These are electrical construction drawings for the EHRM Infrastructure Upgrades at Hampton VA Medical Center, Hampton, Virginia. The documents consist of Level 01 and Level 02 electrical plans for multiple buildings (114, 116, 137, 146, 148, 148T, 168, 173-173A, and 110/110B), prepared at 100% Construction Documents phase dated July 18, 2025.
The drawings depict electrical power distribution, including A-side and B-side sourced power feeders (both concealed and underground/underfloor configurations), panelboards, transformers, backup power systems, emergency systems, telecommunications bonding infrastructure, and lighting layouts across various facility areas. Key elements include switchboards, automatic transfer switches (ATS), main distribution panels (MDP), data racks, access control panels, fire alarm systems, and utility rooms. General notes require contractors to field-verify all existing electrical systems, coordinate shutdowns with the VA to maintain power to essential equipment, provide backup emergency power, seal wall and ceiling penetrations to fire ratings, update circuit panel directories, provide pull boxes for long feeder runs, conceal conduit in walls or above ceilings, and coordinate all work with general contractors. The documents are prepared by SPEES Design Build (23830 Pacific Highway S., Suite 203, Kent, WA 98032) under VA project number IM 360://509-22-700, with the engineering discipline listed as M/E (Mechanical/Electrical).
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A A
B B
A A
B B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
B
C
E
G
H
J
K
L
M
N
P
Q
R
S
A102K
CGB-4
CORRIDOR
A102
PRIVATE
ROOM
A102C
LAUNDRY
ROOM
A102B
PRIVATE ADA
ROOM
A102D
PRIVATE
ROOM
A102E
PRIVATE
ROOM
A102F
PRIVATE
ROOM
A102G
PRIVATE
ROOM
A102H
PRIVATE
ROOM
A102J
TOILET
SHOWER
A102J.1
TOILET
SHOWER
A102G.1
TOILET
SHOWER
A102E.1
TOILET
SHOWER
A102E.2
TOILET
SHOWER
A102H.1
TOILET
SHOWER
A102F.1 ADA TOILET
SHOWER
A102D.1
PRIVATE
ROOM
A102A
TOILET
SHOWER
A102A.1
CONFERENCE
ROOM
A101
KITCHEN
A104
CONFERENCE
ROOM
A105
OFFICE
A106
OFFICE
A107
OFFICE
A110
OFFICE
A111
WORK ROOM
A112
MEN'S
TOILET
A113
TR
A114
WOMEN'S
TOILET
A115
JANITOR
STORAGE
A116
ELEVATOR
AG09
STAIR
S1A-3
CORRIDOR
C1A-1
STAIR
S1A-1
114EP402
114EP402
114EP402
114EP402
AREA SHOWN
BLDG 114
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:4
:5
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
114EP102
BLDG 114 - LEVEL 02 - ELECTRICAL PLAN
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
- 1/8" = 1'-0"
1 BLDG 114 - LEVEL 02 - ELECTRICAL PLAN 4'0 8' 16'
PROJECT
NORTH
Revisions: Date:
KEY PLAN
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
A A
AA
A A A A A A
A A A A A
A
A
A
A
A
A
A
A
AA
AA
B
B
B
B
B B B B B B B B B
B
B
B
B
B
B
B
AAAAAA
A A
B B
A A
B B
AREA SHOWN
BLDG 116
A B C D E F F.5 G H H.5 J K L M NM.5
TR
103B
116EP401
116EP401
METERING ENCLOSURE
SWBD 116
500KVA XFMR
JBOX
CHILLER ECB
PANEL RE1 DISCONNECT
30KVA XFMR
HIGH VOLTAGE
EQUIPMENT
ATS-116
116-P-02 116-P-01
TO PANELBOARD "116-103BA"
(REFERENCE SHEET 116EP401)
TO PANELBOARD "116-103BB"
(REFERENCE SHEET 116EP401)
116EP401
CONFERENCE
ROOM
102I
OFFICE/STORAGE
102H
OFFICE
102J
BREAK
ROOM
102G
STORAGE
102E
SALAD
PREPARATION
102F
NOURISHMENT
103D
POT-PAN
WASH
103C
STORAGE
103E
OFFICES
103A
PAPER
STORAGE
CORRIDOR
C120
FREEZER #3
107C
FREEZER
DAY ISSUE
107D
FREEZER #2
107B
INGREDIENT
CONTROL
FREEZER #1
107A
COOLER
COOLER
103H
KITCHEN
PRODUCTION
DISH ROOM
102B
102A
BREAK
ROOM
CART
RETURN
AREA
101F
CHARGING
ROOM
101A
OFFICE
101B
SUPERVISOR
FOOD
SERVICE
101C
TRAY
SERVICE
CART
WASHING
101E
STORAGE
STOCK
101D
COMMUNICATION
CLOSET
101D.1
LEAD
DIETITIAN
102D
FEMALE
TOILET
100C
LOBBY
MEN'S
TOILET
100B
VESTIBULE
100A
SECRETARY
100D
SUPERVISOR
DIETITIAN
100F
CHIEF
SERVICE
100E
DINING AREA
MECHANICAL
ROOM
SHIPPING
FOOD BANK
#2
106A
SHIPPING
FOOD BANK
#1
M/T
REFRIGERATOR
M/T
REFRIGERATOR
MEAT
PREPARATION
REFRIGERATOR
#2
113AENCLOSED
DOCK
COOLER
114 FREEZER
DAY ISSUE
112A
VC ROOM
MECHANICAL
ROOM
113B
DRY
STORAGE
103F
CORRIDOR
C123
STORAGE
114A
CHEM
STORAGE
114B
MECHANICAL
ROOM
LOCKER
ROOM MALE
MEN'S
TOILET
115A STORAGE
DRY GOODS
WOMEN'S
TOILET
118A
LOCKER
ROOM
FEMALE
STORAGE,
LAUNDRY
103G
CORRIDOR
C101
SERVING
LINE
102C
FIRE PANEL
SECURITY PANEL
PRIMARY BONDING
BUSBAR (PBB) E-504
116EP401
TO SBB (REFERENCE SHEET 116EP401)
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:4
:2
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
116EP101
BLDG 116 - LEVEL 01 - ELECTRICAL PLAN
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
8'0 16' 32'
PROJECT
NORTH
- 1/16" = 1'-0"
1 BLDG 116 - LEVEL 01 - ELECTRICAL PLAN
KEY PLAN
TRUE
NORTH
GENERAL NOTES
Revisions: Date:
KEY NOTES
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAMS FOR
ADDITIONAL INFORMATION.
PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET
EG602 FOR ADDITIONAL INFORMATION.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
AAAAAAA
A A A A A A A A A A A
A
A
A
A
A
A
B
B
B
B
B
B B B B B
BB
B B B B B B B
B
B
B
B
A A
B B
A A
B B
A B C E F J K
G H I L M N O P SQ R TD
SUPERVISOR OFFICES
A69
WORK AREA
A67A
LOCK SHOP OFFICE
A67
SOCIAL WORKER
A66
VOC SPEC
A64
CORRIDOR
CA12
OFFICE
A65
ADDICTION THERAPIST
A63
OFFICE
A56
ADDICTION THERAPIST
A54
CORRIDOR
CA11
ADDICTION
THERAPIST
A55
PHYSICIAN
A53
ADDICTION
THERAPIST
A49
ADDICTION
THERAPIST
A47
PHYSICIAN
A48
SOCIAL WORKER
A46
CORRIDOR
CA10
PHYSICIAN
A39
HAC
A43
ELECT CLOSET
A45
ADDICTION THERAPIST
A37
PHYSICIAN
A38
MHC OFFICE
A29
ADDICTION THERAPIST
A27
SATP/SAW OFFICE
A28SATP/SAW COORDINATOR
A28A
OFFICE
A25
PHYSICIAN OFFICE
A26
OFFICE
A23
CORRIDOR
CA8
CORRIDOR
CA7
SOCIAL WORKER
A22
SOCIAL WORKER
A21
ADDICTION THERAPIST
A20
CORRIDOR
CA5
CORRIDOR
CA6
SOCIAL WORKER
A18
PHYSICIAN
A19
VENDING ROOM
A16
COMM CLOSET
A14
PST GROUP
A12
WAITING AREA
A13
OFFICE
A17
SOCIAL WORKER
A30
SOCIAL WORKER
A32
SOCIAL WORKER
A34
PHYSICIAN
A36
PHYSICIAN
A40
PHYSICIAN
A71
PHYSCOLOGIST
A73
CHAPLAIN OFFICE
A75
CORRIDOR
CA1
OFFICE
A02A
OFFICE
A02B
CORRIDOR
A02
GROUP ROOM
A04
CORRIDOR
CA2
SCI OFFICE
A01 SCI REC THERAPIST
A10
CORRIDOR
CA3
SCI REC THERAPIST
A08
DIETICIAN/ NUTRITION
A03
TRAINING/ CONF RM
A06
GROUP ROOM
A09
GROUP ROOM
A07
KINESIOTHERAPY
A131
OFFICE
A131A
SUPERVISOR'S OFFICE
A68A
EQUIP STORAGE
A70
EQUIP CLEANING
A70A
PT CLOTHING ROOM
A58
MAINT STORAGE
A70B
OFFICE
A52
ELECTRICAL CLOSET
A50
ELECTRICAL ROOM
A44
CORRIDOR
CA9
PHYCH INTERN
A84
PHYSICIAN
A82
PHYSICIAN
A80
PHYSICIAN
A78
CLINICAL NURSE
A76
PHYCH INTERN
A83
PHYSICIAN OFFICE
A81
CLINICAL NURSE
A87
PHYSICIAN OFFICE
A86
BEHAVIORAL PSYCH
A93
BEHAVIORAL PSYCH
A92
CORRIDOR
CA16 CORRIDOR
CA17
NEURO PSYCH LAB
A96
PSYCHOLOGIST
A100
VRT OFFICE
A98
STORAGE
A99A
CORRIDOR
CA18
PSYCHOLOGIST
A99
OFFICE
A102
LEAD PSYCHOLOGIST
A104
SOCIAL WORKER MGR
A106
MH & BS ADMIN OFF
A108
CORRIDOR
CA14
PSYCHOLOGIST
A79
PSYCHOLOGIST
A77
TR
A85
OFFICE
A125
PHYSICIAN
A89
SC/MDS COORDINATOR
A123
SCI CONF ROOM
A91
CENTRAL TESTING
A95
PHYSICIAN
A97
PHYSICIAN
A101
PSYCHOLOGIST
A103
MENS TOILET
A117
FEMALE TOILET
A115
EDUCATION/CONF RM
A105
CORRIDOR
CA19
CORRIDOR
CA15
MH&BS SECRETARY
A110
PHYSICIAN
A132
MALE TOILET
A128
FEMALE TOILET
A126
ELECT CLOSET
A124
COMM CLOSET
A124A
HAC
A140
NURSE CLINIC
A141
SOCIAL WORKER
A133
SOCIAL WORKER
A135
PHYSICIAN
A137
PSYCHOLOGIST
A139
SCI DENTAL TREAT
A143
BREAK ROOM
A68
ELEC CLOSET
A112
STAFF LOUNGE
A113
PHYSICIAN
CORRIDOR
CA20
PHYSICIAN
A116
CORRIDOR
CA22
Room
CA23
AO OFFICE
A145
CHIEF, SCI
A147
CORRIDOR
CA25
TV/REC ROM
A144
DATA CLOSET
A122
DIETICIAN
D100C
ELEC.
D100D
WARMING KITCHEN
D100E
DINING
D100
KITCHEN
D100B
TO PANELBOARD "137-A85A"
(REFERENCE SHEET 137EP401a)
TO PANELBOARD "137-A85B"
(REFERENCE SHEET 137EP401a)
137-P-07
137-P-02
CLERICAL SPACE
A11A
CLERICAL SPACE
A11C
CLERICAL SPACE
A11B
137EP401a
137EP401a
137EP401a
137EP401a
Room
Room
01C
Room
01A
Room
01B
Room
Room
C1
Room
Room
Room
A06A
Room
A02D
137EP401e
137EP401e
TO PANEL "137-DP-TRB",
(REFERENCE SHEET 137EP401e)
TO PANEL "137-DP-TRA",
(REFERENCE SHEET 137EP401e)
TO PRIMARY BONDING BUSBAR
(REFERENCE SHEET 137EP401e)
137EP101A
SEE SHEET 137EP101C
137EP101A SEE SHEET
137EP101B
TO PANELBOARD "137-B105BA"
(REFERENCE SHEET 137EP101B)
TO SBB
(REFERENCE SHEET 137EP101B)
TO PANELBOARD "137-B105BB"
(REFERENCE SHEET 137EP101B)
137-P-04
AREA SHOWN
BLDG 137
AREA A
LEGEND
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:5
:3
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
137EP101A
BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -
AREA A
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
- 1" = 25'-0"
1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA A
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
KEY NOTES
1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
8'0 16' 32'
PROJECT
Revisions: Date:
A A A A A A
A A A A A A A A A A
A
A
A
B B B B B B B
BB
B B B B B B B B B B
B
B
AA
A A
B B
A A
B B
AREA SHOWN
BLDG 137
AREA B
O P S VQ R T U
W X Y Z AA BB CC DD EE FF GG HH II JJ KK LL
CORRIDOR
CA19
CHIEF, MH&BS SVC
A110A
MULTI. PURPOSE OFFICE
B04
PSYCHOLOGIST OFFICE
B06
MEDICAL GAS STORAGE
B08
PSYCHIATRIST OFFICE
A114
CONFERENCE ROOM
B07
NURSE MANAGER
B11
SOCIAL WORKER OFFICE
B13A
SOCIAL WORKER OFFICE
B13C
HAC
B145
PSYCIATRIST OFFICE
B141
PSYCHIATRIST OFFICE
B139
NURSE MANAGER
B137
NURSE SUB STATION
B35
SOCIAL WORKER OFFICE
B13B
EQUIPMENT STORAGE
B33
NURSE WORKROOM
B15
NURSE SUB STATION
B31
OFFICE SUITE
B13
CORRIDOR
CB9
HEARING ROOM
B05
PHYSICIAN OFFICE/
DICTATION
B149
INTERVIEW RM
B03
VISITOR
TOILET
B151
VISITOR
TOILET
B153
SMALL VISITOR RM
B155
NURSE EDUCATION
B01
CORRIDOR
CB1
CORRIDOR
CB2
PATIENT ROOM
B28
PATIENT TOILET
B28A
STORAGE
B30
PATIENT ROOM
B26
PATIENT TOILET
B26A
CLEAN LINEN
B24
PATIENT ROOM
B22
SECURE PATIENT STORAGE
B18
ANTEROOM
B16
PATIENT ROOM
B27
PATIENT TOILET
B27A
PATIENT TOILET
B25A
PATIENT ROOM
B21
PATIENT TOILET
B21A
CORRIDOR
CB3
NOURISHMENT
B40
SEC./COMM. CLOSET
B42
SPD CLEAN UTILITY
B43
ELECTRICAL CLOSET
B44
SOILED UTILITY
B45
QUIET ROOM
B47
CORRIDOR
CB5
FEMALE LOCKER ROOM
B39
MALE LOCKER ROOM
B41
EXAM ROOM
B34
PATIENT SHOWER
B117
PATIENT SHOWER
B115
REPORT ROOM/LOUNGE
B113 SPD CLEAN UTILITY
B111
SOILED UTILITY ROOM
B109
NURSING INSTRUCTOR
B105A
STORAGE
B107
CLASSROOM/
CONFERENCE ROOM
B105
TR
B105B
STAIRWELL
NO. 1
BS1
STAFF
TOILET
B41A STORAGE
B105C
PATIENT SHOWER
B49
PATIENT SHOWER
B51
ASSESSMENT ROOM
B53
NURSE STATION
B75
MEDICATION ROOM
B103A
MEDICATION VESTIBULE
B103
PATIENT
ISOLATION ROOM
B56B
PATIENT
ISOLATION TOILET
B56A
SECURE
PATIENT STORAGE
B58
PATIENT ROOM
B60
PATIENT TOILET
B60A
PATIENT TOILET
B62A
PATIENT ROOM
B62
PATIENT ROOM
B66
PATIENT TOILET
B66A
PATIENT TOILET
B68A
PATIENT ROOM
B68
CORRIDOR
CB12
PATIENT ROOM
B67
PATIENT ROOM
B65
PATIENT ROOM
B63
PATIENT TOILET
B63A
PATIENT ROOM
B61
PATIENT ROOM
B59
PATIENT TOILET
B61A
CORRIDOR
CB10
CORRIDOR
CB14
CORRIDOR
CB4
CORRIDOR
CB13
GROUP ROOM
B76
PATIENT TOILET
B80B
PATIENT TOILET
B80A
ART THERAPHY
STORAGE
B78
DAY/ DINING ROOM
B80
ENVIRONMENTAL
STORAGE
B77
SECLUSION
ROOM
B84A
ANTEROOM
B84
PATIENT
TOILET
B84B
AV ROOM
B80C.1
SECLUSION ROOM
B84C
STORAGE
B80C
FEMALE TV ROOM
B88
TOILET
B88A
PATIENT ROOM
B90
PATIENT TOILET
B90A
PATIENT TOILET
B92A
PATIENT ROOM
B92
PATIENT ROOM
B96
PATIENT TOILET
B96A
PATIENT TOILET
B98A
PATIENT ROOM
B98
PATIENT TOILET
B22A
PATIENT TOILET
B20A
PATIENT ROOM
B20
PATIENT ROOM
B25
PATIENT ROOM
B23
PATIENT ROOM
B17
PATIENT TOILET
B17A
PATIENT TOILET
B23A
PATIENT ISOLATION ROOM
B16B
PATIENT TOILET
B16A
ANTE ROOM
B56
PATIENT TOILET
B59A
SHOWER
B64
CLEAN LINEN
B70
PATIENT TOILET
B67A
PATIENT TOILET
B65A
CLEAN LINEN
B101
PATIENT ROOM
B99
PATIENT TOILET
B99A
PATIENT TOILET
B97A
PATIENT ROOM
B97
WOMEN'S SHOWER
B95
PATIENT ROOM
B93
PATIENT TOILET
B93A
PATIENT ROOM
B91A
PATIENT ROOM
B91
SHOWER ROOM
B89
PATIENT ISOLATION ROOM
87B
PATIENT ISOLATION TOILET
B87A
ANTE ROOM
B87
CORRIDOR
CB15
STORAGE
B133
PATIENT ROOM
B131
PATIENT TOILET
B131A
PATIENT TOILET
B129A
PATIENT ROOM
B129
CLEAN STORAGE/ LINEN
B127
PATIENT ROOM
B125
PATIENT TOILET
B125A
PATIENT TOILET
B123A
PATIENT ROOM
B123
SECURE PATIENT STORAGE
B121
CORRIDOR
CB11
PATIENT ISOLATION ROOM
B119B
PATIENT ISOLATION TOILET
B119A
ANTE ROOM
B119
PATIENT TOILET
B120A
PATIENT ROOM
B120
PATIENT ROOM
B122
PATIENT TOILET
B122A
PATIENT TOILET
B124A
PATIENT ROOM
B124
PATIENT ROOM
B128
PATIENT TOILET
B128A
PATIENT TOILET
B130A
PATIENT ROOM
B130
NOURISHMENT
B114
VESTIBULE
B110
PATIENT LAUNDRY
B108
SOILED LINEN
B142
VESTIBULE
CB8
EMS STORAGE
B144
VISITOR ROOM
B148
INTERN WORK ROOM
B150
CORRIDOR
CA20
EXAM ROOM
B32
STAFF TOILET
B39A
137EP401b
137EP401b
TO PANELBOARD "137-B105BB"
(REFERENCE SHEET 137EP401b)
TO PANELBOARD "137-B105BA"
(REFERENCE SHEET 137EP401b)
137-P-09
137-P-04
137EP401b
137EP401b
TO SBB
(REFERENCE SHEET 137EP401b)
137EP101BSEE SHEET
137EP101A
137EP101B
SEE SHEET
137EP101C
TO PANELBOARD "137-DP-TRA"
(REFERENCE SHEET 137EP101A)
TO PANELBOARD "137-DP-TRB"
(REFERENCE SHEET 137EP101A)
LEGEND
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:5
:4
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
137EP101B
BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -
AREA B
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
KEY NOTES
1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
- 1/16" = 1'-0"
1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA B 8'0 16' 32'
PROJECT
A
A
A
A
A
A
A
A
A
A
A
A
AAAAAAA
B
B
B
B
B
B
B
B
B
B
B
B
B
B
A A
B B
A A
B B
AREA SHOWN
BLDG 137
AREA C
F J K
G H I L M N O P S VQ R T U W X Y Z
STAFF SHOWER
1C209
STAFF SHOWER
1C210
PATIENT TLT. 7
1C213A
PATIENT ROOM 14 - ONE
BED
1C213
PATIENT ROOM 15 - ONE
BED
1C214
PATIENT TLT. 5
1C214A
CLOSET
1C214B
PATIENT ROOM 16 - ONE
BED
1C215
CLOSET
1C215B
PATIENT TLT. 6
1C215A
PATIENT TLT. 8
1C217A
CLOSET
1C213B
PATIENT ROOM 17 - ONE
BED
1C217
PATIENT ROOM 18 - ONE
BED
1C218
PATIENT TLT. 18
1C218A
PATIENT TLT. 19
1C221A
STAIR #2
1C220
CLOSET
1C217B
CLOSET
1C218B
ELEC
1C216
PATIENT ROOM 19 - ONE
BED
1C221
CLOSET
1C221B
PATIENT ROOM 20 - ONE
BED
1C222
CLOSET
1C222B
PATIENT TLT. 20
1C222A
PATIENT TLT. 21
1C224A
PATIENT ROOM 25 - ONE
BED
1C230
CLOSET
1C230B
O.P. NURSE
1C132A
PATIENT ROOM1 - ONE BED
1C129
CORRIDOR
CC6
PATIENT TLT. 1
1C129A
PATIENT TLT. 2
1C127A
PATIENT ROOM 2- ONE BED
1C127
PATIENT TLT. 14
1C122A
TELE. HEALTH
1C132B
PATIENT ROOM 5- ONE BED
1C133
PATIENT TLT. 4
1C133A
PATIENT TLT. 3
1C134A
PATIENT ROOM 25 - ONE
BED
1C134
SATELLITE HEAD-END CLST.
1C132
TRAINING ROOM
1C131
COMPUTER
1C130
PATIENT ROOM 31&32-TWO
BED
1C122
PATIENT TLT. 42
1C122B
SPD
1C126
CLEAN LINEN
1C123
HAC
1C124
CORRIDOR
CC5
CORRIDOR
CC8
NURSE STATION
1C118
DAY ROOM
1C128
CORRIDOR
CC4
PATIENT TLT. 41
1C120B
PATIENT ROOM 37&38-TWO
BED
1C120
PATIENT TLT. 16
1C120A
NURSE MANAGER
1C119 MED ROOM
C118A
MEDS
1C117
CLERK
1C141
CORRIDOR
CC7
OCCUPATIONAL THERAPHY
1C135
ELECTRIC
1C9A
PATIENT TLT. 11
1C136A
PATIENT ROOM 41&42 - TWO
BED
C136
STUDENT OFFICE
1C212
SOILED UTILITY
1C211
PATIENT ROOM 35&36 - TWO
BED
1C137
PATIENT TLT. 15
1C137A
NOUR KITCH.
1C138
STAFF TOILET
C139
PATIENT ROOM 11 - ONE
BED
1C115
PATIENT TLT. 27
1C115A
PATIENT TLT. 26
1C112A
PATIENT ROOM 3 - ONE BED
1C112
PATIENT STORAGE
1C116
RESP OFFICE
1C114
TR
1C142
EQUIPMENT STORAGE
1C113
ELECTRIC
1C143
ELECTRIC
1C111A
PATIENT ROOM 30 - ONE
BED
1C140
Room
1C107
PATIENT TLT. 25
1C140A
PATIENT TLT. 32
1C144A
PATIENT ROOM 10 -ONE BED
1C144
J.BOX
SCH2
DISC. SCL2
SCL2 SEC 1
SCL2 SEC 2
CONTROLS ENCLOSURE
SCC2
SCEQ2
SCLS2
TELECOMMUNICATION RACK
SCL1A
XFMR TL1A
J.BOX
SCC3A
XFMR TC3
CONTROLS ENCLOSURE
137EP401c
137EP401c
137-P-08
TO PANELBOARD "137-1C142A"
(REFERENCE SHEET 137EP401c)
137-P-03
TO PANELBOARD "137-1C142B"
(REFERENCE SHEET 137EP401c)
137-CU-03-1C142
137-1C142A-20
137-P-13
137EP401c
137EP401c
E-503
EQUIP.
TO SBB
(REFERENCE SHEET 137EP401c)
137EP101C
SEE SHEET 137EP101B
137EP101C
SEE SHEET 137EP101D
137EP101C
SEE SHEET 137EP101B
137EP101C
SEE SHEET 137EP101D
LEGEND
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:5
:4
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
137EP101C
BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -
AREA C
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
KEY NOTES
1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
- 1/16" = 1'-0"
1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA C 8'0 16' 32'
PROJECT
A A A A A A
A
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
B B B B B B B
A A
B B
A A
B B
AREA SHOWN
BLDG 137
AREA D
F J K
G H I L M N O P S VQ R T U
PATIENT ROOM
C183
PATIENT ROOM
C181
PATIENT TOILET
B183A
PATIENT TOILET
C185A
PATIENT TOILET
C179A
PATIENT TOILET
C181A
PATIENT ROOM
C185
PATIENT ROOM
C179
PATIENT ROOM
C187
TR
C175
STORAGE ROOM
C177
PATIENT TOILET
C173A
PATIENT ROOM
C173
PATIENT ROOM
C171
PATIENT
TOILET
C171A
PATIENT
TOILET
C169A
PATIENT ROOM
C169
PATIENT ROOM
C167
PATIENT TOILET
C167A
WAITING ROOM
C165
VESTIBULE
CV1
CORRIDOR
CC10A
DIRTY LINEN
C163
ELECTRICAL
C161
PATIENT TOILET
C157A SPRINKLER
C159
PATIENT ROOM
C157
DAY ROOM
C156
MEDS
C158A
NURSE STATION
C158
CORRIDOR
CC12
PATIENT TOILET
C170A
PATIENT ROOM
C170
PATIENT ROOM
C172
PATIENT TOILET
C172A
CLOSET
C174
PATIENT TOILET
C190A
PATIENT ROOM
C190
PATIENT ROOM
C192
PATIENT TOILET
C187A
PATIENT TOILET
C189A
PATIENT ROOM
C189
CORRIDOR
CC13
STAIR
CS1
PATIENT ROOM
C191
PATIENT TOILET
C191A
PATIENT TOILET
C193A
PATIENT TOILET
C194A
PATIENT TOILET
C192A
PATIENT ROOM
C193
PATIENT ROOM
C194
PATIENT ROOM
C195
PATIENT ROOM
C196
PATIENT TOILET
C195A
PATIENT TOILET
C197A
PATIENT TOILET
C196A
PATIENT ROOM
C197
PATIENT TOILET
C199A
PATIENT ROOM
C199
PATIENT ROOM
C107
CORRIDOR
1C16
CORRIDOR
1C12
NOURISHMENT
KITCHEN
1C108
PATIENT ROOM
C108
TOILET/ SHOWER AREA
C108A
SHARED PATIENT TLT.
26/27
1C106A
PATIENT ROOM 27 - ONE
BED
1C106
PATIENT ROOM
C109
PATIENT TLT. 40
C109A
SOILED UTILITY
1C110
CORRIDOR
CC3
NURSE MANAGER
1C104
PATIENT ROOM 21 - ONE
BED
1C224
CLOSET
1C224B
CLOSET
1C225B
PATIENT ROOM 22 - ONE
BED
1C225
PATIENT TLT. 25
1C230A
PATIENT TLT. 24
1C229A
CLN. LINEN
1C226
SPD
1C227
PATIENT TLT. 22
1C225A
PATIENT TLT. 23
1C228A
PATIENT ROOM23-ONE
BED
1C228
PATIENT ROOM 24 - ONE
BED
1C229
CLOSET
1C229B
CLOSET
1C228B
RECREATION THERAPY
1C111
PATIENT STORAGE2
1C105B
CLOSET
1C105A
NURSE SATELLITE
1C105
CORRIDOR
CC2
STUDENT OFFICE
1C103C
MED ROOM
1C105C
STAFF KITCHEN
1C100A
TOILET
1C103B
TOILET
1C103A
PATIENT ROOM 24 - ONE
BED
1C102
PATIENT TLT. 24
1C102A
LAUNDRY
1C101
CORRIDOR
CC1
STAFF LOUNGE
1C100
PATIENT TLT. 32
1C144A
SOILED LINEN
1C146
TLT.
1C147
HAC
1C148
PATIENT TLT. 33
1C149A
PATIENT ROOM 39 & 40 -
TWO BED
1C149
PATIENT TLT. 34
1C149B
PATIENT ROOM 29 - ONE
BED
1C150
SHARED PATIENT TLT.
28/29
1C150A
PATIENT ROOM 28 - ONE
BED
1C151
NOURISHMENT KITCHEN
1C152
SHARED PSYCH.
1C153
ASSOC. CHIEF NURSE
1C154
PATIENT TLT. 31
1C155A
PATIENT ROOM 4 - ONE
BED
1C155
CORRIDOR
CC11
CORRIDOR
CC10
137EP401d
137EP401d
C2
DISC. SAFETY SWITCH #1
DISC. SAFETY SWITCH #2
DISC. SAFETY SWITCH #3
75 kVA XFMR
C1-SEC 1
C1-SEC 2
225 kVA XFMR
LP1-SEC 1
LP1-SEC 2
MDP1
CONTROLS ENCLOSURE
75 kVA XFMR
LS
FIRE ALARM POWER SUPPLY
137-P-05
TO PANELBOARD "137-C175B"
(REFERENCE SHEET 137EP401d)
TO PANELBOARD "137-C175A"
(REFERENCE SHEET 137EP401d)
137-P-10
137EP401d
137EP401d
TO SBB
(REFERENCE SHEET 137EP401d)
SEE SHEET 137EP101C
137EP101D
SEE SHEET 137EP101C
137EP101D
LEGEND
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:5
:4
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
137EP101D
BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -
AREA D
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
KEY NOTES
1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
- 1/16" = 1'-0"
1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA D 8'0 16' 32'
PROJECT
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A A A A A A A A A A A A
A
A
A
A
A
A
A
A
A A A A A A
A A A A A A A A A A A A
B B B B B B
B
B
B
B
B
B
B
B
B B B B B B B B B B B B B B
B B B B B B B B
BBBBBBB
A A
B B
A A
B B
AREA SHOWN
A B C D E F G H L M N O P Q R S T U V W X Y Z
6.5
18.5
146EP401a
146EP401a
146EP401b
146EP401b
146-90AA-6,8
146-CU-02-90A
146-P-05
146-P-02
TO PANELBOARD "146-3B"
(REFERENCE SHEET 146EP401a)
TO PANELBOARD "146-3A"
(REFERENCE SHEET 146EP401a)
TO PANELBOARD "146-90AB"
(REFERENCE SHEET 146EP401b)
146-P-03
TO PANELBOARD "146-90AA"
(REFERENCE SHEET 146EP401b)
146-P-06
ELECT
CLOSET
E1
SOCIAL
WORKER
2 TR
MECH
ROOM
CONFERENCE
ROOM
ACNS EXT
CARE
NURSING
NURSE
PRACTITIONER
NURSE
PRACTITIONER
MEN'S
TOILET
WOMEN'S
TOILET
PATIENT
ROOM (4)
LIBRARY
TOILET
BATH
14 BATH
TOILET
PATIENT
ROOM (2)
PATIENT
ROOM (4)
QUIET ROOM
CLEAN LINEN
O2 STORAGE
TOILET
CONGREGATE
BATH
BATH
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
STORAGE
DAY / DINING
ROOM
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(1)
TOILET
SHOWER
ROOM
PATIENT
ROOM
(1)
PATIENT
ROOM
(1)
SHOWER
ROOM
TOILET
PATIENT
ROOM
(1)
PATIENT
ROOM
(2)
TOILET
TOILET
NURSE
STATION
NOURISHMENT
ROOM
MEDICATION
ROOM
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
STAFF
LOUNGE
CLEAN
SUPPLY
SOILED
UTILITY
NUTRITION
ROOM
55A
BATH
HAC
NURSE
STATION
TOILET
CLOSET
MEDICATION
ROOM
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM (2)
TOILET
PATIENT
ROOM (2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM (2)
TOILET
TOILET
PATIENT
ROOM (2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM (2)
TOILET
OFFICE
5A
ENTRANCE
C1A
DATA
CLOSET
T1
BATH
23A
TOILET
34A
TOILET
41AELEC CLOSET
E3
DATA CLOSET
T2
PATIENT
ROOM
(1)
STAFF TOILET
TOILET
SOCIAL WORK
SUPPLY ROOM
AREA MAINT
MECHANICAL
ROOM
STORAGE
PATIENT
LAUNDRY
HAC
STAFF OFFICE
SPD STORAGE
O/T STORAGE
HAC
OT CLINIC
UNISEX
TOILET
UNISEX
TOILET
OT OFFICE
K / T OFFICE
K / T STORAGE
KT CLINIC
ECRC DINING
ECRC
KITCHEN
ECRC
DAYROOM
VENDING
HYDRO
LUGGAGE
FILE STORAGE
BEAUTY
SALON /
BARBER SHOP
PATIENT
ROOM
(1)
TOILET
TOILET
PATIENT
ROOM
(1)
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(4)
PATIENT
ROOM (2)
TOILET
TOILET
PATIENT
ROOM (2)
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM (2)
BATH
HAC
NURSE
STATION
MED
ROOM
TOILET
TOILET
SOILED
UTILITY
CLEAN
LINEN
NURSE
TRAINING
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(1)
TOILET
BATH
PATIENT
ROOM
(1)
PATIENT
ROOM
(1)
TOILET
BATH
PATIENT
ROOM
(1)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
TOILET
TOILET
PATIENT
ROOM
(2)
PATIENT
ROOM
(2)
BATH
CONGREGATE
BATH
TOILET
NUR. MGR
177A
CLEAN LINEN
OXYGEN
STORAGE
QUIET ROOM
PATIENT
ROOM (2)
PATIENT
ROOM
(4)
TOILET
BATH
184BATH
TOILET
PATIENT
ROOM (4)
DEN
ELECT
CLOSET
E8
DATA
CLOSET
T5
NUTRITION
177B
BATH
175A
CORRIDOR
C6A
ELECT
CLOSET
E5
DATA CLOSET
T3
COOKING
CHILL
STAGING
104A
CORRIDOR
C6
STORAGE /
WORK AREA
111a
CORRIDOR
C7 CORRIDOR
C8
DATA
CLOSET
T4
ELECT
CLOSET
E6
CORRIDOR
C10
CORRIDOR
C9
CORRIDOR
C1
CORRIDOR
C2
CORRIDOR
C3
NURSE
MANAGER
55B
CORRIDOR
C4
CORRIDOR
C9A
CORRIDOR
C5
CORRIDOR
C8A
TR
90A
2 1
146EP401a
146EP401a
146EP401b
146EP401b
146-90AA-20
TO SBB
(REFERENCE SHEET 146EP401b)
TO SBB
(REFERENCE SHEET 146EP401a)
TO SHEET 146EP401c
TO SHEET 146EP401c
146EP401c
146EP401c
MECHANICAL
ROOM
MECHANICAL
ROOM
BLDG 146
LEGEND
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:0
:2
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
146EP101
BLDG 146 - LEVEL 01 - ELECTRICAL PLAN
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
0 20' 40'10'
PROJECT
NORTH
- 1" = 20'-0"
1 BLDG 146 - LEVEL 01 - ELECTRICAL PLAN
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR
CEILINGS UNLESS OTHERWISE NOTED.
10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL
CONTRACTOR FOR COMPLETION OF WORK.
TRUE
NORTH
GENERAL NOTES
PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO
SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR
ADDITIONAL INFORMATION.
KEY NOTES
AAA
A
A
A
A
A
A
A
AAAAAAAA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AAAAAAAA
B B B B B B B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BBBB
A A
BBBB
B
B
B
BBBBBBB
A A A A A
A
A
AAAAAAA
B
B
B
B
B
B
B
BB
B
B
B
B
B
B
B
B B B B B B B B B
A
A
B
B
B
BBBBBBB
AAAAAAA
A A
B B
A A
B B
As
Bs
Cs
Ds
Es
Fs
Gs
Hs
Is
Js
Ks
1s 2s 3s 4s 5s 6s 7s 8s 9s 10s 11s 12s 13s 14s
Aa
Ba
Ca
Da
Ea
Fa
Ga
Ha
Ia
Ja
Ka
L
1a 2a 3a 4a 5a 6a 7a 8a 9a 10a 11a 12a
Ab
Bb
Cb
Db
Eb
Fb
Gb
Hb
Ib
Jb
Kb
Mb
Nb
Ob
Pb
1b 2b 3b 4b 5b 6b 7b 8b 9b 10b 11b 12b 13b
Ac
1c
Bc
Cc
Dc
Ec
Fc
Gc
Hc
Ic
Jc
Kc
Lc
2c 3c 4c 5c 6c 7c 8c 9c 10c 11c 12c 13c 14c 15c
Ad
Bd
Cd
Dd
Ed
Fd
Gd
Hd
Id
Jd
Kd
Md
Nd
Od
Pd
Qd
Rd
1d 2d 3d 4d 5d 6d 7d 8d 9d 10d 11d 12d 13d
PATIENT RM (2)
P100
EM200
L100
MP-100
B-100
MB-100
EMB-100
J.BOX
75 kVA XFMR
DISCONNECT
CONTROL
ENCLOSURE
A200
EMA-200
A-200EMA-200
J.BOX
XFMR
PUMP CONTROLLER
RELAY PANEL
EMA-100
MA-100
A-100
DISCONNECT
A-200
EMA-200
DISC.
DISC.
D
IS
C
DISC.
DISC.
DISC.
DISC.
CONTROLS
ENCLOSURE
75kVA XFMR
TR
C185
ELECTRICAL CLOSET
C176
QUIET ROOM
D179
OFFICE
B180
148-P-08
148-P-02
148-P-05
148-P-11
148-P-10
148-P-04
148-P-03
148-P-09
TO PANELBOARD "148-B185B"
(REFERENCE SHEET
148EP401b)
TO PANELBOARD "148-B185A"
(REFERENCE SHEET 148EP401b)
TO PANELBOARD "148-A185A"
(REFERENCE SHEET 148EP401a)
TO PANELBOARD "148-A185B"
(REFERENCE SHEET 148EP401a)
TO PANELBOARD "148-D185A"
(REFERENCE SHEET 148EP401d)
TO PANELBOARD "148-D185B"
(REFERENCE SHEET 148EP401d)
PATIENT RM (2)
B119
A-200
EMA-200
EMA-100
MA-100
A-100
SWITCH CONTROLS
DISC.
DISC.
75 kVA
XFMR
DISC.
J.BOX
CONTROL
ENCLOSURE
C-100
MC-100
EMC-100
TO PANELBOARD
"148-C185A"
(REFERENCE SHEET
148EP401c)
TO PANELBOARD
"148-C185B"
(REFERENCE SHEET
148EP401c)
148EP401c
148EP401c
148EP401c
148EP401c
148EP401b
148EP401a
148EP401a
148EP401a
148EP401a
148EP401b
148EP401b
148EP401b
148EP401d
148EP401d
148EP401d
148EP401d
TR
A185
NO CURE PATIENT
ROOM
B137
PATIENT
SHOW ER/TOILET
B136
PATIENT SHOW ER
/TOILET
B135
PATIENT RM
B134
DAP OFFICE
B124
VACANT TOILET
B123
ELECTRICAL CLOSET
B125
STORAGE
B122
PATIENT RM (1)
B121
PATIENT
SHOW ER/TOILET
B120
PATIENT RM (2)
B115
PATIENT SHOW ER/
TOILET
B114
PATIENT SHOW ER
/TOILET
B113
PATIENT RM (2)
B112
PATIENT ROOM
B111
PATIENT
SHOW ER/TOILET
B110
PATIENT
SOW ER/TOILET
B109
PATIENT RM (2)
B108
STORAGE
B106
COMMUNICATION
CLOSET
B105
STORAGE
B104
PATIENT ROOM (2)
B103
PATIENT
SHOW ER/TOILET
B101
PATIENT
SHOW ER/TOILET
B102
PATIENT ROOM (2)
B100
CORRIDOR / LOUNGE
B107
CORRIDOR
CB1
TR
B185
LUGGAGE STORAGE
CB4
KITCHENETTE
B183
LAUNDRY
B182
MED FOS HOME
OFFICE
B181
OFFICE
B179
ELECTRICAL CLOSET
B176
LOUNGE
B178
STORAGE
B177
COMMUNICATION
CLOSET
B175
SOILED LINEN
B167
STORAGE
B166
PATIENT
SHOW ER/TOILET
B165
PATIENT RM (2)
B164
PATIENT RM (2)
B159
PATIENT ROOM /
TOILET
B158
PATIENT ROOM /
SHOW ER
B157
PATIENT RM (2)
B156
CORRIDOR
PATIENT ROOM
B152
PATIENT
SHOW ER/TOILET
B150
PATIENT
SHOW ER/TOILET
B151
H&CC OFFICE
B149
H&CC NURSE OFFICE
B148
H&CC RECEPTION
B153
ROOF
ACCESS/STORAGE
B154
TOILET
B147
H&CC MANAGER
B146
PATIENT RM (1)
B145
PATIENT
SHOW ER/TOILET
B162
PATIENT
SHOW ER/TOILET
B143
PATIENT ROOM (2)
B142
PATIENT ROOM (2)
PATIENT
SHOW ER/TOILET
B140
PATIENT
SHOW ER/TOILET
B139
PATIENT ROOM (2)
B138
LOUNGE
B133
CORRIDOR
CB2
HAC
B126
PATIENT RM (1)
B127
PATIENT
SHOW ER/TOILET
B128
STAFF TOILET
B129
PATIENT
SHOW ER/TOILET
B130
ROOF ACCESS
B132
PATIENT RM (1)
B131
CORRIDOR
CB3
COURTYARD
B155
PATIENT
SHOW ER/TOILET
B117
PATIENT
SHOW ER/TOILET
B118
PATIENT RM (2)
B116
PATIENT
SHOW ER/TOILET
PATIENT
SHOW ER/TOILET
B161
PATIENT RM (2)
B163
PATIENT RM(1)
B169
STORAGE
B168
PATIENT
SHOW ER/TOILET
B170
HAC
B171
PATIENT
SHOW ER/TOILET
B172
PATIENT RM (1)
B174
STORAGE
B184
PATIENT RM (2)
C111
PATIENT RM (2)
C108
PATIENT
TOILET/SHOW ER
C110
PATIENT
TOILET/SHOW ER
C109
STORAGE
C106
COMMUNICATION
CLOSET
C105
CLOSET
C104
LOUNGE
C107
PATIENT RM (2)
C103
PATIENT
TOILET/SHOW ER
C101
PATIENT
TOILET/SHOW ER
C102
PATIENT RM (2)
C100
CORRIDOR
CC1
LUGGAGE STORAGE
C184
KITCHENETTE
C183
LAUNDRY
C182
SSA OFFICE
C181
DOM SECT OFFICE
C180
VOC REHAB OFFICE
C179
LOUNGE
C178
STORAGE
C177
COMMUNICATION
CLOSET
C175
SOILED UTILITY
C167
CLEAN LINEN
C166
PATIENT
TOILET/SHOW ER
C165
PATIENT RM (2)
C164
PATIENT RM (2)
C159
PATIENT
TOILET/SHOW ER
C158
PATIENT
TOILET/SHOW ER
C157
PATIENT RM (2)
C162
PATIENT RM (2)
C152
PATIENT
TOILET/SHOW ER
C151
PATIENT
SHOW ER/TOILET
C150
PATIENT RM (2)
C149
OFFICE
C148
STAFF
TOILET/SHOW ER
C153
STORAGE/ROOF
ACCESS
C154
PATIENT RM (2)
C146
PATIENT RM (1)
C145
PATIENT
TOILET/SHOW ER
C144
PATIENT
TOILET/SHOW ER
C143
PATIENT RM (2)
C142
PATIENT RM (2)
C141
PATIENT
SHOW ER/TOILET
C140
PATIENT
SHOW ER/TOILET
C139
PATIENT RM (2)
C138
PATIENT ROOM (2)
C137
PATIENT
TOILET/SHOW ER
C136
PATIENT
TOILET/SHOW ER
C135
PATIENT ROOM (2)
C134
DAP OFFICE
C124
STORAGE ROOM
C122
STAFF
TOILET/SHOW ER
C123
STORAGE
C125
LOUNGE
C133
PATIENT RM (1)
C121
PATIENT
TOILET/SHOW ER
C120
PATIENT ROOM (2)
C115
PATIENT
TOILET/SHOW ER
C114
PATIENT
TOILET/SHOW ER
C113
PATIENT ROOM
C112
PATIENT ROOM (2)
C116
PATIENT
TOILET/SHOW ER
C118
PATIENT
TOILET/SHOW ER
C117
PATIENT RM (2)
C119
HAC
C126
STAFF TOILET
C129
PATIENT
TOILET/SHOW ER
C130
PATIENT
TOILET/SHOW ER
C128
PATIENT RM (1)
C127
PATIENT RM (1)
C131
STORAGE ACCESS
C132
CORRIDOR
CC3
CORRIDOR
CC2
COURTYARD
CC4
STORAGE
C174
HAC
C171
STORAGE
C168
PATIENT
TOILETSHOW ER
C172
PATIENT
TOILET/SHOW ER
C170
PATIENT RM (1)
C169
PATIENT ROOM (2)
C163
PATIENT
TOILET/SHOW ER
C161
PATIENT
TOILET/SHOW ER
PATIENT RM (2)
C160
LOUNGE
PATIENT ROOM (2)
D100
PATIENT
SHOW ER/TOILET
D101
PATIENT
SHOW ER/TOILET
D102
PATIENT ROOM
D103
STORAGE
D104
COMMUNICATION
CLOSET
D105
STORAGE
D106
LOUNGE
D107
PATIENT ROOM (2)
D108
PATIENT
SHOW ER/TOILET
D109
PATIENT
SHOW ER/TOILET
D110
PATIENT ROOM (2)
D111
PATIENT RM (2)
D112
PATIENT
SHOW ER/TOILET
D113
PATIENT
SHOW ER/TOILET
D114
PATIENT RM (2)
D115
PATIENT RM (2)
D116
PATIENT
SHOW ER/TOILET
D117
PATIENT
SHOW ER/TOILET
D118
PATIENT RM (2)
D119
PATIENT
SHOW ER/TOILET
D120
PATIENT RM (1)
D121
VACO OFFICE
D122
STAFF
SHOW ER/TOILET
D123
VACO OFFICE
D124
ELECTRICAL CLOSET
D125
HAC
D126
PATIENT RM (1)
D127
PATIENT
SHOW ER/TOILET
D128
STAFF TOILET
D129
PATIENT
SHOW ER/TOILET
D130
RESIDENCE
A152
BATHROOM
A150
BATHROOM
A151
RESIDENCE
A149
RESIDENCE
A148
PATIENT RM (2)
A146
PATIENT
SHOW ER/TOILET
A147
ELECTRICAL RM
A154
RESIDENCE
A160
BATHROOM
A162
RESIDENCE
A145
CORRIDOR
CA3
ATRIUM
A153
OFFICE
S104A
OFFICE
S105
CHIEF, DOMICILLARY
S108
OFFICE
S109
OFFICE
S107
STORAGE
S106
DOM CARE
OFFICE/RECEPTION
S104
MAIN ENTRANCE
S100
MEN'S TOILET
S102
W OMEN'S TOILET
S103
FITNESS CENTER
S142
CORRIDOR
S101
GROUP/CONFERENCE
RM
S111
CONNECTING
CORRIDOR
CS1A
LAUNDRY
A182
SOCIAL W ORK
A181
SOCIAL SCIENCE
ASST.
A180
PROGRAM
SPECIALIST
A179
ELEC. CLOSET
A176
CLOSET
A171.1
HAC
A171
KITCHENETTE
A183
SPRINKLER ROOM
A184
PATIENT RM (1)
D131
STORAGE/ROOF
ACCESS
D132
VACO RECEPTIONIST
VACO OFFICE
D134
STAFF
SHOW ER/TOILET
D135
PATIENT
SHOW ER/TOILET
D136
PATIENT RM (2)
D137
PATIENT ROOM (2)
D138
PATIENT
SHOW ER/TOILET
D139 PATIENT
SHOW ER/TOILET
D140
PATIENT ROOM (2)
D141
PATIENT ROOM (2)
D142
PATIENT
SHOW ER/TOILET
D143
PATIENT
SHOW ER/TOILET
D144
PATIENT RM (1)
D145
PATIENT ROOM (2)
D146
STAFF
SHOW ER/TOILET
D147
TRANS RES GRGM
OFFICE
D148
PATIENT ROOM (2)
D149
PATIENT
SHOW ER/TOILET
D150
PATIENT
SHOW ER/TOILET
D151
PATIENT ROOM (2)
D152
LOUNGE
D153
STORAGE/ROOF
ACCESS
D154
PATIENT RM (2)
D156
PATIENT
SHOW ER/TOILET
D157
PATIENT
SHOW ER/TOILET
D158
PATIENT RM (2)
D159
PATIENT RM (2)
D160
PATIENT
SHOW ER/TOILET
D161
PATIENT
SHOW ER/TOILET
D162
PATIENT RM (2)
D163
PATIENT RM (2)
D164
PATIENT
SHOW ER/TOILET
D165
CLEAN LINEN
D166
SOILED UTILITY
D167
STORAGE
D168
PATIENT RM (1)
D169
PATIENT
SHOW ER/TOILET
D170
HAC
D171
STAFF TOILET
D172
PATIENT RM (1)
D173
STORAGE
D174
COMMUNICATION
CLOSET
D175
ELECTRICAL CLOSET
D176
STORAGE
D177
FMS AREA
MAINTENANCE
A167
STORAGE
A166
BATHROOM
A165
RESIDENCE
A164
PATIENT RM (2)
A159
PATIENT
SHOW ER/TOILET
A158
PATIENT
SHOW ER/TOILET
A157
PATIENT RM (2)
A156
BATHROOM
A161
RESIDENCE
A163
RESIDENCE
A169
STORAGE
A168
BATHROOM
A170HAC
A175
BATHROOM
A172
RESIDENCE
A173
ROOF HATCH/
LADDER RM
A174
BATHROOM
A144 BATHROOM
A143 RESIDENCE
A142
RESIDENCE
A141
BATHROOM
A139
BATHROOM
A140
RESIDENCE
A138
RESIDENCE
A137
OFFICE
A134
BATHROOM
A135
BATHROOM
A136
LOUNGE
D178
DOM SECT OFFICE
D180
SSA OFFICE
D181
LAUNDRY
D182
KITCHENETTE
D183
LUGGAGE STORAGE
D184
TR
D185
COURTYARD
D186
MEDICAL LOUNGE
A124
RESIDENCE
A122
NURSE
PRACTITIONER
A123
ELECTRICAL CLOSET
A125
RESIDENCE
A121
BATHROOM
A120
RESIDENCE
A115
BATHROOM
A114
BATHROOM
A113
RESIDENCE
A112
ATRIUM
A107
RESIDENCE
A111
BATHROOM
A110
BATHROOM
A109
RESIDENCE
A108
RESIDENCE
A103
STORAGE
A106
DATA CLOSET
A105
STORAGE
A104
RESIDENCE
A116
PATIENT
SHOW ER/TOILET
A118
BATHROOM
A117
RESIDENCE
A119
HAC
A126
RESIDENCE
A127
BATHROOM
A128
BATHROOM
A130
PATIENT
SHOW ER/TOILET
A129
ROOF HATCH/
LADDER RM
A132
RESIDENCE
A131
BATHROOM
A101
BATHROOM
A102
RESIDENCE
A100
CORRIDOR
CD1
CORRIDOR
CD4
CORRIDOR
CD3
CORRIDOR
CD2
STORAGE
S142 A
STORAGE
S142 B
STORAGE
S142 C
OFFICE
S139
MEN'S TOILET
S141
W OMEN'S TOILET
S140
CLOSET
S139 A
STORAGE
S139 B
VENDING
S137
HAC
S138
CLOSET
S137 A
CLOSET
S136 D
CLOSET
S136 E
STORAGE
S136 C
STORAGE
S136B
STORAGE
S136 A
GROUP ROOM
S136
LIBRARY
S134
W AITING ROOM
S135
W AITING RM
S115
PATIENT SCREENING
S116
STORAGE
S117
OFFICE
S125
OFFICE
S126 A
ELECTRICAL CLOSET
S127
MAIN
COMMUNICATION
CLOSET
S128
MECHANICAL ROOM
S132
ELECTRICAL ROOM
S133
MECHANICAL ROOM
S131
STORAGE
S130
STORAGE
S129
OFFICE
EMS STORAGE
S124
STORAGE
S123
MEN'S
TOILET/SHOW ER
S122
W OMEN'S
TOILET/SHOW ER
S121
OFFICE
S119
OFFICE
S118
GENERAL STORAGE
S114
ELECTRICAL CLOSET
S113
BREAK
ROOM/LOUNGE
S120
CORRIDOR
CORRIDOR
CA4
ATRIUM
A133
ATRIUM
CA2
ATRIUM
A178
ATRIUM
CA1
CONNECTING
CORRIDOR
CS1B
CORRIDOR
CS2
CORRIDOR
CS3
COURTYARD
CS4
CORRIDOR
Room
Room
Room
Room
CORRIDOR
CORRIDOR
PATIENT ROOM
C173
CORRIDOR
Room
CORRIDOR
CORRIDOR
CORRIDOR
148EP401e
148EP401e
TO SBB
(REFERENCE SHEET
148EP401c)
TO SBB
(REFERENCE SHEET 148EP401d)
TO SBB
(REFERENCE SHEET 148EP401a)
TO SBB
(REFERENCE SHEET 148EP401b)
AREA SHOWN
BLDG 148
'A' SIDE POWER, CONCEALED WHERE POSSIBLE
'B' SIDE POWER, CONCEALED WHERE POSSIBLE
'A' SIDE POWER, UNDERGROUND /UNDERFLOOR
'B' SIDE POWER, UNDERGROUND /UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:0
:3
A
M
B
IM
/5
-2
-7
V A
H a m p to n E
H R
M /E
E
B L D
G
.r v t
148EP101
BLDG 148 - LEVEL 01 - ELECTRICAL PLAN
JPB/WNM BCL/GPB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
- 1" = 25'-0"
1 BLDG 148 - LEVEL 01 - ELECTRICAL PLAN 0' 25' 50'15'5' 10'
PROJECT
NORTH
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .