Att. 23 - KSI.pdf

PDF 312 KB Posted

Attached to
Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
Solicitation number
36C77626R0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Key Subcontractor Information (KSI) form template for Solicitation 36C77626R0041, an EHRM Infrastructure Upgrades project in Hampton, VA. The form is designed for subcontractors to provide detailed project information to prime contractors for incorporation into proposals, with KSI submissions counting toward the overall page limitation specified in the CON 100 Instructions to Offerors.

Offerors must complete one KSI form for each of up to three projects; no additional projects beyond three will be accepted, and each project cannot have more than one system project number. All projects submitted must be furnished and installed by a communications installer and must include a final acceptance date. Additionally, projects must demonstrate Division 27 complexity in the project description and meet or exceed $5 million in Division 27 complexity work. The form requires submission of standard project information including installation location, project title, contract number, contract value, prime contractor name, client contact details, project start date, final acceptance date, and system project number. Section 2 requires a detailed project description covering each system's function, operation, and installation methodology.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 12 - Set 2 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 36C77626R0041 | EHRM INFRASTRUCTURE UPDGRADES HAMPTON, VA.

KEY SUBCONTRACTOR INFORMATON (KSI)

*KSIs should be provided back to the PRIME to incorporate into their proposal, all KSIs should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the

CON 100 Instructions to Offerors.

KEY SUBCONTRACTOR INFORMATION – Offeror to complete 1 form for each project #1-3. No other projects beyond projects 1-3 will be accepted. Projects cannot have more than one system project number.

Projects submitted shall be furnished and installed by the communications installer. Shall have a final acceptance date. Shall demonstrate division 27 complexity in the project description and meet or exceed 5 million dollars of division 27 complexity work.

1. PROJECT INFORMATION

• Installation location

• Project Title

• Contract Number

• Contract Value

• Prime Contractor Name

• Client’s name and contact information as listed below

• Address:

• Telephone and E-mail

• Date of Project Start

• Date of Final Acceptance.

• System Project Number.

2. PROJECT DESCRIPTION

Description of each system related to this project; include function, operation, and installation

File details come from the government source that posted it. Updated .