (TPO) sheet roofing adhered to roof deck that matches the existing roof.

2.2 SYSTEM PERFORMANCE

A. Design roofing system complying with specified performance:

1. Load Resistance: ASCE/SEI 7; Design criteria: as indicated on Structural Drawings.

2. Energy Performance:

a. EPA Energy Star Listed for low-slope roof products.

b. ASTM E1980; Minimum 78 Solar Reflectance Index (SRI).

c. CRRC-1; Minimum 0.70 initial solar reflectance and minimum 0.75 emissivity.

d. Three-Year Aged Performance: Minimum 0.55 solar reflectance tested in according to ASTM C1549 or ASTM E1918, and minimum 0.75 thermal emittance tested in according to ASTM C1371 or ASTM E408.

1) Where tested aged values are not available:

a) Calculate compliance adjusting initial solar reflectance according to ASHRAE 90.1.

b) Provide roofing system with minimum 64 three-year aged

Solar Reflectance Index calculated according to ASTM E1980 with 12 W/square meter/degree K (2.1 BTU/hour/square foot) convection coefficient.

2.3 PRODUCTS - GENERAL

A. Provide roof system components from one manufacturer.

B. Sustainable Construction Requirements:

1. Solar Reflectance Index: 78 minimum.

2. Biobased Content: Where applicable, provide products designated by

USDA and meeting or exceeding USDA recommendations for bio-based content, and products meeting Rapidly Renewable Materials and certified sustainable wood content definitions; refer to www.biopreferred.gov.

3. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Non-flooring adhesives and sealants.

http://www.biopreferred.gov/

07 54 23 - 7

2.4 TPO ROOFING MEMBRANE

A. TPO Sheet: ASTM D6878/D6878M, internally fabric or scrim reinforced,

1.5 mm (60 mils) thick, with fabric backing.

1. Color: White.

2.5 MEMBRANE ACCESSORY MATERIALS

A. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as TPO sheet membrane.

B. Factory Formed Flashings: Inside and outside corners, pipe boots, and other special flashing shapes to minimize field fabrication.

C. Bonding Adhesive: Manufacturer's standard, water based.

D. Metal Termination Bars: Manufacturer's standard, stainless-steel or aluminum, 25 mm wide by 3 mm thick (1-inch wide by 1/8 inch thick) factory drilled for fasteners.

E. Battens: Manufacturer's standard, galvannealed or galvanized steel sheet, 25 mm wide by 1.3 mm thick (1-inch wide by 0.05 inch thick), factory punched for fasteners.

F. Fasteners: Manufacturer's standard coated steel with metal or plastic plates, to suit application.

G. Primers, Sealers, T-Joint Covers, Lap Sealants, and Termination

Reglets: As specified by roof membrane manufacturer.

H. Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

2.6 ACCESSORIES

A. Temporary Protection Materials:

1. Expanded Polystyrene (EPS) Insulation: ASTM C578.

2. Plywood: NIST DOC PS 1, Grade CD Exposure 1.

3. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine and verify substrate suitability with roofing Installer and roofing inspector present.

1. Verify roof penetrations are complete, secured against movement, and firestopped.

2. Verify roof deck is adequately secured to resist wind uplift.

07 54 23 - 8

3. Verify roof deck is clean, dry, and in-plane ready to receive roofing system.

B. Correct unsatisfactory conditions before beginning roofing work.

3.2 PREPARATION

A. Partial roof deck construction before beginning roofing work:

1. Curbs, blocking, edge strips, nailers, cants, and other components to which insulation, roofing, and base flashing is attached in place ready to receive insulation and roofing.

2. Coordinate roofing membrane installation with existing flashing work and roof insulation work so insulation and flashing are installed concurrently to permit continuous roofing operations.

3. Complete installation of new and existing flashing, insulation, and roofing in same day except for the area where temporary protection is required when work is stopped for inclement weather or end of workday.

B. Dry out existing surfaces including roof deck flutes, that become wet from any cause during progress of the work before roofing work is resumed. Apply materials to dry substrates, only.

C. Broom clean new and existing adjacent roof decks. Remove dust, dirt and debris.

D. Remove projections on the entire roof capable of damaging roofing materials.

E. Verify if concrete decks are present before tearing off portions of the existing roofing syste, except Insulating Concrete:

1. If concrete decks are present, test the concrete decks for moisture according to ASTM D4263 before installing roofing materials.

2. If concrete decks are present, prime concrete decks. Keep primer back 100 mm (4 inches) from precast concrete deck joints.

3. Allow primer to dry before application of bitumen.

3.3 TEMPORARY PROTECTION

A. Install temporary protection consisting of a temporary seal and water cut-offs at the end of each day's work and when work is halted for an indefinite period or work is stopped when precipitation is imminent.

B. Install temporary cap flashing over top of new and existing base flashings where permanent flashings are not in place to protect against water intrusion into roofing system. Securely anchor all flashing in place to prevent blow off and damage by construction activities.

07 54 23 - 9

C. Temporarily seal exposed new and existing insulation surfaces within roofing membrane.

1. Apply temporary seal and water cut off by extending roofing membrane beyond insulation and securely embedding edge of the roofing membrane in 6 mm (1/4 inch) thick by 50 mm (2 inches) wide strip of temporary closure sealant. Weight roofing membrane edge with sandbags, to prevent displacement; space sandbags maximum 2400 mm

(8 feet) on center.

2. Direct water away from the new work area. Provide drainage, as required, to prevent water accumulation.

3. Check daily to ensure temporary seal remains watertight. Reseal open areas and weight down.

D. Before the work resumes, cut off and discard portions of roof membrane in contact with temporary seal.

1. Cut minimum 150 mm (6 inches) back from sealed and/or existing edges and surfaces.

E. Remove sandbags and remove from site.

3.4 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings. Verify existing roof warranties in place and review the information with the current roof manufacturer to not void the roof warranty currently in place.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Comply with NRCA Manual installation requirements.

C. Comply with UL 580 for uplift resistance.

D. Do not allow membrane and flashing to contact surfaces contaminated with asphalt, coal tar, oil, grease, or other substances incompatible with TPO.

3.5 ROOFING INSTALLATION

A. Verify current roofing system and current roof structure before demolition activities begin.

B. Once all roofing shop drawings and materials have been approved by the A/E and VA COR, Contractor shall submit a Swing Path plan to the COR 28 days in advance before commencement of work can take place.

07 54 23 - 10

C. Begin selective demolition activities where the new mechanical platform is being constructed. The roof shall be cleaned at the end of each day to avoid damage to other areas of the existing roof.

D. Install the membrane so the sheets run in the same direction and dimension of the existing roof system.

E. installation at the low point of the roof and work towards the high point. Lap membrane shingled in water flow direction.

F. Position the membrane free of buckles and wrinkles.

G. Roll membrane out; inspect for defects as membrane is unrolled. Remove defective areas:

1. Lap edges and ends of sheets 50 mm (2 inches) or more as recommended by the manufacturer.

2. Heat weld laps. Apply pressure as required. Seam strength of laps as required by ASTM D4434/D4434M.

3. Check seams to ensure continuous adhesion and correct defects.

4. Finish seam edges with beveled bead of lap sealant.

5. Finish seams same day as membrane is installed.

6. Anchor membrane perimeter to roof deck or parapet wall as indicated on drawings.

7. Repair areas of welded seams where samples have been taken, existing membrane has been cut, or marginal welds, bond voids, or skips occurs.

8. Repair fishmouths and wrinkles by cutting to lay flat and installing patch over cut area extending 100 mm (4 inches) beyond cut.

H. Membrane Perimeter Anchorage:

1. Install batten at perimeter of each roof area, curb flashing, expansion joints and similar penetrations on top of roof membrane as indicated on drawings.

I. Adhered System:

1. Apply bonding adhesive in quantities required by roof membrane manufacturer.

2. Fold sheet back on itself, clean and coat the bottom side of the membrane and the top of substrate with adhesive. Do not coat the lap joint area.

3. After adhesive has set according to adhesive manufacturer's instruction, roll roofing membrane into adhesive minimizing voids and wrinkles.

07 54 23 - 11

4. Repeat for other half of sheet.

3.6 FLASHING INSTALLATION

A. Install new flashings & re-install existing flashings the same day as roofing membrane is installed. When flashing cannot be completely installed in one day, complete installation until all flashing is watertight and provide temporary covers or seals.

B. Re-flashing Roof Drains:

1. Install roof drain flashing as recommended by roofing membrane manufacturer.

a. Coordinate to set the metal drain flashing in asphalt roof cement, holding cement back from the edge of the metal flange.

b. Do not allow the roof cement to come in contact with TPO roofing membrane.

c. Adhere roofing membrane to metal flashing with bonding adhesive.

2. Turn down the metal drain flashing and roofing membrane into drain body. Install clamping ring and strainer.

C. Installing Base Flashing and Pipe Flashing:

1. Install flashing sheet to pipes, wall or curbs to minimum200 mm

(8 inches) above roof surfaces and extending roofing manufacturer's standard lap dimension onto roofing membranes.

a. Adhere flashing with bonding adhesive.

b. Form inside and outside corners of flashing sheet according to NRCA manual. Form pipe flashing according to NRCA manual.

c. Lap ends roofing manufacturer's standard dimension.

d. Heat weld flashing membranes together and flashing membranes to roofing membranes. Finish exposed edges with lap sealant.

e. Install flashing membranes according to NRCA manual.

2. Anchor top of flashing to walls and curbs with fasteners spaced maximum150 mm (6 inches) on center. Use surface mounted fastening strip with sealant on ducts. Use pipe clamps on pipes or other round penetrations.

3. Apply sealant to top edge of flashing.

D. Installing Building Expansion Joints:

1. Install base flashing on curbs as specified.

2. Coordinate installation with metal expansion joint cover.

3. Install flexible tubing 1-1/2 times the width of joint centered over joint. Cover tubing with flashing sheet adhered to base flashing and

07 54 23 - 12 lapping base flashing roofing manufacturer's standard dimension.

Finish edges of laps with sealant.

E. Repairs to Membrane and Flashings:

1. Remove sections of roofing membrane or flashing that are creased, wrinkled, or fishmouthed.

2. Cover removed areas, cuts and damaged areas with a patch extending

100 mm (4 inches) beyond damaged, cut, or removed area. Heat weld to roofing membrane or flashing sheet. Finish edge of lap with lap sealant.

3.7 FIELD QUALITY CONTROL

A. Field Tests: Performed by testing laboratory at the direction of the VA

COR.

1. Fastener Pull Out Tests: ANSI/SPRI FX-1; one test for every

230 square meter (2,500 square feet) of deck. Perform tests for each combination of fastener type and roof deck type before installing roof insulation.

a. Test at locations selected by Contracting Officer's Representative.

b. Do not proceed with roofing work when pull out resistance is less than manufacturer's required resistance.

c. Test Results:

1) Repeat tests using different fastener type or use additional fasteners achieve pull out resistance required to meet specified wind uplift performance.

2) Patch cementitious deck to repair areas of fastener tests holes.

2. Examine and probe roofing membrane and flashing seams in presence of Contracting Officer's Representative and Manufacturer's field representative.

3. Probe seams to detect marginal bonds, voids, skips, and fishmouths.

4. Cut 100 mm (4 inch) wide by 300 mm (12 inch) long samples through seams where directed by Contracting Officer's Representative.

5. Cut one sample for every 450 m (1500 feet) of seams.

6. Cut samples perpendicular to seams.

7. Failure of samples to pass ASTM D1876 test will be cause for rejection of work.

07 54 23 - 13

8. Repair areas where samples are taken and where marginal bond, voids, and skips occur.

9. Repair fishmouths and wrinkles by cutting to lay flat. Install patch over cut area extending 100 mm (4 inches) beyond cut.

B. Manufacturer Services:

1. Inspect existing roof system, initial installation, installation in progress, and completed work.

2. Issue supplemental installation instructions necessitated by field conditions.

3. Prepare and submit inspection reports.

4. Certify completed installation complies with manufacturer's instructions and warranty requirements.

3.8 CLEANING

A. Remove excess adhesive before adhesive sets.

B. Clean exposed roofing surfaces. Remove contaminants and stains to comply with specified solar reflectance performance.

3.9 PROTECTION

A. Protect roofing system from traffic and construction operations.

1. Protect roofing system when used for subsequent work platform, materials storage, or staging.

2. Distribute scaffolding loads to exert maximum 50 percent roofing system materials compressive strength.

3. Provide a crane lift plan 28 days prior to the start of construction on Building 32.

B. Loose lay temporary insulation board overlaid with plywood or OSB.

1. Weight boards to secure against wind uplift.

C. Remove protective materials immediately before acceptance.

D. Repair damage.

- - - E N D - - -

07 54 23 - 14

---INTENTIONALLY BLANK---

SECTION 07 54 23
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
PART 1 - GENERAL
1.1 SUMMARY
1.2 RELATED WORK
1.3 APPLICABLE PUBLICATIONS
1.4 PREINSTALLATION MEETINGS
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.7 DELIVERY
1.8 STORAGE AND HANDLING
1.9 FIELD CONDITIONS
1.10 WARRANTY
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 SYSTEM PERFORMANCE
2.3 PRODUCTS - GENERAL
2.4 TPO ROOFING MEMBRANE
2.5 MEMBRANE ACCESSORY MATERIALS
2.6 ACCESSORIES
PART 3 - EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.3 TEMPORARY PROTECTION
3.4 INSTALLATION - GENERAL
3.5 ROOFING INSTALLATION
3.6 FLASHING INSTALLATION
3.7 FIELD QUALITY CONTROL
3.8 CLEANING
3.9 PROTECTION