About this file

This document is a solicitation for a firm-fixed-price construction contract to perform Electronic Health Record Modernization (EHRM) infrastructure upgrades at the Ann Arbor VA Medical Center. The procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) certified by the Small Business Administration. The project has a North American Industry Classification System (NAICS) code of 236220 - Commercial and Institutional Building Construction and an estimated value between $10-20 million. Bids are due by 9am EDT on September 23, 2024 and must include a bid guarantee of 20% of the bid price or $3 million, whichever is less. The government will award to the responsible bidder whose conforming bid is the lowest price. The contractor must complete the work within 720 calendar days after receiving the notice to proceed.

View the file

Other files

File Type Posted
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM 10 16 2024.pdf PDF
S07 - Complete Abstract of Bids OF 1419- Ann Arbor EHRM.pdf PDF
IFB 36C77624B0025 Amendment 0005 Asbestos Info.pdf PDF
IFB 36C77624B0025 Amendment 0004.pdf PDF
36C77624B0025 Amendment 0003.pdf PDF
S05 Ann_Arbor CMS_Question_Matrix_V3.xlsx XLSX spreadsheet
Attachment 12 - EHRM Window Screen Details.pdf PDF
Attachment 08 - 075423 TPO Roofing.pdf PDF
Attachment 14 - MS Versions of PDFs.zip ZIP file
Attachment 07 - 013323 Shop Drawings_CA Edits 2.pdf PDF
Attachment 02 - 1E.ET472.pdf PDF
Attachment 06 - 000110 TOC - updated TPO and 236323.pdf PDF
Attachment 11 - CABLE MATRICES.pdf PDF
Attachment 04 - 21-092 SubReg 100 Percent.pdf PDF
Attachment 10 - Addendum 1.pdf PDF
Attachment 09 -236323 AirCooledClosedCircuitFluidCooler.pdf PDF
36C77624B0025 0002.docx DOCX document
Attachment 05 - 21-092-Pre-Bid RFIs_AE responses 1.pdf PDF
Attachment 15 - DB WR GD No MI20240100 09062024.pdf PDF
Attachment 03 - 1W.A-491_Addendum 1.pdf PDF
Attachment 01 - Q and A Results Ann Arbor MI.docx DOCX document
Attachment 13 - G-003_Addendum 1.pdf PDF
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.pdf PDF
S04 - Virtual Visit Attendee List - 08 29 2024.docx DOCX document
36C77624B0025 Ammendment 0001.docx DOCX document
S04 -Virtual and Site Visit Agenda - IFB 2024 08 29 2024.doc DOC document
S04 - Pre-Bid Site Visit Sign-in Sheet - 09 04 2024.docx DOCX document
Attachment 02_Drawings 07122024 Part 1.pdf PDF
Attachment 04_Drawings 07122024 Part 3.pdf PDF
Attachment 11 Division Breakdown Template.xls XLS spreadsheet
Attachment 06_Drawings 07122024 Part 5.pdf PDF
Attachment 05_Drawings 07122024 Part 4.pdf PDF
Attachment 08_Limitations on Subcontracting - Construction.docx DOCX document
Attachment 03_Drawings 07122024 Part 2.pdf PDF
Attachment 07_Drawings 07122024 Part 6.pdf PDF
Attachment 09_JA Ann Arbor Final REDACTED.pdf PDF
Attachment 10 DB Wages General Decision Number MI20240100 07 26 24.pdf PDF
Attachment 01_Specifications Ann Arbor MI.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 83

36C77624B0025 X

08-22-2024

506-21-705

36C776

N/A

Emil Reyes Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

Emil D. Reyes (216) 447-8300

In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran - Owned Small Business (SDVOSB) Set-Aside.

The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall perform all work necessary that will result in the completion of the EHRM Infrastructure Upgrade Construction Project at the Ann Arbor VA Medical Center , in accordance with the attached specifications and drawings.

The project is located at the:

Ann Arbor VA Medical Center (Lieutenant Colonel Charles S. Kettles VA Medical Center) 2215 Fuller Road Ann Arbor, MI 48105-2303

North American Industry Classification System (NAICS): 236220 – Commercial and Institutional Building Construction

VAAR Magnitude of Construction: $10,000,000 to $20,000,000

PLEASE NOTE: The Contractor agrees to attend any post award conference convened by the contracting activity.

PLEASE NOTE: Submissions are due at 9am, bid opening will start at 9:30am.

14 720

X X 52.211-10

X 10

0 9am EDT

09-23-2024

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

VAFSC

Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 BID MATERIAL:

1.2 BID GUARANTEE:

1.3 PAYMENT & PERFORMANCE BONDS:

1.4 TAXES:

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

2.2 INVITATION FOR BID:

2.3 SDVOSB SET-ASIDE:

2.4 TECHNICAL QUESTIONS:

2.5 AMENDMENTS:

2.6 PRE-BID SITE VISIT:

2.7 PREPARATION OF BIDS:

2.8 BID SUBMISSION:

2.9 DETERMINATION OF NON-RESPONSIVE:

2.10 DETERMINATION OF RESPONSIBILITY:

2.11 VETS 4212:

2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):

2.13 CONTRACT AWARD:

2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT

MANAGER:

2.17 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

2.18 52.216-1 TYPE OF CONTRACT (APR 1984)

2.19 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014)

2.20 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.21 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023)

2.22 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014)

2.23 52.228-1 BID GUARANTEE (SEP 1996)

2.24 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.25 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995)

2.26 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

2.27 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

2.28 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.29 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.30 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.31 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024) ...28

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND

REPRESENTATION (JUN 2020)

GENERAL CONDITIONS

4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)

4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (NOV 2021)

4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(FEB 2024)

4.5 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT

FOR EPA-DESIGNATED ITEMS (MAY 2008)

4.6 52.223-20 AEROSOLS (MAY 2024)

4.7 52.223-21 FOAMS (MAY 2024)

4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.10 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024)

4.11 52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING

POTENTIAL HYDROFLUOROCARBONS (MAY 2024)

4.12 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN

1997)

4.13 52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)

4.14 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN

2020)

4.15 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:

4.16 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.17 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.18 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)

4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.23 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL

PRODUCTS (APR 2019)

4.24 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY (FEB 2023)

4.25 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.26 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..70

4.27 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.28 MANDATORY WRITTEN DISCLOSURES

4.29 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.30 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.31 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.32 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY

(FEB 2023)

4.33 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.34 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.35 LIST OF ATTACHMENTS

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVIC

ES

QUANTIT

Y

UNI

T UNIT PRICE AMOUNT

1.00 JB ________________

GENERAL CONSTRUCTION: Base Bid: Work includes selective demolition, general construction, and alterations (including necessary removal of existing structures and construction and certain other items). Work includes all labor, material, equipment and supervision to perform the required demolition and construction work on this project including Architectural Modifications, Fire Protection Systems, Plumbing Systems, Mechanical Systems, Electrical Systems, and Telecommunications Systems as described in the Specifications and indicated on the construction documents and drawings.

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL ________________

NOTICE

1. Line Item 0001 (Base Bid) contains all the work for this project.

2. Bidders must provide a lump sum price for Line Item 0001 (Base Bid). Failure to do so may render their bid as nonresponsive.

3. Award will be made on Grand Total (Line Item 0001 - Base Bid).

4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.

5. Contractor is required to fill in their Unique Entity Identifier number associated with

SAM.gov in Block No. 14 on Standard Form (SF) 1442.

6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE

AND BONDS

1.1 BID MATERIAL:

Bid materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Invitation for Bid (IFB). The VA will not provide printed copies of drawings or specifications.

It is the responsibility of the offeror to obtain the bid materials in a time and manner sufficient to respond to this solicitation by the specified due date.

