1.7 Infection Control Barrier Sample.pdf

PDF 2 MB Posted

Attached to
Z1DA--578-26-016 Donation Renovations Building 217 Phase 2 CON
Solicitation number
36C25226B0028
Issued by

About this file

This document is a series of photographs documenting temporary construction containment equipment and monitoring systems installed in a controlled area.

The first image shows a yellow-framed containment enclosure with labeled components including: a manometer (pressure differential gauge displaying -0.045 reading), an Indoor Laser Scanning Monitoring (ILSM) system, a sign-in sheet, Pollution Control Room Alarm (PCRA), and an Infection Control Room Alarm (ICRA). The enclosure features danger signs indicating a construction area keep-out zone and hard hat requirement, with an entrance door visible on the right side. The second image displays a Dwyer DigiMag digital pressure gauge installed on an edge guard with polyethylene tubing connected to the positive side to provide accurate room pressure readings. The documentation notes that the HEPA filter machine should be blowing out of the room. The third image shows a Digital Differential Pressure Gauge (DDPG) mounted on the exterior of the containment structure with associated tubing and mounting hardware visible. These photographs appear to be documentation of containment protocols and pressure monitoring equipment, likely for a construction or renovation project requiring infection control or pollution control measures.

View the file

Other files

File Type Posted
S06 Amendment 0002 Solicitation 36C25226B0028.docx DOCX document
P09 - SOW BNOE_Nurse Call.docx DOCX document
Pre-Bid Site Visit Sign-in.pdf PDF
S06 Amendment 0001 Solicitation 36C25226B0028.docx DOCX document
FINAL RFI QUESTIONS AND ANSWERS FOR PROJECT 578-26-016.docx DOCX document
57826016_Addendumnumber2_08202026.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2_.pdf PDF
9. 578-26-016 Building 217 Abatement Specifications.pdf PDF
5c. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 3.pdf PDF
4. VHA ICRA-1.3 -Dec 9 2024- 578-26-016.pdf PDF
3. Interim Life Safety Measures -ILSM 578-26-016.pdf PDF
1.17 Emergency Contact List - Template.pdf PDF
1.11 No Smoking Policy 10-1-19.pdf PDF
1.5 Safety and Health During Construction Activities.pdf PDF
1.1 Hines Underground Utility Plan.pdf PDF
P09 578-26-016 Donation Renovations Phase 2 Construction SOW 7-27-26.docx DOCX document
P07 WAGE DETERMINATION IL20260009 05-18-2026.pdf PDF
13. Hines AC Shop HVAC Controls Requirements.docx DOCX document
10. Building 217 Colored Space Drawings.pdf PDF
7d. 578-20-002 Basis of Design -BOD Part 4.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2.pdf PDF
7a. 578-20-002 Basis of Design -BOD Part 1.pdf PDF
5a. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 1.pdf PDF
1.6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
1.4 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1.3 Parking Designations 08042025.pdf PDF
36C25226B0028.docx DOCX document
11. Building 217 _ Exterior Rooms.pdf PDF
8. 578-26-016 Building 217 Abatement Drawings.pdf PDF
7c. 578-20-002 Basis of Design -BOD Part 3.pdf PDF
5b. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 2.pdf PDF
2. VHA PCRA-1.1 -May 21 2024- 578-26-016.pdf PDF
1.15 Hines COVID-19 Guidelines.pdf PDF
1.14 OIT Horizontal Cable Requirements.pdf PDF
1.12 Cutting Welding and Other Hot Work.pdf PDF
1.10 Fire Protection Code Reviews.pdf PDF
1.9 Above Ceiling Permits.pdf PDF
1.2 HINES VA SITE PLAN 5-1-2025.pdf PDF
12. Hines VA Lock Hardware Standards.docx DOCX document
6. 578-26-016 CLIN1 Specifications Book R1.pdf PDF
1.16 VHA Supplemental COVID-19 Requirements.pdf PDF
1.13 Asbestos Survey Glossary.pdf PDF
1.8 Dig Permit SOP Form.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAHINDoyleL Text Box Entrance

VHAHINDoyleL Text Box Manometer

VHAHINDoyleL Text Box

ICRA

VHAHINDoyleL Text Box

PCRA

VHAHINDoyleL Text Box

ILSM

VHAHINDoyleL Text Box Sign-in

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINSidleB Image

VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.

VHAHINSidleB Image

File details come from the government source that posted it. Updated .