This file contains final construction drawings for the EHRM (Electronic Health Records Management) Infrastructure Upgrades project at Hampton VA Medical Center in Hampton, Virginia. The drawings are organized by discipline and represent 100% construction documents dated July 18, 2025, with a project number of 590-22-700. The architect/engineer of record is STAMPCONSULTANT, located at 23830 Pacific Highway South, Suite 203, Kent, WA 98032, working under a Design Build contract with SPEES.
The drawings depict comprehensive infrastructure upgrades across multiple buildings (110, 110A, 110B, 113, 114, 116, 135, 137, 138, 138A, 144, 146, 148, 148A-D, 148S, 148T, 168, 173, and others) at the medical center. Work includes demolition and new construction of telecommunications rooms (TRs), fire-rated stair replacements, HVAC modifications including new VRF/VRV cooling units and ductless split systems, fire protection system upgrades with new sprinkler installations and fire extinguisher cabinet replacements, plumbing modifications including condensate line installations, electrical upgrades, and interior finishing work. The project incorporates infection control and risk assessment (ICRA) protocols with Class II, III, and IV barriers, 2-hour and 1-hour fire-rated assemblies, and anti-static flooring treatments. Key specifications include new semi-recessed fire extinguisher cabinets meeting ABC ratings, standard response sprinklers, FRT plywood wall protection, resilient rubber base installation, and coordinated mechanical/electrical/plumbing penetrations through rated assemblies with fire caulking requirements.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N Q
P
EXISTING FIRE
RISER
EXISTING
ELECTRICAL
EQUIPMENTS
INTERIOR LINE
OF NEW WALL
12' - 10"
EXISTING FE. REPLACE WITH NEW
SEMI-RECESSED FEC. REPLACE
EXISTING FE WITH NEW CLEAN
AGENT EXTINGUISHER THAT MEETS
OR EXCEEDS THE ABC RATING AND
SIZE OF EXISTING EXTINGUISHER.
SEE DETAIL 3/A-603
ENTRY POINT
9 8
ENTRY POINT
N
P
N
P
233 SF
LINEN STORAGE
CG02
62 SF
LINEN CHUTE
(CLOSED)
EBG-12
742 SF
CORRIDOR
CGC-1
312 SF
DIALYSIS
STORAGE
DG23
01a
124 SF
TR
SGC-1
IN-04.02-8
81 SF
FIRE RISER
SGC-1a
12' - 10" (CLR.)
IN
-0
.0
-9
E X
IS
T
IN
G
F
L O
O R
IN
G
N E
W
O
O R
IN
G
10'x10' TR FORM
FACTOR
2"x2" TRENCH ALONG WALL WITH
SLOTTED METAL COVER. COORDINATE
WATER SENSOR WITH MECHANICAL
AND ELECTRICAL.
(F O
R E
X C
E P
T
IO
N
(E
X
IS
T
SGC-1
IN-01.31
EXISTING ELECTRICAL
EQUIPMENT
NEW SEMI-RECESSED FEC. NEW
CLEAN AGENT FIRE EXTINGUISHER.
SEE DETAIL 3/A-603
N
P
233 SF
LINEN STORAGE
CG02
62 SF
LINEN CHUTE
(CLOSED)
EBG-12
742 SF
CORRIDOR
CGC-1
312 SF
DIALYSIS
STORAGE
DG23
EXPOSED
124 SF
TR
SGC-1
81 SF
FIRE RISER
SGC-1a
1' - 3"
1' - 3" 1' - 2"
1' - 2"
2' - 4"
KEY AREA SHOWN
PROJECT
NORTH
742 SF
CORRIDOR
CGC-1
209 SF
STAIR 1
SGC-1
233 SF
LINEN STORAGE
CG02
62 SF
LINEN SHOOT
(CLOSED)
EBG-12
312 SF
DIALYSIS
STORAGE
DG23
742 SF
CORRIDOR
CGC-1
209 SF
STAIR 1
SGC-1
233 SF
LINEN STORAGE
CG02
62 SF
LINEN SHOOT
(CLOSED)
EBG-12
312 SF
DIALYSIS
STORAGE
DG23
RM SGC-1
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
2HR FIRE BARRIER
EXISTING WALL ACTING AS ICRA
BOUNDARY. SEAL ANY OPENINGS AND
PENETRATIONS AS REQUIRED.
POLYETHYLENE SHEETING
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0 /2
:0
:0 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
.r v t
110A-100
BUILDING 110 - LEVEL 00 DEMO FLOOR PLAN,
DEMO RCP, FLOOR PLAN & RCP
MA AL/OB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1/4" = 1'-0"
RM SGC-1 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM SGC-1 - DEMO RCP
1/4" = 1'-0"
RM SGC-1 - FLOOR PLAN
1/4" = 1'-0"
RM SGC-1 - RCP
KEY PLAN
GENERAL NOTES
KEYNOTES (THIS SHEET ONLY)
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE
MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE
DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED
AND NEW DOORS ARE INSTALLED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO
MATCH EXISTING.
DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR
STRUCTURE UNDERNEATH. REMOVE EXISTING
SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING
FOR NEW WORK.
CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH
EXISTING.
INSTALL NEW DOOR/FRAME.
APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER
WITH SEALANT AT THE BOTTOM.
INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,
TYPICAL.
ICRA KEYNOTES
INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO
ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG
EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE
EXPOSED OUTSIDE OF CONSTRUCTION AREA.
PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.
LEGEND
ICRA LEGEND - CLASS II
Revisions: Date:
07-18-2025
KEY AREA SHOWN
PROJECT
NORTH
DD
DUCT TO EXTERIOR
ANTE
ROOM
13 11
169 SF
LAB SPECIMEN
GA-153
61 SF
FEM. TOILET
GA-154
80 SF
MALE TOILET
GA-155
530 SF
CORRIDOR
CGB18
107 SF
DIETITIAN
CG-156
116 SF
DIETITIAN
CG-157
331 SF
LAB
COLLECTIONS
CG-158
303 SF
CGB17
DD
DD
61 SF
FEM. TOILET
GA-154
80 SF
MALE TOILET
GA-155
530 SF
CORRIDOR
CGB18
G A
-1
NEW
FLOORING
EXISTING
FLOORING
IN-04.02-10
/4
(E X
IS
T
± 24' - 2" (EXIST.)
/4
(E
X
IS
T
2"x2" TRENCH ALONG WALL WITH
SLOTTED METAL COVER.
COORDINATE WATER SENSOR WITH
MECHANICAL AND ELECTRICAL.
228 SF
TR
GA-157
169 SF
LAB SPECIMEN
GA-153
327 SF
LAB
COLLECTIONS
CG-158
10x10 TR FORM FACTOR
± 10' - 0 1/2" (EXIST.)
1001b
NOTE: EXISTING FE TO BE UPGRADED.
SEE SHEET 110AS100 FOR FE LOCATION.
DD
61 SF
FEM. TOILET
GA-154
80 SF
MALE TOILET
GA-155
530 SF
CORRIDOR
CGB18
EXPOSED
1' - 4"
1' - 2"
2' - 3"
2' - 3"
228 SF
TR
GA-157
169 SF
LAB SPECIMEN
GA-153
327 SF
LAB
COLLECTIONS
CG-158
2' - 4" 6' - 7"
RM GA-157
POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
EXISTING WALL ACTING AS ICRA
BOUNDARY. SEAL ANY OPENINGS AND
PENETRATIONS AS REQUIRED.
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
169 SF
LAB SPECIMEN
GA-153
61 SF
FEM. TOILET
GA-154
80 SF
MALE TOILET
GA-155
530 SF
CORRIDOR
CGB18
107 SF
DIETITIAN
CG-156
116 SF
DIETITIAN
CG-157
331 SF
LAB
COLLECTIONS
CG-158
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0
/2
:0
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
B
.r v t
110BA-100
BUILDING 110B - LEVEL 00 - DEMO FLOOR
PLAN, DEMO RCP, FLOOR PLAN & RCP
MA CO
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE
MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE
DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED
AND NEW DOORS ARE INSTALLED.
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
DEMOLISH EXISTING DOOR/FRAME. PREPARE FOR NEW
DOOR/FRAME AND/OR INFILL WALL TO MATCH EXISTING.
DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR
STRUCTURE UNDERNEATH. REMOVE EXISTING
SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING
FOR NEW WORK.
DEMOLISH EXISTING BASE, REMOVE EXISTING ADHESIVE
AND PREPARE FOR NEW BASE.
DEMOLISH EXISTING WALL. PATCH EXPOSED WALL
CONNECTION TO MATCH EXISTING.
DEMOLISH EXISTING ACT COMPLETELY INCLUDING ALL
GRIDS, SUPPORTING WIRES, CLIPS, AND PERIMETER WALL
ANGLES TO EXPOSE UNDERSIDE OF STRUCTURE ABOVE.
PATCH WALLS WHERE CEILING IS REMOVED.
INSTALL NEW DOOR/FRAME.
INSTALL NEW RESILIENT RUBBER BASE AT ROOM
PERIMETER WITH SEALANT AT THE BOTTOM.
APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
INSTALL NEW FRT PLYWOOD OVER WALLS PER DETAIL
3/AE421, TYPICAL.
INFILL WALL, PATCH AND PAINT TO MATCH EXISTING.
ICRA KEYNOTES
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM GA-157 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM GA-157 - DEMO RCP
1/4" = 1'-0"
RM GA-157 - FLOOR PLAN
1/4" = 1'-0"
RM GA-157 - RCP
LEGEND
ICRA LEGEND - CLASS IV
Revisions: Date:
27B
27 31
27A
110A
110B
110D
13W
148-D
148-S
148-A
148T
146B
146A
138A 138136
137A
137C
137D
137B
137C
148B
173A
148-C
170 150
110C
143 167
G R
A V
E L
R O
A D
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
AVERILL AVENUE
A M
E S
S T
R E
E T
HARRIS AVENUE
JONES CREEK
K N
O X S
T R
E E
T
T H
O M
P S
O N
S T
R E
E T
F R A N
K
LI
N B
O U
LE
V A R
D
MALLORY STREET
M A
R T
IN
L. K
IN
G
JR
. B O
U L E
V A R
D
M A R
TIN
L. K
IN
G
JR
. B O U
LE
V
AR
D
E M
A N
C
IP
A T
IO
N D
R
SHORE ROAD
H A R R
IS
A V E N
U E
HARRIS AVENUE
M c C
L E
L L A
N
S E
W E
LL
A
V E
N U
E
A V
E N
U E
J M O R T V X AA CC DD EE FF GG HH II
TELEPHONE CLOSET
C109
21 SF
CLEAN STORAGE
C108
221 SF
URINE COLLECTION
C110
58 SF
FEMALE TOILET
C112
46 SF
URINALYSIS
C114
348 SF
CORRIDOR
CIC-4
552 SF
ELEVATOR 5
E1B-5
90 SF
LOCKER ROOM
C113
89 SF
STAIR 6
S1C-6
152 SF
M
IC
R O
S C
O P
E R
O O
M
C
S
F
BLOOD COLLECTION
C117
92 SF
ELECTRICAL CLOSET
C151
34 SF
HAC
C116
43 SF
STAT LAB
C118
184 SF
BLOOD DONOR
C118A
229 SF
FEMALE TOILET
C120
127 SF
BLOOD BANK
C122
285 SF
HEMAT & SEROLOGY
C126
797 SF
CYTOLOGY
C130A
103 SF
BAL & SOLUTION ROOM
C128
188 SF
HISTOPATOLOGY
C130
387 SF
MYCOBACTERIOLOGY
C132
416 SF
STAIR 7
SIC-7
143 SF
SHAFT
V1
71 SF
CORRIDOR
C1C-5
387 SF
CHEMISTRY LAB
C127
1878 SF
CHASE
V2
26 SF
FLUORO, MICROSCOPE ROOM
C142
109 SF
CORRIDOR
C1C-8
495 SF
PATHOLOGY OFFICE
C141
122 SF
OFFICE
C139
209 SF
LABORATORY
C144
160 SF
ASS TECH. OFFICE
C143
123 SF
PATHOLOGIST OFFICE
C145
123 SF
MALE TOILET
C146
66 SF
RESIDENT ROOM
C147
123 SF
CORRIDOR
C1C-6
480 SF
MICROBIOLOGY
C133
1047 SF
T.B. LAB
C135
134 SF
OFFICE
C137
206 SF
CORRIDOR
C1C-7
203 SF
CORRIDOR
C1C-6A
61 SF
CONFERENCE ROOM
C218m
156 SF
INSTRUMENT PREP AREA
B102L
74 SF
RECOVERY ROOM
B102L.1
57 SF
ORAL SURGERY ROOM
B102K
165 SF
OFFICE
B125
91 SF
OFFICE
B123
99 SF
OFFICE
B121
108 SF
OFFICE
B119
105 SF
OPERATORY ROOM
B102J
139 SF
STORAGE
B102H1
40 SF
OPERATORY ROOM
B102H2
114 SF
EXAM ROOM
B102F
128 SF
STORAGE, SUPPLY
B102E
65 SF
COMM CLOSET
B102E.1
50 SF
CORRIDOR
C1B1
953 SF
CORRIDOR
C1B2
128 SF
STAFF TOILET
B106
66 SF
OFFICE
B111F
291 SF
OFFICE
B111E
143 SF
CONFERENCE ROOM
B111B
348 SF
CHIEF OFFICE
B111C
163 SF
CORRIDOR
B111
70 SF
OFFICE
B111A
145 SF
STAIRWAY #2
S1B2
188 SF P
IP
E C
H A
S E
EXAM ROOM
B102I
99 SF
MENTAL LAB
B102G
122 SF
EXAM ROOM
B102W
141 SF
EXAM ROOM
B102U
118 SF
STORAGE CLOSET
B102Y
121 SF
EXAM ROOM
B102X
124 SF
EXAM ROOM
B102V
103 SF
EXAM ROOM
B102O
141 SF
CHIEF, DENTAL SVC
B102N
133 SF
ADMIN OFFICE
B102M
162 SF
CLEAN INSTRUMENT ROOM
B102Q
130 SF
OPERATORY ROOM
B102S.2
95 SF
CHAINGING ROOM
B102S.4
47 SF
EXAM ROOM
B102R
114 SF
ANTI ROOM
B102S
108 SF
DIRTY UTILITY ROOM
B102S.3
53 SF
EXAM ROOM
B102T
94 SF
ELEVATOR #10
E1B10
74 SF
COMM CLOSET
B111D
20 SF
COMM CLOSET
B104
11 SF
RECEPTION/FILE ROOM
B102A
141 SF
EXAM ROOM
B102B
99 SF
CONFERENCE ROOM
B102C
243 SF
MEN CHANGING
B107
96 SF
WOMEN CHANGING
B105
138 SF
WOMEN TOILET
B103
129 SF
131 SF
ELEVATOR #9
E1C9
84 SF
ELEVATOR #8
E1C8
73 SF
LOBBY
C100
1326 SF
CORRIDOR
C1C2
172 SF
BREAK/CONF ROOM
C106
291 SF
UNISEX TOILET
D101
80 SF
MSA SUPERVISOR
D103
100 SF EXAM ROOM
D107
176 SF
P
IP
E C
H A
S E
STAIRWAY #3
S1D3
181 SF
DATA CLOSET
D108
16 SF
ELECTRICAL CLOSET
D110
31 SF
DATA CLOSET
D112
36 SF
SOILED UTILITY
D116
84 SF
EXAM ROOM
D118
115 SF
STAFF LOUNGE
D154
198 SF
EXAM ROOM
D148
192 SF
EXAM ROOM
D146
156 SF
EXAM ROOM
D143
133 SF
ELEVATOR #6
E1D6
71 SF
MED ROOM
D155
87 SF
EXAM ROOM
D157
173 SF
EXAM ROOM
D160
133 SF
CONSULTATION ROOM
D122
120 SF
STORAGE
D121
15 SF
EXAM ROOM
D117
155 SF
EXAM ROOM
D119
134 SF
TEAMLET STATION
450 SF
CORRIDOR
C1D3
870 SF
EXAM ROOM
D138
155 SF
STAIRWAY #4
S1D4
162 SF
EXAM ROOM
D139
166 SF
EXAM ROOM
D135
130 SF
EXAM ROOM
D133
130 SF
STAFF TOILET
D131
53 SF
EXAM ROOM
D129
130 SF
EXAM ROOM
D127
160 SF
STAIRWAY # 5
S1B5
160 SF
OPERATORY ROOM
B102S.1
109 SF
EXAM ROOM
B102P
112 SF
STORAGE
B102D
12 SF
OFFICE
B117
99 SF
STORAGE
B101
101 SF
ANCILLARY TESTING COOR
C105
283 SF
HVAC
C103
55 SF
HAC ROOM
D105
56 SF
MECHANICAL ROOM
D154
212 SF
COFERENCE ROOM
D106
346 SF
WAITING AREA
D100
516 SF
RECEPTION AREA
D102
261 SF
STORAGE ROOM
D137
31 SF
STORAGE
D125
44 SF
TEAMLET STATION
D163
139 SF
ASST CHIEF OFFICE
D162a
99 SF
PROGRAM MGT OFFICE
D162
84 SFEXAM ROOM
D156
129 SF
UNISEX TOILET
D158
59 SFUNISEX TOILET
D113
46 SF
CLEAN UTILITY
D115
66 SF
CORRIDOR
C1D4
555 SF
EXAM ROOM
D147
142 SF
UNISEX TOILET
D145
93 SF
EXAM ROOM
D149
134 SF
TEAMLET STATION
D150
146 SF
CORRIDOR
C1D2
374 SF
CORRIDOR
C1D1
362 SF
INFORMATION DESK
C104
94 SF
ELECTRICAL CLOSET
C102
31 SF
CORRIDOR
C1C1
480 SF
WAITING AREA
B102
506 SF
CORRIDOR
C1B3
557 SF
CORRIDOR
C1B4
517 SF
A B C D E F G I K L N Q S U W Z BB
Y
H
P
BUILDING 110
SECTION 2A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES AND
AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 110
SECTION 2B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
PHASE 1: CONTRACTOR TO COMPLETE THE
WORK OF THIS TR AND ASSOCIATED DATA
DROPS. COMPLETE ONE SECTION AT A TIME
AS DIRECTED TO COR.
BUILDING 110A
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110A
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BLDG. 110A
BLDG. 110
BLDG. 110B
EXISTING FE. REPLACE WITH NEW SEMI-
RECESSED FEC. REPLACE EXISTING FE WITH
NEW CLEAN AGENT EXTINGUISHER THAT MEETS
OR EXCEEDS THE ABC RATING AND SIZE OF
EXISTING EXTINGUISHER. SEE DETAIL 3/A-603
FE
FE
FE
FE
FE
FE
FE FE
FE
FE FE
FE
FE
FE
FE FE
FE
FE
FE
FE
D
IA
M O N D L
IN
E
TR
S1C1
124 SF
FIRE RISER
S1C1b
57 SF
445 SF
CORRIDOR
C1-1
952 SF
OFFICE
1C-100
503 SF
ELEV. LOBBY
C1-2
116 SF
ELEV
115 SF
ELEV
117 SF
ELEV
186 SF
STAIR
426 SF
BLOWER ROOM
1C-105
205 SF
ELECTRICAL SWITCH GEAR
1C-104
1380 SF
STORAGE
N/A
285 SF
CORRIDOR
C2-13
BLDG. 110B
TR
ICRA PHASING LINE
ICRA CLASS II
ICRA CLASS III
ICRA CLASS IV
FEC
FE
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
2 HR FIRE BARRIER
1 HR SMOKE BARRIER
1 HR FIRE BARRIER
2 HR FIRE/SMOKE BARRIER
NON-RATED SMOKE PARTITION
BUILDING BOUNDARY LINE
BUILDING 110 COMPLEX
KEY AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0
/2
:0
:5 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
B
.r v t
110AS101
BUILDING 110, 110A, 110B - LEVEL 01 -
PHASING PLAN
MA RB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
1" = 20'-0"
BUILDING 110, 110A, 110B - LEVEL 01- PHASING PLAN
LEGEND
KEY PLAN
PROJECT
NORTH
0' 10' 20' 40'
Revisions: Date:
110, 110(A,B,C,D)
NORTH
L N
P
INTERIOR LINE
OF NEW WALL
EXISTING FIRE
RISER
DUCT TO
EXTERIOR
12' - 10"
EXISTING FE. REPLACE WITH NEW SEMI-
RECESSED FEC. REPLACE EXISTING FE WITH NEW
CLEAN AGENT EXTINGUISHER THAT MEETS OR
EXCEEDS THE ABC RATING AND SIZE OF EXISTING
EXTINGUISHER. SEE DETAIL 3/A-603
ENTRY POINT
BARRIER TO BLOCK ONE SIDE OF DOOR.
WORK SHOULD BE DONE DURING NON-
WORKING HOURS AND SHOULD BE
COMPLETED IN THE SHORTEST TIME
POSSIBLE. COORDINATE WORK WITH COR.
ANTE
ROOM
11 9
N
P
55 SF
HVAC
C103
283 SF
ANCILLARY
TESTING COOR
C105
80 SF
UNISEX TOILET
D101
480 SF
CORRIDOR
C1C1
516 SF
WAITING AREA
D100
01a
E X
IS
T
O
O R
IN
G
N
O
O R
IN
G
(F O
R E
X C
E P
T
IO
N
(E
X
IS
T
10'x10' TR FORM
FACTOR
124 SF
TR
S1C1 S1C1
IN-04.02-12
IN-04.02-11
57 SF
FIRE RISER
S1C1b
12' - 10" (CLR.)
NEW FLOOR SHALL BE
OF 2-HR FIRE RATING
CONSTRUCTION.
2"x2" TRENCH ALONG WALL WITH
SLOTTED METAL COVER.
COORDINATE WATER SENSOR WITH
MECHANICAL AND ELECTRICAL.
F-1
IN-01.31
NEW SEMI-RECESSED FEC. NEW
CLEAN AGENT FIRE EXTINGUISHER.
SEE DETAIL 3/A-603
172 SF
CORRIDOR
C1C2
L
N
P
L
N
P
55 SF
HVAC
C103
80 SF
UNISEX TOILET
D101
480 SF
CORRIDOR
C1C1
283 SF
ANCILLARY
TESTING COOR
C105
516 SF
WAITING AREA
D100
EXPOSED
124 SF
TR
S1C1
57 SF
FIRE RISER
S1C1b
1' - 10" 2' - 0"
1' - 10" 2' - 0" 3' - 1"
172 SF
CORRIDOR
C1C2
RM S1C1
185 SF
STAIRWAY #1
S1C1
55 SF
HVAC
C103
283 SF
ANCILLARY
TESTING COOR
C105
80 SF
UNISEX TOILET
D101
480 SF
CORRIDOR
C1C1 516 SF
WAITING AREA
D100
172 SF
CORRIDOR
C1C2
185 SF
STAIRWAY #1
S1C1
55 SF
HVAC
C103
283 SF
ANCILLARY
TESTING COOR
C105
80 SF
UNISEX TOILET
D101
480 SF
CORRIDOR
C1C1
516 SF
WAITING AREA
D100
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
2HR FIRE BARRIER
POLYETHYLENE SHEETING
HEPA EQUIPPED AIR FILTER
ICRA CLASS IV LEGEND - TR
ICRA CLASS II LEGEND - FEC
POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
EXISTING WALL ACTING AS ICRA
BOUNDARY. SEAL ANY OPENINGS AND
PENETRATIONS AS REQUIRED.
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
.r v t
110A-101
BUILDING 110 - LEVEL 01 DEMO FLOOR PLAN,
DEMO RCP, FLOOR PLAN & RCP
MA CO
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
GENERAL NOTES
KEYNOTES (THIS SHEET ONLY)
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,
AND ELECTRICAL ITEMS ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED
AND NEW DOORS ARE INSTALLED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM S1C1 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM S1C1 - FLOOR PLAN
1/4" = 1'-0"
RM S1C1 - DEMO RCP
1/4" = 1'-0"
RM S1C1 - RCP
DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO
MATCH EXISTING.
CONSTRUCT NEW 2HR FIRE RATED FLOOR, ALIGNED TO
EXISTING FLOOR STRUCTURE. SEE STRUCTURAL DETAILS.
CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH
EXISTING.
INSTALL NEW DOOR/FRAME.
APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER
WITH SEALANT AT THE BOTTOM.
INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,
TYPICAL.
ICRA KEYNOTES
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.
INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO
ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG
EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE
EXPOSED OUTSIDE OF CONSTRUCTION AREA.
INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
LEGEND
ICRA LEGEND
Revisions: Date:
27B
27 31
27A
110A
110B
110D
13W
148-D
148-S
148-A
148T
146B
146A
138A 138136
137A
137C
137D
137B
137C
148B
173A
148-C
170 150
110C
143 167
G R
A V
E L
R O
A D
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
AVERILL AVENUE
A M
E S
S T
R E
E T
HARRIS AVENUE
JONES CREEK
K N
O X S
T R
E E
T
T H
O M
P S
O N
S T
R E
E T
F R A N
K
LI
N B
O U
LE
V A R
D
MALLORY STREET
M A
R T
IN
L. K
IN
G
JR
. B O
U L E
V A R
D
M A R
TIN
L. K
IN
G
JR
. B O U
LE
V
AR
D
E M
A N
C
IP
A T
IO
N D
R
SHORE ROAD
H A R R
IS
A V E N
U E
HARRIS AVENUE
M c C
L E
L L A
N
S E
W E
LL
A
V E
N U
E
A V
E N
U E
J M O R T V X AA CC DD EE FF GG HH II
124 SF
CHIEF EYE CLINIC
2C-116
126 SF
MEN'S STAFF TOILET
2C-102A
89 SF
TEL
2D-147
62 SF
HAC
2C-112
51 SF
EMS
2C-111
369 SF
CORRIDOR
C2C22
104 SF
MEN'S STAFF LOCKERS
2C-102
2260 SF
MECHANICAL ROOM
2C-118
22 SF
STORAGE
2D-144A
21 SF
STORAGE
2D-144B
125 SF
CHIEF OPTH
2D-142
113 SF
ARGON LASER
2D-140
122 SF
OPTOMETRY
2D-139
426 SF
CORRIDOR
C2-17
124 SF
EYE LANE
2D-114
140 SF
EYE LANE
2D-112
111 SF
SCOPE CLEANING
2D-110A
92 SF
DIRTY SCOPE CLEANING
2D-110
371 SF
CORRIDOR
C2D15 54 SF
TOILET
2D-109A
249 SF
ENDOSCOPY
2D-109
257 SF
ENDOSCOPY
2D-111
54 SF
TOILET
2D-111A
158 SF
EYE LANE
2D-113
48 SF
EYE LANE
2D-116
75 SF
SOILED SPD
2D-125
69 SF
OFFICE
2D-126
116 SF
ENT EXAM
2D-127
116 SF
EXAM
2D-128
107 SF
AUDIO
2D-129
283 SF
RECEPTION
C2D6
155 SF
MIN SURG
2D-130
130 SF
EXAM
2D-132
126 SF
EXAM
2D-134
127 SF
EXAM
2D-136
132 SF
EXAM
2D-138
72 SF
VIS FLD
2D-137
73 SF
VIS FLD
2D-135
45 SF
CLEAN STORAGE
2D-141
43 SF
LOW VISION CLINIC
2D-143
115 SF
ELEC
2D-145
404 SF
CORRIDOR
C2C21
54 SF
TOILET
2D-107A
293 SF
GAST LAB
2D-107
140 SF
CONSULT
2D-105
89 SF
STERILE
2A-124
304 SF
LOW VISION
2D-122
128 SF
LASER TREATENT
2D-121
101 SF
LOW VISION
2D-103
547 SF
LOW VISION
2D-119
396 SF
ENT HALL
C2D19
122 SF
EXAM
2D-100B
31 SF
CLOSET
2D-100D
121 SF
EXAM
2D-100E
122 SF
CHARTING ROOM
2D-101
88 SF
TOILET
2D-102
83 SF
CHANGING
2D-104
62 SF
TOILET
2D-104A
57 SF
CLEAN UTILITY
2D-106D
73 SF
SOILED UTILITY
2D-106C
77 SF
TOILET
2D-100F1
69 SF
TOILET
2D-100G
150 SF
INFUSION
2D-100F
1503 SF
CHEMO
2D-100
124 SF
EXAM
2D-100C
93 SF
OFFICE/CONSULT
2D-100A
58 SF
TOILET
2D-106B
928 SF
RECOVERY
2D-106
134 SF
NURSE STATION
2D-106A
192 SF
CORRIDOR
C2D14
152 SF
CONSUL
2A-102
133 SF
PHYS
2A-103
149 SF
TREATMENT 1
2A-104
151 SF
LOUNGE
2A-105
141 SF
TREATMENT 2
2A-106
285 SF
RECEPTION
C2A3
54 SF
MED 1
2A-114
76 SF
OTHER
2A-113
92 SF
EXAM 1
2A-112
319 SF
CORRIDOR
C2D18
333 SF
CORRIDOR
C2D20
72 SF
WOMEN'S STAFF LOCKERS
2D-146
150 SF
WOMEN'S STAFF TOILETS
2D-146A
25 SF
WOMEN'S STAFF SHOWER
2D-146B
231 SF
BRONC (NP)
2D-108
476 SF
CORRIDOR
C2-7
63 SF
STAFF TOILET
2A-111
92 SF
EXAM 2
2A-110
87 SF
EXAM 3
2A-109
79 SF
EXAM 4
2A-108
56 SF
TOILET
2A-119A
46 SF
PATIENT TOILET
2A-120
145 SF
TREATMENT
2A-119
95 SF
EXAM 5 (NP)
2A-118
101 SF
EXAM 6 (NO)
2A-117
101 SF
EXAM 7 (NP)
2A-116
168 SF
TRIAGE 1 (NP)
2A-115
99 SF
TRIAGE NURSE
2A-163
105 SF
TRIAGE NURSE
2A-164
92 SF
TRIAGE NURSE
2A-165
108 SF
EXAM 10
2A-128
109 SF
EXAM 9
2A-127
108 SF
EXAM 8
2A-126
146 SF
ELEC
2A-125
549 SF
TRAINING/GROUP ROOM
2A-124
56 SF
PATIENT TOILET
2A-124A
144 SF
TELEPHONE CLOSET
2A-131
129 SF
EXAM 12
2A-130
108 SF
EXAM 11
2A-129
111 SF
EXAM 19
2A-148
98 SF
EXAM 20
2A-136
111 SF
EXAM 21
2A-135
111 SF
EXAM 22
2A-134
98 SF
EXAM 23
2A-123
98 SF
EXAM 24
2A-121
111 SF
EXAM 25
2A-122
110 SF
EXAM 26
2A-107
541 SF
CORRIDOR
2A-317
551 SF
CORRIDOR
C2-9
477 SF
CORRIDOR
C2-12
550 SF
CORRIDOR
C2-11
75 SF
MED
2A-157
107 SF
EKG
2A-158
115 SF
OFFICE
2A-159
68 SF
STAFF TOILET
2A-326
57 SF
OFFICE
2A-161
56 SF
HAC
2A-162
111 SF
ORTHO EXAM
2A-149
113 SF
EXAM 16
2A-150
96 SF
NURSE TRIAGE
2A-331
96 SF
ORTHO CLINIC
2A-332
115 SF
ORTHO CLINIC
2A-333
322 SF
RECEPTION
C2A5
143 SF
TREATMENT3
2A-142
144 SF
TREATMENT 7
2A-143
143 SF
TREATMENT 4
2A-141
142 SF
TREATMENT 5
2A-140
143 SF
TREATMENT 6
2A-139
42 SF
PATIENT TOILET
2A-143A
52 SF
PATIENT TOILET
2A-144A
149 SF
TREATMENT ROOM
2A-144
171 SF
GU LAB
2A-145
85 SF
SOILED UTILITY
2A-138
97 SF
CLEAN UTILITY
2A-137
57 SF
PATIENT TOILET
2A-145A
31 SF
STORAGE
2A-146
34 SF
CLEAN LINEN
2A-147
476 SF
CORRIDOR
C2-8
122 SF
TR
2A-154A
PHASE 1:
CONTRACTOR TO COMPLETE THE WORK OF THIS TR
AND ASSOCIATED DATA DROPS PRIOR TO MOVING TO
PHASE 2. COMPLETE ONE SECTION AT A TIME AS
DIRECTED TO COR.
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
SECTION 2A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES
AND AVAILABILITY TO COMPLETE
DATA WIRING IN THIS AREA.
SECTION 2B:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES
AND AVAILABILITY TO COMPLETE
DATA WIRING IN THIS AREA.
175 SF
AREA
MAINTENANCE
2C-115
209 SF
EQUIPMENT STORAGE
2C-114
597 SF
CORRIDOR
C2C23
205 SF
DATA CLOSET
2C-113
89 SF
HSE STAFF
2D-144
350 SF
MEN'S TOILETS
2C-101 226 SF
WOMEN'S
TOILETS
2C-100
154 SF
INFO DESK
C2C28
1906 SF
MECHANICAL ROOM
2-AB
341 SF
STORAGE
2-AC
157 SF
STAIR #2
2S2
146 SF
PHYS
2A-101
279 SF
R.O.I
2A-100
152 SF
STAIR #1
2S1
STAIR 7
S2C-7
225 SF
CHIEF TECH
C218d
155 SF
PACS MANAGER
C218c
157 SF
HAC
C223
26 SF
STORAGE ROOM
C243a.1
27 SF
STAFF LOUNGE
C243a
159 SF
RADIOLOGIST
C243b
95 SF
STORAGE ROOM
C243c
51 SF
STORAGE CLOSET
C244
7 SF
RADIOLOGIST
C243
237 SF
FLOUROSCOPE ROOM
C242
357 SF
DRESSING ROOM
C240
91 SF
TOILET
C240a
27 SF
CONTROL ROOM
C238a
63 SF
FLOUROSCOPE ROOM
C238
298 SF
READING ROOM
C237
493 SF
CONFERENCE ROOM
C237a
124 SF
SPECIAL-PROCEDURE SUPPLY
C235
144 SF
SUPERVISOR OFFICE
C221
139 SF
DRESSING ROOM
C233
85 SF
AO IMAGING
C218b
133 SF
SECRETARY AREA
C218e
265 SF
DRT SUPERVISOR
C218a
137 SF
CHIEF IMAGING
C218f
152 SF
READING ROOM
C218g
125 SF
STORAGE ROOM
C218h
86 SF
RADIOGRAPHIC ROOM
C234
230 SF
CT ROOM
C232
289 SF
CORRIDOR
C218
242 SF
ULTRASOUND # 3
C216g
152 SF
CORRIDOR
C2C4
1346 SF
GURNEY WAITING
C229
86 SF
CORRIDOR
C2C5
374 SF
CONTROL ROOM
C234a
26 SF
TOILET
C231
80 SF
73 SF
PHOTO ROOM
2D-131
73 SF
UNT SND
2D-133
476 SF
CORRIDOR
C2-10
A B C D E F G I K L N Q S U W Z BB
Y
H
P
BUILDING 110A
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110A
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 2A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES AND
AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 110
SECTION 2B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 110
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA FOR ROOM
CLOSURES AND AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 110
PHASE 1: CONTRACTOR TO COMPLETE THE WORK OF THIS
TR AND ASSOCIATED DATA DROPS. COMPLETE ONE
SECTION AT A TIME AS DIRECTED TO COR.
BLDG. 110A
BLDG. 110
BLDG. 110B
596 SF
CORRIDOR
C2D13
65 SF
ELEV
C2-1
NEW SEMI-RECESSED FEC. NEW CLEAN AGENT
FIRE EXTINGUISHER. SEE DETAIL 3/A-603
EXISTING FE. REPLACE WITH NEW SEMI-
RECESSED FEC. REPLACE EXISTING FE WITH
NEW CLEAN AGENT EXTINGUISHER THAT MEETS
OR EXCEEDS THE ABC RATING AND SIZE OF
EXISTING EXTINGUISHER. SEE DETAIL 3/A-603
FE
FE
FE
FE
FE
FEFEFE
FE
FE
FE
FE
FE
FE
FEFE
FEFE
FE FE
D
IA
M O N D L
IN
E
D
IA
M O N D L
IN
E
99 SF
HAC
2C-176
112 SF
ENDOC 1
2C-174
112 SF
ENDOC 2
2C-172
112 SF
GI 1
2C-170
112 SF
GI 2
2C-168
54 SF
UNISEX RESTROOM
2C-163
394 SF
CORRIDOR
C2C6
515 SF
CORRIDOR
C2C5
66 SF
ELEV
41 SF
Room
E2F
194 SF
STAIRS #5
2S5
130 SF
EXAM RM
2B170
50 SF
ELECTRICAL RM
2B171
125 SF
EXAM RM
2B172
53 SF
STORAGE
2B173A
165 SF
PACT TEAM
2B173B
270 SF
PACT TEAM
2B173D
127 SF
EXAM RM
2B174
124 SF
EXAM RM
2B176
127 SF
EXAM RM
2B-132
20 SF
STORAGE
2B-133
129 SF
EXAM RM
2B-134
16 SF
FIRE CLOSET
2B-135
130 SF
EXAM RM
2B-136
55 SF
STORAGE
2B-137A
157 SF
OFFICE
2B-137B
276 SF
DOCUMENTATION AREA
2B-137D
168 SF
OFFICE
2B-137E
66 SF
MED RM
2B-137F
125 SF
EXAM RM
2B-138
306 SF
BREAK RM
2B-140
52 SF
CLEAN LINEN
2B-141
144 SF
SLEEP 1
2B-100
242 SF
MONITOR RM
2B-101
144 SF
SLEEP 2
2B-102
63 SF
STORAGE
2B-103
96 SF
CLEAN UTILITY
2B-148
144 SF
SLEEP 6
2B-105
144 SF
SLEEP 4
2B-106
144 SF
SLEEP 5
2B-107
144 SF
SLEEP 3
2B-104
80 SF
RESTROOM
2B-102A
80 SF
RESTROOM
2B-104A
73 SF
RESTROOM
2B-106A
11 SF
STORAGE
2B-106A.1
197 SF
MENS RESTROOM
2B-112A
190 SF
MENS LOCKER
2B-112
176 SF
WOMENS LOCKER
2B-110
197 SF
RESTROOM
2B-110A
143 SF
EXAM RM 1A
2B-120
142 SF
EXAM RM 1B
2B-122
143 SF
EXAM RM 2A
2B-124
144 SF
EXAM RM 1B
2B-126
143 SF
EXAM RM 3A
2B-128
144 SF
EXAM RM 3B
2B-130
143 SF
EXAM RM 4A
2B-121
141 SF
EXAM RM 4B
2B-123
143 SF
EXAM RM 5A
2B-125
144 SF
EXAM RM 5B
2B-127
143 SF
EXAM RM 6A
2B-129 144 SF
EXAM RM 6B
2B-131
14 SF
O2 STORAGE
2B-177
20 SF
ELECTRICAL CLOSET
2B-175
93 SF
CLEA SUPPLY
2B-164
57 SF
STORAGE
2B-165
164 SF
PACT TEAM
2B173E
57 SF
UNISEX RESTROOM
2B163
66 SF
MED RM
2B173F
91 SF
ELECTRIC RM
2B-151
69 SF
HAC
2B-147
57 SF
UNISEX
2B-153
80 SF
RESTROOM
2B-105A
80 SF
RESTROOM
2B-107A
11 SF
STORAGE
2B-105A.1
11 SF
STORAGE
2B-107A.1
73 SF
RESTROOM
2B-100A
11 SF
STORAGE
2B100A.1
11 SF
STORAGE
2B102A.1
11 SF
STORAGE
2B104A.1
89 SF
STORAGE RM
2C-150
69 SF
STORAGE
2C-151
20 SF
STORAGE
2C-175 141 SF
NEUROLOGY 1
2C-173
222 SF
NEUROLOGY 2
2C-169
84 SF
OFFICE
2C-153
19 SF
STORAGE
2C-152A
37 SF
CHECK OUT
2C-152C
103 SF
RECEPTION AREA
2C-152
192 SF
CHECK IN
2C-152B
201 SF
SECURITY
2C-154
109 SF
CLEAN SUPPLY
2C-155
65 SF
SOILED UTILITY
2C-157
134 SF
NURSE
2C-165
25 SF
ELECTRICAL CLOSET
2C-166
27 SF
SCALE/CART
2C-159
678 SF
WAITING AREA
C2C3
652 SF
WAITING AREA
2D-179
630 SF
KIOSK AREA
2D-180
287 SF
2D-181
264 SF
MH GROUP
2B-154
268 SF
MH GROUP
2B-156
19 SF
STORAGE
2B-157
19 SF
STORAGE
2B-159
1555 SF
CORRIDOR
C2C7
214 SF
CORRIDOR
C2C4
345 SF
PACT TEAM SUITE
2B173
908 SF
CORRIDOR
C2B8
52 SF
SCALE/CART
2B161
52 SF
CRASH CART
2B-155
359 SF
PACT TEAM SUITE
2B-137
914 SF
CORRIDOR
C2B4
559 SF
CORRIDOR
C2B6
512 SF
CORRIDOR
C2B3
491 SF
CORRIDOR
C2B1
268 SF
CORRIDOR
C2B2
520 SF
ELEVATOR LOBBY
2A-173
442 SF
ELEVATORS
2A-170
484 SF
CORRIDOR
C2C27
205 SF
STAIR #4
2S4
ULTRASOUND # 2
C216e
127 SF
WAITING AREA
C216
299 SF
TOILET
C216f
54 SF
TOILET
C216d
40 SFULTRASOUND # 1
C216c
115 SF
TOILET
C216c1
46 SF
DECON ROOM
C216b
63 SF
OFFICE
C216a
49 SF
VIEWING
C214
107 SF
DRESSING ROOM
C212c
32 SF
DRESSING ROOM
C212d
32 SF
DRESSING ROOM
C212b
48 SF
ULTRASOUND WATING ROOM
C212
219 SF
ULTRASOUND
C212a
172 SF
OFFICE
C210
227 SF
DATA CLOSET
C209
28 SF
STORAGE
C211
78 SF
MECHANICAL ROOM
C207
73 SF
ELEVATOR 5
E2C-5
108 SF
RADIOLOGY STORAGE
C213
107 SF
RECEPTION ROOM
C226
213 SF
STAIR 6
S2C6
165 SF
WAITING AREA
C219
475 SF
CT CONTROL RM
C230
225 SF
CT EXAM
C228
273 SF
ELECTRICAL CLOSET
C217
38 SF
ELECTRICAL PANEL
C215
21 SF
373 SF
GROUP RM
2B-182
114 SF
WORK AREA
2B-160
92 SF
SOILED UTILITY
2B-162
14 SF
STORAGE
2B-182A
144 SF
CHECKOUT
2B-158A
273 SF
CHECK IN
2B-158B
11 SF
STORAGE
2B-158C 7 SF
STORAGE
2B158B
19 SF
RECEPTION
2B-158
125 SF
TEST LAB PULMONARY
2C-160125 SF
GI 4
2C-162
126 SF
GI 3
2C-164
126 SF
TEST LAB PULMONARY
2C-158
123 SF
NURSE TRIAGE
2C-156
205 SF
MENS RESTROOM
2C-178
179 SF
WOMENS RESTROOM
2C-179
11 SF
STORAGE
2C180
19 SF
STORAGE
2C181
505 SF
CORRIDOR
C2C8
954 SF
CORRIDOR
C2B7
ORTHOTICS OFFICE
B246
416 SF
LAB CHIEF PROSTHETICS
B247
106 SF
3D PRINTER RM
B245
98 SF
CORRIDOR
C2B-5
349 SF
STORAGE RM
B242
167 SF
STORAGE RM
B242A
74 SF
HAC
B244
45 SF
CORRIDOR
C2B-5
349 SF
STORAGE RM
B243
105 SF
STAIR 2
S2B2
197 SF
STAFF LOUNGE
D242
105 SF
STORAGE
D244
42 SF EKG/SUB SPECIALTY CHECK IN
D243
225 SF
CORRIDOR
C2D-6
145 SF
OFFICE
D241
173 SF
READING RM
D238
113 SF
CORRIDOR
C2D-5
174 SF
HAC
D239
51 SF
CPAC STORAGE
D237A
78 SF
CPAC CLINIC
D237
155 SF
STAFF TOILET/SHOWER
D240
59 SF
CARDIOLOGY STRESS LAB
D216D
240 SF
X-RAY RM B
D216B
370 SF
CONTROL RM
D216E
108 SF
X-RAY RM-A
D216A
331 SF
CORRIDOR
D216
235 SF
HOT LABORATORY
D215
163 SF
NUCLEAR MEDICINE CHECK IN OFFICE
D216C
86 SF
STORAGE CLOSET
D215A
25 SF
STORAGE
D215B
24 SF
CORRIDOR
C2D2
82 SF
ELEVATOR 6
E2D6
99 SF
WAITING AREA
D220
426 SF
STAIR 4
S2D4
157 SF
CHIEF CARDIOLOGIST
D235
214 SF
ECG LAB
D234
395 SF
CORRIDOR
C2D-4
164 SF
CHIEF NEUROLOGIST
D233
99 SF
CARDIOLOGIST OFFICE
D231
98 SF
EXAM ROOM
D229
100 SF
CARDIOLOGY EXAM
D227
94 SF
EKG LAB
D225
99 SF
CARDIOLOGY NURSE
D223
74 SF
BREAK RM
D226A
160 SF
STRESS LAB
D226
256 SF
ECHO LAB #1
D230
214 SF
ECHO LAB #2
D232
190 SF
CORRIDOR
C2D-3
558 SF
CARDIOLOGY
D221
67 SF
REPRO ROOM
D219
53 SF
STORAGE RM (OXYGEN)
D214
43 SF
CPAP CLINIC
D208
216 SF
TELEPHONE CLOSET
D210
10 SF
HOME OXYGEN CLINIC
D206
135 SF
PULMONARY LAB
D204
276 SF
OFFICE
D202
186 SF
OFFICE
D202A
183 SF
TOILET
C200H
70 SF
TOILET
C200G
74 SF
KITCHEN
C200F
100 SF
RESIDENTS KITCHEN
C200E
125 SF
RES. SLEEP ROOM
C200D
163 SF
RES. SLEEP ROOM
C200C
165 SF
RES. SLEEP ROOM
C200B
131 SF
RES. SLEEP ROOM
C200A
137 SF
RESIDENTS LOUNGE
C200
535 SF
RESPIRATORY SUPPLY RM
B202
401 SF
RESPIRATORY OFFICE
B206
420 SF
MEDICINE OFFICE
B210
185 SF
STAIR 5
S2B5
156 SF
ORTHOTICS LAB
B239
369 SF
ORTHOTICS STORAGE
B235
403 SF
OFFICE
B231
403 SF
STAFF LOUNGE
B227AI
156 SF
OFFICE
B229
109 SF
B227A
75 SF
WAITING
B227
519 SF
OFFICE
B228
104 SF
RECEPTIONIST
B226
62 SF
TREATMENT RM
B230
128 SF
STORAGE
B230A
62 SF
TREATMENT RM
B232
98 SF
TREATMENT RM
B234
95 SF
CHIEF PROSTETICS TREATMENT CENTER
B238
218 SF
BIO-MED TECHS
B224
377 SF
BIO-MED RM
B220
402 SF
STORAGE
B225
54 SF
SUPERVISOR OFFICE
B223
210 SF
BIOMED STORAGE
B221
104 SF
MALETOLIET
B219
207 SF
CORRIDOR
C2B-2
187 SF
ELEVATOR 10
E2B10
74 SF
CHASE
B209A
24 SF
EQUIPMENT STORAGE
B209
60 SF
NURSING TIMEKEEPER
B207
129 SF
ABG LAB
B205
132 SF
NURSING ADMIN PATIENT SAFETY MGR
OFFICE
B203
138 SF
CORRIDOR
C2B-1
450 SF
DATA CLOSET
B214
55 SF
ELECTRICAL CLOSET
B212
63 SF
DATA CLOSET
B208
12 SF
811 SF
OFFICE
N/D
1364 SF
AREA MAINTENANCE
N/A
TR
S2C-1
124 SF
MILLION VET PROGRAM OFFICE
D201
144 SF
FIRE RISER
S2C-1B
76 SF
EMPLOYEE ASSISTANCE PROGRAM
COUNCILOR
D203
120 SF
CAPC OFFICE
D207
88 SF
SUPPLY RM
D209
104 SF
STAIR 3
S2D3
201 SF
FEC
159 SF
ORTHO EXAM ROOM
2A-154
167 SF
TRIAGE 2
2A-156121 SF
BLIND VENT ASSOCIATION OFFICE
2A-155
21 SF
2C-102A1
5722 SF
ELEV LOBBY
C2C1
BLDG. 110B
36 SF
XXX-1
TR
ICRA PHASING LINE
ICRA CLASS II
ICRA CLASS III
ICRA CLASS IV
FEC
FE
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
2 HR FIRE BARRIER
1 HR SMOKE BARRIER
1 HR FIRE BARRIER
2 HR FIRE/SMOKE BARRIER
NON-RATED SMOKE PARTITION
BUILDING BOUNDARY LINE
BUILDING 110 COMPLEX
KEY AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
B
.r v t
110AS102
BUILDING 110, 110A, 110B - LEVEL 02 -
PHASING PLAN
MA RB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
LEGEND
KEY PLAN
1" = 20'-0"
BUILDING 110, 100A, 100B - LEVEL 02- PHASING PLAN
PROJECT
NORTH
0' 10' 20' 40'
FE
FE
110, 110(A,B)
Revisions: Date:
NORTH
N
Q
P
INTERIOR LINE
OF NEW WALL
EXISTING FIRE
RISER
12' - 10"
ENTRY POINT
DUCT TO
EXTERIOR
ANTE
ROOM
10 10
L N
P
N
P
IN-04.02-13
E X
IS
T
O
O R
IN
G
N
O
O R
IN
G
(F O
R E
X C
E P
T
IO
N
(E
X
IS
T
10'x10' TR FORM
FACTOR
S2C-1
12' - 10" (CLR.)
56 SF
HAC
C201
147 SF
OFFICE
C203
364 SF
CORRIDOR
C2C-1
487 SF
CORRIDOR
C2D-1
144 SF
MILLION VET
PROGRAM
OFFICE
D201
6 SF
EMERGENCY
PANEL CLOSET
D200
124 SF
TR
S2C-1
76 SF
FIRE RISER
S2C-1B
IN-04.02-14
NEW FLOOR SHALL BE
OF 2-HR FIRE RATING
CONSTRUCTION.
2"x2" TRENCH ALONG WALL WITH SLOTTED
METAL COVER. COORDINATE WATER SENSOR
WITH MECHANICAL AND ELECTRICAL.
F-1
IN-01.31
NEW SEMI-RECESSED FEC. NEW
CLEAN AGENT FIRE
EXTINGUISHER. SEE DETAIL
3/A-603
01a
L N
P
EXPOSED
56 SF
HAC
C201
52 SF
ANTE-ROOM
C2C-3
147 SF
OFFICE
C203
364 SF
CORRIDOR
C2C-1 487 SF
CORRIDOR
C2D-1
144 SF
MILLION VET
PROGRAM
OFFICE
D201
124 SF
TR
S2C-1
76 SF
FIRE RISER
S2C-1B 1' - 7" 1' - 7"
1' - 7" 1' - 7"
3' - 1"
52 SF
ANTE-ROOM
C2C-3
147 SF
OFFICE
C203
204 SF
STAIR 1
S2C1
56 SF
HAC
C201
6 SF
EMERGENCY
PANEL CLOSET
D200
144 SF
MILLION VET
PROGRAM
OFFICE
D201
364 SF
CORRIDOR
C2C-1
487 SF
CORRIDOR
C2D-1
52 SF
ANTE-ROOM
C2C-3
147 SF
OFFICE
C203
204 SF
STAIR 1
S2C1
56 SF
HAC
C201
364 SF
CORRIDOR
C2C-1
6 SF
EMERGENCY
PANEL CLOSET
D200
144 SF
MILLION VET
PROGRAM
OFFICE
D201
RM S2C-1
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
2HR FIRE BARRIER
POLYETHYLENE SHEETING
HEPA EQUIPPED AIR FILTER
ICRA CLASS IV LEGEND - TR
ICRA CLASS II LEGEND - FEC
POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
EXISTING WALL ACTING AS ICRA
BOUNDARY. SEAL ANY OPENINGS AND
PENETRATIONS AS REQUIRED.
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0 /2
:4
:0 p m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
.r v t
110A-102
BUILDING 110 - LEVEL 02 DEMO FLOOR PLAN,
DEMO RCP, FLOOR PLAN & RCP
MA ME
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
KEY PLAN
GENERAL NOTES
KEYNOTES (THIS SHEET ONLY)
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,
AND ELECTRICAL ITEMS ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED
AND NEW DOORS ARE INSTALLED.
1/4" = 1'-0"
RM S2C-1 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM S2C-1 - DEMO RCP
1/4" = 1'-0"
RM S2C-1 - FLOOR PLAN
1/4" = 1'-0"
RM S2C-1 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING STAIRS. PATCH AND REPAIR WALLS TO
MATCH EXISTING.
CONSTRUCT NEW 2HR FIRE RATED FLOOR, ALIGNED TO
EXISTING FLOOR STRUCTURE. SEE STRUCTURAL DETAILS.
CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH
EXISTING.
INSTALL NEW DOOR/FRAME.
APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER
WITH SEALANT AT THE BOTTOM.
INSTALL FRT PLYWOOD OVER WALLS PER DETAIL 3/AE421,
TYPICAL.
ICRA KEYNOTES
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.
INSTALL FIRE RETARDANT POLYETHYLENE SHEETING TO
ISOLATE CONSTRUCTION ZONE. TAPE AND SEAL ALONG
EDGES AND ANY AREAS WHERE POTENTIAL DUST MAY BE
EXPOSED OUTSIDE OF CONSTRUCTION AREA.
LEGEND
ICRA LEGEND
Revisions: Date:
1 HR SMOKE BARRIER
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
KEY AREA SHOWN
PROJECT
NORTH
CC DD
DUCT TO
EXTERIOR
13 12
INTERIOR LINE
OF NEW WALL
4' - 0"
13' - 6"
ANTE ROOM
CC DD
122 SF
TR
2A-154A
476 SF
CORRIDOR
C2-10
2A-154A
E X
IS
T
O
O R
IN
G
N
O
O R
IN
G
CC DD
IN-04.02-15
10'x10' TR FORM FACTOR
01b
13' - 6" (CLR.)
5722 SF
ELEV LOBBY
C2C1
159 SF
ORTHO EXAM
ROOM
2A-154
167 SF
TRIAGE 2
2A-156
121 SF
BLIND VENT
ASSOCIATION
OFFICE
2A-155
IN-01.02
NEW SEMI-RECESSED FEC.
NEW CLEAN AGENT FIRE
EXTINGUISHER. SEE DETAIL
3/A-603
01d
ALIGN
(E X
IS
T
122 SF
TR
2A-154A
476 SF
CORRIDOR
C2-10
EXPOSED
CC DD
2' - 1" 1' - 7"
2' - 0" 1' - 7"
159 SF
ORTHO EXAM
ROOM
2A-154
167 SF
TRIAGE 2
2A-156121 SF
BLIND VENT
ASSOCIATION
OFFICE
2A-155
5722 SF
ELEV LOBBY
C2C1
81 SF
SPLINT STORAGE
2A-154A
159 SF
ORTHO EXAM
ROOM
2A-154
476 SF
CORRIDOR
C2A10
121 SF
BLIND VENT
ASSOCIATION
OFFICE
2A-155
167 SF
SCI OUTPATIENT
CLINIC
2A-156
5765 SF
ELEV LOBBY
C2C1
81 SF
SPLINT STORAGE
2A-154A
159 SF
ORTHO EXAM
ROOM
2A-154
476 SF
CORRIDOR
C2A10
121 SF
BLIND VENT
ASSOCIATION
OFFICE
2A-155
167 SF
SCI OUTPATIENT
CLINIC
2A-156
5765 SF
ELEV LOBBY
C2C1
RM 2A-154A
POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
EXISTING WALL ACTING AS ICRA
BOUNDARY. SEAL ANY OPENINGS AND
PENETRATIONS AS REQUIRED.
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MAT
HEPA EQUIPPED EXHAUST
KEY PLAN
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE
MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE
DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1/4" = 1'-0"
RM 2A-154A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2A-154A - DEMO RCP
1/4" = 1'-0"
RM 2A-154A - FLOOR PLAN
1/4" = 1'-0"
RM 2A-154A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR
STRUCTURE UNDERNEATH. REMOVE EXISTING
SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING
FOR NEW WORK.
DEMOLISH EXISTING BASE, REMOVE EXISTING ADHESIVE AND
PREPARE FOR NEW BASE.
DEMOLISH EXISTING PLUMBING FIXTURE. SEE MECHANICAL
PLANS.
DEMOLISH EXISTING ACT COMPLETELY INCLUDING ALL
GRIDS, SUPPORTING WIRES, CLIPS, AND PERIMETER WALL
ANGLES TO EXPOSE UNDERSIDE OF STRUCTURE ABOVE.
PATCH WALLS WHERE CEILING IS REMOVED.
INSTALL NEW DOOR/FRAME.
INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER
WITH SEALANT AT THE BOTTOM.
APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
INSTALL NEW FRT PLYWOOD OVER WALLS PER DETAIL
3/AE421, TYPICAL.
CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH
EXISTING ON ROOM.
INFILL WALL. PATCH AND PAINT TO MATCH EXISTING.
ICRA KEYNOTES
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"X36", TYPICAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0 /2
:4
:1 p m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
B
.r v t
110BA-102
BUILDING 110B - LEVEL 02 - DEMO FLOOR
PLAN, DEMO RCP, FLOOR PLAN & RCP
MA ME
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
LEGEND
ICRA LEGEND - CLASS IV
Revisions: Date:
27B
27 31
27A
110A
110B
110D
13W
148-D
148-S
148-A
148T
146B
146A
138A 138136
137A
137C
137D
137B
137C
148B
173A
148-C
170 150
110C
143 167
G R
A V
E L
R O
A D
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
AVERILL AVENUE
A M
E S
S T
R E
E T
HARRIS AVENUE
JONES CREEK
K N
O X S
T R
E E
T
T H
O M
P S
O N
S T
R E
E T
F R A N
K
LI
N B
O U
LE
V A R
D
MALLORY STREET
M A
R T
IN
L. K
IN
G
JR
. B O
U L E
V A R
D
M A R
TIN
L. K
IN
G
JR
. B O U
LE
V
AR
D
E M
A N
C
IP
A T
IO
N D
R
SHORE ROAD
H A R R
IS
A V E N
U E
HARRIS AVENUE
M c C
L E
L L A
N
S E
W E
LL
A
V E
N U
E
A V
E N
U E
J M O R T V X AA CC DD EE FF GG HH II
STAIR 7
S3C - 7
230 SF
ANES. HOLDING CART
C333
137 SF
ANES. OFFICE
C331
209 SF
ANES. WORK & STORAGE
C329
168 SF
SUPPLY TECH.
C327
122 SF
OR DIRECTOR
C323
140 SF
LOUNGE
C321
196 SF
VESTIBULE
35 SF
FEMALE LOCKER RM.
C315
241 SF
SHOWER
C315A
127 SF
CYSTO. 2
C311
455 SF
OP EQUIPMENT STORAGE
C334B
174 SF
OR 5
C346
504 SF
OR 4
C350
541 SF
OR 3
C354
541 SF
SUB-STERILE
C358
74 SF
HAC
C334A
25 SF
EXIST. D/W (CLEAN)
C334C
14 SF
OR 1
C326
510 SF
OR 2
C330
535 SF
VEST.
C314
49 SF
VEST.
67 SF
STAIR 6
S3C - 6
157 SF
ELEC.
C357J
96 SF
SHOWER
C316A
22 SF
MALE LOCKER ROOM
C316
191 SF
INSTRUMENT PREP STORAGE
C309
372 SF
CLOSET
C360
10 SF
CLOSET
C359
10 SF
CONTROL
C319
163 SF
CORRIDOR
C3C5
744 SF
HVAC CLOSET
C322
11 SF
CORRIDOR
C3C - 6
909 SF
CLEAN CORE
C334
951 SF
VESTIBULE
114 SF
CORRIDOR
C3C4
499 SF
P-4
C357E
83 SF
P-5
C357F
78 SF
P-5
C357G
79 SF
520 SF
ELEVATOR LOBBY
C3C2
240 SF
STAIR
483 SF
TELECOM
3C-10
ICU ISOLATION ROOM
B337A
258 SF
ANTE ROOM
B337
125 SF
ICU ISOLATION ROOM (ADA)
B337B
168 SF
ICU PATIENT ROOM (ADA)
B333
261 SF
PATIENT BATH
B337B1
57 SF
ICU STORAGE
B336
27 SF
HAC
B334
70 SF
STAIR ROOM
S3B-2
197 SF
COMM CHASE
32 SF
COMMUNICATION CLOSET
B310
74 SF
NURSE MANAGER
B308
96 SF
STAFF LOUNGE
B306
155 SF
LOCKERS
B302
134 SF
LINEN CLOSET
B304
11 SF
STAFF BATH
B302A
66 SF
CORRIDOR
C3B-4
691 SF
TELECOM CLOSET
B311
38 SF
COMM CLOSET
B309
57 SF
NOURISHMENT ROOM
B321
104 SF
PATIENT ROOM 4
B307
226 SF
PATIENT ROOM 3
B305
218 SF
PATIENT BATH
B305A
39 SF
PATIENT BATH
B307A
41 SF
PATIENT ROOM 2
B303
194 SF
PATIENT ROOM 1
B301
191 SF
PATIENT BATH
B301A
37 SF
PATIENT BATH
B303A
37 SF
MEDS ROOM
B323
153 SF
ICU PATIENT ROOM
B322
257 SF
PHYSICIAN CHARTING
B320B
106 SF
ICU PATIENT ROOM
B324
253 SF
ICU PATIENT ROOM
B326
252 SF
E Q
U
IP
M E
N T
S T
O R
A G
E
B
S
F
ICU PATIENT ROOM
B328
256 SF
C L
E A
N U
T
IL
IT
Y
C L
O S
E T
B
S
F
ICU PATIENT ROOM
B330
259 SF
C O
N F
E R
E N
C E
R O
O M
B
S
F
STAIR 5
S3B-5
162 SF
PATIENT BATH
B333B
80 SF
ELEVATOR 10
E3B-10
103 SFSTAFF TOILET
B312
45 SF
SOILED UTILITY CLOSET
B314
154 SF
LINEN CLOSET
B316
25 SF
PATIENT BATH
B318B1
39 SF
ICU ISOLATION ROOM
B318B
185 SF
ANTE ROOM
B318
121 SF
ICU ISOLATION ROOM
B318A
251 SF
ICU PATIENT ROOM
B315
274 SF
CORRIDOR
C3B-1
306 SF
RECEPTION/WAITING AREA
C301C
291 SF
OFFICE
C301
99 SF
CLOSE
C300
18 SF
WOMEN'S TOILET
C301B
149 SF
MEN'S TOILET
C301A
149 SF
C301D
88 SF
C301E
137 SF
BREAK ROOM
D302
654 SF
NUTRITION
D303
77 SF
COOK / CHILL
D304
94 SF
WARD SUPPLIES
D305
152 SF
STAFF TOILET
D302A
52 SF
ELECTRICAL CLOSET
D306
85 SF
TELEPHONE CLOSET
D308
126 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
S
F
PRIVATE BATH
D318A
38 SF
PRIVATE BATH
D320A
38 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
S
F
E X
A M
T
R E
A T
M E
N T
R O
O M
D
S
F
PRIVATE BATH
D322A
38 SF
PRIVATE TOILET
D324A
38 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
S
F
STAIR 4
S3D-4
164 SF
PRIVATE BATH
D325B1
44 SF
EXAM/ TREATMENT ROOM
D325B
137 SF
ANTE ROOM
D325
76 SF
EXAM/ TREATMENT ROOM
D325A
143 SF
PRIVATE BATH
D325A1
50 SF
LINEN CLOSET
D323
13 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
B
S
F
PRIVATE BATH
D321B1
52 SF
ANTE ROOM
D321
78 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
A
S
F
PRIVATE BATH
D321A1
52 SF
S T
O R
A G
E C
L O
S E
T
D
S F
PRIVATE BATH
D317B.1
50 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
B
S
F
ANTE ROOM
D317
77 SF
CORRIDOR
C3D-3
563 SF
E X
A M
T
R E
A T
M E
N T
R O
O M
D
A
S
F
PRIVATE BATH
D317A1
50 SF
CLINIC RECEPTION AREA
D310
202 SF
STAFF WORK AREA
D310A
169 SF
STAFF TOILET
D310A1
27 SF
MEDICATION ROOM
D312
152 SF
VASCULAR LAB
D316
178 SF
PRIVATE TOILET
D316A
45 SF
LINEN CLOSET
D314
12 SF
PRIVATE TOILET
D315A
54 SF
VASCULAR LAB
D315
182 SF
ANESTHETIST OFFICE
D313
122 SF
STAFF BATH
D313A
38 SF
HAC
D311
16 SF
SOILED UTILITY
D309
165 SF
ELEVATOR #6
E3D6
87 SF
STAIR 3
S3D-3
202 SF
BAY 5
D335G
123 SF
BAY6
D335H
95 SF
BAY 7
D335J
97 SF
BAY 8
D335K
96 SF
BAY 9
D335L
111 SF
LINEN CHUTE
C302
61 SF
HAC
C304
58 SF
BAY 10
D335M
98 SF
EQUIPMENT STORAGE
D335N
71 SF
CORRIDOR
C3B-3
351 SF
TELEMETRY
B320A
97 SF
NURSE STATION
B320
210 SF
ICU STORAGE
B327
13 SF
CORRIDOR
C3B-2
887 SF
CORRIDOR
C3C-2
178 SF
CORRIDOR
C3C-1
364 SF
CORRIDOR
C3C3
218 SF
CORRIDOR
C3D-1
414 SF
CORRIDOR
C3D-2
887 SF
ADMIN
D338
273 SF
RECEPTION
D337
76 SF
WAITING ROOM
D336
391 SF
CORRIDOR
C3D4
378 SF
BAY 3
D335B
99 SF
BAY 1
D335A
101 SF
CORRIDOR
D335.1
50 SF
INSTRUMENT PREP / STORAGE
C305
298 SF
ELEVATOR 9
E3C-9
84 SF
ELEVATOR 8
E3C-8
75 SF
OFFICE ROOM
C301F
104 SF
OFFICE ROOM
C301H
97 SF
OFFICE ROOM
C301G
118 SF
A B C D E F G I K L N Q S U W Z BB
Y
H
P
BUILDING 110
SECTION 2A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES AND
AVAILABILITY TO COMPLETE DATA
WIRING IN THIS AREA.
BUILDING 110
SECTION 2B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110
PHASE 1: CONTRACTOR TO COMPLETE THE
WORK OF THIS TR AND ASSOCIATED DATA
DROPS. COMPLETE ONE SECTION AT A TIME
AS DIRECTED TO COR.
BUILDING 110A
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110A
SECTION 1B:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
BUILDING 110B
SECTION 1A:
CONTRACTOR TO COORDINATE WITH VA
FOR ROOM CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN THIS AREA.
EXISTING FE. REPLACE WITH NEW SEMI-RECESSED
FEC. REPLACE EXISTING FE WITH NEW CLEAN
AGENT EXTINGUISHER THAT MEETS OR EXCEEDS
THE ABC RATING AND SIZE OF EXISTING
EXTINGUISHER. SEE DETAIL 3/A-603
FE FE
FE
FE
FE
FE
FE
FE
FE
FEFE
FE
FE
FE
FE
D
IA
M O N D L
IN
E
TR
S3C-1
143 SF
FIRE RISER
S3C-1b
76 SF
680 SF
CORRIDOR
D335
327 SF
INDUCTION ROOM
D335Y
156 SF
NURSE STATION
C357D
266 SF
CORRIDOR
C357
98 SF
SOIL UTILITY
D3352
110 SF
CLEAN SUPPLY
D357X
56 SF
STAFF TOILET
C357C
106 SF
P-2 NEGATIVE PRESSURE
C357B
113 SF
P-1
C357A
256 SF
NURSE STATION
D335E
73 SF
IRM/IT
3C100
ORTHO STORAGE
C346B
103 SF
941 SF
C339
200 SF
C336
107 SF
C338
33 SF
C340
241 SF
C342
1832 SF
HALLWAY
C3C8
59 SF
PATIENT TOILET
D335R
42 SF
PATIENT TOILET
D335P
95 SF
BAY 4
D335D
91 SF
BAY 2
D335C
23 SF
HOTELING
D335Q
892 SF
CORRIDOR
D335
P-6
C357H
84 SF
BLDG. 110
BLDG. 110B
BLDG. 110A
124 SF
XXX-5
TR
ICRA PHASING LINE
ICRA CLASS II
ICRA CLASS III
ICRA CLASS IV
FEC
FE
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
2 HR FIRE BARRIER
1 HR SMOKE BARRIER
1 HR FIRE BARRIER
2 HR FIRE/SMOKE BARRIER
NON-RATED SMOKE PARTITION
BUILDING BOUNDARY LINE
BUILDING 110 COMPLEX
KEY AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/0 /2
:0
:3 a m
B
IM
/5
-2
-7
V A
H a m p to n
E H
R M
/B L D
G
B
.r v t
110AS103
BUILDING 110, 110A, 110B - LEVEL 03 -
PHASING PLAN
MA RB
100% CONSTRUCTION
DOCUMENTS
07/18/2025
590-22-700EHRM INFRASTRUCTURE
UPGRADES - HAMPTON
HAMPTON VA MEDICAL CENTER, HAMPTON, VIRGINIA
LEGEND
KEY PLAN
1" = 20'-0"
BUILDING 110, 100A, 100B - LEVEL 03- PHASING PLAN
PROJECT
NORTH
0' 10' 20' 40'
Revisions: Date:
110, 110(A,B)
L N
P
INTERIOR LINE
OF NEW WALL
EXISTING FIRE
RISER
12' - 10"
EXISTING FE. REPLACE WITH NEW SEMI-RECESSED
FEC. REPLACE EXISTING FE WITH NEW CLEAN AGENT
EXTINGUISHER THAT MEETS OR EXCEEDS THE ABC
RATING AND SIZE OF EXISTING EXTINGUISHER. SEE
DETAIL 3/A-603.
10ENTRY
POINT
DUCT TO
EXTERIOR
ANTE
ROOM
8 9
111 SF
BAY 9
D335L
61 SF
LINEN CHUTE
C302
98 SF
BAY 10
D335M
364 SF
CORRIDOR
C3C-1
414 SF
CORRIDOR
C3D-1
223 SF
STAIRS 1
S3C-1
N
P
223 SF
STAIRS 1
S3C-1
61 SF
LINEN CHUTE
C302
58 SF
HAC
C304
98 SF
BAY 10
D335M
N
P
111 SF
BAY 9
D335L
61 SF
LINEN CHUTE
C302
98 SF
BAY 10
D335M
01a
IN-04.02-16
N
O
O R
IN
G
E X
IS
T
O
O R
IN
G
(F O
R E
X C
E P
T
IO
N
(E
X
IS
T
10'x10' TR FORM
FACTOR
143 SF
TR
S3C-1
S3C-1
12' - 10" (CLR.)
3 4
364 SF
CORRIDOR
C3C-1 414 SF
CORRIDOR
C3D-1
58 SF
HAC
C304
IN-04.02-17
76 SF
FIRE RISER
S3C-1b
NEW FLOOR SHALL BE
OF 2-HR FIRE RATING
CONSTRUCTION.
2"x2" TRENCH ALONG WALL WITH SLOTTED
METAL COVER. COORDINATE WATER SENSOR
WITH MECHANICAL AND ELECTRICAL.
F-1
IN-01.31
NEW SEMI-RECESSED FEC. NEW
CLEAN AGENT FIRE EXTINGUISHER.
SEE DETAIL 3/A-603
N
P
61 SF
LINEN CHUTE
C302
58 SF
HAC
C304
98 SF
BAY 10
D335M
EXPOSED
143 SF
TR
S3C-1
76 SF
FIRE RISER
S3C-1b
3' - 1"
1' - 2" 1' - 2"
1' - 2"
KEY AREA SHOWN
PROJECT
NORTH
RM S3C-1
2 HR FIRE BARRIER
2 HR FIRE/SMOKE BARRIER
1 HR SMOKE BARRIER
NEW FLOOR 2 HR FIRE RATED
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
NEW DOOR
NEW LIGHTS (SEE ELECTRICAL DETAILS)
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
POLYETHYLENE SHEETING
HEPA EQUIPPED AIR FILTER
ICRA CLASS IV LEGEND - TR
ICRA CLASS II LEGEND - FEC
POSITIVE ( + ) PRESSURE
CONSTRU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .