Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf
PDF 34 MB Posted
- Attached to
- Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
- Solicitation number
- 36C77626R0041
About this file
This document is a comprehensive set of final construction drawings organized by discipline for the EHRM Infrastructure Upgrades project at Hampton VA Medical Center in Hampton, Virginia (Project Number 590-22-700). The drawings were prepared by SPEES Design Build and issued at 100% Construction Documents level on July 18, 2025, by the Office of Construction and Facilities Management for the U.S. Department of Veterans Affairs.
The mechanical drawings (Set 3 of 8) encompass HVAC system installations across multiple buildings (007-011, 013, 014, 015, 017, 018, 027, 028, 031, 033, 035, 036, 037, 043, 048, 066, 083, 110, 110A, 110B, 113, 114, 116, 137, 146, 148, 148T, 168, and 173) at the medical center. Key products and services include Variable Refrigerant Flow (VRF) systems with wall-mounted indoor units (Daikin FXAQ24PVJU units with 20,246 BTU/h capacity), ductless split cooling units (various capacities), ceiling-mounted fan coil units, and Computer Room Air Conditioning (CRAC) units. The specifications require refrigerant piping installation per ASHRAE 15-2022, condensate line routing with moisture sensors, pipe insulation per Section 23 07 11, and pipe support per Section 23 05 11. Additionally, the drawings include fire protection modifications with new sprinkler installations, demolition of existing HVAC equipment, ductwork modifications, and coordination with mechanical and electrical contractors. All equipment features BACnet control interface integration with Building Management Systems, low ambient temperature controls, and crank case heaters. The drawings provide detailed floor plans, reflected ceiling plans, enlarged details, equipment schedules, and general notes for complete HVAC system replacement and upgrades across the facility.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C
(E)16"x8"
(E)16"x10"
12 13
(E)12"x6"
(E)14"x6"
T
OFFICE
102A
STAIRWELL
OFFICE
102E
ANTEROOM
A B C
TR
102A
STAIRWELL
ANTEROOM
OFFICE
102E
066-VRF-01-102A
066-CU-01-102A8
6 7
066-CU-02-202F8
R L /R
S
T
H
M R
3/8"Ø, 5/8"Ø
(E)16"x8"
(E)16"x10"
3/8"Ø, 5/8"Ø2
3/4"Ø3
D
066-VRF-02-102A 1
RL/RS
T
A B C
12 13
A B C
TR
102A
STAIRWELL
OFFICE
102E
ANTEROOM
EXPOSED
OFFICE
102A
STAIRWELL
OFFICE
102E
ANTEROOM
102A
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:3
:0 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
066-M-401
BLDG 066 - LVL 01 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"1
RM 102A - DEMOLITION FLOOR PLAN
1/4" = 1'-0"3
RM 102A - FLOOR PLAN
1/4" = 1'-0"2
RM 102A - DEMOLITION RCP
1/4" = 1'-0"4
RM 102A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING
UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU
WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISH
FLOOR LEVEL BEFORE PENETRATING WALL.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL
REFRIGERATION LINESET COVER TO CONCEAL
REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
SEE "CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL"
ON SHEET M-501.
DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.
TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET
066-M-402.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.
ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE
SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN
UPRIGHT POSITION.
DEMOLISH EXISTING ABANDONED SANITARY PIPES.
REMOVE AND RETAIN EXISTING THERMOSTAT. SEE
KEYNOTE #18 FOR RE-INSTALLATION.
CONDENSATE TO BE DISCHARGED TO THE GROUND.
TERMINATE CONDENSATE PIPING WITH A DOWNTURNED
ELBOW 12" ABOVE FINISHED GRADE.
INSTALL RETAINED THERMOSTAT. SEE KEYNOTE #16.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
Revisions: Date:
7/18/25 201 of 713
202F
A B C
(E)16"x10"
(E)12"x6" (E)18"x10"
(E)14"x10"
T
OFFICE
202G
OFFICE
OFFICE
202F
STAIRWELL
A B C
TR
202F
STAIRWELL
OFFICE
OFFICE
202G
066-VRF-03-202F
T
H
M
R
(E)16"x10"
(E)18"x10"
RL/RS
D
3/8"Ø, 5/8"Ø 2
R L /R
S D
3/4"Ø
066-VRF-04-202F 1
T
A B C
OFFICE
202F
STAIRWELL
OFFICE
202G
OFFICE
A B C
TR
202F
STAIRWELL
OFFICE
202G
OFFICE
EXPOSED
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:3
:0 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
066-M-402
BLDG 066 - LVL 02 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"1
RM 202F - DEMOLITION FLOOR PLAN
1/4" = 1'-0"3
RM 202F - FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"2
RM 202F- DEMOLITION RCP
PROJECT
NORTH
1/4" = 1'-0"4
RM 202F - RCP
PROJECT
NORTH
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING
UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL
REFRIGERATION LINESET COVER TO CONCEAL
REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
066-M-401.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.
ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE
SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN
UPRIGHT POSITION.
REMOVE AND RETAIN EXISTING THERMOSTAT. SEE
KEYNOTE #14 FOR RE-INSTALLATION.
DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.
INSTALL RETAINED THERMOSTAT. SEE KEYNOTE #12.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
Revisions: Date:
7/18/25 202 of 713
A B
C D E F G H
MULTIPURPOSE
ROOM
TR
MECHANICAL
ROOM
ANTIROOM
WOMEN'S
RESTROOM
BA-104I
MEN'S
RESTROOM
083-M-401
083-M-401
083-M-401
083-M-401
BUILDING 083
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:4
:2 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
083-M-101
BLDG 083 - LVL 01 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"1
BLDG 083 - LVL 01 - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date:
7/18/25 203 of 713
A B
2 OFFICE
MEHANICAL
ROOM
MULTIPURPOSE
ROOM
TR
M
T
H
A B
MULTIPURPOSE
ROOM
MECHANICAL
ROOM
083-AC-01-102
083-CU-01-1029
RL/RS
D
R
3/4"Ø
1/4"Ø, 5/8"Ø
TR
A B
MULTIPURPOSE
ROOM
MECHANICAL
ROOM
EXPOSED
SHOWN AREA
PROJECT
NORTH
A B
OFFICE
MEHANICAL
ROOM
MULTIPURPOSE
ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:4
:2 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
083-M-401
BLDG 083 - LVL 01 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"2
RM 102 - DEMOLITION RCP
1/4" = 1'-0"3
RM 102 - FLOOR PLAN
1/4" = 1'-0"4
RM 102 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"1
RM 102 - DEMOLITION FLOOR PLAN
PROJECT
NORTH
DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
DEMOLISH EXISTING QUICK RESPONSE PENDENT
SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.
ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE
SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN
UPRIGHT POSITION.
INSTALL NEW DUCTLESS SPLIT COOLING UNIT. SEE
EQUIPMENT SCHEDULES ON SHEET M-602.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
CONDENSATE TO BE DISCHARGED TO THE GROUND.
TERMINATE CONDENSATE PIPING WITH A DOWNTURNED
ELBOW 12" ABOVE FINISHED GRADE.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU
WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.
SEE "CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL"
ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
EXISTING EQUIPMENT TO REMAIN.
MAINTAIN A MINIMUM DISTANCE OF 18" BETWEEN UNITS.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
Revisions: Date:
7/18/25 204 of 713
BUILDING 110
AREA SHOWN
TRUE
NORTH
A B C D E F G I K L N Q S U W Z BB
Y
H
P
110-M-401
PIPE BASEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-101
BLDG 110 - LVL 0B - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
PROJECT
NORTH
SITE PLAN
1/16" = 1'-0"1
BLDG 110 - LVL 0B - OVERALL PLAN
7/18/25 205 of 713
A B C D E F G I K L N Q S U W Z BB
Y
H
P
MORGUE STORAGE
BG15c
AUTOPSY AREA MORGUE
BG15
DECON STORAGE
BG13
ANTI ROOM
BG13a
STAIR 1
SGB-1
CORRIDOR
CGB-2
LOCKER ROOM MORGUE
BG15b
STORAGE CLOSET MORGUE
BG15a
SOCIAL WORKER
BG25 MENTAL HEALTH OFFICE
BG23
CORRIDOR
CGB-1
NEURO
BG22a
EXAM ROOM
BG22b
TRIAGE AREA
BG22
EXAM ROOM
BG22c
EXAM ROOM
BG22d
EXAM ROOM
BG22e
SPECIALTY CLINIC WAITING
BG16
CLERICAL
BG16f
LOUNGE
BG16f1
OFFICE
BG16g CHECK OUT
BG16e
STORAGE
BG16h
OFFICE
BG16j
OFFICE
BG16k
TOILET
BG16n1
NEPH
BG16n
NEPH
BG16q
DERM
BG16u
STAIR 5
SGB-2
DERM
BG16t
PULM
BG16r
NEURO/DERM
BG16p
DERM
BG16m
SLEEP/PLUM
BG16l
MED ROOM
BG16d
CLEAN UTILITY
BG16c
WOMEN'S TOILET
BG16b
CORRIDOR
CGB-3
SOILED UTILITY
BG16a
HAC
BG14
HAC CLOSET
BG14a
WHEELCHAIR STORAGE
BG12
WHEELCHAIR STORAGE
BG12a
DATA CLOSET
BG08
PATIENT CLOTHING OFFICE
BG06a
ESCORT OFFICE
BG05
WHEELCHAIR STORAGE
BG11
CREDIT UNION ATM
BG09a
CREDIT UNION ATM
BG09
PATIENT CLOTHING OFFICE
BG06 EMS LOUNGE
BG02
EMS STORAGE
CG01
STAIR SUB-BASEMENT
SGC-2
EMS STORAGE
CG01A
STORAGE ROOM
DG26
BIO MED EQUIP. TESTING
DG24
WATER/CONCENTRATE PREP
DG22
STAFF LOUNGE
DG20
STAFF TOILET
DG20a
DATA CLOSET
DG18
DATA CLOSET
DG21a
DIALYSIS STORAGE
DG21
DIALYSIS STORAGE
DG23
LINEN STORAGE
CG02
LINEN CHUTE (CLOSED)
EBG-12
MECH ROOM
CG03
CORRIDOR
CSC-2
ELEVATOR 8
EBG-8
LACTATION ROOM
BG01
CORRIDOR
CGB-4
VESTIBULE
BG03
ELECT. CLOSET
DG16
FEMALE LOCKERS
DG14
HAC
DG10
EQUIPMENT STORAGE
DG06
EXAM ROOM
DG04
CHIEF NURSE OFFICE
DG02
PUBLIC TOILET
DG01c
CONFERENCE ROOM
DG01b
STAIR 4
SGD-2
RECEPTION/WAITING
DG01
VESTIBULE
DG01a
NOURISHMENT
DG05b
ELECTRICAL CLOSET
DG01d
LINEN STORAGE
DG05a
CORRIDOR
CGD-1
CLEAN SUPPLY ROOM
DG13
SOILED UTILITY ROOM
DG05f
PRIVATE ROOM
DG05d
PRIVATE ROOM
DG05c
PRIVATE TOILET
DG05d.1
PRIVATE TOILET
DG05c.1
NURSE STATION 2
DG05n
NURSE STATION 3
DG05p
NURSE STATION 1
DG05m
MEDS ROOM
DG05g
CORRIDOR
CGD-3
ELEVATOR 6
EDG-6
PRIVATE ROOM
DG05h
PRIVATE ROOM
DG05j
PRIVATE TOILET
DG05j.1
TELECOM. ROOM
DG28
PRIVATE TOILET
DG05h.1
STAIR 3
SGD-1
MECHANICAL ROOM
DG27
PUBLIC TOILET
DG29
CORRIDOR
CGD-5
PATIENT TRAINING ROOM
DG05k
CORRIDOR
CGD-1
STAFF TOILET
DG05e
ELEV. 10
EGB-10TOILET & SHOWER
BG15b1
TOILET
BG19
MENTAL HEALTH OFFICE
BG21
TR
SGC-1
FIRE RISER
SGC-1a
110-M-402
110-M-402
110-M-402
110-M-402
ELECTRICAL ROOM
CG46 MECH ROOM
CG113
MECHANICAL
N/A
CORRIDOR
CG-32
REPRODUCTION
GC-104
OPER. SUPER.
GC-105
MAIL DIST.
GC-106
CORRIDOR
CG-33
OFFICE
CG47B
ASST CHIEF ROOM
CG44
CORRIDOR
CG47
ELEVATOR 7
ECG-7
CORRIDOR
CCG-4
STAIR 6
SCG-6
CONTAMINATION AREA
CG48
BREAK ROOM
CG49
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-102
BLDG 110 - LVL 00 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 00 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 206 of 713
Y
H
P
CHIEF OFFICE
B111C
CONFERENCE ROOM
B111B
OFFICE
B111A
CORRIDOR
B111
OFFICE
B111F
OFFICE
B111E
COMM CLOSET
B111D
STAFF TOILET
B106
STAIRWAY #2
S1B2
PIPE CHASE
B107A
MEN CHANGING
B107
WOMEN CHANGING
B105
WOMEN TOILET
B103
STORAGE
B101
BREAK/CONF ROOM
C106
ELEVATOR #9
E1C9
ELEVATOR #8
E1C8
CORRIDOR
C1C2
ANCILLARY TESTING COOR
C105
HVAC
C103
UNISEX TOILET
D101 MSA SUPERVISOR
D103
HAC ROOM
D105
EXAM ROOM
D107
EXAM ROOM
D148
TEAMLET STATION
D150
EXAM ROOM
D149
CORRIDOR
C1D2
EXAM ROOM
D146
UNISEX TOILET
D145
EXAM ROOM
D147
EXAM ROOM
D143
STAIRWAY #3
S1D3
ELEVATOR #6
E1D6
MED ROOM
D155
EXAM ROOM
D157
MECHANICAL ROOM
D154
TEAMLET STATION
D163
ASST CHIEF OFFICE
D162a
PROGRAM MGT OFFICE
D162
EXAM ROOM
D160
EXAM ROOM
D156
UNISEX TOILET
D158
CORRIDOR
C1D4
STAFF LOUNGE
D154
UNISEX TOILET
D113
CLEAN UTILITY
D115
EXAM ROOM
D117
EXAM ROOM
D119
EXAM ROOM
D127
EXAM ROOM
D133
EXAM ROOM
D129
EXAM ROOM
D135
EXAM ROOM
D139
STORAGE ROOM
D137
CORRIDOR
C1D3
EXAM ROOM
D138
STAIRWAY #4
S1D4
TEAMLET STATION
CONSULTATION ROOM
D122
EXAM ROOM
D118
SOILED UTILITY
D116
DATA CLOSET
D112
OFFICE
B117
OFFICE
B119
OFFICE
B121
OFFICE
B123
OFFICE
B125
CORRIDOR
C1B1
RECOVERY ROOM
B102L.1
ORAL SURGERY ROOM
B102K
INSTRUMENT PREP AREA
