Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf

PDF 34 MB Posted

Attached to
Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
Solicitation number
36C77626R0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a comprehensive set of final construction drawings organized by discipline for the EHRM Infrastructure Upgrades project at Hampton VA Medical Center in Hampton, Virginia (Project Number 590-22-700). The drawings were prepared by SPEES Design Build and issued at 100% Construction Documents level on July 18, 2025, by the Office of Construction and Facilities Management for the U.S. Department of Veterans Affairs.

The mechanical drawings (Set 3 of 8) encompass HVAC system installations across multiple buildings (007-011, 013, 014, 015, 017, 018, 027, 028, 031, 033, 035, 036, 037, 043, 048, 066, 083, 110, 110A, 110B, 113, 114, 116, 137, 146, 148, 148T, 168, and 173) at the medical center. Key products and services include Variable Refrigerant Flow (VRF) systems with wall-mounted indoor units (Daikin FXAQ24PVJU units with 20,246 BTU/h capacity), ductless split cooling units (various capacities), ceiling-mounted fan coil units, and Computer Room Air Conditioning (CRAC) units. The specifications require refrigerant piping installation per ASHRAE 15-2022, condensate line routing with moisture sensors, pipe insulation per Section 23 07 11, and pipe support per Section 23 05 11. Additionally, the drawings include fire protection modifications with new sprinkler installations, demolition of existing HVAC equipment, ductwork modifications, and coordination with mechanical and electrical contractors. All equipment features BACnet control interface integration with Building Management Systems, low ambient temperature controls, and crank case heaters. The drawings provide detailed floor plans, reflected ceiling plans, enlarged details, equipment schedules, and general notes for complete HVAC system replacement and upgrades across the facility.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C

(E)16"x8"

(E)16"x10"

12 13

(E)12"x6"

(E)14"x6"

T

OFFICE

102A

STAIRWELL

OFFICE

102E

ANTEROOM

A B C

TR

102A

STAIRWELL

ANTEROOM

OFFICE

102E

066-VRF-01-102A

066-CU-01-102A8

6 7

066-CU-02-202F8

R L /R

S

T

H

M R

3/8"Ø, 5/8"Ø

(E)16"x8"

(E)16"x10"

3/8"Ø, 5/8"Ø2

3/4"Ø3

D

066-VRF-02-102A 1

RL/RS

T

A B C

12 13

A B C

TR

102A

STAIRWELL

OFFICE

102E

ANTEROOM

EXPOSED

OFFICE

102A

STAIRWELL

OFFICE

102E

ANTEROOM

102A

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:3

:0 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

066-M-401

BLDG 066 - LVL 01 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"1

RM 102A - DEMOLITION FLOOR PLAN

1/4" = 1'-0"3

RM 102A - FLOOR PLAN

1/4" = 1'-0"2

RM 102A - DEMOLITION RCP

1/4" = 1'-0"4

RM 102A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING

UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU

WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISH

FLOOR LEVEL BEFORE PENETRATING WALL.

CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL

REFRIGERATION LINESET COVER TO CONCEAL

REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO

COORDINATE COLOR WITH VA COR.

SEE "CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL"

ON SHEET M-501.

DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.

TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET

066-M-402.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.

ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE

SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN

UPRIGHT POSITION.

DEMOLISH EXISTING ABANDONED SANITARY PIPES.

REMOVE AND RETAIN EXISTING THERMOSTAT. SEE

KEYNOTE #18 FOR RE-INSTALLATION.

CONDENSATE TO BE DISCHARGED TO THE GROUND.

TERMINATE CONDENSATE PIPING WITH A DOWNTURNED

ELBOW 12" ABOVE FINISHED GRADE.

INSTALL RETAINED THERMOSTAT. SEE KEYNOTE #16.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

Revisions: Date:

7/18/25 201 of 713

202F

A B C

(E)16"x10"

(E)12"x6" (E)18"x10"

(E)14"x10"

T

OFFICE

202G

OFFICE

OFFICE

202F

STAIRWELL

A B C

TR

202F

STAIRWELL

OFFICE

OFFICE

202G

066-VRF-03-202F

T

H

M

R

(E)16"x10"

(E)18"x10"

RL/RS

D

3/8"Ø, 5/8"Ø 2

R L /R

S D

3/4"Ø

066-VRF-04-202F 1

T

A B C

OFFICE

202F

STAIRWELL

OFFICE

202G

OFFICE

A B C

TR

202F

STAIRWELL

OFFICE

202G

OFFICE

EXPOSED

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:3

:0 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

066-M-402

BLDG 066 - LVL 02 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"1

RM 202F - DEMOLITION FLOOR PLAN

1/4" = 1'-0"3

RM 202F - FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"2

RM 202F- DEMOLITION RCP

PROJECT

NORTH

1/4" = 1'-0"4

RM 202F - RCP

PROJECT

NORTH

INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING

UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL

REFRIGERATION LINESET COVER TO CONCEAL

REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO

COORDINATE COLOR WITH VA COR.

DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

066-M-401.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.

ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE

SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN

UPRIGHT POSITION.

REMOVE AND RETAIN EXISTING THERMOSTAT. SEE

KEYNOTE #14 FOR RE-INSTALLATION.

DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.

INSTALL RETAINED THERMOSTAT. SEE KEYNOTE #12.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

Revisions: Date:

7/18/25 202 of 713

A B

C D E F G H

MULTIPURPOSE

ROOM

TR

MECHANICAL

ROOM

ANTIROOM

WOMEN'S

RESTROOM

BA-104I

MEN'S

RESTROOM

083-M-401

083-M-401

083-M-401

083-M-401

BUILDING 083

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:2 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

083-M-101

BLDG 083 - LVL 01 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"1

BLDG 083 - LVL 01 - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date:

7/18/25 203 of 713

A B

2 OFFICE

MEHANICAL

ROOM

MULTIPURPOSE

ROOM

TR

M

T

H

A B

MULTIPURPOSE

ROOM

MECHANICAL

ROOM

083-AC-01-102

083-CU-01-1029

RL/RS

D

R

3/4"Ø

1/4"Ø, 5/8"Ø

TR

A B

MULTIPURPOSE

ROOM

MECHANICAL

ROOM

EXPOSED

SHOWN AREA

PROJECT

NORTH

A B

OFFICE

MEHANICAL

ROOM

MULTIPURPOSE

ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:2 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

083-M-401

BLDG 083 - LVL 01 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"2

RM 102 - DEMOLITION RCP

1/4" = 1'-0"3

RM 102 - FLOOR PLAN

1/4" = 1'-0"4

RM 102 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"1

RM 102 - DEMOLITION FLOOR PLAN

PROJECT

NORTH

DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

DEMOLISH EXISTING QUICK RESPONSE PENDENT

SPRINKLER.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE.

ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE

SIZES. INSTALL NEW STANDARD RESPONSE SPRINKLER IN

UPRIGHT POSITION.

INSTALL NEW DUCTLESS SPLIT COOLING UNIT. SEE

EQUIPMENT SCHEDULES ON SHEET M-602.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

CONDENSATE TO BE DISCHARGED TO THE GROUND.

TERMINATE CONDENSATE PIPING WITH A DOWNTURNED

ELBOW 12" ABOVE FINISHED GRADE.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU

WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.

SEE "CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL"

ON SHEET M-501.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

EXISTING EQUIPMENT TO REMAIN.

MAINTAIN A MINIMUM DISTANCE OF 18" BETWEEN UNITS.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

Revisions: Date:

7/18/25 204 of 713

BUILDING 110

AREA SHOWN

TRUE

NORTH

A B C D E F G I K L N Q S U W Z BB

Y

H

P

110-M-401

PIPE BASEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:1 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-101

BLDG 110 - LVL 0B - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

PROJECT

NORTH

SITE PLAN

1/16" = 1'-0"1

BLDG 110 - LVL 0B - OVERALL PLAN

7/18/25 205 of 713

A B C D E F G I K L N Q S U W Z BB

Y

H

P

MORGUE STORAGE

BG15c

AUTOPSY AREA MORGUE

BG15

DECON STORAGE

BG13

ANTI ROOM

BG13a

STAIR 1

SGB-1

CORRIDOR

CGB-2

LOCKER ROOM MORGUE

BG15b

STORAGE CLOSET MORGUE

BG15a

SOCIAL WORKER

BG25 MENTAL HEALTH OFFICE

BG23

CORRIDOR

CGB-1

NEURO

BG22a

EXAM ROOM

BG22b

TRIAGE AREA

BG22

EXAM ROOM

BG22c

EXAM ROOM

BG22d

EXAM ROOM

BG22e

SPECIALTY CLINIC WAITING

BG16

CLERICAL

BG16f

LOUNGE

BG16f1

OFFICE

BG16g CHECK OUT

BG16e

STORAGE

BG16h

OFFICE

BG16j

OFFICE

BG16k

TOILET

BG16n1

NEPH

BG16n

NEPH

BG16q

DERM

BG16u

STAIR 5

SGB-2

DERM

BG16t

PULM

BG16r

NEURO/DERM

BG16p

DERM

BG16m

SLEEP/PLUM

BG16l

MED ROOM

BG16d

CLEAN UTILITY

BG16c

WOMEN'S TOILET

BG16b

CORRIDOR

CGB-3

SOILED UTILITY

BG16a

HAC

BG14

HAC CLOSET

BG14a

WHEELCHAIR STORAGE

BG12

WHEELCHAIR STORAGE

BG12a

DATA CLOSET

BG08

PATIENT CLOTHING OFFICE

BG06a

ESCORT OFFICE

BG05

WHEELCHAIR STORAGE

BG11

CREDIT UNION ATM

BG09a

CREDIT UNION ATM

BG09

PATIENT CLOTHING OFFICE

BG06 EMS LOUNGE

BG02

EMS STORAGE

CG01

STAIR SUB-BASEMENT

SGC-2

EMS STORAGE

CG01A

STORAGE ROOM

DG26

BIO MED EQUIP. TESTING

DG24

WATER/CONCENTRATE PREP

DG22

STAFF LOUNGE

DG20

STAFF TOILET

DG20a

DATA CLOSET

DG18

DATA CLOSET

DG21a

DIALYSIS STORAGE

DG21

DIALYSIS STORAGE

DG23

LINEN STORAGE

CG02

LINEN CHUTE (CLOSED)

