This file contains final construction drawings for the EHRM (Electronic Health Records Management) Infrastructure Upgrades project at Hampton VA Medical Center in Hampton, Virginia. The drawings are organized by discipline and represent 100% construction documents dated July 18, 2025, with a project number of 590-22-700. The architect/engineer of record is STAMPCONSULTANT, located at 23830 Pacific Highway South, Suite 203, Kent, WA 98032, working under a Design Build contract with SPEES.

The drawings depict comprehensive infrastructure upgrades across multiple buildings (110, 110A, 110B, 113, 114, 116, 135, 137, 138, 138A, 144, 146, 148, 148A-D, 148S, 148T, 168, 173, and others) at the medical center. Work includes demolition and new construction of telecommunications rooms (TRs), fire-rated stair replacements, HVAC modifications including new VRF/VRV cooling units and ductless split systems, fire protection system upgrades with new sprinkler installations and fire extinguisher cabinet replacements, plumbing modifications including condensate line installations, electrical upgrades, and interior finishing work. The project incorporates infection control and risk assessment (ICRA) protocols with Class II, III, and IV barriers, 2-hour and 1-hour fire-rated assemblies, and anti-static flooring treatments. Key specifications include new semi-recessed fire extinguisher cabinets meeting ABC ratings, standard response sprinklers, FRT plywood wall protection, resilient rubber base installation, and coordinated mechanical/electrical/plumbing penetrations through rated assemblies with fire caulking requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA |, newest first.
File Type Posted
Att. 3 - Brand Name Justification.pdf PDF
Att. 2 - Specifications - 4-23-2026.pdf PDF
Att. 1 - Tech Questions Tracker - 590-22-700.pdf PDF
36C77626R0041 0003.pdf PDF
36C77626R0041 0002.pdf PDF
Att. 1 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
36C77626R0041 0001.pdf PDF
Attachment 01 - Site Visit Sign in Sheet.pdf PDF
Att. 6 - Set 4 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 24 - Key Personnel.pdf PDF
Att. 23 - KSI.pdf PDF
Att. 17 - Set 7 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 14 - Set 4 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 8 - Set 6 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 3 - Set 1 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 2 - Specifications.pdf PDF
36C77626R0041.pdf PDF
Att. 22 - Limitations on Subcontracting.pdf PDF
Att. 18 - Set 8 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 13 - Set 3 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 10 - Set 8 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 9 - Set 7 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 7 - Set 5 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 5 - Set 3 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 21 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Att. 20 - Division Pricing Template.xlsx XLSX spreadsheet
Att. 19 - DBA Wage Determination.pdf PDF
Att. 16 - Set 6 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 11 - Set 1 of 8 Final Drawings By Discipline 590 22 700.pdf PDF
Att. 4 - Set 2 of 8 Final Drawings By Building 590 22 700.pdf PDF
Att. 1 - Construction SOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N Q

P

EXISTING FIRE

RISER

EXISTING

ELECTRICAL

EQUIPMENTS

INTERIOR LINE

OF NEW WALL

12' - 10"

EXISTING FE. REPLACE WITH NEW

SEMI-RECESSED FEC. REPLACE

EXISTING FE WITH NEW CLEAN

AGENT EXTINGUISHER THAT MEETS

OR EXCEEDS THE ABC RATING AND

SIZE OF EXISTING EXTINGUISHER.

SEE DETAIL 3/A-603

ENTRY POINT

9 8

ENTRY POINT

N

P

N

P

233 SF

LINEN STORAGE

CG02

62 SF

LINEN CHUTE

(CLOSED)

EBG-12

742 SF

CORRIDOR

CGC-1

312 SF

DIALYSIS

STORAGE

DG23

01a

124 SF

TR

SGC-1

IN-04.02-8

81 SF

FIRE RISER

SGC-1a

12' - 10" (CLR.)

IN

-0

.0

-9

E X

IS

T

IN

G

F

L O

O R

IN

G

N E

W

O

O R

IN

G

10'x10' TR FORM

FACTOR

2"x2" TRENCH ALONG WALL WITH

SLOTTED METAL COVER. COORDINATE

WATER SENSOR WITH MECHANICAL

AND ELECTRICAL.

(F O

R E

X C

E P

T

IO

N

(E

X

IS

T

SGC-1

IN-01.31

EXISTING ELECTRICAL

EQUIPMENT

NEW SEMI-RECESSED FEC. NEW

CLEAN AGENT FIRE EXTINGUISHER.

SEE DETAIL 3/A-603

N

P

233 SF

LINEN STORAGE

CG02

62 SF

LINEN CHUTE

(CLOSED)

EBG-12

742 SF

CORRIDOR

CGC-1

312 SF

DIALYSIS

STORAGE

DG23

EXPOSED

124 SF

TR

SGC-1

81 SF

FIRE RISER

SGC-1a

1' - 3"

1' - 3" 1' - 2"

1' - 2"

2' - 4"

KEY AREA SHOWN

PROJECT

NORTH

742 SF

CORRIDOR

CGC-1

209 SF

STAIR 1

SGC-1

233 SF

LINEN STORAGE

CG02

62 SF

LINEN SHOOT

(CLOSED)

EBG-12

312 SF

DIALYSIS

STORAGE

DG23

742 SF

CORRIDOR

CGC-1

209 SF

STAIR 1

SGC-1

233 SF

LINEN STORAGE

CG02

62 SF

LINEN SHOOT

(CLOSED)

EBG-12

312 SF

DIALYSIS

STORAGE

DG23

RM SGC-1

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

2HR FIRE BARRIER

EXISTING WALL ACTING AS ICRA

BOUNDARY. SEAL ANY OPENINGS AND

PENETRATIONS AS REQUIRED.

POLYETHYLENE SHEETING

CONSTRUCTION TACKY MAT

HEPA EQUIPPED EXHAUST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:0

:0 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

.r v t

110A-100

BUILDING 110 - LEVEL 00 DEMO FLOOR PLAN,

DEMO RCP, FLOOR PLAN & RCP

MA AL/OB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1/4" = 1'-0"

RM SGC-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM SGC-1 - DEMO RCP

1/4" = 1'-0"

RM SGC-1 - FLOOR PLAN

1/4" = 1'-0"

RM SGC-1 - RCP

KEY PLAN

GENERAL NOTES

KEYNOTES (THIS SHEET ONLY)

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE

MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE

DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED

AND NEW DOORS ARE INSTALLED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO

MATCH EXISTING.

DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR

STRUCTURE UNDERNEATH. REMOVE EXISTING

SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING

FOR NEW WORK.

CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH

EXISTING.

INSTALL NEW DOOR/FRAME.

APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER

WITH SEALANT AT THE BOTTOM.

INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,

TYPICAL.

ICRA KEYNOTES

INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO

ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG

EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE

EXPOSED OUTSIDE OF CONSTRUCTION AREA.

PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.

LEGEND

ICRA LEGEND - CLASS II

Revisions: Date:

07-18-2025

KEY AREA SHOWN

PROJECT

NORTH

DD

DUCT TO EXTERIOR

ANTE

ROOM

13 11

169 SF

LAB SPECIMEN

GA-153

61 SF

FEM. TOILET

GA-154

80 SF

MALE TOILET

GA-155

530 SF

CORRIDOR

CGB18

107 SF

DIETITIAN

CG-156

116 SF

DIETITIAN

CG-157

331 SF

LAB

COLLECTIONS

CG-158

303 SF

CGB17

DD

DD

61 SF

FEM. TOILET

GA-154

80 SF

MALE TOILET

GA-155

530 SF

CORRIDOR

CGB18

G A

-1

NEW

FLOORING

EXISTING

FLOORING

IN-04.02-10

/4

(E X

IS

T

± 24' - 2" (EXIST.)

/4

(E

X

IS

T

2"x2" TRENCH ALONG WALL WITH

SLOTTED METAL COVER.

COORDINATE WATER SENSOR WITH

MECHANICAL AND ELECTRICAL.

228 SF

TR

GA-157

169 SF

LAB SPECIMEN

GA-153

327 SF

LAB

COLLECTIONS

CG-158

10x10 TR FORM FACTOR

± 10' - 0 1/2" (EXIST.)

1001b

NOTE: EXISTING FE TO BE UPGRADED.

SEE SHEET 110AS100 FOR FE LOCATION.

DD

61 SF

FEM. TOILET

GA-154

80 SF

MALE TOILET

GA-155

530 SF

CORRIDOR

CGB18

EXPOSED

1' - 4"

1' - 2"

2' - 3"

2' - 3"

228 SF

TR

GA-157

169 SF

LAB SPECIMEN

GA-153

327 SF

LAB

COLLECTIONS

CG-158

2' - 4" 6' - 7"

RM GA-157

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

EXISTING WALL ACTING AS ICRA

BOUNDARY. SEAL ANY OPENINGS AND

PENETRATIONS AS REQUIRED.

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MAT

HEPA EQUIPPED EXHAUST

169 SF

LAB SPECIMEN

GA-153

61 SF

FEM. TOILET

GA-154

80 SF

MALE TOILET

GA-155

530 SF

CORRIDOR

CGB18

107 SF

DIETITIAN

CG-156

116 SF

DIETITIAN

CG-157

331 SF

LAB

COLLECTIONS

CG-158

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0

/2

:0

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

B

.r v t

110BA-100

BUILDING 110B - LEVEL 00 - DEMO FLOOR

PLAN, DEMO RCP, FLOOR PLAN & RCP

MA CO

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE

MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE

DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED

AND NEW DOORS ARE INSTALLED.

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

DEMOLISH EXISTING DOOR/FRAME. PREPARE FOR NEW

DOOR/FRAME AND/OR INFILL WALL TO MATCH EXISTING.

DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR

STRUCTURE UNDERNEATH. REMOVE EXISTING

SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING

FOR NEW WORK.

DEMOLISH EXISTING BASE, REMOVE EXISTING ADHESIVE

AND PREPARE FOR NEW BASE.

DEMOLISH EXISTING WALL. PATCH EXPOSED WALL

CONNECTION TO MATCH EXISTING.

DEMOLISH EXISTING ACT COMPLETELY INCLUDING ALL

GRIDS, SUPPORTING WIRES, CLIPS, AND PERIMETER WALL

ANGLES TO EXPOSE UNDERSIDE OF STRUCTURE ABOVE.

PATCH WALLS WHERE CEILING IS REMOVED.

INSTALL NEW DOOR/FRAME.

INSTALL NEW RESILIENT RUBBER BASE AT ROOM

PERIMETER WITH SEALANT AT THE BOTTOM.

APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

INSTALL NEW FRT PLYWOOD OVER WALLS PER DETAIL

3/AE421, TYPICAL.

INFILL WALL, PATCH AND PAINT TO MATCH EXISTING.

ICRA KEYNOTES

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM GA-157 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM GA-157 - DEMO RCP

1/4" = 1'-0"

RM GA-157 - FLOOR PLAN

1/4" = 1'-0"

RM GA-157 - RCP

LEGEND

ICRA LEGEND - CLASS IV

Revisions: Date:

27B

27 31

27A

110A

110B

110D

13W

148-D

148-S

148-A

148T

146B

146A

138A 138136

137A

137C

137D

137B

137C

148B

173A

148-C

170 150

110C

143 167

G R

A V

E L

R O

A D

FRANKLIN BOULEVARD

FRANKLIN BOULEVARD

AVERILL AVENUE

AVERILL AVENUE

A M

E S

S T

R E

E T

HARRIS AVENUE

JONES CREEK

K N

O X S

T R

E E

T

T H

O M

P S

O N

S T

R E

E T

F R A N

K

LI

N B

O U

LE

V A R

D

MALLORY STREET

M A

R T

IN

L. K

IN

G

JR

. B O

U L E

V A R

D

M A R

TIN

L. K

IN

G

JR

. B O U

LE

V

AR

D

E M

A N

C

IP

A T

IO

N D

R

SHORE ROAD

H A R R

IS

A V E N

U E

HARRIS AVENUE

M c C

L E

L L A

N

S E

W E

LL

A

V E

N U

E

A V

E N

U E

J M O R T V X AA CC DD EE FF GG HH II

TELEPHONE CLOSET

C109

21 SF

CLEAN STORAGE

C108

221 SF

URINE COLLECTION

C110

58 SF

FEMALE TOILET

C112

46 SF

URINALYSIS

C114

348 SF

CORRIDOR

CIC-4

552 SF

ELEVATOR 5

E1B-5

90 SF

LOCKER ROOM

C113

89 SF

STAIR 6

S1C-6

152 SF

M

IC

R O

S C

O P

E R

O O

M

C

S

F

BLOOD COLLECTION

C117

92 SF

ELECTRICAL CLOSET

C151

34 SF

HAC

C116

43 SF

STAT LAB

C118

184 SF

BLOOD DONOR

C118A

229 SF

FEMALE TOILET

C120

127 SF

BLOOD BANK

C122

285 SF

HEMAT & SEROLOGY

C126

797 SF

CYTOLOGY

C130A

103 SF

BAL & SOLUTION ROOM

C128

188 SF

HISTOPATOLOGY

C130

387 SF

MYCOBACTERIOLOGY

C132

416 SF

STAIR 7

SIC-7

143 SF

SHAFT

V1

71 SF

CORRIDOR

C1C-5

387 SF

CHEMISTRY LAB

C127

1878 SF

CHASE

V2

26 SF

FLUORO, MICROSCOPE ROOM

C142

109 SF

CORRIDOR

C1C-8

495 SF

PATHOLOGY OFFICE

C141

122 SF

OFFICE

C139

209 SF

LABORATORY

C144

160 SF

ASS TECH. OFFICE

C143

123 SF

PATHOLOGIST OFFICE

C145

123 SF

MALE TOILET

C146

66 SF

RESIDENT ROOM

C147

123 SF

CORRIDOR

C1C-6

480 SF

MICROBIOLOGY

C133

1047 SF

T.B. LAB

C135

134 SF

OFFICE

C137

206 SF

CORRIDOR

C1C-7

203 SF

CORRIDOR

C1C-6A

61 SF

CONFERENCE ROOM

C218m

156 SF

INSTRUMENT PREP AREA

B102L

74 SF

RECOVERY ROOM

B102L.1

57 SF

ORAL SURGERY ROOM

B102K

165 SF

OFFICE

B125

91 SF

OFFICE

B123

99 SF

OFFICE

B121

108 SF

OFFICE

B119

105 SF

OPERATORY ROOM

B102J

139 SF

STORAGE

B102H1

40 SF

OPERATORY ROOM

B102H2

114 SF

EXAM ROOM

B102F

128 SF

STORAGE, SUPPLY

B102E

65 SF

COMM CLOSET

B102E.1

50 SF

CORRIDOR

C1B1

953 SF

CORRIDOR

C1B2

128 SF

STAFF TOILET

B106

66 SF

OFFICE

B111F

291 SF

OFFICE

B111E

143 SF

CONFERENCE ROOM

B111B

348 SF

CHIEF OFFICE

B111C

163 SF

CORRIDOR

B111

70 SF

OFFICE

B111A

145 SF

STAIRWAY #2

S1B2

188 SF P

IP

E C

H A

S E

EXAM ROOM

B102I

99 SF

MENTAL LAB

B102G

122 SF

EXAM ROOM

B102W

141 SF

EXAM ROOM

B102U

118 SF

STORAGE CLOSET

B102Y

121 SF

EXAM ROOM

B102X

124 SF

EXAM ROOM

B102V

103 SF

EXAM ROOM

B102O

141 SF

CHIEF, DENTAL SVC

B102N

133 SF

ADMIN OFFICE

B102M

162 SF

CLEAN INSTRUMENT ROOM

B102Q

130 SF

OPERATORY ROOM

B102S.2

95 SF

CHAINGING ROOM

B102S.4

47 SF

EXAM ROOM

B102R

114 SF

ANTI ROOM

B102S

108 SF

DIRTY UTILITY ROOM

B102S.3

53 SF

EXAM ROOM

B102T

94 SF

ELEVATOR #10

E1B10

74 SF

COMM CLOSET

B111D

20 SF

COMM CLOSET

B104

11 SF

RECEPTION/FILE ROOM

B102A

141 SF

EXAM ROOM

B102B

99 SF

CONFERENCE ROOM

B102C

243 SF

MEN CHANGING

B107

96 SF

WOMEN CHANGING

B105

138 SF

WOMEN TOILET

B103

129 SF

131 SF

ELEVATOR #9

E1C9

84 SF

ELEVATOR #8

E1C8

73 SF

LOBBY

C100

1326 SF

CORRIDOR

C1C2

172 SF

BREAK/CONF ROOM

C106

291 SF

UNISEX TOILET

D101

80 SF

MSA SUPERVISOR

D103

100 SF EXAM ROOM

D107

176 SF

P

IP

E C

H A

S E

STAIRWAY #3

S1D3

181 SF

DATA CLOSET

D108

16 SF

ELECTRICAL CLOSET

D110

31 SF

DATA CLOSET

D112

36 SF

SOILED UTILITY

D116

84 SF

EXAM ROOM

D118

115 SF

STAFF LOUNGE

D154

198 SF

EXAM ROOM

D148

192 SF

EXAM ROOM

D146

156 SF

EXAM ROOM

D143

133 SF

ELEVATOR #6

E1D6

71 SF

MED ROOM

D155

87 SF

EXAM ROOM

D157

173 SF

EXAM ROOM

D160

133 SF

CONSULTATION ROOM

D122

120 SF

STORAGE

D121

15 SF

EXAM ROOM

D117

155 SF

EXAM ROOM

D119

134 SF

TEAMLET STATION

450 SF

CORRIDOR

C1D3

870 SF

EXAM ROOM

D138

155 SF

STAIRWAY #4

S1D4

162 SF

EXAM ROOM

D139

166 SF

EXAM ROOM

D135

130 SF

EXAM ROOM

D133

130 SF

STAFF TOILET

D131

53 SF

EXAM ROOM

D129

130 SF

EXAM ROOM

D127

160 SF

STAIRWAY # 5

S1B5

160 SF

OPERATORY ROOM

B102S.1

109 SF

EXAM ROOM

B102P

112 SF

STORAGE

B102D

12 SF

OFFICE

B117

99 SF

STORAGE

B101

101 SF

ANCILLARY TESTING COOR

C105

283 SF

HVAC

C103

55 SF

HAC ROOM

D105

56 SF

MECHANICAL ROOM

D154

212 SF

COFERENCE ROOM

D106

346 SF

WAITING AREA

D100

516 SF

RECEPTION AREA

D102

261 SF

STORAGE ROOM

D137

31 SF

STORAGE

D125

44 SF

TEAMLET STATION

D163

139 SF

ASST CHIEF OFFICE

D162a

99 SF

PROGRAM MGT OFFICE

D162

84 SFEXAM ROOM

D156

129 SF

UNISEX TOILET

D158

59 SFUNISEX TOILET

D113

46 SF

CLEAN UTILITY

D115

66 SF

CORRIDOR

C1D4

555 SF

EXAM ROOM

D147

142 SF

UNISEX TOILET

D145

93 SF

EXAM ROOM

D149

134 SF

TEAMLET STATION

D150

146 SF

CORRIDOR

C1D2

374 SF

CORRIDOR

C1D1

362 SF

INFORMATION DESK

C104

94 SF

ELECTRICAL CLOSET

C102

31 SF

CORRIDOR

C1C1

480 SF

WAITING AREA

B102

506 SF

CORRIDOR

C1B3

557 SF

CORRIDOR

C1B4

517 SF

A B C D E F G I K L N Q S U W Z BB

Y

H

P

BUILDING 110

SECTION 2A:

CONTRACTOR TO COORDINATE

WITH VA FOR ROOM CLOSURES AND

AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

BUILDING 110

SECTION 2B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

PHASE 1: CONTRACTOR TO COMPLETE THE

WORK OF THIS TR AND ASSOCIATED DATA

DROPS. COMPLETE ONE SECTION AT A TIME

AS DIRECTED TO COR.

BUILDING 110A

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110A

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BLDG. 110A

BLDG. 110

BLDG. 110B

EXISTING FE. REPLACE WITH NEW SEMI-

RECESSED FEC. REPLACE EXISTING FE WITH

NEW CLEAN AGENT EXTINGUISHER THAT MEETS

OR EXCEEDS THE ABC RATING AND SIZE OF

EXISTING EXTINGUISHER. SEE DETAIL 3/A-603

FE

FE

FE

FE

FE

FE

FE FE

FE

FE FE

FE

FE

FE

FE FE

FE

FE

FE

FE

D

IA

M O N D L

IN

E

TR

S1C1

124 SF

FIRE RISER

S1C1b

57 SF

445 SF

CORRIDOR

C1-1

952 SF

OFFICE

1C-100

503 SF

ELEV. LOBBY

C1-2

116 SF

ELEV

115 SF

ELEV

117 SF

ELEV

186 SF

STAIR

426 SF

BLOWER ROOM

1C-105

205 SF

ELECTRICAL SWITCH GEAR

1C-104

1380 SF

STORAGE

N/A

285 SF

CORRIDOR

C2-13

BLDG. 110B

TR

ICRA PHASING LINE

ICRA CLASS II

ICRA CLASS III

ICRA CLASS IV

FEC

FE

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

2 HR FIRE BARRIER

1 HR SMOKE BARRIER

1 HR FIRE BARRIER

2 HR FIRE/SMOKE BARRIER

NON-RATED SMOKE PARTITION

BUILDING BOUNDARY LINE

BUILDING 110 COMPLEX

KEY AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0

/2

:0

:5 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

B

.r v t

110AS101

BUILDING 110, 110A, 110B - LEVEL 01 -

PHASING PLAN

MA RB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

1" = 20'-0"

BUILDING 110, 110A, 110B - LEVEL 01- PHASING PLAN

LEGEND

KEY PLAN

PROJECT

NORTH

0' 10' 20' 40'

Revisions: Date:

110, 110(A,B,C,D)

NORTH

L N

P

INTERIOR LINE

OF NEW WALL

EXISTING FIRE

RISER

DUCT TO

EXTERIOR

12' - 10"

EXISTING FE. REPLACE WITH NEW SEMI-

RECESSED FEC. REPLACE EXISTING FE WITH NEW

CLEAN AGENT EXTINGUISHER THAT MEETS OR

EXCEEDS THE ABC RATING AND SIZE OF EXISTING

EXTINGUISHER. SEE DETAIL 3/A-603

ENTRY POINT

BARRIER TO BLOCK ONE SIDE OF DOOR.

WORK SHOULD BE DONE DURING NON-

WORKING HOURS AND SHOULD BE

COMPLETED IN THE SHORTEST TIME

POSSIBLE. COORDINATE WORK WITH COR.

ANTE

ROOM

11 9

N

P

55 SF

HVAC

C103

283 SF

ANCILLARY

TESTING COOR

C105

80 SF

UNISEX TOILET

D101

480 SF

CORRIDOR

C1C1

516 SF

WAITING AREA

D100

01a

E X

IS

T

O

O R

IN

G

N

O

O R

IN

G

(F O

R E

X C

E P

T

IO

N

(E

X

IS

T

10'x10' TR FORM

FACTOR

124 SF

TR

S1C1 S1C1

IN-04.02-12

IN-04.02-11

57 SF

FIRE RISER

S1C1b

12' - 10" (CLR.)

NEW FLOOR SHALL BE

OF 2-HR FIRE RATING

CONSTRUCTION.

2"x2" TRENCH ALONG WALL WITH

SLOTTED METAL COVER.

COORDINATE WATER SENSOR WITH

MECHANICAL AND ELECTRICAL.

F-1

IN-01.31

NEW SEMI-RECESSED FEC. NEW

CLEAN AGENT FIRE EXTINGUISHER.

SEE DETAIL 3/A-603

172 SF

CORRIDOR

C1C2

L

N

P

L

N

P

55 SF

HVAC

C103

80 SF

UNISEX TOILET

D101

480 SF

CORRIDOR

C1C1

283 SF

ANCILLARY

TESTING COOR

C105

516 SF

WAITING AREA

D100

EXPOSED

124 SF

TR

S1C1

57 SF

FIRE RISER

S1C1b

1' - 10" 2' - 0"

1' - 10" 2' - 0" 3' - 1"

172 SF

CORRIDOR

C1C2

RM S1C1

185 SF

STAIRWAY #1

S1C1

55 SF

HVAC

C103

283 SF

ANCILLARY

TESTING COOR

C105

80 SF

UNISEX TOILET

D101

480 SF

CORRIDOR

C1C1 516 SF

WAITING AREA

D100

172 SF

CORRIDOR

C1C2

185 SF

STAIRWAY #1

S1C1

55 SF

HVAC

C103

283 SF

ANCILLARY

TESTING COOR

C105

80 SF

UNISEX TOILET

D101

480 SF

CORRIDOR

C1C1

516 SF

WAITING AREA

D100

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

2HR FIRE BARRIER

POLYETHYLENE SHEETING

HEPA EQUIPPED AIR FILTER

ICRA CLASS IV LEGEND - TR

ICRA CLASS II LEGEND - FEC

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

EXISTING WALL ACTING AS ICRA

BOUNDARY. SEAL ANY OPENINGS AND

PENETRATIONS AS REQUIRED.

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MAT

HEPA EQUIPPED EXHAUST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

.r v t

110A-101

BUILDING 110 - LEVEL 01 DEMO FLOOR PLAN,

DEMO RCP, FLOOR PLAN & RCP

MA CO

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

GENERAL NOTES

KEYNOTES (THIS SHEET ONLY)

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,

AND ELECTRICAL ITEMS ARE DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED

AND NEW DOORS ARE INSTALLED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM S1C1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM S1C1 - FLOOR PLAN

1/4" = 1'-0"

RM S1C1 - DEMO RCP

1/4" = 1'-0"

RM S1C1 - RCP

DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO

MATCH EXISTING.

CONSTRUCT NEW 2HR FIRE RATED FLOOR, ALIGNED TO

EXISTING FLOOR STRUCTURE. SEE STRUCTURAL DETAILS.

CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH

EXISTING.

INSTALL NEW DOOR/FRAME.

APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER

WITH SEALANT AT THE BOTTOM.

INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,

TYPICAL.

ICRA KEYNOTES

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.

INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO

ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG

EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE

EXPOSED OUTSIDE OF CONSTRUCTION AREA.

INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

LEGEND

ICRA LEGEND

Revisions: Date:

27B

27 31

27A

110A

110B

110D

13W

148-D

148-S

148-A

148T

146B

146A

138A 138136

137A

137C

137D

137B

137C

148B

173A

148-C

170 150

110C

143 167

G R

A V

E L

R O

A D

FRANKLIN BOULEVARD

FRANKLIN BOULEVARD

AVERILL AVENUE

AVERILL AVENUE

A M

E S

S T

R E

E T

HARRIS AVENUE

JONES CREEK

K N

O X S

T R

E E

T

T H

O M

P S

O N

S T

R E

E T

F R A N

K

LI

N B

O U

LE

V A R

D

MALLORY STREET

M A

R T

IN

L. K

IN

G

JR

. B O

U L E

V A R

D

M A R

TIN

L. K

IN

G

JR

. B O U

LE

V

AR

D

E M

A N

C

IP

A T

IO

N D

R

SHORE ROAD

H A R R

IS

A V E N

U E

HARRIS AVENUE

M c C

L E

L L A

N

S E

W E

LL

A

V E

N U

E

A V

E N

U E

J M O R T V X AA CC DD EE FF GG HH II

124 SF

CHIEF EYE CLINIC

2C-116

126 SF

MEN'S STAFF TOILET

2C-102A

89 SF

TEL

2D-147

62 SF

HAC

2C-112

51 SF

EMS

2C-111

369 SF

CORRIDOR

C2C22

104 SF

MEN'S STAFF LOCKERS

2C-102

2260 SF

MECHANICAL ROOM

2C-118

22 SF

STORAGE

2D-144A

21 SF

STORAGE

2D-144B

125 SF

CHIEF OPTH

2D-142

113 SF

ARGON LASER

2D-140

122 SF

OPTOMETRY

2D-139

426 SF

CORRIDOR

C2-17

124 SF

EYE LANE

2D-114

140 SF

EYE LANE

2D-112

111 SF

SCOPE CLEANING

2D-110A

92 SF

DIRTY SCOPE CLEANING

2D-110

371 SF

CORRIDOR

C2D15 54 SF

TOILET

2D-109A

249 SF

ENDOSCOPY

2D-109

257 SF

ENDOSCOPY

2D-111

54 SF

TOILET

2D-111A

158 SF

EYE LANE

2D-113

48 SF

EYE LANE

2D-116

75 SF

SOILED SPD

2D-125

69 SF

OFFICE

2D-126

116 SF

ENT EXAM

2D-127

116 SF

EXAM

2D-128

107 SF

AUDIO

2D-129

283 SF

RECEPTION

C2D6

155 SF

MIN SURG

2D-130

130 SF

EXAM

2D-132

126 SF

EXAM

2D-134

127 SF

EXAM

2D-136

132 SF

EXAM

2D-138

72 SF

VIS FLD

2D-137

73 SF

VIS FLD

2D-135

45 SF

CLEAN STORAGE

2D-141

43 SF

LOW VISION CLINIC

2D-143

115 SF

ELEC

2D-145

404 SF

CORRIDOR

C2C21

54 SF

TOILET

2D-107A

293 SF

GAST LAB

2D-107

140 SF

CONSULT

2D-105

89 SF

STERILE

2A-124

304 SF

LOW VISION

2D-122

128 SF

LASER TREATENT

2D-121

101 SF

LOW VISION

2D-103

547 SF

LOW VISION

2D-119

396 SF

ENT HALL

C2D19

122 SF

EXAM

2D-100B

31 SF

CLOSET

2D-100D

121 SF

EXAM

2D-100E

122 SF

CHARTING ROOM

2D-101

88 SF

TOILET

2D-102

83 SF

CHANGING

2D-104

62 SF

TOILET

2D-104A

57 SF

CLEAN UTILITY

2D-106D

73 SF

SOILED UTILITY

2D-106C

77 SF

TOILET

2D-100F1

69 SF

TOILET

2D-100G

150 SF

INFUSION

2D-100F

1503 SF

CHEMO

2D-100

124 SF

EXAM

2D-100C

93 SF

OFFICE/CONSULT

2D-100A

58 SF

TOILET

2D-106B

928 SF

RECOVERY

2D-106

134 SF

NURSE STATION

2D-106A

192 SF

CORRIDOR

C2D14

152 SF

CONSUL

2A-102

133 SF

PHYS

2A-103

149 SF

TREATMENT 1

2A-104

151 SF

LOUNGE

2A-105

141 SF

TREATMENT 2

2A-106

285 SF

RECEPTION

C2A3

54 SF

MED 1

2A-114

76 SF

OTHER

2A-113

92 SF

EXAM 1

2A-112

319 SF

CORRIDOR

C2D18

333 SF

CORRIDOR

C2D20

72 SF

WOMEN'S STAFF LOCKERS

2D-146

150 SF

WOMEN'S STAFF TOILETS

2D-146A

25 SF

WOMEN'S STAFF SHOWER

2D-146B

231 SF

BRONC (NP)

2D-108

476 SF

CORRIDOR

C2-7

63 SF

STAFF TOILET

2A-111

92 SF

EXAM 2

2A-110

87 SF

EXAM 3

2A-109

79 SF

EXAM 4

2A-108

56 SF

TOILET

2A-119A

46 SF

PATIENT TOILET

2A-120

145 SF

TREATMENT

2A-119

95 SF

EXAM 5 (NP)

2A-118

101 SF

EXAM 6 (NO)

2A-117

101 SF

EXAM 7 (NP)

2A-116

168 SF

TRIAGE 1 (NP)

2A-115

99 SF

TRIAGE NURSE

2A-163

105 SF

TRIAGE NURSE

2A-164

92 SF

TRIAGE NURSE

2A-165

108 SF

EXAM 10

2A-128

109 SF

EXAM 9

2A-127

108 SF

EXAM 8

2A-126

146 SF

ELEC

2A-125

549 SF

TRAINING/GROUP ROOM

2A-124

56 SF

PATIENT TOILET

2A-124A

144 SF

TELEPHONE CLOSET

2A-131

129 SF

EXAM 12

2A-130

108 SF

EXAM 11

2A-129

111 SF

EXAM 19

2A-148

98 SF

EXAM 20

2A-136

111 SF

EXAM 21

2A-135

111 SF

EXAM 22

2A-134

98 SF

EXAM 23

2A-123

98 SF

EXAM 24

2A-121

111 SF

EXAM 25

2A-122

110 SF

EXAM 26

2A-107

541 SF

CORRIDOR

2A-317

551 SF

CORRIDOR

C2-9

477 SF

CORRIDOR

C2-12

550 SF

CORRIDOR

C2-11

75 SF

MED

2A-157

107 SF

EKG

2A-158

115 SF

OFFICE

2A-159

68 SF

STAFF TOILET

2A-326

57 SF

OFFICE

2A-161

56 SF

HAC

2A-162

111 SF

ORTHO EXAM

2A-149

113 SF

EXAM 16

2A-150

96 SF

NURSE TRIAGE

2A-331

96 SF

ORTHO CLINIC

2A-332

115 SF

ORTHO CLINIC

2A-333

322 SF

RECEPTION

C2A5

143 SF

TREATMENT3

2A-142

144 SF

TREATMENT 7

2A-143

143 SF

TREATMENT 4

2A-141

142 SF

TREATMENT 5

2A-140

143 SF

TREATMENT 6

2A-139

42 SF

PATIENT TOILET

2A-143A

52 SF

PATIENT TOILET

2A-144A

149 SF

TREATMENT ROOM

2A-144

171 SF

GU LAB

2A-145

85 SF

SOILED UTILITY

2A-138

97 SF

CLEAN UTILITY

2A-137

57 SF

PATIENT TOILET

2A-145A

31 SF

STORAGE

2A-146

34 SF

CLEAN LINEN

2A-147

476 SF

CORRIDOR

C2-8

122 SF

TR

2A-154A

PHASE 1:

CONTRACTOR TO COMPLETE THE WORK OF THIS TR

AND ASSOCIATED DATA DROPS PRIOR TO MOVING TO

PHASE 2. COMPLETE ONE SECTION AT A TIME AS

DIRECTED TO COR.

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA FOR ROOM

CLOSURES AND AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA FOR ROOM

CLOSURES AND AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

SECTION 2A:

CONTRACTOR TO COORDINATE

WITH VA FOR ROOM CLOSURES

AND AVAILABILITY TO COMPLETE

DATA WIRING IN THIS AREA.

SECTION 2B:

CONTRACTOR TO COORDINATE

WITH VA FOR ROOM CLOSURES

AND AVAILABILITY TO COMPLETE

DATA WIRING IN THIS AREA.

175 SF

AREA

MAINTENANCE

2C-115

209 SF

EQUIPMENT STORAGE

2C-114

597 SF

CORRIDOR

C2C23

205 SF

DATA CLOSET

2C-113

89 SF

HSE STAFF

2D-144

350 SF

MEN'S TOILETS

2C-101 226 SF

WOMEN'S

TOILETS

2C-100

154 SF

INFO DESK

C2C28

1906 SF

MECHANICAL ROOM

2-AB

341 SF

STORAGE

2-AC

157 SF

STAIR #2

2S2

146 SF

PHYS

2A-101

279 SF

R.O.I

2A-100

152 SF

STAIR #1

2S1

STAIR 7

S2C-7

225 SF

CHIEF TECH

C218d

155 SF

PACS MANAGER

C218c

157 SF

HAC

C223

26 SF

STORAGE ROOM

C243a.1

27 SF

STAFF LOUNGE

C243a

159 SF

RADIOLOGIST

C243b

95 SF

STORAGE ROOM

C243c

51 SF

STORAGE CLOSET

C244

7 SF

RADIOLOGIST

C243

237 SF

FLOUROSCOPE ROOM

C242

357 SF

DRESSING ROOM

C240

91 SF

TOILET

C240a

27 SF

CONTROL ROOM

C238a

63 SF

FLOUROSCOPE ROOM

C238

298 SF

READING ROOM

C237

493 SF

CONFERENCE ROOM

C237a

124 SF

SPECIAL-PROCEDURE SUPPLY

C235

144 SF

SUPERVISOR OFFICE

C221

139 SF

DRESSING ROOM

C233

85 SF

AO IMAGING

C218b

133 SF

SECRETARY AREA

C218e

265 SF

DRT SUPERVISOR

C218a

137 SF

CHIEF IMAGING

C218f

152 SF

READING ROOM

C218g

125 SF

STORAGE ROOM

C218h

86 SF

RADIOGRAPHIC ROOM

C234

230 SF

CT ROOM

C232

289 SF

CORRIDOR

C218

242 SF

ULTRASOUND # 3

C216g

152 SF

CORRIDOR

C2C4

1346 SF

GURNEY WAITING

C229

86 SF

CORRIDOR

C2C5

374 SF

CONTROL ROOM

C234a

26 SF

TOILET

C231

80 SF

73 SF

PHOTO ROOM

2D-131

73 SF

UNT SND

2D-133

476 SF

CORRIDOR

C2-10

A B C D E F G I K L N Q S U W Z BB

Y

H

P

BUILDING 110A

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110A

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 2A:

CONTRACTOR TO COORDINATE

WITH VA FOR ROOM CLOSURES AND

AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

BUILDING 110

SECTION 2B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA FOR ROOM

CLOSURES AND AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

BUILDING 110

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA FOR ROOM

CLOSURES AND AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

BUILDING 110

PHASE 1: CONTRACTOR TO COMPLETE THE WORK OF THIS

TR AND ASSOCIATED DATA DROPS. COMPLETE ONE

SECTION AT A TIME AS DIRECTED TO COR.

BLDG. 110A

BLDG. 110

BLDG. 110B

596 SF

CORRIDOR

C2D13

65 SF

ELEV

C2-1

NEW SEMI-RECESSED FEC. NEW CLEAN AGENT

FIRE EXTINGUISHER. SEE DETAIL 3/A-603

EXISTING FE. REPLACE WITH NEW SEMI-

RECESSED FEC. REPLACE EXISTING FE WITH

NEW CLEAN AGENT EXTINGUISHER THAT MEETS

OR EXCEEDS THE ABC RATING AND SIZE OF

EXISTING EXTINGUISHER. SEE DETAIL 3/A-603

FE

FE

FE

FE

FE

FEFEFE

FE

FE

FE

FE

FE

FE

FEFE

FEFE

FE FE

D

IA

M O N D L

IN

E

D

IA

M O N D L

IN

E

99 SF

HAC

2C-176

112 SF

ENDOC 1

2C-174

112 SF

ENDOC 2

2C-172

112 SF

GI 1

2C-170

112 SF

GI 2

2C-168

54 SF

UNISEX RESTROOM

2C-163

394 SF

CORRIDOR

C2C6

515 SF

CORRIDOR

C2C5

66 SF

ELEV

41 SF

Room

E2F

194 SF

STAIRS #5

2S5

130 SF

EXAM RM

2B170

50 SF

ELECTRICAL RM

2B171

125 SF

EXAM RM

2B172

53 SF

STORAGE

2B173A

165 SF

PACT TEAM

2B173B

270 SF

PACT TEAM

2B173D

127 SF

EXAM RM

2B174

124 SF

EXAM RM

2B176

127 SF

EXAM RM

2B-132

20 SF

STORAGE

2B-133

129 SF

EXAM RM

2B-134

16 SF

FIRE CLOSET

2B-135

130 SF

EXAM RM

2B-136

55 SF

STORAGE

2B-137A

157 SF

OFFICE

2B-137B

276 SF

DOCUMENTATION AREA

2B-137D

168 SF

OFFICE

2B-137E

66 SF

MED RM

2B-137F

125 SF

EXAM RM

2B-138

306 SF

BREAK RM

2B-140

52 SF

CLEAN LINEN

2B-141

144 SF

SLEEP 1

2B-100

242 SF

MONITOR RM

2B-101

144 SF

SLEEP 2

2B-102

63 SF

STORAGE

2B-103

96 SF

CLEAN UTILITY

2B-148

144 SF

SLEEP 6

2B-105

144 SF

SLEEP 4

2B-106

144 SF

SLEEP 5

2B-107

144 SF

SLEEP 3

2B-104

80 SF

RESTROOM

2B-102A

80 SF

RESTROOM

2B-104A

73 SF

RESTROOM

2B-106A

11 SF

STORAGE

2B-106A.1

197 SF

MENS RESTROOM

2B-112A

190 SF

MENS LOCKER

2B-112

176 SF

WOMENS LOCKER

2B-110

197 SF

RESTROOM

2B-110A

143 SF

EXAM RM 1A

2B-120

142 SF

EXAM RM 1B

2B-122

143 SF

EXAM RM 2A

2B-124

144 SF

EXAM RM 1B

2B-126

143 SF

EXAM RM 3A

2B-128

144 SF

EXAM RM 3B

2B-130

143 SF

EXAM RM 4A

2B-121

141 SF

EXAM RM 4B

2B-123

143 SF

EXAM RM 5A

2B-125

144 SF

EXAM RM 5B

2B-127

143 SF

EXAM RM 6A

2B-129 144 SF

EXAM RM 6B

2B-131

14 SF

O2 STORAGE

2B-177

20 SF

ELECTRICAL CLOSET

2B-175

93 SF

CLEA SUPPLY

2B-164

57 SF

STORAGE

2B-165

164 SF

PACT TEAM

2B173E

57 SF

UNISEX RESTROOM

2B163

66 SF

MED RM

2B173F

91 SF

ELECTRIC RM

2B-151

69 SF

HAC

2B-147

57 SF

UNISEX

2B-153

80 SF

RESTROOM

2B-105A

80 SF

RESTROOM

2B-107A

11 SF

STORAGE

2B-105A.1

11 SF

STORAGE

2B-107A.1

73 SF

RESTROOM

2B-100A

11 SF

STORAGE

2B100A.1

11 SF

STORAGE

2B102A.1

11 SF

STORAGE

2B104A.1

89 SF

STORAGE RM

2C-150

69 SF

STORAGE

2C-151

20 SF

STORAGE

2C-175 141 SF

NEUROLOGY 1

2C-173

222 SF

NEUROLOGY 2

2C-169

84 SF

OFFICE

2C-153

19 SF

STORAGE

2C-152A

37 SF

CHECK OUT

2C-152C

103 SF

RECEPTION AREA

2C-152

192 SF

CHECK IN

2C-152B

201 SF

SECURITY

2C-154

109 SF

CLEAN SUPPLY

2C-155

65 SF

SOILED UTILITY

2C-157

134 SF

NURSE

2C-165

25 SF

ELECTRICAL CLOSET

2C-166

27 SF

SCALE/CART

2C-159

678 SF

WAITING AREA

C2C3

652 SF

WAITING AREA

2D-179

630 SF

KIOSK AREA

2D-180

287 SF

2D-181

264 SF

MH GROUP

2B-154

268 SF

MH GROUP

2B-156

19 SF

STORAGE

2B-157

19 SF

STORAGE

2B-159

1555 SF

CORRIDOR

C2C7

214 SF

CORRIDOR

C2C4

345 SF

PACT TEAM SUITE

2B173

908 SF

CORRIDOR

C2B8

52 SF

SCALE/CART

2B161

52 SF

CRASH CART

2B-155

359 SF

PACT TEAM SUITE

2B-137

914 SF

CORRIDOR

C2B4

559 SF

CORRIDOR

C2B6

512 SF

CORRIDOR

C2B3

491 SF

CORRIDOR

C2B1

268 SF

CORRIDOR

C2B2

520 SF

ELEVATOR LOBBY

2A-173

442 SF

ELEVATORS

2A-170

484 SF

CORRIDOR

C2C27

205 SF

STAIR #4

2S4

ULTRASOUND # 2

C216e

127 SF

WAITING AREA

C216

299 SF

TOILET

C216f

54 SF

TOILET

C216d

40 SFULTRASOUND # 1

C216c

115 SF

TOILET

C216c1

46 SF

DECON ROOM

C216b

63 SF

OFFICE

C216a

49 SF

VIEWING

C214

107 SF

DRESSING ROOM

C212c

32 SF

DRESSING ROOM

C212d

32 SF

DRESSING ROOM

C212b

48 SF

ULTRASOUND WATING ROOM

C212

219 SF

ULTRASOUND

C212a

172 SF

OFFICE

C210

227 SF

DATA CLOSET

C209

28 SF

STORAGE

C211

78 SF

MECHANICAL ROOM

C207

73 SF

ELEVATOR 5

E2C-5

108 SF

RADIOLOGY STORAGE

C213

107 SF

RECEPTION ROOM

C226

213 SF

STAIR 6

S2C6

165 SF

WAITING AREA

C219

475 SF

CT CONTROL RM

C230

225 SF

CT EXAM

C228

273 SF

ELECTRICAL CLOSET

C217

38 SF

ELECTRICAL PANEL

C215

21 SF

373 SF

GROUP RM

2B-182

114 SF

WORK AREA

2B-160

92 SF

SOILED UTILITY

2B-162

14 SF

STORAGE

2B-182A

144 SF

CHECKOUT

2B-158A

273 SF

CHECK IN

2B-158B

11 SF

STORAGE

2B-158C 7 SF

STORAGE

2B158B

19 SF

RECEPTION

2B-158

125 SF

TEST LAB PULMONARY

2C-160125 SF

GI 4

2C-162

126 SF

GI 3

2C-164

126 SF

TEST LAB PULMONARY

2C-158

123 SF

NURSE TRIAGE

2C-156

205 SF

MENS RESTROOM

2C-178

179 SF

WOMENS RESTROOM

2C-179

11 SF

STORAGE

2C180

19 SF

STORAGE

2C181

505 SF

CORRIDOR

C2C8

954 SF

CORRIDOR

C2B7

ORTHOTICS OFFICE

B246

416 SF

LAB CHIEF PROSTHETICS

B247

106 SF

3D PRINTER RM

B245

98 SF

CORRIDOR

C2B-5

349 SF

STORAGE RM

B242

167 SF

STORAGE RM

B242A

74 SF

HAC

B244

45 SF

CORRIDOR

C2B-5

349 SF

STORAGE RM

B243

105 SF

STAIR 2

S2B2

197 SF

STAFF LOUNGE

D242

105 SF

STORAGE

D244

42 SF EKG/SUB SPECIALTY CHECK IN

D243

225 SF

CORRIDOR

C2D-6

145 SF

OFFICE

D241

173 SF

READING RM

D238

113 SF

CORRIDOR

C2D-5

174 SF

HAC

D239

51 SF

CPAC STORAGE

D237A

78 SF

CPAC CLINIC

D237

155 SF

STAFF TOILET/SHOWER

D240

59 SF

CARDIOLOGY STRESS LAB

D216D

240 SF

X-RAY RM B

D216B

370 SF

CONTROL RM

D216E

108 SF

X-RAY RM-A

D216A

331 SF

CORRIDOR

D216

235 SF

HOT LABORATORY

D215

163 SF

NUCLEAR MEDICINE CHECK IN OFFICE

D216C

86 SF

STORAGE CLOSET

D215A

25 SF

STORAGE

D215B

24 SF

CORRIDOR

C2D2

82 SF

ELEVATOR 6

E2D6

99 SF

WAITING AREA

D220

426 SF

STAIR 4

S2D4

157 SF

CHIEF CARDIOLOGIST

D235

214 SF

ECG LAB

D234

395 SF

CORRIDOR

C2D-4

164 SF

CHIEF NEUROLOGIST

D233

99 SF

CARDIOLOGIST OFFICE

D231

98 SF

EXAM ROOM

D229

100 SF

CARDIOLOGY EXAM

D227

94 SF

EKG LAB

D225

99 SF

CARDIOLOGY NURSE

D223

74 SF

BREAK RM

D226A

160 SF

STRESS LAB

D226

256 SF

ECHO LAB #1

D230

214 SF

ECHO LAB #2

D232

190 SF

CORRIDOR

C2D-3

558 SF

CARDIOLOGY

D221

67 SF

REPRO ROOM

D219

53 SF

STORAGE RM (OXYGEN)

D214

43 SF

CPAP CLINIC

D208

216 SF

TELEPHONE CLOSET

D210

10 SF

HOME OXYGEN CLINIC

D206

135 SF

PULMONARY LAB

D204

276 SF

OFFICE

D202

186 SF

OFFICE

D202A

183 SF

TOILET

C200H

70 SF

TOILET

C200G

74 SF

KITCHEN

C200F

100 SF

RESIDENTS KITCHEN

C200E

125 SF

RES. SLEEP ROOM

C200D

163 SF

RES. SLEEP ROOM

C200C

165 SF

RES. SLEEP ROOM

C200B

131 SF

RES. SLEEP ROOM

C200A

137 SF

RESIDENTS LOUNGE

C200

535 SF

RESPIRATORY SUPPLY RM

B202

401 SF

RESPIRATORY OFFICE

B206

420 SF

MEDICINE OFFICE

B210

185 SF

STAIR 5

S2B5

156 SF

ORTHOTICS LAB

B239

369 SF

ORTHOTICS STORAGE

B235

403 SF

OFFICE

B231

403 SF

STAFF LOUNGE

B227AI

156 SF

OFFICE

B229

109 SF

B227A

75 SF

WAITING

B227

519 SF

OFFICE

B228

104 SF

RECEPTIONIST

B226

62 SF

TREATMENT RM

B230

128 SF

STORAGE

B230A

62 SF

TREATMENT RM

B232

98 SF

TREATMENT RM

B234

95 SF

CHIEF PROSTETICS TREATMENT CENTER

B238

218 SF

BIO-MED TECHS

B224

377 SF

BIO-MED RM

B220

402 SF

STORAGE

B225

54 SF

SUPERVISOR OFFICE

B223

210 SF

BIOMED STORAGE

B221

104 SF

MALETOLIET

B219

207 SF

CORRIDOR

C2B-2

187 SF

ELEVATOR 10

E2B10

74 SF

CHASE

B209A

24 SF

EQUIPMENT STORAGE

B209

60 SF

NURSING TIMEKEEPER

B207

129 SF

ABG LAB

B205

132 SF

NURSING ADMIN PATIENT SAFETY MGR

OFFICE

B203

138 SF

CORRIDOR

C2B-1

450 SF

DATA CLOSET

B214

55 SF

ELECTRICAL CLOSET

B212

63 SF

DATA CLOSET

B208

12 SF

811 SF

OFFICE

N/D

1364 SF

AREA MAINTENANCE

N/A

TR

S2C-1

124 SF

MILLION VET PROGRAM OFFICE

D201

144 SF

FIRE RISER

S2C-1B

76 SF

EMPLOYEE ASSISTANCE PROGRAM

COUNCILOR

D203

120 SF

CAPC OFFICE

D207

88 SF

SUPPLY RM

D209

104 SF

STAIR 3

S2D3

201 SF

FEC

159 SF

ORTHO EXAM ROOM

2A-154

167 SF

TRIAGE 2

2A-156121 SF

BLIND VENT ASSOCIATION OFFICE

2A-155

21 SF

2C-102A1

5722 SF

ELEV LOBBY

C2C1

BLDG. 110B

36 SF

XXX-1

TR

ICRA PHASING LINE

ICRA CLASS II

ICRA CLASS III

ICRA CLASS IV

FEC

FE

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

2 HR FIRE BARRIER

1 HR SMOKE BARRIER

1 HR FIRE BARRIER

2 HR FIRE/SMOKE BARRIER

NON-RATED SMOKE PARTITION

BUILDING BOUNDARY LINE

BUILDING 110 COMPLEX

KEY AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:0

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

B

.r v t

110AS102

BUILDING 110, 110A, 110B - LEVEL 02 -

PHASING PLAN

MA RB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

LEGEND

KEY PLAN

1" = 20'-0"

BUILDING 110, 100A, 100B - LEVEL 02- PHASING PLAN

PROJECT

NORTH

0' 10' 20' 40'

FE

FE

110, 110(A,B)

Revisions: Date:

NORTH

N

Q

P

INTERIOR LINE

OF NEW WALL

EXISTING FIRE

RISER

12' - 10"

ENTRY POINT

DUCT TO

EXTERIOR

ANTE

ROOM

10 10

L N

P

N

P

IN-04.02-13

E X

IS

T

O

O R

IN

G

N

O

O R

IN

G

(F O

R E

X C

E P

T

IO

N

(E

X

IS

T

10'x10' TR FORM

FACTOR

S2C-1

12' - 10" (CLR.)

56 SF

HAC

C201

147 SF

OFFICE

C203

364 SF

CORRIDOR

C2C-1

487 SF

CORRIDOR

C2D-1

144 SF

MILLION VET

PROGRAM

OFFICE

D201

6 SF

EMERGENCY

PANEL CLOSET

D200

124 SF

TR

S2C-1

76 SF

FIRE RISER

S2C-1B

IN-04.02-14

NEW FLOOR SHALL BE

OF 2-HR FIRE RATING

CONSTRUCTION.

2"x2" TRENCH ALONG WALL WITH SLOTTED

METAL COVER. COORDINATE WATER SENSOR

WITH MECHANICAL AND ELECTRICAL.

F-1

IN-01.31

NEW SEMI-RECESSED FEC. NEW

CLEAN AGENT FIRE

EXTINGUISHER. SEE DETAIL

3/A-603

01a

L N

P

EXPOSED

56 SF

HAC

C201

52 SF

ANTE-ROOM

C2C-3

147 SF

OFFICE

C203

364 SF

CORRIDOR

C2C-1 487 SF

CORRIDOR

C2D-1

144 SF

MILLION VET

PROGRAM

OFFICE

D201

124 SF

TR

S2C-1

76 SF

FIRE RISER

S2C-1B 1' - 7" 1' - 7"

1' - 7" 1' - 7"

3' - 1"

52 SF

ANTE-ROOM

C2C-3

147 SF

OFFICE

C203

204 SF

STAIR 1

S2C1

56 SF

HAC

C201

6 SF

EMERGENCY

PANEL CLOSET

D200

144 SF

MILLION VET

PROGRAM

OFFICE

D201

364 SF

CORRIDOR

C2C-1

487 SF

CORRIDOR

C2D-1

52 SF

ANTE-ROOM

C2C-3

147 SF

OFFICE

C203

204 SF

STAIR 1

S2C1

56 SF

HAC

C201

364 SF

CORRIDOR

C2C-1

6 SF

EMERGENCY

PANEL CLOSET

D200

144 SF

MILLION VET

PROGRAM

OFFICE

D201

RM S2C-1

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

2HR FIRE BARRIER

POLYETHYLENE SHEETING

HEPA EQUIPPED AIR FILTER

ICRA CLASS IV LEGEND - TR

ICRA CLASS II LEGEND - FEC

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

EXISTING WALL ACTING AS ICRA

BOUNDARY. SEAL ANY OPENINGS AND

PENETRATIONS AS REQUIRED.

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MAT

HEPA EQUIPPED EXHAUST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:4

:0 p m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

.r v t

110A-102

BUILDING 110 - LEVEL 02 DEMO FLOOR PLAN,

DEMO RCP, FLOOR PLAN & RCP

MA ME

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

KEY PLAN

GENERAL NOTES

KEYNOTES (THIS SHEET ONLY)

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,

AND ELECTRICAL ITEMS ARE DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED

AND NEW DOORS ARE INSTALLED.

1/4" = 1'-0"

RM S2C-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM S2C-1 - DEMO RCP

1/4" = 1'-0"

RM S2C-1 - FLOOR PLAN

1/4" = 1'-0"

RM S2C-1 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO

MATCH EXISTING.

CONSTRUCT NEW 2HR FIRE RATED FLOOR, ALIGNED TO

EXISTING FLOOR STRUCTURE. SEE STRUCTURAL DETAILS.

CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH

EXISTING.

INSTALL NEW DOOR/FRAME.

APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER

WITH SEALANT AT THE BOTTOM.

INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,

TYPICAL.

ICRA KEYNOTES

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.

INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO

ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG

EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE

EXPOSED OUTSIDE OF CONSTRUCTION AREA.

LEGEND

ICRA LEGEND

Revisions: Date:

1 HR SMOKE BARRIER

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

KEY AREA SHOWN

PROJECT

NORTH

CC DD

DUCT TO

EXTERIOR

13 12

INTERIOR LINE

OF NEW WALL

4' - 0"

13' - 6"

ANTE ROOM

CC DD

122 SF

TR

2A-154A

476 SF

CORRIDOR

C2-10

2A-154A

E X

IS

T

O

O R

IN

G

N

O

O R

IN

G

CC DD

IN-04.02-15

10'x10' TR FORM FACTOR

01b

13' - 6" (CLR.)

5722 SF

ELEV LOBBY

C2C1

159 SF

ORTHO EXAM

ROOM

2A-154

167 SF

TRIAGE 2

2A-156

121 SF

BLIND VENT

ASSOCIATION

OFFICE

2A-155

IN-01.02

NEW SEMI-RECESSED FEC.

NEW CLEAN AGENT FIRE

EXTINGUISHER. SEE DETAIL

3/A-603

01d

ALIGN

(E X

IS

T

122 SF

TR

2A-154A

476 SF

CORRIDOR

C2-10

EXPOSED

CC DD

2' - 1" 1' - 7"

2' - 0" 1' - 7"

159 SF

ORTHO EXAM

ROOM

2A-154

167 SF

TRIAGE 2

2A-156121 SF

BLIND VENT

ASSOCIATION

OFFICE

2A-155

5722 SF

ELEV LOBBY

C2C1

81 SF

SPLINT STORAGE

2A-154A

159 SF

ORTHO EXAM

ROOM

2A-154

476 SF

CORRIDOR

C2A10

121 SF

BLIND VENT

ASSOCIATION

OFFICE

2A-155

167 SF

SCI OUTPATIENT

CLINIC

2A-156

5765 SF

ELEV LOBBY

C2C1

81 SF

SPLINT STORAGE

2A-154A

159 SF

ORTHO EXAM

ROOM

2A-154

476 SF

CORRIDOR

C2A10

121 SF

BLIND VENT

ASSOCIATION

OFFICE

2A-155

167 SF

SCI OUTPATIENT

CLINIC

2A-156

5765 SF

ELEV LOBBY

C2C1

RM 2A-154A

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

EXISTING WALL ACTING AS ICRA

BOUNDARY. SEAL ANY OPENINGS AND

PENETRATIONS AS REQUIRED.

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MAT

HEPA EQUIPPED EXHAUST

KEY PLAN

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE

MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE

DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

1/4" = 1'-0"

RM 2A-154A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 2A-154A - DEMO RCP

1/4" = 1'-0"

RM 2A-154A - FLOOR PLAN

1/4" = 1'-0"

RM 2A-154A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR

STRUCTURE UNDERNEATH. REMOVE EXISTING

SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING

FOR NEW WORK.

DEMOLISH EXISTING BASE, REMOVE EXISTING ADHESIVE AND

PREPARE FOR NEW BASE.

DEMOLISH EXISTING PLUMBING FIXTURE. SEE MECHANICAL

PLANS.

DEMOLISH EXISTING ACT COMPLETELY INCLUDING ALL

GRIDS, SUPPORTING WIRES, CLIPS, AND PERIMETER WALL

ANGLES TO EXPOSE UNDERSIDE OF STRUCTURE ABOVE.

PATCH WALLS WHERE CEILING IS REMOVED.

INSTALL NEW DOOR/FRAME.

INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER

WITH SEALANT AT THE BOTTOM.

APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

INSTALL NEW FRT PLYWOOD OVER WALLS PER DETAIL

3/AE421, TYPICAL.

CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH

EXISTING ON ROOM.

INFILL WALL. PATCH AND PAINT TO MATCH EXISTING.

ICRA KEYNOTES

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:4

:1 p m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

B

.r v t

110BA-102

BUILDING 110B - LEVEL 02 - DEMO FLOOR

PLAN, DEMO RCP, FLOOR PLAN & RCP

MA ME

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

LEGEND

ICRA LEGEND - CLASS IV

Revisions: Date:

27B

27 31

27A

110A

110B

110D

13W

148-D

148-S

148-A

148T

146B

146A

138A 138136

137A

137C

137D

137B

137C

148B

173A

148-C

170 150

110C

143 167

G R

A V

E L

R O

A D

FRANKLIN BOULEVARD

FRANKLIN BOULEVARD

AVERILL AVENUE

AVERILL AVENUE

A M

E S

S T

R E

E T

HARRIS AVENUE

JONES CREEK

K N

O X S

T R

E E

T

T H

O M

P S

O N

S T

R E

E T

F R A N

K

LI

N B

O U

LE

V A R

D

MALLORY STREET

M A

R T

IN

L. K

IN

G

JR

. B O

U L E

V A R

D

M A R

TIN

L. K

IN

G

JR

. B O U

LE

V

AR

D

E M

A N

C

IP

A T

IO

N D

R

SHORE ROAD

H A R R

IS

A V E N

U E

HARRIS AVENUE

M c C

L E

L L A

N

S E

W E

LL

A

V E

N U

E

A V

E N

U E

J M O R T V X AA CC DD EE FF GG HH II

STAIR 7

S3C - 7

230 SF

ANES. HOLDING CART

C333

137 SF

ANES. OFFICE

C331

209 SF

ANES. WORK & STORAGE

C329

168 SF

SUPPLY TECH.

C327

122 SF

OR DIRECTOR

C323

140 SF

LOUNGE

C321

196 SF

VESTIBULE

35 SF

FEMALE LOCKER RM.

C315

241 SF

SHOWER

C315A

127 SF

CYSTO. 2

C311

455 SF

OP EQUIPMENT STORAGE

C334B

174 SF

OR 5

C346

504 SF

OR 4

C350

541 SF

OR 3

C354

541 SF

SUB-STERILE

C358

74 SF

HAC

C334A

25 SF

EXIST. D/W (CLEAN)

C334C

14 SF

OR 1

C326

510 SF

OR 2

C330

535 SF

VEST.

C314

49 SF

VEST.

67 SF

STAIR 6

S3C - 6

157 SF

ELEC.

C357J

96 SF

SHOWER

C316A

22 SF

MALE LOCKER ROOM

C316

191 SF

INSTRUMENT PREP STORAGE

C309

372 SF

CLOSET

C360

10 SF

CLOSET

C359

10 SF

CONTROL

C319

163 SF

CORRIDOR

C3C5

744 SF

HVAC CLOSET

C322

11 SF

CORRIDOR

C3C - 6

909 SF

CLEAN CORE

C334

951 SF

VESTIBULE

114 SF

CORRIDOR

C3C4

499 SF

P-4

C357E

83 SF

P-5

C357F

78 SF

P-5

C357G

79 SF

520 SF

ELEVATOR LOBBY

C3C2

240 SF

STAIR

483 SF

TELECOM

3C-10

ICU ISOLATION ROOM

B337A

258 SF

ANTE ROOM

B337

125 SF

ICU ISOLATION ROOM (ADA)

B337B

168 SF

ICU PATIENT ROOM (ADA)

B333

261 SF

PATIENT BATH

B337B1

57 SF

ICU STORAGE

B336

27 SF

HAC

B334

70 SF

STAIR ROOM

S3B-2

197 SF

COMM CHASE

32 SF

COMMUNICATION CLOSET

B310

74 SF

NURSE MANAGER

B308

96 SF

STAFF LOUNGE

B306

155 SF

LOCKERS

B302

134 SF

LINEN CLOSET

B304

11 SF

STAFF BATH

B302A

66 SF

CORRIDOR

C3B-4

691 SF

TELECOM CLOSET

B311

38 SF

COMM CLOSET

B309

57 SF

NOURISHMENT ROOM

B321

104 SF

PATIENT ROOM 4

B307

226 SF

PATIENT ROOM 3

B305

218 SF

PATIENT BATH

B305A

39 SF

PATIENT BATH

B307A

41 SF

PATIENT ROOM 2

B303

194 SF

PATIENT ROOM 1

B301

191 SF

PATIENT BATH

B301A

37 SF

PATIENT BATH

B303A

37 SF

MEDS ROOM

B323

153 SF

ICU PATIENT ROOM

B322

257 SF

PHYSICIAN CHARTING

B320B

106 SF

ICU PATIENT ROOM

B324

253 SF

ICU PATIENT ROOM

B326

252 SF

E Q

U

IP

M E

N T

S T

O R

A G

E

B

S

F

ICU PATIENT ROOM

B328

256 SF

C L

E A

N U

T

IL

IT

Y

C L

O S

E T

B

S

F

ICU PATIENT ROOM

B330

259 SF

C O

N F

E R

E N

C E

R O

O M

B

S

F

STAIR 5

S3B-5

162 SF

PATIENT BATH

B333B

80 SF

ELEVATOR 10

E3B-10

103 SFSTAFF TOILET

B312

45 SF

SOILED UTILITY CLOSET

B314

154 SF

LINEN CLOSET

B316

25 SF

PATIENT BATH

B318B1

39 SF

ICU ISOLATION ROOM

B318B

185 SF

ANTE ROOM

B318

121 SF

ICU ISOLATION ROOM

B318A

251 SF

ICU PATIENT ROOM

B315

274 SF

CORRIDOR

C3B-1

306 SF

RECEPTION/WAITING AREA

C301C

291 SF

OFFICE

C301

99 SF

CLOSE

C300

18 SF

WOMEN'S TOILET

C301B

149 SF

MEN'S TOILET

C301A

149 SF

C301D

88 SF

C301E

137 SF

BREAK ROOM

D302

654 SF

NUTRITION

D303

77 SF

COOK / CHILL

D304

94 SF

WARD SUPPLIES

D305

152 SF

STAFF TOILET

D302A

52 SF

ELECTRICAL CLOSET

D306

85 SF

TELEPHONE CLOSET

D308

126 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

S

F

PRIVATE BATH

D318A

38 SF

PRIVATE BATH

D320A

38 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

S

F

E X

A M

T

R E

A T

M E

N T

R O

O M

D

S

F

PRIVATE BATH

D322A

38 SF

PRIVATE TOILET

D324A

38 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

S

F

STAIR 4

S3D-4

164 SF

PRIVATE BATH

D325B1

44 SF

EXAM/ TREATMENT ROOM

D325B

137 SF

ANTE ROOM

D325

76 SF

EXAM/ TREATMENT ROOM

D325A

143 SF

PRIVATE BATH

D325A1

50 SF

LINEN CLOSET

D323

13 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

B

S

F

PRIVATE BATH

D321B1

52 SF

ANTE ROOM

D321

78 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

A

S

F

PRIVATE BATH

D321A1

52 SF

S T

O R

A G

E C

L O

S E

T

D

S F

PRIVATE BATH

D317B.1

50 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

B

S

F

ANTE ROOM

D317

77 SF

CORRIDOR

C3D-3

563 SF

E X

A M

T

R E

A T

M E

N T

R O

O M

D

A

S

F

PRIVATE BATH

D317A1

50 SF

CLINIC RECEPTION AREA

D310

202 SF

STAFF WORK AREA

D310A

169 SF

STAFF TOILET

D310A1

27 SF

MEDICATION ROOM

D312

152 SF

VASCULAR LAB

D316

178 SF

PRIVATE TOILET

D316A

45 SF

LINEN CLOSET

D314

12 SF

PRIVATE TOILET

D315A

54 SF

VASCULAR LAB

D315

182 SF

ANESTHETIST OFFICE

D313

122 SF

STAFF BATH

D313A

38 SF

HAC

D311

16 SF

SOILED UTILITY

D309

165 SF

ELEVATOR #6

E3D6

87 SF

STAIR 3

S3D-3

202 SF

BAY 5

D335G

123 SF

BAY6

D335H

95 SF

BAY 7

D335J

97 SF

BAY 8

D335K

96 SF

BAY 9

D335L

111 SF

LINEN CHUTE

C302

61 SF

HAC

C304

58 SF

BAY 10

D335M

98 SF

EQUIPMENT STORAGE

D335N

71 SF

CORRIDOR

C3B-3

351 SF

TELEMETRY

B320A

97 SF

NURSE STATION

B320

210 SF

ICU STORAGE

B327

13 SF

CORRIDOR

C3B-2

887 SF

CORRIDOR

C3C-2

178 SF

CORRIDOR

C3C-1

364 SF

CORRIDOR

C3C3

218 SF

CORRIDOR

C3D-1

414 SF

CORRIDOR

C3D-2

887 SF

ADMIN

D338

273 SF

RECEPTION

D337

76 SF

WAITING ROOM

D336

391 SF

CORRIDOR

C3D4

378 SF

BAY 3

D335B

99 SF

BAY 1

D335A

101 SF

CORRIDOR

D335.1

50 SF

INSTRUMENT PREP / STORAGE

C305

298 SF

ELEVATOR 9

E3C-9

84 SF

ELEVATOR 8

E3C-8

75 SF

OFFICE ROOM

C301F

104 SF

OFFICE ROOM

C301H

97 SF

OFFICE ROOM

C301G

118 SF

A B C D E F G I K L N Q S U W Z BB

Y

H

P

BUILDING 110

SECTION 2A:

CONTRACTOR TO COORDINATE

WITH VA FOR ROOM CLOSURES AND

AVAILABILITY TO COMPLETE DATA

WIRING IN THIS AREA.

BUILDING 110

SECTION 2B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110

PHASE 1: CONTRACTOR TO COMPLETE THE

WORK OF THIS TR AND ASSOCIATED DATA

DROPS. COMPLETE ONE SECTION AT A TIME

AS DIRECTED TO COR.

BUILDING 110A

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110A

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

BUILDING 110B

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

EXISTING FE. REPLACE WITH NEW SEMI-RECESSED

FEC. REPLACE EXISTING FE WITH NEW CLEAN

AGENT EXTINGUISHER THAT MEETS OR EXCEEDS

THE ABC RATING AND SIZE OF EXISTING

EXTINGUISHER. SEE DETAIL 3/A-603

FE FE

FE

FE

FE

FE

FE

FE

FE

FEFE

FE

FE

FE

FE

D

IA

M O N D L

IN

E

TR

S3C-1

143 SF

FIRE RISER

S3C-1b

76 SF

680 SF

CORRIDOR

D335

327 SF

INDUCTION ROOM

D335Y

156 SF

NURSE STATION

C357D

266 SF

CORRIDOR

C357

98 SF

SOIL UTILITY

D3352

110 SF

CLEAN SUPPLY

D357X

56 SF

STAFF TOILET

C357C

106 SF

P-2 NEGATIVE PRESSURE

C357B

113 SF

P-1

C357A

256 SF

NURSE STATION

D335E

73 SF

IRM/IT

3C100

ORTHO STORAGE

C346B

103 SF

941 SF

C339

200 SF

C336

107 SF

C338

33 SF

C340

241 SF

C342

1832 SF

HALLWAY

C3C8

59 SF

PATIENT TOILET

D335R

42 SF

PATIENT TOILET

D335P

95 SF

BAY 4

D335D

91 SF

BAY 2

D335C

23 SF

HOTELING

D335Q

892 SF

CORRIDOR

D335

P-6

C357H

84 SF

BLDG. 110

BLDG. 110B

BLDG. 110A

124 SF

XXX-5

TR

ICRA PHASING LINE

ICRA CLASS II

ICRA CLASS III

ICRA CLASS IV

FEC

FE

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

2 HR FIRE BARRIER

1 HR SMOKE BARRIER

1 HR FIRE BARRIER

2 HR FIRE/SMOKE BARRIER

NON-RATED SMOKE PARTITION

BUILDING BOUNDARY LINE

BUILDING 110 COMPLEX

KEY AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:0

:3 a m

B

IM

/5

-2

-7

V A

H a m p to n

E H

R M

/B L D

G

B

.r v t

110AS103

BUILDING 110, 110A, 110B - LEVEL 03 -

PHASING PLAN

MA RB

100% CONSTRUCTION

DOCUMENTS

07/18/2025

590-22-700EHRM INFRASTRUCTURE

UPGRADES - HAMPTON

HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA

LEGEND

KEY PLAN

1" = 20'-0"

BUILDING 110, 100A, 100B - LEVEL 03- PHASING PLAN

PROJECT

NORTH

0' 10' 20' 40'

Revisions: Date:

110, 110(A,B)

L N

P

INTERIOR LINE

OF NEW WALL

EXISTING FIRE

RISER

12' - 10"

EXISTING FE. REPLACE WITH NEW SEMI-RECESSED

FEC. REPLACE EXISTING FE WITH NEW CLEAN AGENT

EXTINGUISHER THAT MEETS OR EXCEEDS THE ABC

RATING AND SIZE OF EXISTING EXTINGUISHER. SEE

DETAIL 3/A-603.

10ENTRY

POINT

DUCT TO

EXTERIOR

ANTE

ROOM

8 9

111 SF

BAY 9

D335L

61 SF

LINEN CHUTE

C302

98 SF

BAY 10

D335M

364 SF

CORRIDOR

C3C-1

414 SF

CORRIDOR

C3D-1

223 SF

STAIRS 1

S3C-1

N

P

223 SF

STAIRS 1

S3C-1

61 SF

LINEN CHUTE

C302

58 SF

HAC

C304

98 SF

BAY 10

D335M

N

P

111 SF

BAY 9

D335L

61 SF

LINEN CHUTE

C302

98 SF

BAY 10

D335M

01a

IN-04.02-16

N

O

O R

IN

G

E X

IS

T

O

O R

IN

G

(F O

R E

X C

E P

T

IO

N

(E

X

IS

T

10'x10' TR FORM

FACTOR

143 SF

TR

S3C-1

S3C-1

12' - 10" (CLR.)

3 4

364 SF

CORRIDOR

C3C-1 414 SF

CORRIDOR

C3D-1

58 SF

HAC

C304

IN-04.02-17

76 SF

FIRE RISER

S3C-1b

NEW FLOOR SHALL BE

OF 2-HR FIRE RATING

CONSTRUCTION.

2"x2" TRENCH ALONG WALL WITH SLOTTED

METAL COVER. COORDINATE WATER SENSOR

WITH MECHANICAL AND ELECTRICAL.

F-1

IN-01.31

NEW SEMI-RECESSED FEC. NEW

CLEAN AGENT FIRE EXTINGUISHER.

SEE DETAIL 3/A-603

N

P

61 SF

LINEN CHUTE

C302

58 SF

HAC

C304

98 SF

BAY 10

D335M

EXPOSED

143 SF

TR

S3C-1

76 SF

FIRE RISER

S3C-1b

3' - 1"

1' - 2" 1' - 2"

1' - 2"

KEY AREA SHOWN

PROJECT

NORTH

RM S3C-1

2 HR FIRE BARRIER

2 HR FIRE/SMOKE BARRIER

1 HR SMOKE BARRIER

NEW FLOOR 2 HR FIRE RATED

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

NEW DOOR

NEW LIGHTS (SEE ELECTRICAL DETAILS)

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

POLYETHYLENE SHEETING

HEPA EQUIPPED AIR FILTER

ICRA CLASS IV LEGEND - TR

ICRA CLASS II LEGEND - FEC

POSITIVE ( + ) PRESSURE

CONSTRU…