Att. 1 - Construction SOW.pdf

PDF 114 KB Posted

Attached to
Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
Solicitation number
36C77626R0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a Scope of Work for a construction project at the Hampton VA Medical Center in Hampton, Virginia (Project #590-22-700) focused on upgrading the Electronic Health Record Modernization (EHRM) infrastructure.

The base bid work includes all labor, materials, equipment, and professional services required to perform general construction, alterations, electrical work, concrete work, masonry work, grading, demolition, and related construction period services across two phases: Phase 1 involves site work on campus infrastructure, and Phase 2 includes work on telecommunications rooms (TRs) and work area outlets broken down by separate buildings and floors. The contractor must develop detailed phasing plans, project schedules, Quality Control plans, Work Breakdown Structures, and Environmental Plans. Specific work includes demolishing and installing new walls, doors, finishes, installing new fire-rated doors and fire extinguisher cabinets with proper firestopping, installing new duct banks and conduits, upgrading telecommunications rooms with ductless split DX or VRF/VRV cooling systems tied to the campus building management system, upgrading IT infrastructure and electrical systems to comply with VA EHRM requirements, modifying fire sprinkler systems, and structural work limited to a new slab infill in Building 110. The work is categorized under various construction standards including Infection Control Risk Assessment (ICRA) classifications ranging from Type B through Type D, with Class II through Class IV requirements depending on adjacent area risk levels.

The tentative schedule establishes substantial completion 1,095 days after Notice to Proceed, with contract award at day D, pre-construction conference at D+10, Notice to Proceed at D+14, and construction start at D+30. Site-specific requirements mandate that all contractor personnel obtain PIV-I badges, complete OSHA 10-hour training (30-hour for superintendents), provide TB test results and proof of flu vaccination, complete Integrity and Compliance Awareness Training, and comply with COVID-19 screening and mask requirements. The work must follow specifications outlined in detailed construction divisions addressing general requirements, demolition, concrete, metals, carpentry, thermal protection, openings, finishes, specialties, fire suppression, plumbing, HVAC, electrical, communications, and electronic safety and security systems.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

PROJECT #590-22-700

EHRM INFRASTRUCTURE UPGRADES

A. PART I - GENERAL

A1. Scope of Contract

1. BID ITEM I (BASE BID): The Contractor shall provide all labor, materials and equipment to accomplish the project per construction drawings and specifications. The contractor shall provide all tools, labor, materials, equipment, supervision, professional services, and expertise required to perform general construction, alterations, electrical work, concrete work, masonry work, grading, grubbing, seeding, necessary removal and disposal of existing trees, structures, and certain other items as indicated in the construction documents. The contractor shall manage and perform construction period services as further defined in the Contract to include, but not limited to, permitting, demolition, construction, construction management, submittals, equipment, scheduling, inspection and testing, environmental protection, recording of (As-Built) drawings and project closeout. The contractor shall also develop a schedule demonstrating fulfillment of the contract requirements such as: Project Schedule, Contractor Quality Control, Work Breakdown Structure (WBS) Plan, Environmental Plan and all other plans listed within this document to include deliverables. The Contractor shall keep the Project Schedule up to date in accordance with the requirements of the contract and shall utilize the plan for scheduling, coordinating, and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). This work includes, but is not limited to:

Demolition:

a. The overall intent of this project is to upgrade and improve the Electronic Health Record Modernization (EHRM) infrastructure of the Hampton VA Medical Center campus in Hampton, Virginia as part of the ongoing national VA EHRM initiative.

i. Phasing This project will take place over two construction phases: Phase 1 – Site work on campus infrastructure and Phase 2 – Work on TRs and work area outlets. Phase 2 shall be broken down to separate buildings and floors. It is the Contractor's responsibility to develop a detailed phasing plan and present plan to COR for approval.

ii. Fire Life Safety Existing building construction and occupancy type shall not be altered as part of this project. Existing egress pathways have been impacted due to the new layout. Install new fire rated doors and fire extinguisher cabinets were indicated. Properly firestop any penetrations through existing or new rated assemblies.

iii. ICRA

Cabling work is categorized as Type B construction. If adjacent areas are low, medium, or high-risk work shall be Class II. If work is to be completed adjacent to a highest-risk area, it escalates to Class III. Work involving TEs and TRs in existing buildings fall under Type C construction. This type of work may be classified as Class II, III, or IV. Generally, it is considered Class II or Class III.

Specifically, in low-risk areas, it is classified as Class II; in medium-risk areas, it is Class III; and in high or highest-risk areas, the classification rises to Class IV. TR towers and data centers are considered Type D work and are classified as Class III or IV, however, most commonly require Class IV. In low-risk areas, this work is classified as Class III. When the adjacent area is rated as medium, high, or highest risk, the work must adhere to Class IV standards. Fire extinguisher cabinet (FEC) work should ideally be included within the TR ICRA barrier zone. If it is not possible to include this work within the TR barriers, it should be treated as Type B work. In this case, the classification depends on the adjacent area's risk level: in low, medium, or high-risk areas, it falls under Class II, while in the highest-risk areas, it must be classified as Class III.

iv. Architectural Demo existing and install new walls, doors, finishes, casework, specialty equipment, and signage as indicated in the contract drawings. Maintain existing conditions in locations shown or areas marked as out of scope. Architectural work also contains any required patch work associated with structural, mechanical, electrical, telecommunications, and technology work.

v. Structural Structural work is limited to the new slab infill for the existing Stair 1 in Building 110 and the surrounding systems involved. The existing stairs will be removed from the shaft to facilitate the installation of the slab infills.

vi. Fire Protection Fire sprinkler systems shall be modified to move/adjust head locations to accommodate space floorplan changes. There is no increase in the total area served by the existing fire protection system.

vii. Civil This project will install all new duct banks, conduits, vaults, and handholes. Additional local repairs and conduit replacement may be necessary during construction.

viii. Mechanical Mechanical scope of work includes some telecom rooms being upgraded, while other telecom rooms will be combined or relocated.

Telecom rooms receiving new mechanical cooling will be cooled with either a ductless split DX system or a VRF/VRV system. These systems will be tied into the campus building management system with points monitoring equipment operation, run time, and space temperature. All telecom rooms will have temperature and humidity wall sensors and a floor-mounted moisture sensor that will be tied into the campus BMS Existing site infrastructure and HVAC utilities in building 148 Telecommunication Rooms will be in keeping with the ISTS, HVAC Design manual, and published Design Alerts.

ix. Plumbing Plumbing services are not included in design.

x. Electrical, Security, & Fire Alarm Electrical scope of work includes upgrading the IT infrastructure and equipment to comply with the new VA Electronic Health Record Modernization (EHRM) system requirements. Select telecommunications rooms (TRs) will be expanded, renovated, or relocated to meet VA standards. For the expanded or relocated TRs, each will be provided with new security provisions as required.

Where life safety systems are impacted during construction; interim life safety measures will be addressed and implemented. Any new fire alarm devices required will match the existing.

xi. Environmental Environmental abatement is not currently in scope of this project.

Based on the VA provided Environmental Report, no known hot materials are being disturbed. If materials are found that are reasonably assumed to be hot, contact the COR prior to demolition.

Additional project specific notes:

a. Items not noted as to be demolished shall be protected from damage.

Any damage not caused by the owner or deemed to be normal wear shall be corrected by the contractor with no additional time and/or money.

b. Temporary construction items such as dust walls, safety barriers, etc.

shall be the responsibility of the contractor. Obtain approval from VA staff prior to the installation of such temporary construction.

c. Coordinate with the VA COR prior to performing shutdowns of electrical power systems, HVAC equipment, commutation systems, fire alarm and fire suppression systems for modifications and tie-ins.

d. Phasing: Refer to drawings for phasing information.

3. Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day.

4. Specific Requirements (see drawings for area of work):

a. DIVISION 01 - GENERAL REQUIREMENTS

i. 01 00 00 General Requirements

ii. 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build)

iii. 01 33 23 Shop Drawings, Product Data, and Samples

iv. 01 35 26 Safety Requirements

v. 01 42 19 Reference Standards

vi. 01 45 00 Quality Control

vii. 01 57 19 Temporary Environmental Controls

viii. 01 58 16 Temporary Interior Signage

ix. 01 74 19 Construction Waste Management

x. 01 81 13 Sustainable Construction Requirements

xi. 01 91 00 General Commissioning Requirements

b. DIVISION 02 – EXISTING CONDITIONS

i. 02 41 00 Demolition

ii. 02 82 11 Traditional Asbestos Abatement

iii. 02 82 13.13 Glovebag Asbestos Abatement

iv. 02 82 13.19 Asbestos Floor Tile and Mastic Abatement

v. 02 83 33.13 Lead-Based Paint Removal and Disposal

c. DIVISION 03 – CONCRETE

i. 03 30 53 Cast-in-Place Concrete

d. DIVISION 04 – MASONRY (NOT USED)

e. DIVISION 05 – METALS

i. 05 12 00 Structural Steel Framing

ii. 05 36 00 Composite Metal Decking

f. DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

i. 06 10 00 Rough Carpentry

ii. 06 20 00 Finish Carpentry

g. DIVISION 07 - THERMAL AND MOISTURE PROTECTION

i. 07 21 13 Thermal Insulation

ii. 07 84 00 Firestopping

iii. 07 92 00 Joint Sealants

h. DIVISION 08 – OPENINGS

i. 08 11 13 Hollow Metal Doors and Frames

ii. 08 14 00 Interior Wood Doors

iii. 08 51 13 Aluminum Windows

iv. 08 71 00 Door Hardware

v. 08 80 00 Glazing

i. DIVISION 09 – FINISHES

i. 09 05 16 Subsurface Preparation for Floor Finishes

ii. 09 06 00 Schedule for Finishes

iii. 09 22 16 Non-Structural Metal Framing

iv. 09 29 00 Gypsum Board

v. 09 65 13 Resilient Base and Accessories

vi. 09 65 19 Resilient Tile Flooring

vii. 09 66 00 Static Dissipative Sealer for Concrete Substrates

viii. 09 91 00 Painting

j. DIVISION 10 – SPECIALTIES (NOT USED)

i. 10 14 00 Signage 01-21

ii. 10 26 00 Wall and Door Protection 01-21

iii. 10 44 13 Fire Extinguisher Cabinets

k. DIVISION 11 – EQUIPMENT (NOT USED)

l. DIVISION 12 – FURNISHINGS (NOT USED)

m. DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)

n. DIVISION 14– CONVEYING EQUIPMENT (NOT USED)

o. DIVISION 21- FIRE SUPPRESSION

i. 21 08 00 Commissioning of Fire Suppression System 11-16

ii. 21 13 13 Wet-Pipe Sprinkler Systems

p. DIVISION 22 – PLUMBING

i. 22 05 11 Common Work Results for Plumbing 01-23

ii. 22 05 23 General-Duty Valves for Plumbing Piping 09-20

iii. 22 07 11 Plumbing Insulation 09-19

iv. 22 11 00 Facility Water Distribution

v. 22 13 00 Facility Sanitary and Vent Piping

q. DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

i. 23 05 11 Common Work Results for HVAC

ii. 23 05 12 General Motor Requirements for HVAC Equipment

iii. 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

iv. 23 05 93 Testing, Adjusting, and Balancing for HVAC

v. 23 07 11 HVAC Insulation

vi. 23 08 00 Commissioning of HVAC Systems

vii. 23 09 23 Direct-Digital Control System for HVAC

viii. 23 21 13 Hydronic Piping

ix. 23 23 00 Refrigerant Piping

x. 23 31 00 HVAC Ducts and Casings

xi. 23 34 00 HVAC Fans

xii. 23 37 00 Air Outlets and Inlets

xiii. 23 81 00 Decentralized Unitary HVAC Equipment

xiv. 23 81 23 Computer-Room Air-Conditioners

xv. 23 81 43 Air-Source Unitary Heat Pumps

r. DIVISION 25 – INTERGRATED AUTOMATION

i. 25 10 10 Advanced Utility Metering System

s. DIVISION 26 – ELECTRICAL

i. 26 05 11 Requirements for Electrical Installations

ii. 26 05 19 Low-Voltage Electrical Power Conductors and Cables

iii. 26 05 26 Grounding and Bonding for Electrical Systems

iv. 26 05 33 Raceway and Boxes for Electrical Systems

v. 26 05 41 Underground Electrical Construction

vi. 26 05 73 Overcurrent Protective Device Coordination Study

vii. 26 08 00 Commissioning of Electrical Systems

viii. 26 09 23 Lighting Controls

ix. 26 22 00 Low-Voltage Transformers

x. 26 24 16 Panelboards

xi. 26 27 26 Wiring Devices

xii. 26 29 21 Enclosed Switches and Circuit Breakers

xiii. 26 43 13 Surge Protective Devices

xiv. 26 51 00 Interior Lighting

xv. 26 56 00 Exterior Lighting

t. DIVISION 27 – COMMUNICATIONS

i. 27 05 26i Grounding and Bonding for Communications Systems

ii. 27 05 33i Conduits and Backboxes for Communications Systems

iii. 27 05 36i Cable Trays for Communications Systems

iv. 27 05 53i Identification for Communications Systems

v. 27 10 00i Structured Cabling

vi. 27 11 16i Communications Cabinets, Racks, Frames, and

Enclosures 12-22

vii. 27 11 19i Communications Termination Blocks and Patch Panels

viii. 27 11 26i Communications Rack Mounted Power Protection

ix. 27 13 13i Communications Copper Backbone Cabling

x. 27 13 23i Communications Optical Fiber Backbone Cabling

xi. 27 15 13i Communications Copper Horizontal Cabling

xii. 27 15 13.13 Communications Optical Fiber Splicing and

Terminations

xiii. 27 16 19i Communications Patch Cords, Station Cords, and Cross

Connect Wire

xiv. 27 78 00 Closeout Submittals for Communications

u. DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

i. 28 05 00 Common Work Results for Electronic Safety and Security

ii. 28 05 13 Conductors and Cables for Electronic Safety and

Security

iii. 28 05 26 Grounding and Bonding for Electronic Safety and

Security

iv. 28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

v. 28 13 00 Physical Access Control System

vi. 28 31 00 Fire Detection and Alarm

vii. 28 23 00 Video Surveillance

viii. 28 31 00 Fire Detection and Alarm

v. Specific Site Requirements: Contractor and all subcontractors shall obtain a PIV-I badge from the HR Badging Office (requires scheduling, fingerprinting, and providing two (2) forms of ID; one of which must be an approved photo ID), provide proof of completion from an approved OSHA 10-hour training course (30-hour for superintendent), complete and provide certificate of training for Integrity and Compliance Awareness Training for all Non-Revenue Staff (TMS course 43790), provide TB test results (refer to specification section 01 35 26 - 22, 1.13 TUBERCULOSIS SCREENING AND FLU for further guidance), provide proof of flu shot, and shall abstain from smoking within the perimeters of the facility. All individuals that enter any VA patient care building(s) are required to be pre-screened for COVID-19 and required to wear a face mask; to include Veterans, employees, visitors, volunteers, and contractors. Contractors entering non-patient care buildings are required to wear a face mask.

Contractors working outside within six (6) feet of one another, or any individual, shall also be required to wear a face mask.

w. Construction Safety Requirements: See Safety Requirements - section 01 35 26, and Hampton VAMC Construction Safety Handbook - section 01 35 26A

x. Submittals: See sections 01 00 00, 01 33 23, and all applicable trade sections.

y. Quality Control: See section 01 45 00.

z. Schedules: See section 01 32 16.15.

aa. Environmental and Waste Management: See sections 01 57 19, and 01

74 19.

A2. Tentative Schedule:

Contract award* D Pre-construction conference D+10 Notice to Proceed D+14 Construction start D+30 Construction completion D+1,095

A. Schedule Objectives - The anticipated substantial completion of this project is 1,095 days after “Notice to Proceed” (NTP).

- - - E N D - - -