B102L
CORRIDOR
C1B3
OPERATORY ROOM
B102J
STORAGE
B102H1
OPERATORY ROOM
B102H2
EXAM ROOM
B102F
STORAGE, SUPPLY
B102E
COMM CLOSET
B102E.1
WAITING AREA
B102
RECEPTION/FILE ROOM
B102A
EXAM ROOM
B102B
CONFERENCE ROOM
B102C
LOBBY
C100
ELECTRICAL CLOSET
C102 INFORMATION DESK
C104
CORRIDOR
C1C1
WAITING AREA
D100
RECEPTION AREA
D102
COFERENCE ROOM
D106
CORRIDOR
C1D1
DATA CLOSET
D108
ELECTRICAL CLOSET
D110
EXAM ROOM
B102I
MENTAL LAB
B102G
EXAM ROOM
B102W
EXAM ROOM
B102U
CORRIDOR
C1B4
EXAM ROOM
B102X
EXAM ROOM
B102V
CLEAN INSTRUMENT ROOM
B102Q
OPERATORY ROOM
B102S.2
ANTI ROOM
B102S
OPERATORY ROOM
B102S.1
DIRTY UTILITY ROOM
B102S.3
CHAINGING ROOM
B102S.4
EXAM ROOM
B102R
EXAM ROOM
B102T
CHIEF, DENTAL SVC
B102N
ADMIN OFFICE
B102M
EXAM ROOM
B102O
EXAM ROOM
B102P
STAIRWAY # 5
S1B5
STORAGE CLOSET
B102Y
110-M-403
110-M-403
110-M-403
110-M-403
TR
S1C1
FIRE RISER
S1C1b
STORAGE
N/A
CLEAN STORAGE
C108
CORRIDOR
CIC-4
COFERENCE ROOM
C218m
URINALYSIS
C114
FEMALE TOILET
C112
URINE COLLECTION
C110
ELEVATOR 5
E1B-5
LOCKER ROOM
C113
CORRIDOR
C1-1
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-103
BLDG 110 - LVL 01 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 01 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 207 of 713
Y
H
P
110-M-404
110-M-404
110-M-404
110-M-404
ORTHOTICS OFFICE
B246
STORAGE RM
B242A
HAC
B244
LAB CHIEF PROSTHETICS
B247
3D PRINTER RM
B245
STORAGE RM
B243
STAIR 2
S2B2
STORAGE RM
B242
CORRIDOR
C2B-5
SUPERVISOR OFFICE
B223
BIO-MED TECHS
B224
STORAGE
B225
CORRIDOR
C2B-2
BIOMED STORAGE
B221
MALETOLIET
B219
ELEVATOR 10
E2B10
BIO-MED RM
B220
OFFICE
B231
STAFF LOUNGE
B227AI OFFICE
B229
B227A
WAITING
B227
STAFF LOUNGE
B227AI
ORTHOTICS STORAGE
B235
ORTHOTICS LAB
B239
CORRIDOR
C2B-4
CHIEF PROSTETICS TREATMENT
CENTER
B238
PROSTHETICS REPRESENTATIVE
OFFICE
B236
TREATMENT RM
B234
TREATMENT RM
B232
STORAGE
B230A
TREATMENT RM
B230
STAIR 5
S2B5
OFFICE
B228
RECEPTIONIST
B226
MEDICINE OFFICE
B210
RESPIRATORY OFFICE
B206
RESPIRATORY SUPPLY RM
B202
CORRIDOR
C2B-1
EQUIPMENT STORAGE
B209
NURSING TIMEKEEPER
B207
UNISEX TOILET
B205a
ABG LAB
B205
NURSING ADMIN PATIENT SAFETY
MGR OFFICE
B203 FEMALE TOILET
B201
ELEVATOR 9
E2C9
ELEVATOR 8
E2C8
OFFICE
C204A
OFFICE
C204B
ANTE ROOM
C204
RES. SLEEP ROOM
C200A
RES. SLEEP ROOM
C200B
RES. SLEEP ROOM
C200C
RES. SLEEP ROOM
C200D
RESIDENTS LOUNGE
C200
KITCHEN
C200F
TOILET
C200G
TOILET
C200H
OFFICE
D202A
OFFICE
D202
PULMONARY LAB
D204
HOME OXYGEN CLINIC
D206
CPAP CLINIC
D208
OFFICE
C205
OFFICE
C203
TR
S2C-1
HAC
C201
CORRIDOR
C2C-1
CORRIDOR
C2D-1
MILLION VET PROGRAM OFFICE
D201
FIRE RISER
S2C-1B
EMPLOYEE ASSISTANCE PROGRAM
COUNCILOR
D203
CAPC OFFICE
D207
UNISEX TOILET
D207a
SUPPLY RM
D209
STAIR 3
S2D3
READING RM
D238
CHIEF CARDIOLOGIST
D235
STAIR 4
S2D4
ECG LAB
D234
CORRIDOR
C2D-4
CHIEF NEUROLOGIST
D233
ECHO LAB #2
D232
ECHO LAB #1
D230
CARDIOLOGIST OFFICE
D231
EXAM ROOM
D229
STRESS LAB
D226
BREAK RM
D226A
EKG LAB
D225
CARDIOLOGY EXAM
D227
WAITING AREA
D220
CARDIOLOGY NURSE
D223
CARDIOLOGY
D221
REPRO ROOM
D219
STORAGE RM (OXYGEN)
D214
ELECTRICAL CLOSET
D212
RECEPTION
D224
X-RAY RM-A
D216A
X-RAY RM B
D216B
CARDIOLOGY STRESS LAB
D216D
NUCLEAR MEDICINE CHECK IN
OFFICE
D216C
HOT LABORATORY
D215
ELEVATOR 6
E2D6
CORRIDOR
D216
CPAC CLINIC
D237
CPAC STORAGE
D237A
HAC
D239
OFFICE
D241
EKG/SUB SPECIALTY CHECK IN
D243
STORAGE
D244
CORRIDOR
C2D-6
STAFF LOUNGE
D242
STAFF TOILET/SHOWER
D240OFFICE
C210
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-104
BLDG 110 - LVL 02 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 02 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 208 of 713
Y
H
P
ICU ISOLATION ROOM
B318B
ANTE ROOM
B318
ICU ISOLATION ROOM
B318A
ICU PATIENT ROOM
B315
SOILED UTILITY CLOSET
B314
PATIENT BATH
B318B1
LINEN CLOSET
B316
CORRIDOR
C3B-1
CORRIDOR
C3B-4
CORRIDOR
C3B-2
ICU PATIENT ROOM
B330
ICU PATIENT ROOM
B328
ICU PATIENT ROOM
B326
ICU PATIENT ROOM
B324
ICU PATIENT ROOM
B322
TELEMETRY
B320A
PHYSICIAN CHARTING
B320B
NURSE STATION
B320
COMM CLOSET
B309
TELECOM CLOSET
B311
ICU ISOLATION ROOM
B337A
ANTE ROOM
B337
ICU ISOLATION ROOM (ADA)
B337B
CORRIDOR
C3B-3
ICU PATIENT ROOM (ADA)
B333
PATIENT BATH
B337B1
ICU STORAGE
B336
HAC
B334
STAIR ROOM
S3B-2
PATIENT BATH
B333B
ELEVATOR 10
E3B-10
STAFF TOILET
B312
COMM CHASE
COMMUNICATION CLOSET
B310
NURSE MANAGER
B308
STAFF LOUNGE
B306
LOCKERS
B302
PATIENT ROOM 4
B307
NOURISHMENT ROOM
B321
EQUIPMENT STORAGE
B325
CLEAN UTILITY CLOSET
B329
CONFERENCE ROOM
B331
CORRIDOR
C3B-2
STAIR 5
S3B-5
PATIENT ROOM 3
B305
PATIENT ROOM 2
B303 PATIENT ROOM 1
B301
PATIENT BATH
B307A
INSTRUMENT PREP / STORAGE
C305
CORRIDOR
C3C3
EQUIPMENT STORAGE
D335N
BAY 10
D335M
HAC
C304
BAY 9
D335L
BAY 8
D335K
BAY 7
D335J
BAY6
D335H
BAY 5
D335G
BAY 1
D335A
CORRIDOR
D335.1
CORRIDOR
C3D4
WAITING ROOM
D336
BAY 3
D335B
RECEPTION
D337
ADMIN
D338
STAIR 3
S3D-3
ELEVATOR #6
E3D6
SOILED UTILITY
D309
STAFF BATH
D313A
ANESTHETIST OFFICE
D313
VASCULAR LAB
D315
HAC
D311
VASCULAR LAB
D316
STAFF WORK AREA
D310A
MEDICATION ROOM
D312
CLINIC RECEPTION AREA
D310
EXAM/ TREATMENT ROOM
D317A
EXAM/ TREATMENT ROOM
D317B
ANTE ROOM
D317
PRIVATE BATH
D317A1
EXAM / TREATMENT ROOM
D321A
EXAM / TREATMENT ROOM
D321B
EXAM/ TREATMENT ROOM
D325A
EXAM/ TREATMENT ROOM
D325B
STAIR 4
S3D-4
EXAM/ TREATMENT ROOM
D324
ANTE ROOM
D325
PRIVATE BATH
D325B1
EXAM / TREATMENT ROOM
D322
EXAM / TREATMENT ROOM
D320
EXAM / TREATMENT ROOM
D318
PRIVATE BATH
D318A
PRIVATE BATH
D320A
BREAK ROOM
D302
NUTRITION
D303
COOK / CHILL
D304
WARD SUPPLIES
D305
ELECTRICAL CLOSET
D306
TELEPHONE CLOSET
D308
CORRIDOR
C3D-2
OFFICE ROOM
C301F
RECEPTION/WAITING AREA
C301C
C301D
C301E
WOMEN'S TOILET
C301B
MEN'S TOILET
C301A
OFFICE
C301
OFFICE ROOM
C301H
OFFICE ROOM
C301G
CLOSE
C300
ELEVATOR 8
E3C-8
LINEN CHUTE
C302
CORRIDOR
C3C-1
CORRIDOR
C3D-1
CORRIDOR
C3B-4
PRIVATE TOILET
D315A
MEDS ROOM
B323
110-M-405
110-M-405
110-M-405
110-M-405
TR
S3C-1
FIRE RISER
S3C-1b
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-105
BLDG 110 - LVL 03 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 03 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 209 of 713
Y
H
P
VASCULAR LAB
B437
OFFICE
B436
OFFICE
B434
TOILET / SHOWER
B433A
HAC
B435
DATA CLOSET
B438
TOILET / SHOWER
B433 STAIR 2
S4B-2
OFFICE
B416
STORAGE CLOSET
B418
SLEEP LAB
B417
SLEEP ROOM
B417A
SLEEP ROOM
B417B
TOILET
B417A1
TOILET
B417B1
STAFF TOILET
B413
OFFICE
B420
STORAGE
B420A
OFFICE
B422
MECHANICAL ROOM
B424A
OFFICE
B424
OFFICE
B426
CHIEF OF SURGERY
B428
ADMIN OFFICER
B431
OFFICE
B429
OFFICE
B427
OFFICE
B425
TOILET / SHOWER
B423A
OFFICE
B423
OFFICE
B421
STAIR 5
S4B-5
CORRIDOR
C4B-2
OFFICE
B419
CLOSET W/ SINK
B411
ELECTRICAL CLOSET
B409
C&P ROOM
B407
C&P EXAM
B403B
C&P EXAM
B403A
C&P EXAM
B401B
C&P EXAM
B401A
ANTI-ROOM
B401
WAITING AREA
C401C
CORRIDOR
C4C-1
CORRIDOR
C4C-2
MEN'S TOILET
C401A
WOMEN'S TOILET
C401B
PATIENT ROOM
D402
PATIENT ROOM
D404
SPD STORAGE
D402B
TOILET / SHOWER
D402A
TOILET / SHOWER
D404A
LOUNGE
D406
OFFICE
C401FOFFICE
C401D
OFFICE
C401E
ELECTRICAL CLOSET
D408
DATA CLOSET
D410
PATIENT ROOM
D416
PATIENT BATH
D416A
PATIENT BATH
D418A
PATIENT ROOM
D418
PATIENT ROOM
D420
PATIENT BATH
D420A
PATIENT BATH
D422A
PATIENT ROOM
D422
STAIR 4
S4D-4
ISOLATION ROOM
D423A
ISOLATION ROOM
D4223B
ISOLATION ROOM
D419B
ISOLATION ROOM
D419A
ISOLATION ROOM
D415B
ISOLATION ROOM
D415A
NURSE STATION
D412
ROOM
D412B
ROOM
D412A PATIENT ROOM
D414
CORRIDOR
C4D-2
2-PATIENT ROOM
D411
PATIENT BATH
D411A
PATIENT BATH
D414A
PATIENT ROOM
D429
PATIENT BATH
D429a
PATIENT BATH
D430A
CORRIDOR
C4D-4
PATIENT ROOM
D430
PATIENT ROOM
D428
EQUIPMENT STORAGE
D426
COOK / CHILL STORAGE
D425
STORAGE
D427
EQUIP STORAGE
D424
STAIR 3
S4D-3
ELEVATOR 4
E4D-4
SOILED UTILITY
D409
NUTRITION ROOM
D407
PATIENT ROOM
D403
TREATMENT ROOM
D400
CONFERENCE ROOM
C406
CORRIDOR
C4C-3
OFFICE
C405
OFFICE
C404
HAC
C403
ELEVATOR 8 & 9
E4C-2
C&P OFFICE
B402
C&P OFFICE
B404
C&P OFFICE
B406
C&P OFFICE
B408
C&P STORAGE
B410
110-M-406
110-M-406
110-M-406
110-M-406
TR
S4D-1
HAC
C402
FIRE RISER
S4D-1b
OFFICE
B414
TOILET / SHOWER
B412
TOILET / SHOWER
B412
ELEVATOR 10
E4B-3
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-106
BLDG 110 - LVL 04 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 04 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 210 of 713
Y
H
P
FAN/MECH ROOM
B506A
ELEV MACH PLATFORM
C2B-2
ELEV/MECH ROOM
B506
STAIR 2
S5B-2
VESTIBULE
B501F
AUDIO/VISUAL OFFICE
B501E
DATA CLOSET
B501C
LIBRARY OFFICE
B501B
LIBRARY OFFICE
B501A
ELEVATOR 8
EC5-8
VESTIBULE
C502
PATIENT EDUCATION
C504
STAIR 1
S5C-1
STAIR 3
S5D-3
ANTIROOM
D507
ELEV/MECH ROOM
D507A
ELEV MECH PLATFORM
D507A.1
FAN/MECH ROOM
D508
FEMALE TOILET
C505
MALE TOILET
C503LIBRARY
B501
110-M-407
110-M-407
110-M-407
TR
C506
AUDITORIUM
D501
110-M-407
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-107
BLDG 110 - LVL 05 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 05 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 211 of 713
Y
H
P
MECH ROOM
C600
ELEVATOR 9
EC6-9
ELEVATOR 8
ECD-8
TOILET
C602
HAC
C603
STAIR 1
SD6-1
TRAINING ROOM
D600
ACOS ED OMO
C601C
EDU TRAIN SPEC
C601A
EDU TRAIN SPEC
C601B
SECRETARY OFFICE
C601
CORRIDOR
C6C1
110-M-408
BUILDING 110
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-108
BLDG 110 - LVL 06 - OVERALL PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/16" = 1'-0"1
BLDG 110 - LVL 06 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
7/18/25 212 of 713
PIPE
BASEMENT
SHOWN AREA
PROJECT
NORTH
L N Q S U
P
2 3
PIPE BASEMENT
SS
S S
4"Ø
5"Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-401
BLDG 110 - LVL 0B - FLOOR PLAN
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
PROJECT
NORTH
EXISTING SANITARY PIPING TO REMAIN.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
VENT FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
110-M-402.
WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION
SEE SHEET 110-M-402.
1/4" = 1'-0"1
LVL 0B - PIPE BASEMENT ENLARGED PLAN
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
7/18/25 213 of 713
SGC-1
L N
P
CORRIDOR
CGC-1
R
M
110-VRF-05-SGC-11
2 H
T
3 3/8"Ø, 5/8"Ø
TR
SGC-1
RL/RS
LINEN STORAGE
CG02
FIRE RISER
SGC-1a
CORRIDOR
CSC-2
WASTE 2"
VENT 1-1/2"
2" FD, V TYPE
VENT 2"
7 10
(E)D
(E )F
P
(E )F
P
(E )D
D
D
110-VRF-06-SGC-11
3/4"Ø
3/8"Ø, 5/8"Ø
3/4"Ø 4
RL/RS
D
N
P
CORRIDOR
CGC-1
STAIR 1
SGC-1
DIALYSIS
STORAGE
DG23LINEN SHOOT
(CLOSED)
EBG-12
LINEN STORAGE
CG02
N
P
DIALYSIS
STORAGE
DG23
TR
SGC-1
LINEN STORAGE
CG02
CORRIDOR
CGC-1
LINEN CHUTE
(CLOSED)
EBG-12 EXPOSED
FIRE RISER
SGC-1a
N
P
7 10
(E )F
P
(E )D
(E )F
P
(E )D
CORRIDOR
CGC-1
STAIR 1
SGC-1
DIALYSIS
STORAGE
DG23
LINEN SHOOT
(CLOSED)
EBG-12
LINEN STORAGE
CG02
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-402
BLDG 110 - LVL 00 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"3
RM SGC-1 - FLOOR PLAN
1/4" = 1'-0"2
RM SGC-1 - DEMOLITION RCP
1/4" = 1'-0"4
RM SGC-1 - RCP
1/4" = 1'-0"1
RM SGC-1 - DEMOLITION FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING
UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU
WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET
110-M-403.
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN
UPRIGHT POSITION. INSTALLNEW BRANCH LINE, TIE-IN TO
NEAREST EXISTING MAIN.
CONDENSATE LINE TO FOLLOW HIGH ALONG WALL TO
ABOVE FLOOR DRAIN. CONDENSATE DRAIN LINE TO
TERMINATE AT FLOOR DRAIN WITH A DOWN TURNED
ELBOW. PROVIDE MINIMUM OF 1" AIR GAP BETWEEN
CONDENSATE PIPE AND FLOOR DRAIN.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
110-M-401.
WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION
SEE SHEET 110-M-403.
EXISTING FIRE ALARM CONTROL PANEL.
EXISTING SPRINKLER TO REMAIN.
EXISTING FIRE PROTECTION DRAIN TO REMAIN.
EXISTING FIRE PROTECTION PIPING TO REMAIN.
EXISTING CONVECTOR HEATER TO REMAIN.
MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN
TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
7/18/25 214 of 713
S1C1
N
P
9 10 13
9 10 12
(E )F
P
(E)D
STAIRWAY #1
S1C1
ANCILLARY
TESTING COOR
C105
HVAC
C103
CORRIDOR
C1C1
UNISEX TOILET
D101
N
P
CORRIDOR
C1C1
HVAC
C103
R
M
110-VRF-07-S1C11
H
T
3/8"Ø, 5/8"Ø
TR
S1C1
ANCILLARY
TESTING COOR
C105
RL/RS
FIRE RISER
S1C1b
WASTE 2"
3/4"Ø
2" FD, B TYPE
VENT 1-1/2"
VENT 2"
9 10
6 7 9 10
9 1210
(E)FP
(E )D
67910
D
15110-VRF-08-S1C11
RL/RS
D
3/4"Ø
3/8"Ø, 5/8"Ø3
(E)FP
N
P
STAIRWAY #1
S1C1
ANCILLARY
TESTING COOR
C105
HVAC
C103
UNISEX TOILET
D101
CORRIDOR
C1C1
N
P
ANCILLARY
TESTING COOR
C105
HVAC
C103
UNISEX TOILET
D101
TR
S1C1
CORRIDOR
C1C1
EXPOSED
FIRE RISER
S1C1b
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:5 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-403
BLDG 110 - LVL 01 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"1
RM S1C1 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"3
RM S1C1 - FLOOR PLAN
1/4" = 1'-0"2
RM S1C1 - DEMOLITION RCP
1/4" = 1'-0"4
RM S1C1 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING
UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU
WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL
REFRIGERATION LINE- SET COVER TO CONCEAL
REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN
UPRIGHT POSITION. INSTALLNEW BRANCH LINE, TIE-IN TO
NEAREST EXISTING MAIN.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
110-M-404.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
110-M-402.
WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION
SEE SHEET 110-M-404.
EXISTING FIRE PROTECTION DRAIN TO REMAIN.
EXISTING FIRE PROTECTION PIPING TO REMAIN.
EXISTING FIRE ALARM CONTROL PANEL.
MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN
TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
7/18/25 215 of 713
S2C-1
P
9 10 13
9 10 12
(E )F
P (E
)D
STAIR 1
S2C1
OFFICE
C203
HAC
C201
CORRIDOR
C2C-1
L N
P
M
R RL/RS
H
T
110-VRF-01-S2C-1
110-VRF-02-S2C-1
FIRE RISER
S2C-1B
D
TR
S2C-1
3/4"Ø5
WASTE 2"
7 8 9
HAC
C201
2" FD, B TYPE
VENT 1-1/2"
9 10 13
9 10 12
(E )D
(E )F
P
VENT 2"
3/8"Ø, 5/8"Ø
N
P
STAIR 1
S2C1
HAC
C201
CORRIDOR
C2C-1
OFFICE
C203
MILLION VET
PROGRAM
OFFICE
D201
N
P
EXPOSED
OFFICE
C203
TR
S2C-1
HAC
C201
FIRE RISER
S2C-1B
MILLION VET
PROGRAM
OFFICE
D201
ANTE-ROOM
C2C-3
CORRIDOR
C2C-1
CORRIDOR
C2D-1
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /M
E C
H
B L D
G
.r v t
110-M-404
BLDG 110 - LVL 02 - DEMOLITION, FLOOR
PLANS & RCPS
MGH/JW AP/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"1
RM S2C-1 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"3
RM S2C-1 - FLOOR PLAN
1/4" = 1'-0"2
RM S2C-1 - DEMOLITION RCP
1/4" = 1'-0"4
RM S2C-1 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN
UPRIGHT POSITION. INSTALL NEW BRANCH LINE, TIE-IN TO
NEAREST EXISTING MAIN.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING
UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE
PIPE INSULATION FOR ALL REFRIGERANT LINES PER
SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN
ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN
MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU
WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE
THRU FLOOR DETAIL" ON SHEET M-501.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL
REFRIGERATION LINE- SET COVER TO CONCEAL
REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
110-M-405.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
110-M-403.
WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION
SEE SHEET 110-M-401.
EXISTING FIRE PROTECTION DRAIN TO REMAIN.
EXISTING FIRE PROTECTION PIPING TO REMAIN.
MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN
TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.
FIRE PROTECTION NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT
ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY
FIELD MEASUREMENT BEFORE BEGINNING ANY
FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH THE CURRENT VA GUIDES AND LOCAL FIRE
PROTECTION CODES AND ORDINANCES.
3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN
DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER
STAMP ON ALL SHOP DRAWINGS.
4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN
ACCORDANCE WITH NFPA 13.
5. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF
WALLS AND ROOF.
6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL
PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS
REQUIRED.
7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,
STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.
PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED
FIRE PROTECTION LINES SHALL BE PAINTED RED.
8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR
SPRINKLER HEAD DENSITY. ANY OTHER HAZARD
CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN
ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13
AND VA FIRE PROTECTION DESIGN GUIDE.
9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE
TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL
IN ACCORDANCE WITH NFPA 13.
KEYNOTES #
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.
EXISTING WORK TO REMAIN SHOWN LIGHT.
DEMOLITION GENERAL NOTES
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT
PIPING CONCEALED IN WALLS, CHASES OR CEILING
SPACES.
7/18/25 216 of 713
S3C-1
P
9 10 13
9 10 12(E )F
P (E
)F P
(E )D
STAIRS 1
S3C-1
BAY 10
D335M
HAC
C304
LINEN CHUTE
C302
CORRIDOR
C3C-1
BAY 9
D335L
N
P
LINEN CHUTE
C302
CORRIDOR
C3C-1
BAY 9
D335L
M
R
RL/RS
H
T
TR
S3C-1
HAC
C304
FIRE RISER
S3C-1b
110-VRF-04-S3C-1
D
WASTE 2"
3/4"Ø5
7 8 9 10
2" FD, B TYPE
VENT 1-1/2"
VENT 2"
9 10 13
9 10 12
(E )D
(E )F
P (E
)F P
78910
3/8"Ø, 5/8"Ø
110-VRF-03-S3C-12
N
P
STAIRS 1
S3C-1
LINEN CHUTE
C302
HAC
C304
BAY 10
D335M
CORRIDOR
C3C-1
BAY 9
D335L
N
P
LINEN CHUTE
C302
HAC
C304
BAY 10
D335M
CORRIDOR
C3C-1
BAY 9
D335L
TR
S3C-1
EXPOSED
FIRE RISER
S3C-1b
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .