These are electrical construction drawings for the EHRM Infrastructure Upgrades at Hampton VA Medical Center, Hampton, Virginia. The documents consist of Level 01 and Level 02 electrical plans for multiple buildings (114, 116, 137, 146, 148, 148T, 168, 173-173A, and 110/110B), prepared at 100% Construction Documents phase dated July 18, 2025.

The drawings depict electrical power distribution, including A-side and B-side sourced power feeders (both concealed and underground/underfloor configurations), panelboards, transformers, backup power systems, emergency systems, telecommunications bonding infrastructure, and lighting layouts across various facility areas. Key elements include switchboards, automatic transfer switches (ATS), main distribution panels (MDP), data racks, access control panels, fire alarm systems, and utility rooms. General notes require contractors to field-verify all existing electrical systems, coordinate shutdowns with the VA to maintain power to essential equipment, provide backup emergency power, seal wall and ceiling penetrations to fire ratings, update circuit panel directories, provide pull boxes for long feeder runs, conceal conduit in walls or above ceilings, and coordinate all work with general contractors. The documents are prepared by SPEES Design Build (23830 Pacific Highway S., Suite 203, Kent, WA 98032) under VA project number IM 360://509-22-700, with the engineering discipline listed as M/E (Mechanical/Electrical).

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A A

B B

A A

B B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

A

B

C

E

G

H

J

K

L

M

N

P

Q

R

S

A102K

CGB-4

CORRIDOR

A102

PRIVATE

ROOM

A102C

LAUNDRY

ROOM

A102B

PRIVATE ADA

ROOM

A102D

PRIVATE

ROOM

A102E

PRIVATE

ROOM

A102F

PRIVATE

ROOM

A102G

PRIVATE

ROOM

A102H

PRIVATE

ROOM

A102J

TOILET

SHOWER

A102J.1

TOILET

SHOWER

A102G.1

TOILET

SHOWER

A102E.1

TOILET

SHOWER

A102E.2

TOILET

SHOWER

A102H.1

TOILET

SHOWER

A102F.1 ADA TOILET

SHOWER

A102D.1

PRIVATE

ROOM

A102A

TOILET

SHOWER

A102A.1

CONFERENCE

ROOM

A101

KITCHEN

A104

CONFERENCE

ROOM

A105

OFFICE

A106

OFFICE

A107

OFFICE

A110

OFFICE

A111

WORK ROOM

A112

MEN'S

TOILET

A113

TR

A114

WOMEN'S

TOILET

A115

JANITOR

STORAGE

A116

ELEVATOR

AG09

STAIR

S1A-3

CORRIDOR

C1A-1

STAIR

S1A-1

114EP402

114EP402

114EP402

114EP402

AREA SHOWN

BLDG 114

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:4

:5

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

114EP102

BLDG 114 - LEVEL 02 - ELECTRICAL PLAN

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

- 1/8" = 1'-0"

1 BLDG 114 - LEVEL 02 - ELECTRICAL PLAN 4'0 8' 16'

PROJECT

NORTH

Revisions: Date:

KEY PLAN

KEY NOTES

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

A A

AA

A A A A A A

A A A A A

A

A

A

A

A

A

A

A

AA

AA

B

B

B

B

B B B B B B B B B

B

B

B

B

B

B

B

AAAAAA

A A

B B

A A

B B

AREA SHOWN

BLDG 116

A B C D E F F.5 G H H.5 J K L M NM.5

TR

103B

116EP401

116EP401

METERING ENCLOSURE

SWBD 116

500KVA XFMR

JBOX

CHILLER ECB

PANEL RE1 DISCONNECT

30KVA XFMR

HIGH VOLTAGE

EQUIPMENT

ATS-116

116-P-02 116-P-01

TO PANELBOARD "116-103BA"

(REFERENCE SHEET 116EP401)

TO PANELBOARD "116-103BB"

(REFERENCE SHEET 116EP401)

116EP401

CONFERENCE

ROOM

102I

OFFICE/STORAGE

102H

OFFICE

102J

BREAK

ROOM

102G

STORAGE

102E

SALAD

PREPARATION

102F

NOURISHMENT

103D

POT-PAN

WASH

103C

STORAGE

103E

OFFICES

103A

PAPER

STORAGE

CORRIDOR

C120

FREEZER #3

107C

FREEZER

DAY ISSUE

107D

FREEZER #2

107B

INGREDIENT

CONTROL

FREEZER #1

107A

COOLER

COOLER

103H

KITCHEN

PRODUCTION

DISH ROOM

102B

102A

BREAK

ROOM

CART

RETURN

AREA

101F

CHARGING

ROOM

101A

OFFICE

101B

SUPERVISOR

FOOD

SERVICE

101C

TRAY

SERVICE

CART

WASHING

101E

STORAGE

STOCK

101D

COMMUNICATION

CLOSET

101D.1

LEAD

DIETITIAN

102D

FEMALE

TOILET

100C

LOBBY

MEN'S

TOILET

100B

VESTIBULE

100A

SECRETARY

100D

SUPERVISOR

DIETITIAN

100F

CHIEF

SERVICE

100E

DINING AREA

MECHANICAL

ROOM

SHIPPING

FOOD BANK

#2

106A

SHIPPING

FOOD BANK

#1

M/T

REFRIGERATOR

M/T

REFRIGERATOR

MEAT

PREPARATION

REFRIGERATOR

#2

113AENCLOSED

DOCK

COOLER

114 FREEZER

DAY ISSUE

112A

VC ROOM

MECHANICAL

ROOM

113B

DRY

STORAGE

103F

CORRIDOR

C123

STORAGE

114A

CHEM

STORAGE

114B

MECHANICAL

ROOM

LOCKER

ROOM MALE

MEN'S

TOILET

115A STORAGE

DRY GOODS

WOMEN'S

TOILET

118A

LOCKER

ROOM

FEMALE

STORAGE,

LAUNDRY

103G

CORRIDOR

C101

SERVING

LINE

102C

FIRE PANEL

SECURITY PANEL

PRIMARY BONDING

BUSBAR (PBB) E-504

116EP401

TO SBB (REFERENCE SHEET 116EP401)

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:4

:2

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

116EP101

BLDG 116 - LEVEL 01 - ELECTRICAL PLAN

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

8'0 16' 32'

PROJECT

NORTH

- 1/16" = 1'-0"

1 BLDG 116 - LEVEL 01 - ELECTRICAL PLAN

KEY PLAN

TRUE

NORTH

GENERAL NOTES

Revisions: Date:

KEY NOTES

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAMS FOR

ADDITIONAL INFORMATION.

PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET

EG602 FOR ADDITIONAL INFORMATION.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

AAAAAAA

A A A A A A A A A A A

A

A

A

A

A

A

B

B

B

B

B

B B B B B

BB

B B B B B B B

B

B

B

B

A A

B B

A A

B B

A B C E F J K

G H I L M N O P SQ R TD

SUPERVISOR OFFICES

A69

WORK AREA

A67A

LOCK SHOP OFFICE

A67

SOCIAL WORKER

A66

VOC SPEC

A64

CORRIDOR

CA12

OFFICE

A65

ADDICTION THERAPIST

A63

OFFICE

A56

ADDICTION THERAPIST

A54

CORRIDOR

CA11

ADDICTION

THERAPIST

A55

PHYSICIAN

A53

ADDICTION

THERAPIST

A49

ADDICTION

THERAPIST

A47

PHYSICIAN

A48

SOCIAL WORKER

A46

CORRIDOR

CA10

PHYSICIAN

A39

HAC

A43

ELECT CLOSET

A45

ADDICTION THERAPIST

A37

PHYSICIAN

A38

MHC OFFICE

A29

ADDICTION THERAPIST

A27

SATP/SAW OFFICE

A28SATP/SAW COORDINATOR

A28A

OFFICE

A25

PHYSICIAN OFFICE

A26

OFFICE

A23

CORRIDOR

CA8

CORRIDOR

CA7

SOCIAL WORKER

A22

SOCIAL WORKER

A21

ADDICTION THERAPIST

A20

CORRIDOR

CA5

CORRIDOR

CA6

SOCIAL WORKER

A18

PHYSICIAN

A19

VENDING ROOM

A16

COMM CLOSET

A14

PST GROUP

A12

WAITING AREA

A13

OFFICE

A17

SOCIAL WORKER

A30

SOCIAL WORKER

A32

SOCIAL WORKER

A34

PHYSICIAN

A36

PHYSICIAN

A40

PHYSICIAN

A71

PHYSCOLOGIST

A73

CHAPLAIN OFFICE

A75

CORRIDOR

CA1

OFFICE

A02A

OFFICE

A02B

CORRIDOR

A02

GROUP ROOM

A04

CORRIDOR

CA2

SCI OFFICE

A01 SCI REC THERAPIST

A10

CORRIDOR

CA3

SCI REC THERAPIST

A08

DIETICIAN/ NUTRITION

A03

TRAINING/ CONF RM

A06

GROUP ROOM

A09

GROUP ROOM

A07

KINESIOTHERAPY

A131

OFFICE

A131A

SUPERVISOR'S OFFICE

A68A

EQUIP STORAGE

A70

EQUIP CLEANING

A70A

PT CLOTHING ROOM

A58

MAINT STORAGE

A70B

OFFICE

A52

ELECTRICAL CLOSET

A50

ELECTRICAL ROOM

A44

CORRIDOR

CA9

PHYCH INTERN

A84

PHYSICIAN

A82

PHYSICIAN

A80

PHYSICIAN

A78

CLINICAL NURSE

A76

PHYCH INTERN

A83

PHYSICIAN OFFICE

A81

CLINICAL NURSE

A87

PHYSICIAN OFFICE

A86

BEHAVIORAL PSYCH

A93

BEHAVIORAL PSYCH

A92

CORRIDOR

CA16 CORRIDOR

CA17

NEURO PSYCH LAB

A96

PSYCHOLOGIST

A100

VRT OFFICE

A98

STORAGE

A99A

CORRIDOR

CA18

PSYCHOLOGIST

A99

OFFICE

A102

LEAD PSYCHOLOGIST

A104

SOCIAL WORKER MGR

A106

MH & BS ADMIN OFF

A108

CORRIDOR

CA14

PSYCHOLOGIST

A79

PSYCHOLOGIST

A77

TR

A85

OFFICE

A125

PHYSICIAN

A89

SC/MDS COORDINATOR

A123

SCI CONF ROOM

A91

CENTRAL TESTING

A95

PHYSICIAN

A97

PHYSICIAN

A101

PSYCHOLOGIST

A103

MENS TOILET

A117

FEMALE TOILET

A115

EDUCATION/CONF RM

A105

CORRIDOR

CA19

CORRIDOR

CA15

MH&BS SECRETARY

A110

PHYSICIAN

A132

MALE TOILET

A128

FEMALE TOILET

A126

ELECT CLOSET

A124

COMM CLOSET

A124A

HAC

A140

NURSE CLINIC

A141

SOCIAL WORKER

A133

SOCIAL WORKER

A135

PHYSICIAN

A137

PSYCHOLOGIST

A139

SCI DENTAL TREAT

A143

BREAK ROOM

A68

ELEC CLOSET

A112

STAFF LOUNGE

A113

PHYSICIAN

CORRIDOR

CA20

PHYSICIAN

A116

CORRIDOR

CA22

Room

CA23

AO OFFICE

A145

CHIEF, SCI

A147

CORRIDOR

CA25

TV/REC ROM

A144

DATA CLOSET

A122

DIETICIAN

D100C

ELEC.

D100D

WARMING KITCHEN

D100E

DINING

D100

KITCHEN

D100B

TO PANELBOARD "137-A85A"

(REFERENCE SHEET 137EP401a)

TO PANELBOARD "137-A85B"

(REFERENCE SHEET 137EP401a)

137-P-07

137-P-02

CLERICAL SPACE

A11A

CLERICAL SPACE

A11C

CLERICAL SPACE

A11B

137EP401a

137EP401a

137EP401a

137EP401a

Room

Room

01C

Room

01A

Room

01B

Room

Room

C1

Room

Room

Room

A06A

Room

A02D

137EP401e

137EP401e

TO PANEL "137-DP-TRB",

(REFERENCE SHEET 137EP401e)

TO PANEL "137-DP-TRA",

(REFERENCE SHEET 137EP401e)

TO PRIMARY BONDING BUSBAR

(REFERENCE SHEET 137EP401e)

137EP101A

SEE SHEET 137EP101C

137EP101A SEE SHEET

137EP101B

TO PANELBOARD "137-B105BA"

(REFERENCE SHEET 137EP101B)

TO SBB

(REFERENCE SHEET 137EP101B)

TO PANELBOARD "137-B105BB"

(REFERENCE SHEET 137EP101B)

137-P-04

AREA SHOWN

BLDG 137

AREA A

LEGEND

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:5

:3

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

137EP101A

BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -

AREA A

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

- 1" = 25'-0"

1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA A

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

KEY NOTES

1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED

DIE-CAST ALUMINUM WHILE-IN-USE COVER.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

8'0 16' 32'

PROJECT

Revisions: Date:

A A A A A A

A A A A A A A A A A

A

A

A

B B B B B B B

BB

B B B B B B B B B B

B

B

AA

A A

B B

A A

B B

AREA SHOWN

BLDG 137

AREA B

O P S VQ R T U

W X Y Z AA BB CC DD EE FF GG HH II JJ KK LL

CORRIDOR

CA19

CHIEF, MH&BS SVC

A110A

MULTI. PURPOSE OFFICE

B04

PSYCHOLOGIST OFFICE

B06

MEDICAL GAS STORAGE

B08

PSYCHIATRIST OFFICE

A114

CONFERENCE ROOM

B07

NURSE MANAGER

B11

SOCIAL WORKER OFFICE

B13A

SOCIAL WORKER OFFICE

B13C

HAC

B145

PSYCIATRIST OFFICE

B141

PSYCHIATRIST OFFICE

B139

NURSE MANAGER

B137

NURSE SUB STATION

B35

SOCIAL WORKER OFFICE

B13B

EQUIPMENT STORAGE

B33

NURSE WORKROOM

B15

NURSE SUB STATION

B31

OFFICE SUITE

B13

CORRIDOR

CB9

HEARING ROOM

B05

PHYSICIAN OFFICE/

DICTATION

B149

INTERVIEW RM

B03

VISITOR

TOILET

B151

VISITOR

TOILET

B153

SMALL VISITOR RM

B155

NURSE EDUCATION

B01

CORRIDOR

CB1

CORRIDOR

CB2

PATIENT ROOM

B28

PATIENT TOILET

B28A

STORAGE

B30

PATIENT ROOM

B26

PATIENT TOILET

B26A

CLEAN LINEN

B24

PATIENT ROOM

B22

SECURE PATIENT STORAGE

B18

ANTEROOM

B16

PATIENT ROOM

B27

PATIENT TOILET

B27A

PATIENT TOILET

B25A

PATIENT ROOM

B21

PATIENT TOILET

B21A

CORRIDOR

CB3

NOURISHMENT

B40

SEC./COMM. CLOSET

B42

SPD CLEAN UTILITY

B43

ELECTRICAL CLOSET

B44

SOILED UTILITY

B45

QUIET ROOM

B47

CORRIDOR

CB5

FEMALE LOCKER ROOM

B39

MALE LOCKER ROOM

B41

EXAM ROOM

B34

PATIENT SHOWER

B117

PATIENT SHOWER

B115

REPORT ROOM/LOUNGE

B113 SPD CLEAN UTILITY

B111

SOILED UTILITY ROOM

B109

NURSING INSTRUCTOR

B105A

STORAGE

B107

CLASSROOM/

CONFERENCE ROOM

B105

TR

B105B

STAIRWELL

NO. 1

BS1

STAFF

TOILET

B41A STORAGE

B105C

PATIENT SHOWER

B49

PATIENT SHOWER

B51

ASSESSMENT ROOM

B53

NURSE STATION

B75

MEDICATION ROOM

B103A

MEDICATION VESTIBULE

B103

PATIENT

ISOLATION ROOM

B56B

PATIENT

ISOLATION TOILET

B56A

SECURE

PATIENT STORAGE

B58

PATIENT ROOM

B60

PATIENT TOILET

B60A

PATIENT TOILET

B62A

PATIENT ROOM

B62

PATIENT ROOM

B66

PATIENT TOILET

B66A

PATIENT TOILET

B68A

PATIENT ROOM

B68

CORRIDOR

CB12

PATIENT ROOM

B67

PATIENT ROOM

B65

PATIENT ROOM

B63

PATIENT TOILET

B63A

PATIENT ROOM

B61

PATIENT ROOM

B59

PATIENT TOILET

B61A

CORRIDOR

CB10

CORRIDOR

CB14

CORRIDOR

CB4

CORRIDOR

CB13

GROUP ROOM

B76

PATIENT TOILET

B80B

PATIENT TOILET

B80A

ART THERAPHY

STORAGE

B78

DAY/ DINING ROOM

B80

ENVIRONMENTAL

STORAGE

B77

SECLUSION

ROOM

B84A

ANTEROOM

B84

PATIENT

TOILET

B84B

AV ROOM

B80C.1

SECLUSION ROOM

B84C

STORAGE

B80C

FEMALE TV ROOM

B88

TOILET

B88A

PATIENT ROOM

B90

PATIENT TOILET

B90A

PATIENT TOILET

B92A

PATIENT ROOM

B92

PATIENT ROOM

B96

PATIENT TOILET

B96A

PATIENT TOILET

B98A

PATIENT ROOM

B98

PATIENT TOILET

B22A

PATIENT TOILET

B20A

PATIENT ROOM

B20

PATIENT ROOM

B25

PATIENT ROOM

B23

PATIENT ROOM

B17

PATIENT TOILET

B17A

PATIENT TOILET

B23A

PATIENT ISOLATION ROOM

B16B

PATIENT TOILET

B16A

ANTE ROOM

B56

PATIENT TOILET

B59A

SHOWER

B64

CLEAN LINEN

B70

PATIENT TOILET

B67A

PATIENT TOILET

B65A

CLEAN LINEN

B101

PATIENT ROOM

B99

PATIENT TOILET

B99A

PATIENT TOILET

B97A

PATIENT ROOM

B97

WOMEN'S SHOWER

B95

PATIENT ROOM

B93

PATIENT TOILET

B93A

PATIENT ROOM

B91A

PATIENT ROOM

B91

SHOWER ROOM

B89

PATIENT ISOLATION ROOM

87B

PATIENT ISOLATION TOILET

B87A

ANTE ROOM

B87

CORRIDOR

CB15

STORAGE

B133

PATIENT ROOM

B131

PATIENT TOILET

B131A

PATIENT TOILET

B129A

PATIENT ROOM

B129

CLEAN STORAGE/ LINEN

B127

PATIENT ROOM

B125

PATIENT TOILET

B125A

PATIENT TOILET

B123A

PATIENT ROOM

B123

SECURE PATIENT STORAGE

B121

CORRIDOR

CB11

PATIENT ISOLATION ROOM

B119B

PATIENT ISOLATION TOILET

B119A

ANTE ROOM

B119

PATIENT TOILET

B120A

PATIENT ROOM

B120

PATIENT ROOM

B122

PATIENT TOILET

B122A

PATIENT TOILET

B124A

PATIENT ROOM

B124

PATIENT ROOM

B128

PATIENT TOILET

B128A

PATIENT TOILET

B130A

PATIENT ROOM

B130

NOURISHMENT

B114

VESTIBULE

B110

PATIENT LAUNDRY

B108

SOILED LINEN

B142

VESTIBULE

CB8

EMS STORAGE

B144

VISITOR ROOM

B148

INTERN WORK ROOM

B150

CORRIDOR

CA20

EXAM ROOM

B32

STAFF TOILET

B39A

137EP401b

137EP401b

TO PANELBOARD "137-B105BB"

(REFERENCE SHEET 137EP401b)

TO PANELBOARD "137-B105BA"

(REFERENCE SHEET 137EP401b)

137-P-09

137-P-04

137EP401b

137EP401b

TO SBB

(REFERENCE SHEET 137EP401b)

137EP101BSEE SHEET

137EP101A

137EP101B

SEE SHEET

137EP101C

TO PANELBOARD "137-DP-TRA"

(REFERENCE SHEET 137EP101A)

TO PANELBOARD "137-DP-TRB"

(REFERENCE SHEET 137EP101A)

LEGEND

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:5

:4

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

137EP101B

BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -

AREA B

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

KEY NOTES

1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED

DIE-CAST ALUMINUM WHILE-IN-USE COVER.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

- 1/16" = 1'-0"

1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA B 8'0 16' 32'

PROJECT

A

A

A

A

A

A

A

A

A

A

A

A

AAAAAAA

B

B

B

B

B

B

B

B

B

B

B

B

B

B

A A

B B

A A

B B

AREA SHOWN

BLDG 137

AREA C

F J K

G H I L M N O P S VQ R T U W X Y Z

STAFF SHOWER

1C209

STAFF SHOWER

1C210

PATIENT TLT. 7

1C213A

PATIENT ROOM 14 - ONE

BED

1C213

PATIENT ROOM 15 - ONE

BED

1C214

PATIENT TLT. 5

1C214A

CLOSET

1C214B

PATIENT ROOM 16 - ONE

BED

1C215

CLOSET

1C215B

PATIENT TLT. 6

1C215A

PATIENT TLT. 8

1C217A

CLOSET

1C213B

PATIENT ROOM 17 - ONE

BED

1C217

PATIENT ROOM 18 - ONE

BED

1C218

PATIENT TLT. 18

1C218A

PATIENT TLT. 19

1C221A

STAIR #2

1C220

CLOSET

1C217B

CLOSET

1C218B

ELEC

1C216

PATIENT ROOM 19 - ONE

BED

1C221

CLOSET

1C221B

PATIENT ROOM 20 - ONE

BED

1C222

CLOSET

1C222B

PATIENT TLT. 20

1C222A

PATIENT TLT. 21

1C224A

PATIENT ROOM 25 - ONE

BED

1C230

CLOSET

1C230B

O.P. NURSE

1C132A

PATIENT ROOM1 - ONE BED

1C129

CORRIDOR

CC6

PATIENT TLT. 1

1C129A

PATIENT TLT. 2

1C127A

PATIENT ROOM 2- ONE BED

1C127

PATIENT TLT. 14

1C122A

TELE. HEALTH

1C132B

PATIENT ROOM 5- ONE BED

1C133

PATIENT TLT. 4

1C133A

PATIENT TLT. 3

1C134A

PATIENT ROOM 25 - ONE

BED

1C134

SATELLITE HEAD-END CLST.

1C132

TRAINING ROOM

1C131

COMPUTER

1C130

PATIENT ROOM 31&32-TWO

BED

1C122

PATIENT TLT. 42

1C122B

SPD

1C126

CLEAN LINEN

1C123

HAC

1C124

CORRIDOR

CC5

CORRIDOR

CC8

NURSE STATION

1C118

DAY ROOM

1C128

CORRIDOR

CC4

PATIENT TLT. 41

1C120B

PATIENT ROOM 37&38-TWO

BED

1C120

PATIENT TLT. 16

1C120A

NURSE MANAGER

1C119 MED ROOM

C118A

MEDS

1C117

CLERK

1C141

CORRIDOR

CC7

OCCUPATIONAL THERAPHY

1C135

ELECTRIC

1C9A

PATIENT TLT. 11

1C136A

PATIENT ROOM 41&42 - TWO

BED

C136

STUDENT OFFICE

1C212

SOILED UTILITY

1C211

PATIENT ROOM 35&36 - TWO

BED

1C137

PATIENT TLT. 15

1C137A

NOUR KITCH.

1C138

STAFF TOILET

C139

PATIENT ROOM 11 - ONE

BED

1C115

PATIENT TLT. 27

1C115A

PATIENT TLT. 26

1C112A

PATIENT ROOM 3 - ONE BED

1C112

PATIENT STORAGE

1C116

RESP OFFICE

1C114

TR

1C142

EQUIPMENT STORAGE

1C113

ELECTRIC

1C143

ELECTRIC

1C111A

PATIENT ROOM 30 - ONE

BED

1C140

Room

1C107

PATIENT TLT. 25

1C140A

PATIENT TLT. 32

1C144A

PATIENT ROOM 10 -ONE BED

1C144

J.BOX

SCH2

DISC. SCL2

SCL2 SEC 1

SCL2 SEC 2

CONTROLS ENCLOSURE

SCC2

SCEQ2

SCLS2

TELECOMMUNICATION RACK

SCL1A

XFMR TL1A

J.BOX

SCC3A

XFMR TC3

CONTROLS ENCLOSURE

137EP401c

137EP401c

137-P-08

TO PANELBOARD "137-1C142A"

(REFERENCE SHEET 137EP401c)

137-P-03

TO PANELBOARD "137-1C142B"

(REFERENCE SHEET 137EP401c)

137-CU-03-1C142

137-1C142A-20

137-P-13

137EP401c

137EP401c

E-503

EQUIP.

TO SBB

(REFERENCE SHEET 137EP401c)

137EP101C

SEE SHEET 137EP101B

137EP101C

SEE SHEET 137EP101D

137EP101C

SEE SHEET 137EP101B

137EP101C

SEE SHEET 137EP101D

LEGEND

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:5

:4

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

137EP101C

BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -

AREA C

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

KEY NOTES

1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED

DIE-CAST ALUMINUM WHILE-IN-USE COVER.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

- 1/16" = 1'-0"

1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA C 8'0 16' 32'

PROJECT

A A A A A A

A

A

A

A

A

A

A

A

A

A

B

B

B

B

B

B

B

B

B

B

B

B

B B B B B B B

A A

B B

A A

B B

AREA SHOWN

BLDG 137

AREA D

F J K

G H I L M N O P S VQ R T U

PATIENT ROOM

C183

PATIENT ROOM

C181

PATIENT TOILET

B183A

PATIENT TOILET

C185A

PATIENT TOILET

C179A

PATIENT TOILET

C181A

PATIENT ROOM

C185

PATIENT ROOM

C179

PATIENT ROOM

C187

TR

C175

STORAGE ROOM

C177

PATIENT TOILET

C173A

PATIENT ROOM

C173

PATIENT ROOM

C171

PATIENT

TOILET

C171A

PATIENT

TOILET

C169A

PATIENT ROOM

C169

PATIENT ROOM

C167

PATIENT TOILET

C167A

WAITING ROOM

C165

VESTIBULE

CV1

CORRIDOR

CC10A

DIRTY LINEN

C163

ELECTRICAL

C161

PATIENT TOILET

C157A SPRINKLER

C159

PATIENT ROOM

C157

DAY ROOM

C156

MEDS

C158A

NURSE STATION

C158

CORRIDOR

CC12

PATIENT TOILET

C170A

PATIENT ROOM

C170

PATIENT ROOM

C172

PATIENT TOILET

C172A

CLOSET

C174

PATIENT TOILET

C190A

PATIENT ROOM

C190

PATIENT ROOM

C192

PATIENT TOILET

C187A

PATIENT TOILET

C189A

PATIENT ROOM

C189

CORRIDOR

CC13

STAIR

CS1

PATIENT ROOM

C191

PATIENT TOILET

C191A

PATIENT TOILET

C193A

PATIENT TOILET

C194A

PATIENT TOILET

C192A

PATIENT ROOM

C193

PATIENT ROOM

C194

PATIENT ROOM

C195

PATIENT ROOM

C196

PATIENT TOILET

C195A

PATIENT TOILET

C197A

PATIENT TOILET

C196A

PATIENT ROOM

C197

PATIENT TOILET

C199A

PATIENT ROOM

C199

PATIENT ROOM

C107

CORRIDOR

1C16

CORRIDOR

1C12

NOURISHMENT

KITCHEN

1C108

PATIENT ROOM

C108

TOILET/ SHOWER AREA

C108A

SHARED PATIENT TLT.

26/27

1C106A

PATIENT ROOM 27 - ONE

BED

1C106

PATIENT ROOM

C109

PATIENT TLT. 40

C109A

SOILED UTILITY

1C110

CORRIDOR

CC3

NURSE MANAGER

1C104

PATIENT ROOM 21 - ONE

BED

1C224

CLOSET

1C224B

CLOSET

1C225B

PATIENT ROOM 22 - ONE

BED

1C225

PATIENT TLT. 25

1C230A

PATIENT TLT. 24

1C229A

CLN. LINEN

1C226

SPD

1C227

PATIENT TLT. 22

1C225A

PATIENT TLT. 23

1C228A

PATIENT ROOM23-ONE

BED

1C228

PATIENT ROOM 24 - ONE

BED

1C229

CLOSET

1C229B

CLOSET

1C228B

RECREATION THERAPY

1C111

PATIENT STORAGE2

1C105B

CLOSET

1C105A

NURSE SATELLITE

1C105

CORRIDOR

CC2

STUDENT OFFICE

1C103C

MED ROOM

1C105C

STAFF KITCHEN

1C100A

TOILET

1C103B

TOILET

1C103A

PATIENT ROOM 24 - ONE

BED

1C102

PATIENT TLT. 24

1C102A

LAUNDRY

1C101

CORRIDOR

CC1

STAFF LOUNGE

1C100

PATIENT TLT. 32

1C144A

SOILED LINEN

1C146

TLT.

1C147

HAC

1C148

PATIENT TLT. 33

1C149A

PATIENT ROOM 39 & 40 -

TWO BED

1C149

PATIENT TLT. 34

1C149B

PATIENT ROOM 29 - ONE

BED

1C150

SHARED PATIENT TLT.

28/29

1C150A

PATIENT ROOM 28 - ONE

BED

1C151

NOURISHMENT KITCHEN

1C152

SHARED PSYCH.

1C153

ASSOC. CHIEF NURSE

1C154

PATIENT TLT. 31

1C155A

PATIENT ROOM 4 - ONE

BED

1C155

CORRIDOR

CC11

CORRIDOR

CC10

137EP401d

137EP401d

C2

DISC. SAFETY SWITCH #1

DISC. SAFETY SWITCH #2

DISC. SAFETY SWITCH #3

75 kVA XFMR

C1-SEC 1

C1-SEC 2

225 kVA XFMR

LP1-SEC 1

LP1-SEC 2

MDP1

CONTROLS ENCLOSURE

75 kVA XFMR

LS

FIRE ALARM POWER SUPPLY

137-P-05

TO PANELBOARD "137-C175B"

(REFERENCE SHEET 137EP401d)

TO PANELBOARD "137-C175A"

(REFERENCE SHEET 137EP401d)

137-P-10

137EP401d

137EP401d

TO SBB

(REFERENCE SHEET 137EP401d)

SEE SHEET 137EP101C

137EP101D

SEE SHEET 137EP101C

137EP101D

LEGEND

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:5

:4

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

137EP101D

BLDG 137 - LEVEL 01 - ELECTRICAL PLAN -

AREA D

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

KEY NOTES

1 PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED

DIE-CAST ALUMINUM WHILE-IN-USE COVER.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

- 1/16" = 1'-0"

1 BLDG 137 - LEVEL 01 - ELECTRICAL PLAN - AREA D 8'0 16' 32'

PROJECT

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A A A A A A A A A A A A A

A

A

A

A

A

A

A

A

A A A A A A

A A A A A A A A A A A A

B B B B B B

B

B

B

B

B

B

B

B

B B B B B B B B B B B B B B

B B B B B B B B

BBBBBBB

A A

B B

A A

B B

AREA SHOWN

A B C D E F G H L M N O P Q R S T U V W X Y Z

6.5

18.5

146EP401a

146EP401a

146EP401b

146EP401b

146-90AA-6,8

146-CU-02-90A

146-P-05

146-P-02

TO PANELBOARD "146-3B"

(REFERENCE SHEET 146EP401a)

TO PANELBOARD "146-3A"

(REFERENCE SHEET 146EP401a)

TO PANELBOARD "146-90AB"

(REFERENCE SHEET 146EP401b)

146-P-03

TO PANELBOARD "146-90AA"

(REFERENCE SHEET 146EP401b)

146-P-06

ELECT

CLOSET

E1

SOCIAL

WORKER

2 TR

MECH

ROOM

CONFERENCE

ROOM

ACNS EXT

CARE

NURSING

NURSE

PRACTITIONER

NURSE

PRACTITIONER

MEN'S

TOILET

WOMEN'S

TOILET

PATIENT

ROOM (4)

LIBRARY

TOILET

BATH

14 BATH

TOILET

PATIENT

ROOM (2)

PATIENT

ROOM (4)

QUIET ROOM

CLEAN LINEN

O2 STORAGE

TOILET

CONGREGATE

BATH

BATH

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

STORAGE

DAY / DINING

ROOM

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(1)

TOILET

SHOWER

ROOM

PATIENT

ROOM

(1)

PATIENT

ROOM

(1)

SHOWER

ROOM

TOILET

PATIENT

ROOM

(1)

PATIENT

ROOM

(2)

TOILET

TOILET

NURSE

STATION

NOURISHMENT

ROOM

MEDICATION

ROOM

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

STAFF

LOUNGE

CLEAN

SUPPLY

SOILED

UTILITY

NUTRITION

ROOM

55A

BATH

HAC

NURSE

STATION

TOILET

CLOSET

MEDICATION

ROOM

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM (2)

TOILET

PATIENT

ROOM (2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM (2)

TOILET

TOILET

PATIENT

ROOM (2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM (2)

TOILET

OFFICE

5A

ENTRANCE

C1A

DATA

CLOSET

T1

BATH

23A

TOILET

34A

TOILET

41AELEC CLOSET

E3

DATA CLOSET

T2

PATIENT

ROOM

(1)

STAFF TOILET

TOILET

SOCIAL WORK

SUPPLY ROOM

AREA MAINT

MECHANICAL

ROOM

STORAGE

PATIENT

LAUNDRY

HAC

STAFF OFFICE

SPD STORAGE

O/T STORAGE

HAC

OT CLINIC

UNISEX

TOILET

UNISEX

TOILET

OT OFFICE

K / T OFFICE

K / T STORAGE

KT CLINIC

ECRC DINING

ECRC

KITCHEN

ECRC

DAYROOM

VENDING

HYDRO

LUGGAGE

FILE STORAGE

BEAUTY

SALON /

BARBER SHOP

PATIENT

ROOM

(1)

TOILET

TOILET

PATIENT

ROOM

(1)

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(4)

PATIENT

ROOM (2)

TOILET

TOILET

PATIENT

ROOM (2)

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM (2)

BATH

HAC

NURSE

STATION

MED

ROOM

TOILET

TOILET

SOILED

UTILITY

CLEAN

LINEN

NURSE

TRAINING

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(1)

TOILET

BATH

PATIENT

ROOM

(1)

PATIENT

ROOM

(1)

TOILET

BATH

PATIENT

ROOM

(1)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

TOILET

TOILET

PATIENT

ROOM

(2)

PATIENT

ROOM

(2)

BATH

CONGREGATE

BATH

TOILET

NUR. MGR

177A

CLEAN LINEN

OXYGEN

STORAGE

QUIET ROOM

PATIENT

ROOM (2)

PATIENT

ROOM

(4)

TOILET

BATH

184BATH

TOILET

PATIENT

ROOM (4)

DEN

ELECT

CLOSET

E8

DATA

CLOSET

T5

NUTRITION

177B

BATH

175A

CORRIDOR

C6A

ELECT

CLOSET

E5

DATA CLOSET

T3

COOKING

CHILL

STAGING

104A

CORRIDOR

C6

STORAGE /

WORK AREA

111a

CORRIDOR

C7 CORRIDOR

C8

DATA

CLOSET

T4

ELECT

CLOSET

E6

CORRIDOR

C10

CORRIDOR

C9

CORRIDOR

C1

CORRIDOR

C2

CORRIDOR

C3

NURSE

MANAGER

55B

CORRIDOR

C4

CORRIDOR

C9A

CORRIDOR

C5

CORRIDOR

C8A

TR

90A

2 1

146EP401a

146EP401a

146EP401b

146EP401b

146-90AA-20

TO SBB

(REFERENCE SHEET 146EP401b)

TO SBB

(REFERENCE SHEET 146EP401a)

TO SHEET 146EP401c

TO SHEET 146EP401c

146EP401c

146EP401c

MECHANICAL

ROOM

MECHANICAL

ROOM

BLDG 146

LEGEND

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:0

:2

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

146EP101

BLDG 146 - LEVEL 01 - ELECTRICAL PLAN

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

0 20' 40'10'

PROJECT

NORTH

- 1" = 20'-0"

1 BLDG 146 - LEVEL 01 - ELECTRICAL PLAN

Revisions: Date:

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

9. ALL CONDUIT SHALL BE CONCEALED IN WALLS OR ABOVE ACCESSIBLE T-BAR

CEILINGS UNLESS OTHERWISE NOTED.

10. COORDINATE ALL CEILING REMOVAL AND REPLACEMENT WITH THE GENERAL

CONTRACTOR FOR COMPLETION OF WORK.

TRUE

NORTH

GENERAL NOTES

PROVIDE CONVENIENCE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED

DIE-CAST ALUMINUM WHILE-IN-USE COVER.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) TO CONNECT PBB TO

SBB. REFERENCE TELECOM BONDING RISER DIAGRAM ON SHEET EG602 FOR

ADDITIONAL INFORMATION.

KEY NOTES

AAA

A

A

A

A

A

A

A

AAAAAAAA

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

AAAAAAAA

B B B B B B B B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

BBBB

A A

BBBB

B

B

B

BBBBBBB

A A A A A

A

A

AAAAAAA

B

B

B

B

B

B

B

BB

B

B

B

B

B

B

B

B B B B B B B B B

A

A

B

B

B

BBBBBBB

AAAAAAA

A A

B B

A A

B B

As

Bs

Cs

Ds

Es

Fs

Gs

Hs

Is

Js

Ks

1s 2s 3s 4s 5s 6s 7s 8s 9s 10s 11s 12s 13s 14s

Aa

Ba

Ca

Da

Ea

Fa

Ga

Ha

Ia

Ja

Ka

L

1a 2a 3a 4a 5a 6a 7a 8a 9a 10a 11a 12a

Ab

Bb

Cb

Db

Eb

Fb

Gb

Hb

Ib

Jb

Kb

Mb

Nb

Ob

Pb

1b 2b 3b 4b 5b 6b 7b 8b 9b 10b 11b 12b 13b

Ac

1c

Bc

Cc

Dc

Ec

Fc

Gc

Hc

Ic

Jc

Kc

Lc

2c 3c 4c 5c 6c 7c 8c 9c 10c 11c 12c 13c 14c 15c

Ad

Bd

Cd

Dd

Ed

Fd

Gd

Hd

Id

Jd

Kd

Md

Nd

Od

Pd

Qd

Rd

1d 2d 3d 4d 5d 6d 7d 8d 9d 10d 11d 12d 13d

PATIENT RM (2)

P100

EM200

L100

MP-100

B-100

MB-100

EMB-100

J.BOX

75 kVA XFMR

DISCONNECT

CONTROL

ENCLOSURE

A200

EMA-200

A-200EMA-200

J.BOX

XFMR

PUMP CONTROLLER

RELAY PANEL

EMA-100

MA-100

A-100

DISCONNECT

A-200

EMA-200

DISC.

DISC.

D

IS

C

DISC.

DISC.

DISC.

DISC.

CONTROLS

ENCLOSURE

75kVA XFMR

TR

C185

ELECTRICAL CLOSET

C176

QUIET ROOM

D179

OFFICE

B180

148-P-08

148-P-02

148-P-05

148-P-11

148-P-10

148-P-04

148-P-03

148-P-09

TO PANELBOARD "148-B185B"

(REFERENCE SHEET

148EP401b)

TO PANELBOARD "148-B185A"

(REFERENCE SHEET 148EP401b)

TO PANELBOARD "148-A185A"

(REFERENCE SHEET 148EP401a)

TO PANELBOARD "148-A185B"

(REFERENCE SHEET 148EP401a)

TO PANELBOARD "148-D185A"

(REFERENCE SHEET 148EP401d)

TO PANELBOARD "148-D185B"

(REFERENCE SHEET 148EP401d)

PATIENT RM (2)

B119

A-200

EMA-200

EMA-100

MA-100

A-100

SWITCH CONTROLS

DISC.

DISC.

75 kVA

XFMR

DISC.

J.BOX

CONTROL

ENCLOSURE

C-100

MC-100

EMC-100

TO PANELBOARD

"148-C185A"

(REFERENCE SHEET

148EP401c)

TO PANELBOARD

"148-C185B"

(REFERENCE SHEET

148EP401c)

148EP401c

148EP401c

148EP401c

148EP401c

148EP401b

148EP401a

148EP401a

148EP401a

148EP401a

148EP401b

148EP401b

148EP401b

148EP401d

148EP401d

148EP401d

148EP401d

TR

A185

NO CURE PATIENT

ROOM

B137

PATIENT

SHOW ER/TOILET

B136

PATIENT SHOW ER

/TOILET

B135

PATIENT RM

B134

DAP OFFICE

B124

VACANT TOILET

B123

ELECTRICAL CLOSET

B125

STORAGE

B122

PATIENT RM (1)

B121

PATIENT

SHOW ER/TOILET

B120

PATIENT RM (2)

B115

PATIENT SHOW ER/

TOILET

B114

PATIENT SHOW ER

/TOILET

B113

PATIENT RM (2)

B112

PATIENT ROOM

B111

PATIENT

SHOW ER/TOILET

B110

PATIENT

SOW ER/TOILET

B109

PATIENT RM (2)

B108

STORAGE

B106

COMMUNICATION

CLOSET

B105

STORAGE

B104

PATIENT ROOM (2)

B103

PATIENT

SHOW ER/TOILET

B101

PATIENT

SHOW ER/TOILET

B102

PATIENT ROOM (2)

B100

CORRIDOR / LOUNGE

B107

CORRIDOR

CB1

TR

B185

LUGGAGE STORAGE

CB4

KITCHENETTE

B183

LAUNDRY

B182

MED FOS HOME

OFFICE

B181

OFFICE

B179

ELECTRICAL CLOSET

B176

LOUNGE

B178

STORAGE

B177

COMMUNICATION

CLOSET

B175

SOILED LINEN

B167

STORAGE

B166

PATIENT

SHOW ER/TOILET

B165

PATIENT RM (2)

B164

PATIENT RM (2)

B159

PATIENT ROOM /

TOILET

B158

PATIENT ROOM /

SHOW ER

B157

PATIENT RM (2)

B156

CORRIDOR

PATIENT ROOM

B152

PATIENT

SHOW ER/TOILET

B150

PATIENT

SHOW ER/TOILET

B151

H&CC OFFICE

B149

H&CC NURSE OFFICE

B148

H&CC RECEPTION

B153

ROOF

ACCESS/STORAGE

B154

TOILET

B147

H&CC MANAGER

B146

PATIENT RM (1)

B145

PATIENT

SHOW ER/TOILET

B162

PATIENT

SHOW ER/TOILET

B143

PATIENT ROOM (2)

B142

PATIENT ROOM (2)

PATIENT

SHOW ER/TOILET

B140

PATIENT

SHOW ER/TOILET

B139

PATIENT ROOM (2)

B138

LOUNGE

B133

CORRIDOR

CB2

HAC

B126

PATIENT RM (1)

B127

PATIENT

SHOW ER/TOILET

B128

STAFF TOILET

B129

PATIENT

SHOW ER/TOILET

B130

ROOF ACCESS

B132

PATIENT RM (1)

B131

CORRIDOR

CB3

COURTYARD

B155

PATIENT

SHOW ER/TOILET

B117

PATIENT

SHOW ER/TOILET

B118

PATIENT RM (2)

B116

PATIENT

SHOW ER/TOILET

PATIENT

SHOW ER/TOILET

B161

PATIENT RM (2)

B163

PATIENT RM(1)

B169

STORAGE

B168

PATIENT

SHOW ER/TOILET

B170

HAC

B171

PATIENT

SHOW ER/TOILET

B172

PATIENT RM (1)

B174

STORAGE

B184

PATIENT RM (2)

C111

PATIENT RM (2)

C108

PATIENT

TOILET/SHOW ER

C110

PATIENT

TOILET/SHOW ER

C109

STORAGE

C106

COMMUNICATION

CLOSET

C105

CLOSET

C104

LOUNGE

C107

PATIENT RM (2)

C103

PATIENT

TOILET/SHOW ER

C101

PATIENT

TOILET/SHOW ER

C102

PATIENT RM (2)

C100

CORRIDOR

CC1

LUGGAGE STORAGE

C184

KITCHENETTE

C183

LAUNDRY

C182

SSA OFFICE

C181

DOM SECT OFFICE

C180

VOC REHAB OFFICE

C179

LOUNGE

C178

STORAGE

C177

COMMUNICATION

CLOSET

C175

SOILED UTILITY

C167

CLEAN LINEN

C166

PATIENT

TOILET/SHOW ER

C165

PATIENT RM (2)

C164

PATIENT RM (2)

C159

PATIENT

TOILET/SHOW ER

C158

PATIENT

TOILET/SHOW ER

C157

PATIENT RM (2)

C162

PATIENT RM (2)

C152

PATIENT

TOILET/SHOW ER

C151

PATIENT

SHOW ER/TOILET

C150

PATIENT RM (2)

C149

OFFICE

C148

STAFF

TOILET/SHOW ER

C153

STORAGE/ROOF

ACCESS

C154

PATIENT RM (2)

C146

PATIENT RM (1)

C145

PATIENT

TOILET/SHOW ER

C144

PATIENT

TOILET/SHOW ER

C143

PATIENT RM (2)

C142

PATIENT RM (2)

C141

PATIENT

SHOW ER/TOILET

C140

PATIENT

SHOW ER/TOILET

C139

PATIENT RM (2)

C138

PATIENT ROOM (2)

C137

PATIENT

TOILET/SHOW ER

C136

PATIENT

TOILET/SHOW ER

C135

PATIENT ROOM (2)

C134

DAP OFFICE

C124

STORAGE ROOM

C122

STAFF

TOILET/SHOW ER

C123

STORAGE

C125

LOUNGE

C133

PATIENT RM (1)

C121

PATIENT

TOILET/SHOW ER

C120

PATIENT ROOM (2)

C115

PATIENT

TOILET/SHOW ER

C114

PATIENT

TOILET/SHOW ER

C113

PATIENT ROOM

C112

PATIENT ROOM (2)

C116

PATIENT

TOILET/SHOW ER

C118

PATIENT

TOILET/SHOW ER

C117

PATIENT RM (2)

C119

HAC

C126

STAFF TOILET

C129

PATIENT

TOILET/SHOW ER

C130

PATIENT

TOILET/SHOW ER

C128

PATIENT RM (1)

C127

PATIENT RM (1)

C131

STORAGE ACCESS

C132

CORRIDOR

CC3

CORRIDOR

CC2

COURTYARD

CC4

STORAGE

C174

HAC

C171

STORAGE

C168

PATIENT

TOILETSHOW ER

C172

PATIENT

TOILET/SHOW ER

C170

PATIENT RM (1)

C169

PATIENT ROOM (2)

C163

PATIENT

TOILET/SHOW ER

C161

PATIENT

TOILET/SHOW ER

PATIENT RM (2)

C160

LOUNGE

PATIENT ROOM (2)

D100

PATIENT

SHOW ER/TOILET

D101

PATIENT

SHOW ER/TOILET

D102

PATIENT ROOM

D103

STORAGE

D104

COMMUNICATION

CLOSET

D105

STORAGE

D106

LOUNGE

D107

PATIENT ROOM (2)

D108

PATIENT

SHOW ER/TOILET

D109

PATIENT

SHOW ER/TOILET

D110

PATIENT ROOM (2)

D111

PATIENT RM (2)

D112

PATIENT

SHOW ER/TOILET

D113

PATIENT

SHOW ER/TOILET

D114

PATIENT RM (2)

D115

PATIENT RM (2)

D116

PATIENT

SHOW ER/TOILET

D117

PATIENT

SHOW ER/TOILET

D118

PATIENT RM (2)

D119

PATIENT

SHOW ER/TOILET

D120

PATIENT RM (1)

D121

VACO OFFICE

D122

STAFF

SHOW ER/TOILET

D123

VACO OFFICE

D124

ELECTRICAL CLOSET

D125

HAC

D126

PATIENT RM (1)

D127

PATIENT

SHOW ER/TOILET

D128

STAFF TOILET

D129

PATIENT

SHOW ER/TOILET

D130

RESIDENCE

A152

BATHROOM

A150

BATHROOM

A151

RESIDENCE

A149

RESIDENCE

A148

PATIENT RM (2)

A146

PATIENT

SHOW ER/TOILET

A147

ELECTRICAL RM

A154

RESIDENCE

A160

BATHROOM

A162

RESIDENCE

A145

CORRIDOR

CA3

ATRIUM

A153

OFFICE

S104A

OFFICE

S105

CHIEF, DOMICILLARY

S108

OFFICE

S109

OFFICE

S107

STORAGE

S106

DOM CARE

OFFICE/RECEPTION

S104

MAIN ENTRANCE

S100

MEN'S TOILET

S102

W OMEN'S TOILET

S103

FITNESS CENTER

S142

CORRIDOR

S101

GROUP/CONFERENCE

RM

S111

CONNECTING

CORRIDOR

CS1A

LAUNDRY

A182

SOCIAL W ORK

A181

SOCIAL SCIENCE

ASST.

A180

PROGRAM

SPECIALIST

A179

ELEC. CLOSET

A176

CLOSET

A171.1

HAC

A171

KITCHENETTE

A183

SPRINKLER ROOM

A184

PATIENT RM (1)

D131

STORAGE/ROOF

ACCESS

D132

VACO RECEPTIONIST

VACO OFFICE

D134

STAFF

SHOW ER/TOILET

D135

PATIENT

SHOW ER/TOILET

D136

PATIENT RM (2)

D137

PATIENT ROOM (2)

D138

PATIENT

SHOW ER/TOILET

D139 PATIENT

SHOW ER/TOILET

D140

PATIENT ROOM (2)

D141

PATIENT ROOM (2)

D142

PATIENT

SHOW ER/TOILET

D143

PATIENT

SHOW ER/TOILET

D144

PATIENT RM (1)

D145

PATIENT ROOM (2)

D146

STAFF

SHOW ER/TOILET

D147

TRANS RES GRGM

OFFICE

D148

PATIENT ROOM (2)

D149

PATIENT

SHOW ER/TOILET

D150

PATIENT

SHOW ER/TOILET

D151

PATIENT ROOM (2)

D152

LOUNGE

D153

STORAGE/ROOF

ACCESS

D154

PATIENT RM (2)

D156

PATIENT

SHOW ER/TOILET

D157

PATIENT

SHOW ER/TOILET

D158

PATIENT RM (2)

D159

PATIENT RM (2)

D160

PATIENT

SHOW ER/TOILET

D161

PATIENT

SHOW ER/TOILET

D162

PATIENT RM (2)

D163

PATIENT RM (2)

D164

PATIENT

SHOW ER/TOILET

D165

CLEAN LINEN

D166

SOILED UTILITY

D167

STORAGE

D168

PATIENT RM (1)

D169

PATIENT

SHOW ER/TOILET

D170

HAC

D171

STAFF TOILET

D172

PATIENT RM (1)

D173

STORAGE

D174

COMMUNICATION

CLOSET

D175

ELECTRICAL CLOSET

D176

STORAGE

D177

FMS AREA

MAINTENANCE

A167

STORAGE

A166

BATHROOM

A165

RESIDENCE

A164

PATIENT RM (2)

A159

PATIENT

SHOW ER/TOILET

A158

PATIENT

SHOW ER/TOILET

A157

PATIENT RM (2)

A156

BATHROOM

A161

RESIDENCE

A163

RESIDENCE

A169

STORAGE

A168

BATHROOM

A170HAC

A175

BATHROOM

A172

RESIDENCE

A173

ROOF HATCH/

LADDER RM

A174

BATHROOM

A144 BATHROOM

A143 RESIDENCE

A142

RESIDENCE

A141

BATHROOM

A139

BATHROOM

A140

RESIDENCE

A138

RESIDENCE

A137

OFFICE

A134

BATHROOM

A135

BATHROOM

A136

LOUNGE

D178

DOM SECT OFFICE

D180

SSA OFFICE

D181

LAUNDRY

D182

KITCHENETTE

D183

LUGGAGE STORAGE

D184

TR

D185

COURTYARD

D186

MEDICAL LOUNGE

A124

RESIDENCE

A122

NURSE

PRACTITIONER

A123

ELECTRICAL CLOSET

A125

RESIDENCE

A121

BATHROOM

A120

RESIDENCE

A115

BATHROOM

A114

BATHROOM

A113

RESIDENCE

A112

ATRIUM

A107

RESIDENCE

A111

BATHROOM

A110

BATHROOM

A109

RESIDENCE

A108

RESIDENCE

A103

STORAGE

A106

DATA CLOSET

A105

STORAGE

A104

RESIDENCE

A116

PATIENT

SHOW ER/TOILET

A118

BATHROOM

A117

RESIDENCE

A119

HAC

A126

RESIDENCE

A127

BATHROOM

A128

BATHROOM

A130

PATIENT

SHOW ER/TOILET

A129

ROOF HATCH/

LADDER RM

A132

RESIDENCE

A131

BATHROOM

A101

BATHROOM

A102

RESIDENCE

A100

CORRIDOR

CD1

CORRIDOR

CD4

CORRIDOR

CD3

CORRIDOR

CD2

STORAGE

S142 A

STORAGE

S142 B

STORAGE

S142 C

OFFICE

S139

MEN'S TOILET

S141

W OMEN'S TOILET

S140

CLOSET

S139 A

STORAGE

S139 B

VENDING

S137

HAC

S138

CLOSET

S137 A

CLOSET

S136 D

CLOSET

S136 E

STORAGE

S136 C

STORAGE

S136B

STORAGE

S136 A

GROUP ROOM

S136

LIBRARY

S134

W AITING ROOM

S135

W AITING RM

S115

PATIENT SCREENING

S116

STORAGE

S117

OFFICE

S125

OFFICE

S126 A

ELECTRICAL CLOSET

S127

MAIN

COMMUNICATION

CLOSET

S128

MECHANICAL ROOM

S132

ELECTRICAL ROOM

S133

MECHANICAL ROOM

S131

STORAGE

S130

STORAGE

S129

OFFICE

EMS STORAGE

S124

STORAGE

S123

MEN'S

TOILET/SHOW ER

S122

W OMEN'S

TOILET/SHOW ER

S121

OFFICE

S119

OFFICE

S118

GENERAL STORAGE

S114

ELECTRICAL CLOSET

S113

BREAK

ROOM/LOUNGE

S120

CORRIDOR

CORRIDOR

CA4

ATRIUM

A133

ATRIUM

CA2

ATRIUM

A178

ATRIUM

CA1

CONNECTING

CORRIDOR

CS1B

CORRIDOR

CS2

CORRIDOR

CS3

COURTYARD

CS4

CORRIDOR

Room

Room

Room

Room

CORRIDOR

CORRIDOR

PATIENT ROOM

C173

CORRIDOR

Room

CORRIDOR

CORRIDOR

CORRIDOR

148EP401e

148EP401e

TO SBB

(REFERENCE SHEET

148EP401c)

TO SBB

(REFERENCE SHEET 148EP401d)

TO SBB

(REFERENCE SHEET 148EP401a)

TO SBB

(REFERENCE SHEET 148EP401b)

AREA SHOWN

BLDG 148

'A' SIDE POWER, CONCEALED WHERE POSSIBLE

'B' SIDE POWER, CONCEALED WHERE POSSIBLE

'A' SIDE POWER, UNDERGROUND /UNDERFLOOR

'B' SIDE POWER, UNDERGROUND /UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:0

:3

A

M

B

IM

/5

-2

-7

V A

H a m p to n E

H R

M /E

E

B L D

G

.r v t

148EP101

BLDG 148 - LEVEL 01 - ELECTRICAL PLAN

JPB/WNM BCL/GPB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

- 1" = 25'-0"

1 BLDG 148 - LEVEL 01 - ELECTRICAL PLAN 0' 25' 50'15'5' 10'

PROJECT

NORTH

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE