Att. 3 - Brand Name Justification.pdf

PDF 212 KB Posted

Attached to
Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
Solicitation number
36C77626R0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a Justification and Approval (J&A) document for other than full and open competition for a federal construction procurement.

The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is seeking to award RFP 36C77626R0041 for the EHRM Infrastructure Upgrades project at the Hampton VA Health Care System in Hampton, Virginia as a firm-fixed-price contract. The overall project value falls between $10,000,000 and $50,000,000 under VAAR construction magnitude. The procurement will be competed as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The VA is requesting approval to specify three brand-name systems without accepting equal or alternate items: Bosch BVMS 12.3 security camera and monitoring system, Lenel OnGuard 8.2 physical security access control system, and Edwards EST 4 fire alarm system. The justification for single-source procurement is based on 41 USC §3304(a)(1)—only one responsible source and no other supplies or services will satisfy agency requirements—due to standardization needs throughout the facility. Using alternative manufacturers would create significant cost duplication and operational incompatibility with existing systems, compromise system integrity, and eliminate access to factory-trained OEM emergency service support within required travel times. The VA completed market research confirming Buy American Act compliance for all three systems. Specific pricing values are redacted in the document. The J&A was signed by Aaron M. Roberts (Healthcare Engineer, Hampton VA Health Care System) on 5/5/26, with contracting officer certification by Scott Elias on 5/5/26 and supervisory approval by Jesse Hobbs (Supervisory Contracting Officer) on 5/5/2026.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. 590-22-700 EHRM Infrastructure Upgrades – Hampton, VA

VHAPG Part 806.3 OFOC Page 1 of 6 Revision: 04 Effective Date: 12/15/25 Acquisition ID#: 36C77626AP0493

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A for Other Than Full and Open Competition

Acquisition Plan Action ID: 36C77626AP0493

1. Contracting Activity:

Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) The proposed procurement, Request for Proposal (RFP) 36C77626R0041 is for the EHRM Infrastructure Upgrades – Hampton, VA project at the Hampton VA Health Care System in Hampton, VA..

2. Nature and/or Description of the Action Being Approved:

This justification is to support the EHRM Infrastructure Upgrades project at the VAMC that will be awarded as a firm-fixed price contract. This justification is for other than full and open competition for the procurement of certain construction materials. The use of a particular brand name for the items listed below accommodate standardization of these items throughout the facility.

a. Security camera and monitoring system

i. Bosch BVMS 12.3

b. Physical security access control system

i. Lenel OnGuard 8.2

c. Fire alarm system

i. Edwards 4

3. Description of Supplies/Services Required to Meet the Agency’s Needs:

This procurement is for the EHRM Infrastructure Upgrades project at the VAMC. The scope includes everything necessary to complete the EHRM Infrastructure Upgrades project that meets the requirements of the Department of Veterans Affairs. There are three (3) brand name items listed for which the VA is not able to accept equal or alternate items. The value of the items are listed below. The VAAR Construction magnitude for the entire project is between $10,000,000 and $50,000,000.

ii. Value:

iii. Description: Complete installation, programming, and licensing of digital cameras that is compatible with existing BVMS 12.3 to ensure and maintain proper operation of the video surveillance system.

b. Physical security access control system

i. Lenel OnGuard 8.2

ii. Value:

iii. Description: Complete installation and programming of card readers and communication components matching existing OnGuard 8.2 to ensure and maintain proper operation of the existing physical access control

VHAPG Part 806.3 OFOC Page 2 of 6 Revision: 04 Effective Date: 12/15/25 Acquisition ID#: 36C77626AP0493 system (PACS). Safeguarding access to all areas of the medical center to only authorized personnel only.

c. Fire alarm system

i. Edwards EST 4

ii. Value:

iii. Description: Complete installation and programming of fire alarm initiating and notification appliances matching existing to ensure and maintain proper operation of the existing fire alarm system.

4. Statutory Authority Permitting Other than Full and Open Competition:

(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by RFO 6.103- 1;

( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by

RFO 6.103-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by RFO 6.103-3;

( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by RFO 6.103-

( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by

RFO 6.103-5;

( ) (6) National Security per 41 USC §3304(a)(6) as implemented by RFO 6.103-6;

( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by RFO 6.103-7;

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):

These items have been standardized throughout the VAMC. Installing a different manufacturers’ systems will create significant duplication in costs for the facility, and in most cases the equipment will not function properly. The specific impact for not using the brand name items is listed below:

ii. Impact: Any other devices and equipment not of the existing manufacturer may not provide correct interface and operability with existing monitoring, recording, and control equipment. The video surveillance system is crucial for safeguarding patients, visitors, staff, and the facility against unlawful and unauthorized activities. Modifications of the existing system without the correct original equipment manufacturer (OEM) components and service can compromise the integrity of the entire system. Factory trained and authorized service must be located and supported by OEM within a limited travel time to provide emergency service support.

b. Physical security access control system

i. Lenel OnGuard 8.2

ii. Impact: Any other devices and equipment not of the existing manufacturer may not provide correct interface and operability with existing PACS. The

VHAPG Part 806.3 OFOC Page 3 of 6 Revision: 04 Effective Date: 12/15/25 Acquisition ID#: 36C77626AP0493

PACS is vital for authorized personnel to access key areas to provide direct patient care and safeguard critical operations of the facility.

Modifications of the existing without the correct OEM components and service can compromise the integrity of the entire system. Factory trained and authorized service must be located and supported by OEM within a limited travel time to provide emergency service support.

c. Fire alarm system

i. Edwards EST 4

ii. Impact: Any other devices and equipment not of the existing manufacturer may not provide correct interface and operability with the existing fire protection system. The fire protection system is critical for safeguarding patients, visitors, staff, and facilities. Modifications of the existing without the correct OEM components and service can compromise the integrity of the entire system. Factory trained and authorized service must be located and supported by OEM within a limited travel time to provide emergency service support.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as possible (including whether a notice was or will be publicized as required by RFO Part 5 and, if not, which exception under RFO Part 5 applies):

In accordance with the Competition in Contracting Act (CICA), the components listed above are identified as brand name; however, the overall procurement will be competed as a Service-Disabled Veteran-Owned Small-Business (SDVOSB) set-aside. This Justification for Other Than Full and Open Competition will be posted to Contract Opportunities with the solicitation.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable:

The Government estimate was prepared by the VA team and confirmed by the Contracting Officer’s Representative (COR). The anticipated price to the Government for the items requested to be brand name is approximately

The items for which brand name approval is being requested are subsequent components to the overall construction project. This procurement will be competed and based on competition; the CO will make a determination of fair and reasonable pricing prior to award.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted:

The market research for the required brand name items was conducted and prepared by the COR and A/E. This information was then shared with the CO for further review. The CO was in concurrence with information provided that supported these brand name items. Approval of the items as brand name only is critical for the overall efficiency of the completed project and the entire VAMC.

VHAPG Part 806.3 OFOC Page 4 of 6 Revision: 04 Effective Date: 12/15/25 Acquisition ID#: 36C77626AP0493

The market research concerning the required brand name items was previously conducted when the procurement of these items were originally purchased. The manufacturers and products are exclusively acceptable for reasons outlined in this J&A.

An additional purpose of the market research was to ensure requirements of the Buy American Act (BAA) has been met for each of the brand name items identified. The A/E team reviewed each of the compliance standards for the BAA and compared it with the components in each of the brand name items. After their thorough review, they have concluded that each item is in compliance with the BAA. See an overview below for each item:

1) Security camera and monitoring system – Bosch BVMS 12.3

i. Based on extensive review Bosch BVMS 12.3 is part of the Bosch

Security and Safety Systems portfolio, which is developed and produced by Bosch Sicherheitssysteme GmbH in Munich, Germany and meets requirements listed under 52.225-5 Trade Agreements.

2) Physical security access control system – Lenel OnGuard 8.2

ii. Based on extensive research online, it has been confirmed that this system is manufactured in Pittsford, New York, USA. Therefore, there are no concerns regarding the “Buy American Act” compliance.

3) Fire alarm system – Edwards EST 4

iii. Based on review of the GSA Advantage Catalog, it has been determined that the Edwards EST 4 system is available for purchase. GSA schedule contractors are required to comply with the requirements at FAR 52.225-5 Trade Agreements. Therefore, there are no concerns regarding the “Buy American Act” or the “Trade Agreements Act” compliance.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition:

The new components (software and servers) must be able to tie into the existing and operational systems including the use of existing hardware. At this time, there are no competing vendors who have the programming rights to the systems, and products must be fully compatible with the existing systems being used at the VAMC.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition:

Not applicable. It is the responsibility of the offerors and the general contractor awarded the project to locate suppliers and obtain pricing for all materials and components, including the items listed in this justification.

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required:

There will be competition for the overall procurement. It will be the responsibility of the offerors to obtain pricing from the suppliers of the items and to submit a competitive proposal for the project.