Att. 15 - Set 5 of 8 Final Drawings By Discipline 590 22 700.pdf
PDF 64 MB Posted
- Attached to
- Y1DA--590-22-700 | Construct EHRM Infrastructure Upgrade | Hampton, VA | Federal contract opportunity
- Solicitation number
- 36C77626R0041
About this file
This is a set of final architectural and engineering drawings organized by discipline for a construction project identified as 590 22 700. The drawings document the detailed design specifications across multiple disciplinary areas including architectural, structural, mechanical, electrical, plumbing, and related systems. These final drawings represent the completed design phase deliverables and serve as the basis for construction documentation and contractor bidding. The drawings include plan views, elevation views, section details, and construction specifications necessary for implementing the project design across all building systems and components. As a technical design document set, this file contains the comprehensive visual and written specifications required for construction contractors to accurately estimate costs and execute the work according to the architect's and engineer's intent.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .