8. 578-26-016 Building 217 Abatement Drawings.pdf

PDF 7 MB Posted

Attached to
Z1DA--578-26-016 Donation Renovations Building 217 Phase 2 CON
Solicitation number
36C25226B0028
Issued by

View the file

Other files

File Type Posted
S06 Amendment 0002 Solicitation 36C25226B0028.docx DOCX document
P09 - SOW BNOE_Nurse Call.docx DOCX document
57826016_Addendumnumber2_08202026.pdf PDF
S06 Amendment 0001 Solicitation 36C25226B0028.docx DOCX document
FINAL RFI QUESTIONS AND ANSWERS FOR PROJECT 578-26-016.docx DOCX document
Pre-Bid Site Visit Sign-in.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2_.pdf PDF
12. Hines VA Lock Hardware Standards.docx DOCX document
6. 578-26-016 CLIN1 Specifications Book R1.pdf PDF
1.16 VHA Supplemental COVID-19 Requirements.pdf PDF
1.13 Asbestos Survey Glossary.pdf PDF
1.8 Dig Permit SOP Form.pdf PDF
11. Building 217 _ Exterior Rooms.pdf PDF
7c. 578-20-002 Basis of Design -BOD Part 3.pdf PDF
5b. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 2.pdf PDF
2. VHA PCRA-1.1 -May 21 2024- 578-26-016.pdf PDF
1.15 Hines COVID-19 Guidelines.pdf PDF
1.14 OIT Horizontal Cable Requirements.pdf PDF
1.12 Cutting Welding and Other Hot Work.pdf PDF
1.10 Fire Protection Code Reviews.pdf PDF
1.9 Above Ceiling Permits.pdf PDF
1.2 HINES VA SITE PLAN 5-1-2025.pdf PDF
9. 578-26-016 Building 217 Abatement Specifications.pdf PDF
5c. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 3.pdf PDF
4. VHA ICRA-1.3 -Dec 9 2024- 578-26-016.pdf PDF
3. Interim Life Safety Measures -ILSM 578-26-016.pdf PDF
1.17 Emergency Contact List - Template.pdf PDF
1.11 No Smoking Policy 10-1-19.pdf PDF
1.7 Infection Control Barrier Sample.pdf PDF
1.5 Safety and Health During Construction Activities.pdf PDF
1.1 Hines Underground Utility Plan.pdf PDF
P09 578-26-016 Donation Renovations Phase 2 Construction SOW 7-27-26.docx DOCX document
P07 WAGE DETERMINATION IL20260009 05-18-2026.pdf PDF
13. Hines AC Shop HVAC Controls Requirements.docx DOCX document
10. Building 217 Colored Space Drawings.pdf PDF
7d. 578-20-002 Basis of Design -BOD Part 4.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2.pdf PDF
7a. 578-20-002 Basis of Design -BOD Part 1.pdf PDF
5a. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 1.pdf PDF
1.6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
1.4 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1.3 Parking Designations 08042025.pdf PDF
36C25226B0028.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEC

FE

C

FEC

FE

C

FE

C

FEC FEC

BEDROOM

B104

BEDROOM

B106

BEDROOM

B107

BEDROOM

B110

BEDROOM

B111

BEDROOM

B114

STR

B115A

LINEN

B115

BEDROOM

B118

BEDROOM

B120

BEDROOM

B122

BEDROOM

B123

BEDROOM

B126

BEDROOM

B127

BEDROOM

B130

BEDROOM

1B131

CONFERENCE

ROOM

B133

OFFICE

B139

PANTRY

1B136

MED

ROOM

B138

OFFICE

B141

MECHANICAL

1A114

O.T.

OFFICE

1A116

LAUNDRY

1A110

BEDROOM

1C106

BEDROOM

1C107

BEDROOM

1C110

BEDROOM

1C111

BEDROOM

1C114

BEDROOM

1C115

BEDROOM

1C118

BEDROOM

1C120

BEDROOM

1C122

BEDROOM

1C123

BEDROOM

1C126

BEDROOM

1C127

BEDROOM

1C130

BEDROOM

1C131

BEDROOM

1C151

BEDROOM

1C152

BEDROOM

1C155

BEDROOM

1C156

BEDROOM

1C159

BEDROOM

1C160

LACTATION

ROOM

C162

BEDROOM

1C164

BEDROOM

1C167

BEDROOM

1C168

BEDROOM

1C171

BEDROOM

1C172

BEDROOM

1C175

BEDROOM

1C176

BREAK

ROOM

C137

OFFICE

C139

MED

SUPPLIES

C140

OFFICE

C138

MED

ROOM

C180

CLEAN

UTILITY

C133

WARD

SUPPLY

C134 HAC

C147SOILED

UTILITY

C146TEL

CLOSET

C115

BREAK

ROOM

1A116

STORAGE

C136

ELECTRICAL

C143

TOILET

1C119

OFFICE

1A128

DIETICIAN

1A125

P.T.

OFFICE

1A124

PHYSICAL

THERAPY

1A23

STORAGE

1A23A

STORAGE

1A23B

WOMENS

LOCKER

ROOM

1A138

MENS

LOCKER

ROOM

1A136

HAC

A133

KITCHEN

1A127

ELECTRICAL

1C43

SOILED

UTILITY

B146

ELEV EQ

1A117 MECHANICAL

1A121

CONGREGATE

BATH

C135

NOURISHMENT

KITCHEN

C141

ELEVATOR

MACHINE

ROOM

1A40

ELECTRICAL

1A39

MECHANICAL

1A32

SOILED

LAUNDRY

HOLDING

1A130

TRASH

ROOM

1A131

CLEAN

LINEN

STORAGE

1B151

TOILET

B119

TOILET

B124

TOILET

B125

TOILET

B128

TOILET

B129

TOILET

1B132

TOILET

B113

TOILET

B112

TOILET

B109

TOILET

B108

TOILET

B105

TOILET

1C174

TOILET

1C173

TOILET

1C170

TOILET

1C169

TOILET

1C166

TOILET

1C165

TOILET

1C163

TOILET

1C161

TOILET

1C157

TOILET

1C154

TOILET

1C153

TOILET

1C152A

TOILET

1C151A

TOILET

1C132

TOILET

1C129

TOILET

1C128

TOILET

1C125

TOILET

1C124

TOILET

1C117

TOILET

1C116

TOILET

1C113

TOILET

1C112

TOILET

1C109

TOILET

1C108

TOILET

1C105

TOILET

B117

STAIR

1-1

STAIR

1-2

STAIR

1-3

STAIR

1-4

STAIR

1-5

TOILET

B103

TOILET

B122

TOILET

1C121

TOILET

1C158

GENERAL NOTES

1. REFER TO ARCHITECT OF RECORD'S (AOR'S) DESIGN DRAWINGS AND

DOCUMENTS FOR DETAILS. ALL WORK SHALL BE PERFORMED PER AOR'S

SCHEDULE.

2. PROPOSED FUTURE CONSTRUCTION SHOWN ON THE ABATEMENT PLANS

IS FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR SHALL NOT USE

THE ABATEMENT PLANS FOR ANY PROPOSED FUTURE CONSTRUCTION.

3. ACCESS TO WORK AREAS AND PROJECT PHASING TO BE DETERMINED BY

COMMISSION'S REPRESENTATIVE, BUILDING OWNER AND CONTRACTOR.

4. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS AND ALL APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS INCLUDING, BUT NOT LIMITED TO, CITY OF CHICAGO,

IDPH, EPA AND OSHA RULES AND REGULATIONS.

5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE QUANTITIES AND

LOCATIONS IN THE FIELD PRIOR TO BIDDING. THE LOCATIONS PROVIDED

IN THE PROJECT DOCUMENTS ARE APPROXIMATE. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR REMOVING ANY ACM WHICH WILL BE

DISTURBED DURING RENOVATION ACTIVITIES, PRIOR TO RENOVATION

ACTIVITIES. ABATEMENT SHALL BE PERFORMED AS OUTLINED IN THE

DESIGN PLANS AND KEPT TO THE EXTENT REQUIRED TO PERFORM THE

PROPOSED CONSTRUCTION AS SPECIFIED IN CONTRACT DOCUMENTS.

6. THE CONTRACTOR IS RESPONSIBLE FOR ALL SECURITY TO THE WORK

AREA(S) DURING THE ENVIRONMENTAL ABATEMENT AND REPLACEMENT

ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY

DAMAGES OR THEFTS TO PROPERTY IN THE WORK AREA(S), UNTIL THE

AREA(S) ARE RETURNED TO THE CPS. THE CONTRACTOR SHALL REPAIR

AND/OR REPLACE DAMAGED OR STOLEN PROPERTY TO THE

SATISFACTION OF THE COMMISSION'S REPRESENTATIVE AND CPS, AND AT

NO ADDITIONAL COST TO THE CPS.

7. WORKER DECONTAMINATION ENCLOSURE SYSTEM SHALL BE

CONSTRUCTED IN STRICT ACCORDANCE WITH IDPH SECTION 855.410.

CLEAN ROOM SHALL BE SIZED TO ACCOMMODATE THE NEEDS OF THE

WORK CREW. DONNING AND DOFFING OF PPE OUTSIDE OF CLEAN ROOM

IS STRICTLY PROHIBITED.

8. THE CONTRACTOR SHALL NOT PERFORM ANY ENVIRONMENTAL

ABATEMENT AND/OR MITIGATION WORK WHEN OCCUPANTS ARE PRESENT

ON THE PREMISES UNLESS APPROPRIATE SEPARATION BARRIERS ARE

INSTALLED TO ENSURE THE SAFETY OF THE OCCUPANTS.

ENVIRONMENTAL ABATEMENT/MITIGATION WORK SHALL NOT BE

PERFORMED WHEN STUDENTS ARE PRESENT ON THE PREMISES.

9. CONTRACTOR IS RESPONSIBLE FOR THE LOCKOUT AND TAGOUT OF ALL

ELECTRICAL AND HVAC SYSTEMS PRIOR TO THE START OF ANY

ABATEMENT WORK. SYSTEMS AND COMPONENTS IN THE WORK AREA

SHALL BE SHUT DOWN AND LOCKED OUT FOR THE DURATION OF THE

PROJECT.

10. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ELECTRICAL AND WATER

SERVICES. CONTRACTOR SHALL VERIFY AVAILABILITY OF THESE

SERVICES PRIOR TO BIDDING.

11. THE CONTRACTOR IS RESPONSIBLE FOR MEETING ALL REQUIREMENTS OF

THE IPDH LEAD POISONING PREVENTION CODE, INCLUDING BUT NOT

LIMITED TO SUBMISSION OF THE WORK PRACTICES AND OCCUPANT

PROTECTION PLAN AND WRITTEN ASSURANCE STATEMENTS.

12. IF CONCEALED (ABOVE CEILING, BEHIND WALLS, WITHIN BUILDING

COMPONENTS) SUSPECT ACM IS DISCOVERED DURING DEMOLITION

AND/OR RENOVATION ACTIVITIES, CONTRACTOR SHALL STOP WORK IN

THE AREA AND PROVIDE ALL NECESSARY MEANS FOR THE

ENVIRONMENTAL CONSULTANT TO COLLECT REPRESENTATIVE SAMPLES

TO DETERMINE IF THE SUSPECT MATERIAL SHALL BE TREATED AS AN

ACM. COMMISSION'S REPRESENTATIVE AND ENVIRONMENTAL

CONSULTANT SHALL PROVIDE CONTRACTOR DIRECTION ON HOW TO

PROCEED.

13. CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL LAYERS OF FLOORING

AND SUBFLOORING DOWN TO THE ORIGINAL FLOOR SYSTEM, OR THE

CONCRETE FLOOR SLAB AS APPLICABLE.

1. ASBESTOS ABATEMENT: REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING

MASTICS & ASSOCIATED FLOOR COVERINGS.

2. ALL WORK SHALL BE CONDUCTED PER SPECIFICATION 02 82 00 AND ALL

APPLICABLE COOK COUNTY, IEPA, IDPH, AND OSHA RULES AND REGULATIONS.

ASBESTOS ABATEMENT SCOPE OF WORK

ASBESTOS ABATEMENT KEYNOTES:

ASBESTOS MASTIC - BENEATH 12"x12" FLOOR TILE

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No.VA CONTRACT NO. 06/10/2026

ASBESTOS ABATEMENT - FIRST FLOOR PLAN RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

CZ CR

578-26-016

ENV-1

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071 Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 03/28/2025

100% CONSTRUCTION DOCUMENTS 07/09/2025

90% CONSTRUCTION DOCUMENTS 05/19/2026

100% CONSTRUCTION DOCUMENTS 06/10/2026

NNOT TO SCALEFIRST FLOOR PLAN

ASBESTOS ABATEMENT1

DN

DN

FEC FEC

OFFICE

2B18

OFFICE

2B15

OFFICE

2B14

OFFICE

2B11

OFFICE

2B10

OFFICE

2B07

OFFICE

2B06 OFFICE

FELLOWS

2B04

OFFICE

2B20

OFFICE

2B22

OFFICE

2B23

OFFICE

2B26

OFFICE

2B27

OFFICE

2B30

OFFICE

2B31

OFFICE

2B49

BEDROOM

2B51

BEDROOM

2B52

BEDROOM

2B55

BEDROOM

2B56

BEDROOM

2B59

BEDROOM

2B60

BEDROOM

2B62

OFFICE

2B64

BEDROOM

2B67

BEDROOM

2B68

BEDROOM

2B71

BEDROOM

2B72

BEDROOM

2B75

BEDROOM

2B76

TEL

CLOSET

SORILCECD220R

LINEN

2B46

HAC

2B47STORAGE

2B34

STORAGE

2B33

BATH

2B35STORAGE

RCC231R

ELECTRICAL

2B43

CONFERENCE

2B37

BREAK

ROOM

2B42

LINEN

2B40

CHAPEL

2B39

OFFICE

2B38

MED

ROOM

2B80

LAUNDRY

2A32

PSYCH

OFFICE

2A33

OFFICE

2A34

OCCUPATIONAL

THERAPY

2A234A

OFFICE

2A36

O.T.

STORAGE

2A35

OFFICE

2A1

WOMENS

LOCKER

ROOM

2A9

MENS

LOCKER

ROOM

2A10

HAC

2A11

OFFICE

2A25

CLEAN

LINEN

STORAGE

A202

ELECTRICAL

A203

MECHANICAL

A205

HAC

SUPPLIES

A206

STORAGE

2A7

OFFICE

2A8

BREAKROOM

2A14

SOCIAL

OFFICE

2A15

P.T.

OFFICE

2A16

KINESIO

THERAPY

2A17

STORAGE

2A18 2

BEDROOM

2C76

BEDROOM

2C75

BEDROOM

2C72

BEDROOM

2C71

BEDROOM

2C68

BEDROOM

2C67

BEDROOM

2C64

BEDROOM

2C62

BEDROOM

2C60

BEDROOM

2C59

BEDROOM

2C56

BEDROOM

2C55

BEDROOM

2C52

BEDROOM

2C51

CLEAN

STORAGE

C231

BEDROOM

2C30

BEDROOM

2C27

BEDROOM

2C26

BEDROOM

2C23

BEDROOM

2C22

BEDROOM

2C20

HOSPICE

SUPPORT

2C18

BEDROOM

2C15

BEDROOM

2C14

BEDROOM

2C11

BEDROOM

2C10

BEDROOM

2C07

BEDROOM

2C06

MECHANICAL

2A20

OFFICE

2A22

PHARMACY

OFFICE

2A23

MECHANICAL

2A24

STORAGE

2C37

OFFICE

2C38 EXAM

TREATMENT

2C39

MED

SUPPLIES

2C40

BREAK

ROOM

2C42

NOURISHMENT

KITCHEN

2C41

CLEAN

UTILITY

2C33

CONGREGATE

BATH

2C35

WARD

SUPPLY

2C34

HAC

2C47SOILED

UTILITY

2C46TELE

CLOSET

2C45

MED

ROOM

2C80

HAC

2A39

STORAGE

RCC201R

STORAGE

2A31

TOILET

2B05

TOILET

RCC216R

TOILET

RCC219R

TOILET

2B16

TOILET

2B17

TOILET

RCC212R

TOILET

RCC215R

TOILET

2B32

TOILET

2B50

TOILET

RCC225R

TOILET

RCC210R

TOILET

2B63

TOILET

2B65

TOILET

2B66

TOILET

RCC206R

TOILET

RCC211R

TOILET

2B77

TOILET

2C17

TOILET

2C16

TOILET

RCC209R

TOILET

RCC207R

TOILET

2C5

TOILET

2C19

TOILET

RCC202R

TOILET

RCC213R

TOILET

2C32

TOILET

RCC218R

TOILET

RCC203R

TOILET

RCC208R

TOILET

2C63

TOILET

2C65

TOILET

2C66

TOILET

RCC204R

TOILET

RCC205RTOILET

2C77

TOILET

2B19

STAIR

2-1

STAIR

2-2

STAIR

2-3

STAIR

2-4

STAIR

2-5

PUBLIC

RESTROOM

2A27

PUBLIC

RESTROOM

2A28

GENERAL NOTES

1. REFER TO ARCHITECT OF RECORD'S (AOR'S) DESIGN DRAWINGS AND

DOCUMENTS FOR DETAILS. ALL WORK SHALL BE PERFORMED PER AOR'S

SCHEDULE.

2. PROPOSED FUTURE CONSTRUCTION SHOWN ON THE ABATEMENT PLANS

IS FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR SHALL NOT USE

THE ABATEMENT PLANS FOR ANY PROPOSED FUTURE CONSTRUCTION.

3. ACCESS TO WORK AREAS AND PROJECT PHASING TO BE DETERMINED BY

COMMISSION'S REPRESENTATIVE, BUILDING OWNER AND CONTRACTOR.

4. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS AND ALL APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS INCLUDING, BUT NOT LIMITED TO, CITY OF CHICAGO,

IDPH, EPA AND OSHA RULES AND REGULATIONS.

5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE QUANTITIES AND

LOCATIONS IN THE FIELD PRIOR TO BIDDING. THE LOCATIONS PROVIDED

IN THE PROJECT DOCUMENTS ARE APPROXIMATE. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR REMOVING ANY ACM WHICH WILL BE

DISTURBED DURING RENOVATION ACTIVITIES, PRIOR TO RENOVATION

ACTIVITIES. ABATEMENT SHALL BE PERFORMED AS OUTLINED IN THE

DESIGN PLANS AND KEPT TO THE EXTENT REQUIRED TO PERFORM THE

PROPOSED CONSTRUCTION AS SPECIFIED IN CONTRACT DOCUMENTS.

6. THE CONTRACTOR IS RESPONSIBLE FOR ALL SECURITY TO THE WORK

AREA(S) DURING THE ENVIRONMENTAL ABATEMENT AND REPLACEMENT

ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY

DAMAGES OR THEFTS TO PROPERTY IN THE WORK AREA(S), UNTIL THE

AREA(S) ARE RETURNED TO THE CPS. THE CONTRACTOR SHALL REPAIR

AND/OR REPLACE DAMAGED OR STOLEN PROPERTY TO THE

SATISFACTION OF THE COMMISSION'S REPRESENTATIVE AND CPS, AND AT

NO ADDITIONAL COST TO THE CPS.

7. WORKER DECONTAMINATION ENCLOSURE SYSTEM SHALL BE

CONSTRUCTED IN STRICT ACCORDANCE WITH IDPH SECTION 855.410.

CLEAN ROOM SHALL BE SIZED TO ACCOMMODATE THE NEEDS OF THE

WORK CREW. DONNING AND DOFFING OF PPE OUTSIDE OF CLEAN ROOM

IS STRICTLY PROHIBITED.

8. THE CONTRACTOR SHALL NOT PERFORM ANY ENVIRONMENTAL

ABATEMENT AND/OR MITIGATION WORK WHEN OCCUPANTS ARE PRESENT

ON THE PREMISES UNLESS APPROPRIATE SEPARATION BARRIERS ARE

INSTALLED TO ENSURE THE SAFETY OF THE OCCUPANTS.

ENVIRONMENTAL ABATEMENT/MITIGATION WORK SHALL NOT BE

PERFORMED WHEN STUDENTS ARE PRESENT ON THE PREMISES.

9. CONTRACTOR IS RESPONSIBLE FOR THE LOCKOUT AND TAGOUT OF ALL

ELECTRICAL AND HVAC SYSTEMS PRIOR TO THE START OF ANY

ABATEMENT WORK. SYSTEMS AND COMPONENTS IN THE WORK AREA

SHALL BE SHUT DOWN AND LOCKED OUT FOR THE DURATION OF THE

PROJECT.

10. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ELECTRICAL AND WATER

SERVICES. CONTRACTOR SHALL VERIFY AVAILABILITY OF THESE

SERVICES PRIOR TO BIDDING.

11. THE CONTRACTOR IS RESPONSIBLE FOR MEETING ALL REQUIREMENTS OF

THE IPDH LEAD POISONING PREVENTION CODE, INCLUDING BUT NOT

LIMITED TO SUBMISSION OF THE WORK PRACTICES AND OCCUPANT

PROTECTION PLAN AND WRITTEN ASSURANCE STATEMENTS.

12. IF CONCEALED (ABOVE CEILING, BEHIND WALLS, WITHIN BUILDING

COMPONENTS) SUSPECT ACM IS DISCOVERED DURING DEMOLITION

AND/OR RENOVATION ACTIVITIES, CONTRACTOR SHALL STOP WORK IN

THE AREA AND PROVIDE ALL NECESSARY MEANS FOR THE

ENVIRONMENTAL CONSULTANT TO COLLECT REPRESENTATIVE SAMPLES

TO DETERMINE IF THE SUSPECT MATERIAL SHALL BE TREATED AS AN

ACM. COMMISSION'S REPRESENTATIVE AND ENVIRONMENTAL

CONSULTANT SHALL PROVIDE CONTRACTOR DIRECTION ON HOW TO

PROCEED.

13. CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL LAYERS OF FLOORING

AND SUBFLOORING DOWN TO THE ORIGINAL FLOOR SYSTEM, OR THE

CONCRETE FLOOR SLAB AS APPLICABLE.

1. ASBESTOS ABATEMENT: REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING

MASTICS & ASSOCIATED FLOOR COVERINGS.

2. ALL WORK SHALL BE CONDUCTED PER SPECIFICATION 02 82 00 AND ALL

APPLICABLE COOK COUNTY, IEPA, IDPH, AND OSHA RULES AND REGULATIONS.

ASBESTOS ABATEMENT SCOPE OF WORK

ASBESTOS ABATEMENT KEYNOTES:

ASBESTOS MASTIC - BENEATH 12"x12" FLOOR TILE

ASBESTOS MASTIC -

BENEATH EPOXY-TYPE SHEET FLOORING

ASBESTOS MASTIC - BENEATH CARPET

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No.VA CONTRACT NO. 06/10/2026

ASBESTOS ABATEMENT -

SECOND FLOOR PLAN RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

CZ CR

578-26-016

ENV-1

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071 Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 03/28/2025

100% CONSTRUCTION DOCUMENTS 07/09/2025

90% CONSTRUCTION DOCUMENTS 05/19/2026

100% CONSTRUCTION DOCUMENTS 06/10/2026

NNOT TO SCALESECOND FLOOR PLAN

ASBESTOS ABATEMENT2

Sheets and Views
HinesVA-0003-Design-ACM-ENV-(1)
2026-06-10_CarnowConibear_Bldg217_Drawing_ACM-ENV-(2).pdf
Sheets and Views
HinesVA-0003-Design-ACM-ENV-(2)

File details come from the government source that posted it. Updated .