EBG-12

MECH ROOM

CG03

CORRIDOR

CSC-2

ELEVATOR 8

EBG-8

LACTATION ROOM

BG01

CORRIDOR

CGB-4

VESTIBULE

BG03

ELECT. CLOSET

DG16

FEMALE LOCKERS

DG14

HAC

DG10

EQUIPMENT STORAGE

DG06

EXAM ROOM

DG04

CHIEF NURSE OFFICE

DG02

PUBLIC TOILET

DG01c

CONFERENCE ROOM

DG01b

STAIR 4

SGD-2

RECEPTION/WAITING

DG01

VESTIBULE

DG01a

NOURISHMENT

DG05b

ELECTRICAL CLOSET

DG01d

LINEN STORAGE

DG05a

CORRIDOR

CGD-1

CLEAN SUPPLY ROOM

DG13

SOILED UTILITY ROOM

DG05f

PRIVATE ROOM

DG05d

PRIVATE ROOM

DG05c

PRIVATE TOILET

DG05d.1

PRIVATE TOILET

DG05c.1

NURSE STATION 2

DG05n

NURSE STATION 3

DG05p

NURSE STATION 1

DG05m

MEDS ROOM

DG05g

CORRIDOR

CGD-3

ELEVATOR 6

EDG-6

PRIVATE ROOM

DG05h

PRIVATE ROOM

DG05j

PRIVATE TOILET

DG05j.1

TELECOM. ROOM

DG28

PRIVATE TOILET

DG05h.1

STAIR 3

SGD-1

MECHANICAL ROOM

DG27

PUBLIC TOILET

DG29

CORRIDOR

CGD-5

PATIENT TRAINING ROOM

DG05k

CORRIDOR

CGD-1

STAFF TOILET

DG05e

ELEV. 10

EGB-10TOILET & SHOWER

BG15b1

TOILET

BG19

MENTAL HEALTH OFFICE

BG21

TR

SGC-1

FIRE RISER

SGC-1a

110-M-402

110-M-402

110-M-402

110-M-402

ELECTRICAL ROOM

CG46 MECH ROOM

CG113

MECHANICAL

N/A

CORRIDOR

CG-32

REPRODUCTION

GC-104

OPER. SUPER.

GC-105

MAIL DIST.

GC-106

CORRIDOR

CG-33

OFFICE

CG47B

ASST CHIEF ROOM

CG44

CORRIDOR

CG47

ELEVATOR 7

ECG-7

CORRIDOR

CCG-4

STAIR 6

SCG-6

CONTAMINATION AREA

CG48

BREAK ROOM

CG49

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:2 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-102

BLDG 110 - LVL 00 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 00 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 206 of 713

Y

H

P

CHIEF OFFICE

B111C

CONFERENCE ROOM

B111B

OFFICE

B111A

CORRIDOR

B111

OFFICE

B111F

OFFICE

B111E

COMM CLOSET

B111D

STAFF TOILET

B106

STAIRWAY #2

S1B2

PIPE CHASE

B107A

MEN CHANGING

B107

WOMEN CHANGING

B105

WOMEN TOILET

B103

STORAGE

B101

BREAK/CONF ROOM

C106

ELEVATOR #9

E1C9

ELEVATOR #8

E1C8

CORRIDOR

C1C2

ANCILLARY TESTING COOR

C105

HVAC

C103

UNISEX TOILET

D101 MSA SUPERVISOR

D103

HAC ROOM

D105

EXAM ROOM

D107

EXAM ROOM

D148

TEAMLET STATION

D150

EXAM ROOM

D149

CORRIDOR

C1D2

EXAM ROOM

D146

UNISEX TOILET

D145

EXAM ROOM

D147

EXAM ROOM

D143

STAIRWAY #3

S1D3

ELEVATOR #6

E1D6

MED ROOM

D155

EXAM ROOM

D157

MECHANICAL ROOM

D154

TEAMLET STATION

D163

ASST CHIEF OFFICE

D162a

PROGRAM MGT OFFICE

D162

EXAM ROOM

D160

EXAM ROOM

D156

UNISEX TOILET

D158

CORRIDOR

C1D4

STAFF LOUNGE

D154

UNISEX TOILET

D113

CLEAN UTILITY

D115

EXAM ROOM

D117

EXAM ROOM

D119

EXAM ROOM

D127

EXAM ROOM

D133

EXAM ROOM

D129

EXAM ROOM

D135

EXAM ROOM

D139

STORAGE ROOM

D137

CORRIDOR

C1D3

EXAM ROOM

D138

STAIRWAY #4

S1D4

TEAMLET STATION

CONSULTATION ROOM

D122

EXAM ROOM

D118

SOILED UTILITY

D116

DATA CLOSET

D112

OFFICE

B117

OFFICE

B119

OFFICE

B121

OFFICE

B123

OFFICE

B125

CORRIDOR

C1B1

RECOVERY ROOM

B102L.1

ORAL SURGERY ROOM

B102K

INSTRUMENT PREP AREA

B102L

CORRIDOR

C1B3

OPERATORY ROOM

B102J

STORAGE

B102H1

OPERATORY ROOM

B102H2

EXAM ROOM

B102F

STORAGE, SUPPLY

B102E

COMM CLOSET

B102E.1

WAITING AREA

B102

RECEPTION/FILE ROOM

B102A

EXAM ROOM

B102B

CONFERENCE ROOM

B102C

LOBBY

C100

ELECTRICAL CLOSET

C102 INFORMATION DESK

C104

CORRIDOR

C1C1

WAITING AREA

D100

RECEPTION AREA

D102

COFERENCE ROOM

D106

CORRIDOR

C1D1

DATA CLOSET

D108

ELECTRICAL CLOSET

D110

EXAM ROOM

B102I

MENTAL LAB

B102G

EXAM ROOM

B102W

EXAM ROOM

B102U

CORRIDOR

C1B4

EXAM ROOM

B102X

EXAM ROOM

B102V

CLEAN INSTRUMENT ROOM

B102Q

OPERATORY ROOM

B102S.2

ANTI ROOM

B102S

OPERATORY ROOM

B102S.1

DIRTY UTILITY ROOM

B102S.3

CHAINGING ROOM

B102S.4

EXAM ROOM

B102R

EXAM ROOM

B102T

CHIEF, DENTAL SVC

B102N

ADMIN OFFICE

B102M

EXAM ROOM

B102O

EXAM ROOM

B102P

STAIRWAY # 5

S1B5

STORAGE CLOSET

B102Y

110-M-403

110-M-403

110-M-403

110-M-403

TR

S1C1

FIRE RISER

S1C1b

STORAGE

N/A

CLEAN STORAGE

C108

CORRIDOR

CIC-4

COFERENCE ROOM

C218m

URINALYSIS

C114

FEMALE TOILET

C112

URINE COLLECTION

C110

ELEVATOR 5

E1B-5

LOCKER ROOM

C113

CORRIDOR

C1-1

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:2 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-103

BLDG 110 - LVL 01 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 01 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 207 of 713

Y

H

P

110-M-404

110-M-404

110-M-404

110-M-404

ORTHOTICS OFFICE

B246

STORAGE RM

B242A

HAC

B244

LAB CHIEF PROSTHETICS

B247

3D PRINTER RM

B245

STORAGE RM

B243

STAIR 2

S2B2

STORAGE RM

B242

CORRIDOR

C2B-5

SUPERVISOR OFFICE

B223

BIO-MED TECHS

B224

STORAGE

B225

CORRIDOR

C2B-2

BIOMED STORAGE

B221

MALETOLIET

B219

ELEVATOR 10

E2B10

BIO-MED RM

B220

OFFICE

B231

STAFF LOUNGE

B227AI OFFICE

B229

B227A

WAITING

B227

STAFF LOUNGE

B227AI

ORTHOTICS STORAGE

B235

ORTHOTICS LAB

B239

CORRIDOR

C2B-4

CHIEF PROSTETICS TREATMENT

CENTER

B238

PROSTHETICS REPRESENTATIVE

OFFICE

B236

TREATMENT RM

B234

TREATMENT RM

B232

STORAGE

B230A

TREATMENT RM

B230

STAIR 5

S2B5

OFFICE

B228

RECEPTIONIST

B226

MEDICINE OFFICE

B210

RESPIRATORY OFFICE

B206

RESPIRATORY SUPPLY RM

B202

CORRIDOR

C2B-1

EQUIPMENT STORAGE

B209

NURSING TIMEKEEPER

B207

UNISEX TOILET

B205a

ABG LAB

B205

NURSING ADMIN PATIENT SAFETY

MGR OFFICE

B203 FEMALE TOILET

B201

ELEVATOR 9

E2C9

ELEVATOR 8

E2C8

OFFICE

C204A

OFFICE

C204B

ANTE ROOM

C204

RES. SLEEP ROOM

C200A

RES. SLEEP ROOM

C200B

RES. SLEEP ROOM

C200C

RES. SLEEP ROOM

C200D

RESIDENTS LOUNGE

C200

KITCHEN

C200F

TOILET

C200G

TOILET

C200H

OFFICE

D202A

OFFICE

D202

PULMONARY LAB

D204

HOME OXYGEN CLINIC

D206

CPAP CLINIC

D208

OFFICE

C205

OFFICE

C203

TR

S2C-1

HAC

C201

CORRIDOR

C2C-1

CORRIDOR

C2D-1

MILLION VET PROGRAM OFFICE

D201

FIRE RISER

S2C-1B

EMPLOYEE ASSISTANCE PROGRAM

COUNCILOR

D203

CAPC OFFICE

D207

UNISEX TOILET

D207a

SUPPLY RM

D209

STAIR 3

S2D3

READING RM

D238

CHIEF CARDIOLOGIST

D235

STAIR 4

S2D4

ECG LAB

D234

CORRIDOR

C2D-4

CHIEF NEUROLOGIST

D233

ECHO LAB #2

D232

ECHO LAB #1

D230

CARDIOLOGIST OFFICE

D231

EXAM ROOM

D229

STRESS LAB

D226

BREAK RM

D226A

EKG LAB

D225

CARDIOLOGY EXAM

D227

WAITING AREA

D220

CARDIOLOGY NURSE

D223

CARDIOLOGY

D221

REPRO ROOM

D219

STORAGE RM (OXYGEN)

D214

ELECTRICAL CLOSET

D212

RECEPTION

D224

X-RAY RM-A

D216A

X-RAY RM B

D216B

CARDIOLOGY STRESS LAB

D216D

NUCLEAR MEDICINE CHECK IN

OFFICE

D216C

HOT LABORATORY

D215

ELEVATOR 6

E2D6

CORRIDOR

D216

CPAC CLINIC

D237

CPAC STORAGE

D237A

HAC

D239

OFFICE

D241

EKG/SUB SPECIALTY CHECK IN

D243

STORAGE

D244

CORRIDOR

C2D-6

STAFF LOUNGE

D242

STAFF TOILET/SHOWER

D240OFFICE

C210

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:2 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-104

BLDG 110 - LVL 02 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 02 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 208 of 713

Y

H

P

ICU ISOLATION ROOM

B318B

ANTE ROOM

B318

ICU ISOLATION ROOM

B318A

ICU PATIENT ROOM

B315

SOILED UTILITY CLOSET

B314

PATIENT BATH

B318B1

LINEN CLOSET

B316

CORRIDOR

C3B-1

CORRIDOR

C3B-4

CORRIDOR

C3B-2

ICU PATIENT ROOM

B330

ICU PATIENT ROOM

B328

ICU PATIENT ROOM

B326

ICU PATIENT ROOM

B324

ICU PATIENT ROOM

B322

TELEMETRY

B320A

PHYSICIAN CHARTING

B320B

NURSE STATION

B320

COMM CLOSET

B309

TELECOM CLOSET

B311

ICU ISOLATION ROOM

B337A

ANTE ROOM

B337

ICU ISOLATION ROOM (ADA)

B337B

CORRIDOR

C3B-3

ICU PATIENT ROOM (ADA)

B333

PATIENT BATH

B337B1

ICU STORAGE

B336

HAC

B334

STAIR ROOM

S3B-2

PATIENT BATH

B333B

ELEVATOR 10

E3B-10

STAFF TOILET

B312

COMM CHASE

COMMUNICATION CLOSET

B310

NURSE MANAGER

B308

STAFF LOUNGE

B306

LOCKERS

B302

PATIENT ROOM 4

B307

NOURISHMENT ROOM

B321

EQUIPMENT STORAGE

B325

CLEAN UTILITY CLOSET

B329

CONFERENCE ROOM

B331

CORRIDOR

C3B-2

STAIR 5

S3B-5

PATIENT ROOM 3

B305

PATIENT ROOM 2

B303 PATIENT ROOM 1

B301

PATIENT BATH

B307A

INSTRUMENT PREP / STORAGE

C305

CORRIDOR

C3C3

EQUIPMENT STORAGE

D335N

BAY 10

D335M

HAC

C304

BAY 9

D335L

BAY 8

D335K

BAY 7

D335J

BAY6

D335H

BAY 5

D335G

BAY 1

D335A

CORRIDOR

D335.1

CORRIDOR

C3D4

WAITING ROOM

D336

BAY 3

D335B

RECEPTION

D337

ADMIN

D338

STAIR 3

S3D-3

ELEVATOR #6

E3D6

SOILED UTILITY

D309

STAFF BATH

D313A

ANESTHETIST OFFICE

D313

VASCULAR LAB

D315

HAC

D311

VASCULAR LAB

D316

STAFF WORK AREA

D310A

MEDICATION ROOM

D312

CLINIC RECEPTION AREA

D310

EXAM/ TREATMENT ROOM

D317A

EXAM/ TREATMENT ROOM

D317B

ANTE ROOM

D317

PRIVATE BATH

D317A1

EXAM / TREATMENT ROOM

D321A

EXAM / TREATMENT ROOM

D321B

EXAM/ TREATMENT ROOM

D325A

EXAM/ TREATMENT ROOM

D325B

STAIR 4

S3D-4

EXAM/ TREATMENT ROOM

D324

ANTE ROOM

D325

PRIVATE BATH

D325B1

EXAM / TREATMENT ROOM

D322

EXAM / TREATMENT ROOM

D320

EXAM / TREATMENT ROOM

D318

PRIVATE BATH

D318A

PRIVATE BATH

D320A

BREAK ROOM

D302

NUTRITION

D303

COOK / CHILL

D304

WARD SUPPLIES

D305

ELECTRICAL CLOSET

D306

TELEPHONE CLOSET

D308

CORRIDOR

C3D-2

OFFICE ROOM

C301F

RECEPTION/WAITING AREA

C301C

C301D

C301E

WOMEN'S TOILET

C301B

MEN'S TOILET

C301A

OFFICE

C301

OFFICE ROOM

C301H

OFFICE ROOM

C301G

CLOSE

C300

ELEVATOR 8

E3C-8

LINEN CHUTE

C302

CORRIDOR

C3C-1

CORRIDOR

C3D-1

CORRIDOR

C3B-4

PRIVATE TOILET

D315A

MEDS ROOM

B323

110-M-405

110-M-405

110-M-405

110-M-405

TR

S3C-1

FIRE RISER

S3C-1b

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-105

BLDG 110 - LVL 03 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 03 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 209 of 713

Y

H

P

VASCULAR LAB

B437

OFFICE

B436

OFFICE

B434

TOILET / SHOWER

B433A

HAC

B435

DATA CLOSET

B438

TOILET / SHOWER

B433 STAIR 2

S4B-2

OFFICE

B416

STORAGE CLOSET

B418

SLEEP LAB

B417

SLEEP ROOM

B417A

SLEEP ROOM

B417B

TOILET

B417A1

TOILET

B417B1

STAFF TOILET

B413

OFFICE

B420

STORAGE

B420A

OFFICE

B422

MECHANICAL ROOM

B424A

OFFICE

B424

OFFICE

B426

CHIEF OF SURGERY

B428

ADMIN OFFICER

B431

OFFICE

B429

OFFICE

B427

OFFICE

B425

TOILET / SHOWER

B423A

OFFICE

B423

OFFICE

B421

STAIR 5

S4B-5

CORRIDOR

C4B-2

OFFICE

B419

CLOSET W/ SINK

B411

ELECTRICAL CLOSET

B409

C&P ROOM

B407

C&P EXAM

B403B

C&P EXAM

B403A

C&P EXAM

B401B

C&P EXAM

B401A

ANTI-ROOM

B401

WAITING AREA

C401C

CORRIDOR

C4C-1

CORRIDOR

C4C-2

MEN'S TOILET

C401A

WOMEN'S TOILET

C401B

PATIENT ROOM

D402

PATIENT ROOM

D404

SPD STORAGE

D402B

TOILET / SHOWER

D402A

TOILET / SHOWER

D404A

LOUNGE

D406

OFFICE

C401FOFFICE

C401D

OFFICE

C401E

ELECTRICAL CLOSET

D408

DATA CLOSET

D410

PATIENT ROOM

D416

PATIENT BATH

D416A

PATIENT BATH

D418A

PATIENT ROOM

D418

PATIENT ROOM

D420

PATIENT BATH

D420A

PATIENT BATH

D422A

PATIENT ROOM

D422

STAIR 4

S4D-4

ISOLATION ROOM

D423A

ISOLATION ROOM

D4223B

ISOLATION ROOM

D419B

ISOLATION ROOM

D419A

ISOLATION ROOM

D415B

ISOLATION ROOM

D415A

NURSE STATION

D412

ROOM

D412B

ROOM

D412A PATIENT ROOM

D414

CORRIDOR

C4D-2

2-PATIENT ROOM

D411

PATIENT BATH

D411A

PATIENT BATH

D414A

PATIENT ROOM

D429

PATIENT BATH

D429a

PATIENT BATH

D430A

CORRIDOR

C4D-4

PATIENT ROOM

D430

PATIENT ROOM

D428

EQUIPMENT STORAGE

D426

COOK / CHILL STORAGE

D425

STORAGE

D427

EQUIP STORAGE

D424

STAIR 3

S4D-3

ELEVATOR 4

E4D-4

SOILED UTILITY

D409

NUTRITION ROOM

D407

PATIENT ROOM

D403

TREATMENT ROOM

D400

CONFERENCE ROOM

C406

CORRIDOR

C4C-3

OFFICE

C405

OFFICE

C404

HAC

C403

ELEVATOR 8 & 9

E4C-2

C&P OFFICE

B402

C&P OFFICE

B404

C&P OFFICE

B406

C&P OFFICE

B408

C&P STORAGE

B410

110-M-406

110-M-406

110-M-406

110-M-406

TR

S4D-1

HAC

C402

FIRE RISER

S4D-1b

OFFICE

B414

TOILET / SHOWER

B412

TOILET / SHOWER

B412

ELEVATOR 10

E4B-3

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-106

BLDG 110 - LVL 04 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 04 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 210 of 713

Y

H

P

FAN/MECH ROOM

B506A

ELEV MACH PLATFORM

C2B-2

ELEV/MECH ROOM

B506

STAIR 2

S5B-2

VESTIBULE

B501F

AUDIO/VISUAL OFFICE

B501E

DATA CLOSET

B501C

LIBRARY OFFICE

B501B

LIBRARY OFFICE

B501A

ELEVATOR 8

EC5-8

VESTIBULE

C502

PATIENT EDUCATION

C504

STAIR 1

S5C-1

STAIR 3

S5D-3

ANTIROOM

D507

ELEV/MECH ROOM

D507A

ELEV MECH PLATFORM

D507A.1

FAN/MECH ROOM

D508

FEMALE TOILET

C505

MALE TOILET

C503LIBRARY

B501

110-M-407

110-M-407

110-M-407

TR

C506

AUDITORIUM

D501

110-M-407

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-107

BLDG 110 - LVL 05 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 05 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 211 of 713

Y

H

P

MECH ROOM

C600

ELEVATOR 9

EC6-9

ELEVATOR 8

ECD-8

TOILET

C602

HAC

C603

STAIR 1

SD6-1

TRAINING ROOM

D600

ACOS ED OMO

C601C

EDU TRAIN SPEC

C601A

EDU TRAIN SPEC

C601B

SECRETARY OFFICE

C601

CORRIDOR

C6C1

110-M-408

BUILDING 110

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-108

BLDG 110 - LVL 06 - OVERALL PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/16" = 1'-0"1

BLDG 110 - LVL 06 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

7/18/25 212 of 713

PIPE

BASEMENT

SHOWN AREA

PROJECT

NORTH

L N Q S U

P

2 3

PIPE BASEMENT

SS

S S

4"Ø

5"Ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:4 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-401

BLDG 110 - LVL 0B - FLOOR PLAN

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

PROJECT

NORTH

EXISTING SANITARY PIPING TO REMAIN.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

VENT FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

110-M-402.

WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION

SEE SHEET 110-M-402.

1/4" = 1'-0"1

LVL 0B - PIPE BASEMENT ENLARGED PLAN

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

7/18/25 213 of 713

SGC-1

L N

P

CORRIDOR

CGC-1

R

M

110-VRF-05-SGC-11

2 H

T

3 3/8"Ø, 5/8"Ø

TR

SGC-1

RL/RS

LINEN STORAGE

CG02

FIRE RISER

SGC-1a

CORRIDOR

CSC-2

WASTE 2"

VENT 1-1/2"

2" FD, V TYPE

VENT 2"

7 10

(E)D

(E )F

P

(E )F

P

(E )D

D

D

110-VRF-06-SGC-11

3/4"Ø

3/8"Ø, 5/8"Ø

3/4"Ø 4

RL/RS

D

N

P

CORRIDOR

CGC-1

STAIR 1

SGC-1

DIALYSIS

STORAGE

DG23LINEN SHOOT

(CLOSED)

EBG-12

LINEN STORAGE

CG02

N

P

DIALYSIS

STORAGE

DG23

TR

SGC-1

LINEN STORAGE

CG02

CORRIDOR

CGC-1

LINEN CHUTE

(CLOSED)

EBG-12 EXPOSED

FIRE RISER

SGC-1a

N

P

7 10

(E )F

P

(E )D

(E )F

P

(E )D

CORRIDOR

CGC-1

STAIR 1

SGC-1

DIALYSIS

STORAGE

DG23

LINEN SHOOT

(CLOSED)

EBG-12

LINEN STORAGE

CG02

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:4 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-402

BLDG 110 - LVL 00 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"3

RM SGC-1 - FLOOR PLAN

1/4" = 1'-0"2

RM SGC-1 - DEMOLITION RCP

1/4" = 1'-0"4

RM SGC-1 - RCP

1/4" = 1'-0"1

RM SGC-1 - DEMOLITION FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING

UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU

WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET

110-M-403.

INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN

UPRIGHT POSITION. INSTALLNEW BRANCH LINE, TIE-IN TO

NEAREST EXISTING MAIN.

CONDENSATE LINE TO FOLLOW HIGH ALONG WALL TO

ABOVE FLOOR DRAIN. CONDENSATE DRAIN LINE TO

TERMINATE AT FLOOR DRAIN WITH A DOWN TURNED

ELBOW. PROVIDE MINIMUM OF 1" AIR GAP BETWEEN

CONDENSATE PIPE AND FLOOR DRAIN.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

110-M-401.

WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION

SEE SHEET 110-M-403.

EXISTING FIRE ALARM CONTROL PANEL.

EXISTING SPRINKLER TO REMAIN.

EXISTING FIRE PROTECTION DRAIN TO REMAIN.

EXISTING FIRE PROTECTION PIPING TO REMAIN.

EXISTING CONVECTOR HEATER TO REMAIN.

MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN

TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

7/18/25 214 of 713

S1C1

N

P

9 10 13

9 10 12

(E )F

P

(E)D

STAIRWAY #1

S1C1

ANCILLARY

TESTING COOR

C105

HVAC

C103

CORRIDOR

C1C1

UNISEX TOILET

D101

N

P

CORRIDOR

C1C1

HVAC

C103

R

M

110-VRF-07-S1C11

H

T

3/8"Ø, 5/8"Ø

TR

S1C1

ANCILLARY

TESTING COOR

C105

RL/RS

FIRE RISER

S1C1b

WASTE 2"

3/4"Ø

2" FD, B TYPE

VENT 1-1/2"

VENT 2"

9 10

6 7 9 10

9 1210

(E)FP

(E )D

67910

D

15110-VRF-08-S1C11

RL/RS

D

3/4"Ø

3/8"Ø, 5/8"Ø3

(E)FP

N

P

STAIRWAY #1

S1C1

ANCILLARY

TESTING COOR

C105

HVAC

C103

UNISEX TOILET

D101

CORRIDOR

C1C1

N

P

ANCILLARY

TESTING COOR

C105

HVAC

C103

UNISEX TOILET

D101

TR

S1C1

CORRIDOR

C1C1

EXPOSED

FIRE RISER

S1C1b

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:5 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-403

BLDG 110 - LVL 01 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"1

RM S1C1 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"3

RM S1C1 - FLOOR PLAN

1/4" = 1'-0"2

RM S1C1 - DEMOLITION RCP

1/4" = 1'-0"4

RM S1C1 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING

UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU

WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL

REFRIGERATION LINE- SET COVER TO CONCEAL

REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO

COORDINATE COLOR WITH VA COR.

INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN

UPRIGHT POSITION. INSTALLNEW BRANCH LINE, TIE-IN TO

NEAREST EXISTING MAIN.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

110-M-404.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

110-M-402.

WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION

SEE SHEET 110-M-404.

EXISTING FIRE PROTECTION DRAIN TO REMAIN.

EXISTING FIRE PROTECTION PIPING TO REMAIN.

EXISTING FIRE ALARM CONTROL PANEL.

MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN

TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

7/18/25 215 of 713

S2C-1

P

9 10 13

9 10 12

(E )F

P (E

)D

STAIR 1

S2C1

OFFICE

C203

HAC

C201

CORRIDOR

C2C-1

L N

P

M

R RL/RS

H

T

110-VRF-01-S2C-1

110-VRF-02-S2C-1

FIRE RISER

S2C-1B

D

TR

S2C-1

3/4"Ø5

WASTE 2"

7 8 9

HAC

C201

2" FD, B TYPE

VENT 1-1/2"

9 10 13

9 10 12

(E )D

(E )F

P

VENT 2"

3/8"Ø, 5/8"Ø

N

P

STAIR 1

S2C1

HAC

C201

CORRIDOR

C2C-1

OFFICE

C203

MILLION VET

PROGRAM

OFFICE

D201

N

P

EXPOSED

OFFICE

C203

TR

S2C-1

HAC

C201

FIRE RISER

S2C-1B

MILLION VET

PROGRAM

OFFICE

D201

ANTE-ROOM

C2C-3

CORRIDOR

C2C-1

CORRIDOR

C2D-1

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /M

E C

H

B L D

G

.r v t

110-M-404

BLDG 110 - LVL 02 - DEMOLITION, FLOOR

PLANS & RCPS

MGH/JW AP/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"1

RM S2C-1 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"3

RM S2C-1 - FLOOR PLAN

1/4" = 1'-0"2

RM S2C-1 - DEMOLITION RCP

1/4" = 1'-0"4

RM S2C-1 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN

UPRIGHT POSITION. INSTALL NEW BRANCH LINE, TIE-IN TO

NEAREST EXISTING MAIN.

INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING

UNIT. SEE EQUIPMENT SCHEDULES ON SHEET M-601.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE

PIPE INSULATION FOR ALL REFRIGERANT LINES PER

SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN

ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN

MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT

PER SPECIFICATION SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU

WALL (RATED/UNRATED) DETAIL" ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE

THRU FLOOR DETAIL" ON SHEET M-501.

CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL

REFRIGERATION LINE- SET COVER TO CONCEAL

REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO

COORDINATE COLOR WITH VA COR.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

110-M-405.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

110-M-403.

WASTE UP TO FLOOR DRAIN ABOVE. FOR CONTINUATION

SEE SHEET 110-M-401.

EXISTING FIRE PROTECTION DRAIN TO REMAIN.

EXISTING FIRE PROTECTION PIPING TO REMAIN.

MOISTURE SENSOR TO BE LOCATED AT LOWEST POINT IN

TRENCHING. SEE ARCHITECTURAL PLAN FOR TRENCHING.

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT

ONLY. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY

FIELD MEASUREMENT BEFORE BEGINNING ANY

FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE

WITH THE CURRENT VA GUIDES AND LOCAL FIRE

PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN

DRAWINGS OR A LICENSED FIRE PROTECTION ENGINEER

STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN

ACCORDANCE WITH NFPA 13.

5. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND VA COR PRIOR TO ANY CUTTING OF

WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL

PIPING PENETRATIONS OF FIRE RATED ASSEMBLIES AS

REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT,

STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS.

PROVIDE LISTED MECHANICAL GUARDS. ALL EXPOSED

FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR

SPRINKLER HEAD DENSITY. ANY OTHER HAZARD

CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LATEST VERSIONS OF NFPA 13

AND VA FIRE PROTECTION DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE

TELECOMMUNICATION RACKS WHERE FEASIBLE BUT STILL

IN ACCORDANCE WITH NFPA 13.

KEYNOTES #

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED.

EXISTING WORK TO REMAIN SHOWN LIGHT.

DEMOLITION GENERAL NOTES

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL INTERIOR CONDENSATE AND REFRIGERANT

PIPING CONCEALED IN WALLS, CHASES OR CEILING

SPACES.

7/18/25 216 of 713

S3C-1

P

9 10 13

9 10 12(E )F

P (E

)F P

(E )D

STAIRS 1

S3C-1

BAY 10

D335M

HAC

C304

LINEN CHUTE

C302

CORRIDOR

C3C-1

BAY 9

D335L

N

P

LINEN CHUTE

C302

CORRIDOR

C3C-1

BAY 9

D335L

M

R

RL/RS

H

T

TR

S3C-1

HAC

C304

FIRE RISER

S3C-1b

110-VRF-04-S3C-1

D

WASTE 2"

3/4"Ø5

7 8 9 10

2" FD, B TYPE

VENT 1-1/2"

VENT 2"

9 10 13

9 10 12

(E )D

(E )F

P (E

)F P

78910

3/8"Ø, 5/8"Ø

110-VRF-03-S3C-12

N

P

STAIRS 1

S3C-1

LINEN CHUTE

C302

HAC

C304

BAY 10

D335M

CORRIDOR

C3C-1

BAY 9

D335L

N

P

LINEN CHUTE

C302

HAC

C304

BAY 10

D335M

CORRIDOR

C3C-1

BAY 9

D335L

TR

S3C-1

EXPOSED

FIRE RISER

S3C-1b

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .