This document is a key personnel qualifications template for Solicitation 36C77626R0041 for EHRM Infrastructure Upgrades in Hampton, VA. The template provides standardized forms for offerors to submit qualifications for four key personnel positions required on the project.

The document contains separate qualification forms for four positions: Project Manager, Onsite Superintendent, Site Safety & Health Officer (SSHO), and CQC Systems Manager. Each form requires submission of general information (name, project role, and years with company), educational background, and demonstration of relevant experience. Project Manager and Onsite Superintendent positions require documentation of five years of construction supervision experience and submission of narratives describing two completed projects similar in size and scope, including project title, location, owner, project value, and completion date. The SSHO position requires demonstration of minimum experience outlined in Specifications Section 01 35 26, Sections 1.7 and 1.8. The CQC Systems Manager position requires demonstration of minimum experience outlined in Specifications Section 01 45 00, Section 3.2 Subpart B. All submitted qualifications will be incorporated into the offeror's proposal and will count toward the page limitation specified in the CON 100 Instructions to Offerors. One form must be submitted for each key personnel position requested.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 36C77626R0041 | EHRM INFRASTRUCTURE UPDGRADES HAMPTON, VA.

Project Manager (Qualifications) *Qualifications should be provided back to the requestor to incorporate into their proposal, all

Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. PROJECT MANAGER GENERAL INFORMATION

• Name: ________________________________

• Project Role: ________________________________

• Years With Company: ________________________________

2. EDUCATIONAL BACKGROUND

3. INFORMATION DEMONSTRATING 5 YEARS OF CONSTRUCTION SUPERVISION

EXPERIENCE

4. PROJECT NARRATIVE DEMONSTRATING TWO COMPLETED PROJECTS SIMILAR

IN SIZE AND SCOPE

• Project Title: ________________________________

• Location: ________________________________

• Owner: ________________________________

• Project Value: ________________________________

• Completion Date: ________________________________

Project Narrative:

Onsite Superintendent (Qualifications)

Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. ONSITE SUPERINTENDENT GENERAL INFORMATION

• Name: ________________________________

3. INFORMATION DEMONSTRATING 5 YEARS OF CONSTRUCTION SUPERVISION

EXPERIENCE

4. PROJECT NARRATIVE DEMONSTRATING TWO COMPLETED PROJECTS SIMILAR

IN SIZE AND SCOPE

• Project Title: ________________________________

• Location: ________________________________

• Owner: ________________________________

• Project Value: ________________________________

• Completion Date: ________________________________

Project Narrative:

Site Safety & Health Officer (SSHO) (Qualifications)

Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. SSHO GENERAL INFORMATION

• Name: ________________________________

3. INFORMATION DEMONSTRATING MINIMUM EXPERIENCE OUTLINED IN

SPECIFICATIONS SECTION 01 35 26, SECTIONS 1.7 AND 1.8.

CQC System Manager (Qualifications)

Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. CQC SYTEMS MANAGER GENERAL INFORMATION

• Name: ________________________________

3. INFORMATION DEMONSTRATING MINIMUM EXPERIENCE OUTLINED IN

SPECIFICATIONS SECTION 01 45 00 SECTIONS 3.2 SUBPART B