1.2 BID GUARANTEE:

A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of bids, will result in the rejection of the bid. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for a hard copy original bond, with the original signatures, notarization and seals has been eliminated. The bid bond must be submitted electronically as part of the bid package.

1.3 PAYMENT & PERFORMANCE BONDS:

The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds must be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds – Construction (DEVIATION). Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

1.4 TAXES:

Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.

http://www.gsa.gov/portal/forms/type/TOP http://www.gsa.gov/portal/forms/type/TOP

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

All solicitation related documents will be published to Contract Opportunities https://Sam.gov.

2.2 INVITATION FOR BID:

This solicitation is being issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.

2.3 SDVOSB SET-ASIDE:

This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSB concerns will not be considered.

All SDVOSBs must be listed as “certified” by the Small Business Administration (SBA) Veteran Small Business Certification (VetCert). Bidders must be certified in the SBA VetCert database (Veteran Small Business Certification (sba.gov)) at TIME OF SUBMISSION OF BIDS AND TIME OF AWARD. Failure to be certified at the time of bid submission and time of award will result in the offeror’s bid being non-responsive.

2.4 TECHNICAL QUESTIONS:

Questions of a technical nature must be provided in writing and must be submitted by the prospective offerors to Emil Reyes and David Mark. Questions must be submitted only via e-mail to: Emil.Reyes@va.gov and David.Mark2@va.gov. The subject line must read: Ann Arbor VAMC – EHRM Infrastructure Upgrades, Construction - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS September 9, 2024 at 1PM ET.

2.5 AMENDMENTS:

Amendments to this solicitation will be posted at https://Sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your bid being considered non-responsive.

2.6 PRE-BID SITE VISIT:

A formal site visit has been scheduled for this project. This will be the only opportunity for potential bidders to visit the site. See FAR Clause 52.236-27 of this solicitation for further information.

All potential bidders, subcontractors and suppliers are strongly encouraged to attend this site visit.

https://sam.gov/ https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fveterans.certify.sba.gov%2F&data=05%7C01%7C%7C8e7e79ec26e24b76315a08dafed3d7c1%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638102483047735633%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=A6miKyttg2IAFGmDSciek4gm%2FPoHYc%2F0Uqk6dvC9Wlg%3D&reserved=0 mailto:Emil.Reyes@va.gov mailto:David.Mark2@va.gov https://sam.gov/

2.7 PREPARATION OF BIDS:

The Government will not pay for any costs incurred in preparation and submission of bids.

2.8 BID SUBMISSION:

A. GENERAL:

(a) Offerors must submit their bids via email to: Emil.Reyes@va.gov and David.Mark2@va.gov.

(b) Only electronic bids will be accepted. No original or hard copies will be accepted.

(c) The bid opening will be conducted via teleconference. An in person bid opening will not be facilitated.

(d) The bid bond shall be submitted as part of the electronic submission. In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for an original bond, with the original signatures, notarization and seals has been eliminated. Also refer to FAR 52.228-15 (DEV APR 2020).

(e) Failure to provide electronic bids and the electronic copy of the bid bond on the date and time set for bid opening, will deem the bid non-responsive.

B. BID PACKAGE CONTENTS:

(a) Standard Form (SF) 1442 Solicitation, Offer and Award:

The Offeror must complete & sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier number associate with SAM.gov in Block 14.

(b) Acknowledgement of All Amendments:

The offeror must acknowledge all amendments by either 1.) Completing block 19 of the SF 1442, or 2.) Returning the signed amendment form(s) with the submission.

(c) Price Schedule:

The Offeror must complete the Price Schedule contained in the solicitation. The Offeror must submit separate pricing for all items listed. Bidders not submitting the Price Schedule will be deemed non-responsive and therefore ineligible for award.

(d) Bid Guarantee:

The Offeror must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on Standard Form 24.

(e) Representations & Certifications:

mailto:Emil.Reyes@va.gov mailto:David.Mark2@va.gov

The offeror must provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.

(f) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:

Offeror must provide their response to FAR 52.204-24 (d) Representation.

(g) Information Regarding Responsibility Matters:

Offeror must provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

(h) Violation of Arms Controls Treaties or Agreements:

Offeror must provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.

(i) Tax on Certain Foreign Procurements:

Offeror must provide their response to FAR 52.229-11 (d)

(j) Post Award Small Business Program Representations:

Offeror must provide their response to FAR 52.219-28 (h), if applicable.

(k) Limitations on Subcontracting:

In accordance with VAAR 852.219-75, offeror must complete ATTACHMENT 08 - VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction and return with their bid submission. Completed form will become part of the official award documentation.

Failure to submit the signed certification with the offeror’s bid will deem the bid non-responsive.

(l) Notice to SDVOSB Joint Venture/Mentor Protegee:

Any offeror submitting a bid as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s bid will deem the bid non-responsive.

C. BID OPENING:

(a) Bids will be publicly read aloud. A conference line will be announced via an amendment to the solicitation approximately seven (7) calendar days prior to the receipt date for bids.

(b) In the event there are any concerns with the bids, in accordance with FAR 14.402-1 (c), Microsoft Teams will be used to assist in the examination of the bid(s).

2.9 DETERMINATION OF NON-RESPONSIVE:

Bids received pertaining to this solicitation will be reviewed for responsiveness. Failure to provide documentation as outlined in the Bid Submission section of the solicitation, at the date and time set for bid opening may deem the bid non-responsive.

2.10 DETERMINATION OF RESPONSIBILITY:

A Determination of Responsibility will be conducted for the apparent “low bidder/awardee” prior to award of the project. The above information, along with other information obtained from Government systems, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.

2.11 VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:

http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered in SAM from the time an offer is submitted through the time of award in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).

2.13 CONTRACT AWARD:

Award may only be made with the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the government, considering only price (see FAR 52.214-19). The low price will be evaluated by the Contracting Officer prior to award to confirm that it is “a fair and reasonable price that is most advantageous to the Government.”

2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

PERFORMANCE ASSESSMENT SYSTEM (CPARS):

As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the http://www.dol.gov/vets/vets4212.htm http://www.sam.gov/ system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438- 1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.

For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report will be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.

2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT

CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements. If the site requires an investigation, the contractor must follow VA Directive 0710.

2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT

MANAGER:

Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations must be replaced with “Contracting Officer’s Representative (COR).”

2.17 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.

(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.

(End of Clause)

2.18 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.19 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

FAR

Number

Title Date

52.222-7 WITHHOLDING OF FUNDS MAY 2014

52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015

2.20 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

8.5 % 6.9 % These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

Ann Arbor, MI

(End of Provision)

FAR

Number

Title Date

52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS

UNDER EXECUTIVE ORDER 14026

JAN 2022

2.21 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023)

(a) Definitions. As used in this clause—

Bahraini, Mexican, or Omani construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of Bahrain, Mexico or Oman; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in Bahrain, Mexico, or Oman into a new and different construction material distinct from the materials from which it was transformed.

Caribbean Basin country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of ‘‘commercial product’’ at Federal Acquisition Regulation (FAR) 2.101;

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at

FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, North Macedonia, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both—

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of ‘‘cost of components’’.

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States.

Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Free Trade Agreement country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country;

or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

Least developed country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. (See United States-Mexico-Canada Agreement 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and all the Free Trade Agreements except the Bahrain FTA, United States-Mexico-Canada Agreement, and the Oman FTA apply to this acquisition. Therefore, the Buy American statute restrictions are waived for designated country construction materials other than Bahraini, Mexican, or Omani construction materials.

(2) The Contractor shall use only domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

N/A

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(4)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(4)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description

Unit of Measure

Quantity Price (Dollars)*

Item 1:

Foreign Construction Material Domestic Construction Material

Item 2:

Foreign Construction Material Domestic Construction Material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]