Attachment 11 - CABLE MATRICES.pdf

PDF 24 KB Posted

Attached to
Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
Solicitation number
36c77624b0025
Issued by

About this file

This document appears to be an attachment containing a Cable Matrices that details the number of cables in various rooms and buildings related to a federal contract opportunity.

The Cable Matrices provides a detailed inventory of the number of cables in different rooms and floors across multiple buildings. It includes information such as the building number, floor number, room number, and the number of cables in each location. The document also includes some comments on recent renovations and the types of cabling (OI&T versus BIOMED).

The related federal contract opportunity is for the construction of Electronic Health Record Modernization (EHRM) infrastructure upgrades at the Ann Arbor VA Medical Center, with a solicitation number of 36c77624b0025. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM 10 16 2024.pdf PDF
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM.pdf PDF
IFB 36C77624B0025 Amendment 0005 Asbestos Info.pdf PDF
IFB 36C77624B0025 Amendment 0004.pdf PDF
36C77624B0025 Amendment 0003.pdf PDF
S05 Ann_Arbor CMS_Question_Matrix_V3.xlsx XLSX spreadsheet
Attachment 12 - EHRM Window Screen Details.pdf PDF
Attachment 08 - 075423 TPO Roofing.pdf PDF
Attachment 14 - MS Versions of PDFs.zip ZIP file
Attachment 07 - 013323 Shop Drawings_CA Edits 2.pdf PDF
Attachment 02 - 1E.ET472.pdf PDF
Attachment 06 - 000110 TOC - updated TPO and 236323.pdf PDF
Attachment 04 - 21-092 SubReg 100 Percent.pdf PDF
Attachment 10 - Addendum 1.pdf PDF
Attachment 09 -236323 AirCooledClosedCircuitFluidCooler.pdf PDF
36C77624B0025 0002.docx DOCX document
Attachment 05 - 21-092-Pre-Bid RFIs_AE responses 1.pdf PDF
Attachment 15 - DB WR GD No MI20240100 09062024.pdf PDF
Attachment 03 - 1W.A-491_Addendum 1.pdf PDF
Attachment 01 - Q and A Results Ann Arbor MI.docx DOCX document
Attachment 13 - G-003_Addendum 1.pdf PDF
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.pdf PDF
S04 - Virtual Visit Attendee List - 08 29 2024.docx DOCX document
36C77624B0025 Ammendment 0001.docx DOCX document
S04 -Virtual and Site Visit Agenda - IFB 2024 08 29 2024.doc DOC document
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.docx DOCX document
Attachment 02_Drawings 07122024 Part 1.pdf PDF
Attachment 04_Drawings 07122024 Part 3.pdf PDF
Attachment 11 Division Breakdown Template.xls XLS spreadsheet
Attachment 06_Drawings 07122024 Part 5.pdf PDF
Attachment 05_Drawings 07122024 Part 4.pdf PDF
Attachment 08_Limitations on Subcontracting - Construction.docx DOCX document
Attachment 03_Drawings 07122024 Part 2.pdf PDF
Attachment 07_Drawings 07122024 Part 6.pdf PDF
Attachment 09_JA Ann Arbor Final REDACTED.pdf PDF
Attachment 10 DB Wages General Decision Number MI20240100 07 26 24.pdf PDF
Attachment 01_Specifications Ann Arbor MI.pdf PDF
36C77624B0025_1.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING NUMBER FLOOR NUMBER ROOM NUMBER

NUMBER OF

CABLES COMMENTS

1W BASEMENT CB03 144

1W FIRST C-103B 0 RECENTLY RENOVITED TR. NO CABLES TO REPLACE OR MOVE.

1W SECOND C2 0 NO OI&T CABLING. ONLY BIOMED CABLING.

1W THIRD C3-1A 0 NO OI&T CABLING. ONLY BIOMED CABLING.

1W FOURTH C4-1A 72

1W FIFTH C5-1A 96

1W SIXTH C6-1A 0 NO OI&T CABLING. ONLY BIOMED CABLING.

1W SEVENTH C7-1A 144

1W EIGHTH C8-1A 48

BUILDING NUMBER FLOOR NUMBER ROOM NUMBER

NUMBER OF

CABLES COMMENTS

1E BASEMENT DB60A 414

1E BASEMENT EB60A 487

1E FIRST D178A 624

1E FIRST E178A 493

1E FIRST L133 158

1E THIRD D312A 504

1E THIRD E321A 467

1E FIFTH D530A 523

1E FIFTH E530A 432

1E SEVENTH D712A 602

1E SEVENTH E718A 432

1W BASEMENT AB29 240

1W BASEMENT BB26 216

1W BASEMENT BB94 60

1W FIRST A149 480

1W FIRST B143 432

1W SECOND B231 288

1W SECOND A237 336

1W THIRD A339 336

1W THIRD B310B 96

1W FOURTH A437 192

1W FOURTH B432A 158

1W FIFTH A535 144

1W FIFTH B525A 224

1W SIXTH A633A 364

1W SIXTH B618A 112

1W SEVENTH A753 384

1W SEVENTH B722A 96

1W EIGHTH A843A 240

1W EIGHTH B812 96

1W NINTH A921A 240

28 BASEMENT FG86 112

28 FIRST F152 237

28 SECOND F224 0 NEW TR

02 SECOND 210 165

03 BASEMENT 02C 128

15 FIRST 15-2 48

22 GROUND G12 125

22 FIRST 8 124

29 A AA6 48

29 B EPS-B2 48

30 B WPS-B02 66

30 D WPS-D02 48

31 BASEMENT 27 48

31 FIRST 117 92

31 SECOND 218 112

32 BASEMENT 3 35

37 BASEMENT 6 384

37 FIRST 118 192

37 SECOND 217 123

37 THIRD 317 77

C STACK RE-CABLING MATRIX

TR EXISTING CABLE MATRIX

File details come from the government source that posted it. Updated .