This file contains mechanical construction drawings and schedules for the Renovations to Building 217 at Edward J. Hines Jr. VA Medical Center (VAMC) under VA Contract No. 578-26-016. The drawings depict the complete mechanical systems design for the project, including detailed specifications for HVAC equipment, piping, ductwork, controls, and related infrastructure.

The mechanical systems include a primary air handling unit (AHU-1) rated at 7,000 CFM supply and return air with steam preheat and cooling capabilities, an air-cooled chiller system (ACCU-1) with 75-ton capacity and redundant glycol-water pumps, variable air volume (VAV) terminal boxes with hot water reheat coils throughout the building zones, centrifugal roof exhaust fans (EF-08, EF-09, EF-11), and a ductless split system (DFSS-108A) for supplemental cooling. The design incorporates energy recovery through heat pipe technology (ERC-1), direct digital controls (DDC) for all terminal units and primary equipment, glycol-based freeze protection down to -20°F, and full seismic bracing compliant with Risk Category IV standards. HVAC piping includes Schedule 80 steel for steam and copper for chilled/hot water with insulation, vibration isolation, and support requirements specified throughout. The project specifications emphasize coordination with architectural and structural elements, ADA compliance for all electrical controls and devices, VA-approved equipment equivalents, and adherence to the latest National Electrical Code, ASME standards, and SMACNA guidelines. All equipment is scheduled for new installation with full operational testing, commissioning of controls systems, and transfer to VA operations.

View the file

Other files

File Type Posted
P09 - SOW BNOE_Nurse Call.docx DOCX document
S06 Amendment 0002 Solicitation 36C25226B0028.docx DOCX document
FINAL RFI QUESTIONS AND ANSWERS FOR PROJECT 578-26-016.docx DOCX document
Pre-Bid Site Visit Sign-in.pdf PDF
S06 Amendment 0001 Solicitation 36C25226B0028.docx DOCX document
57826016_Addendumnumber2_08202026.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2_.pdf PDF
1.7 Infection Control Barrier Sample.pdf PDF
4. VHA ICRA-1.3 -Dec 9 2024- 578-26-016.pdf PDF
8. 578-26-016 Building 217 Abatement Drawings.pdf PDF
1.9 Above Ceiling Permits.pdf PDF
3. Interim Life Safety Measures -ILSM 578-26-016.pdf PDF
2. VHA PCRA-1.1 -May 21 2024- 578-26-016.pdf PDF
11. Building 217 _ Exterior Rooms.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2.pdf PDF
36C25226B0028.docx DOCX document
P07 WAGE DETERMINATION IL20260009 05-18-2026.pdf PDF
1.5 Safety and Health During Construction Activities.pdf PDF
1.6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
1.12 Cutting Welding and Other Hot Work.pdf PDF
1.10 Fire Protection Code Reviews.pdf PDF
7c. 578-20-002 Basis of Design -BOD Part 3.pdf PDF
1.3 Parking Designations 08042025.pdf PDF
10. Building 217 Colored Space Drawings.pdf PDF
5a. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 1.pdf PDF
1.1 Hines Underground Utility Plan.pdf PDF
9. 578-26-016 Building 217 Abatement Specifications.pdf PDF
P09 578-26-016 Donation Renovations Phase 2 Construction SOW 7-27-26.docx DOCX document
5b. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 2.pdf PDF
1.2 HINES VA SITE PLAN 5-1-2025.pdf PDF
1.15 Hines COVID-19 Guidelines.pdf PDF
1.17 Emergency Contact List - Template.pdf PDF
1.11 No Smoking Policy 10-1-19.pdf PDF
1.4 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
13. Hines AC Shop HVAC Controls Requirements.docx DOCX document
7d. 578-20-002 Basis of Design -BOD Part 4.pdf PDF
7a. 578-20-002 Basis of Design -BOD Part 1.pdf PDF
1.14 OIT Horizontal Cable Requirements.pdf PDF
1.13 Asbestos Survey Glossary.pdf PDF
1.16 VHA Supplemental COVID-19 Requirements.pdf PDF
1.8 Dig Permit SOP Form.pdf PDF
6. 578-26-016 CLIN1 Specifications Book R1.pdf PDF
12. Hines VA Lock Hardware Standards.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 TONS & HIGHERTXV EQUALIZING LINE

VALVED BYPASS FOR FILTER DRYER 40 TONS & HIGHER

STRAINER 40 TONS & HIGHER

SIGHT GLASS/MOISTURE INDICATOR 25 TONS & HIGHER

SOLENOID VALVE 20 TONS & HIGHER

FILTER DRYER 5 TONS & HIGHER

THERMAL EXPANSION VALVE 5 TONS & HIGHER

CAPILLARY TUBE SYSTEM 4 TONS & LOWER

DEVICE APPLICATION

REFRIGERANT DEVICE APPLICATION SCHEDULE

2D

NTS

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

FT.

FT.

1" M

AX

1THRU 3/4

5 FT

1 1/21 1/4 2

2 1/2

TYPICAL WATER PIPING

NTS

NTS

D

SIDE VIEW TRAPEZE HANGER FOR UP

TO 1000 LB. UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

BUILT IN BIRD

SCREEN 1/2" MESH

CENTRIFUGAL ROOF

EXHAUSTER

ROOFING & FLASHING OF

CURB BY GENERAL CONTR.

BUILT-IN DISCONNECT

FURNISHED AND INSTALLED

TO SUIT ROOF PITCH

PRE-FAB ROOF CURB SLOPED

POWER WIRING

SEE DRAWINGS FOR SIZE.

EXHAUST DUCT UP THRU ROOF

SWITCH

CONDUIT

BY VENTILATION CONTR. GRAVITY

BACKDRAFT DAMPER

(SEE SCHEDULE)

N.C. MOTOR OPERATED

DAMPER (SEE FLOOR PLAN)

M

CU

DFSS

BAND

1-5/8" 12 GAUGE

CHANNEL OR 2"x2"x1/4"

ANGLE

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH

CHANNEL

WELD

SADDLEINSULATION SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE STRENGTH

INSULATION (9 PSF MIN.

DENSITY) UNDER INSULATION

SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

PIPE HANGER DETAIL

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

PROVIDE INSULATION

SHIELD & INSERT FOR

ALL PIPING (8" MIN.)

PIPE HANGER

STEEL BEAM

HANGER ROD

CONCRETE INSERT

CONCRETE SLAB

INSERT NUT

HANGER ROD

LOCKING NUT

HANGER ROD

LAG SCREWS

SUPPORT NUT

WOOD JOIST OR BEAM

WELDS WEB MEMBERS O.W.S.J.

HANGER NUT

STEEL JOIST

PIPE HANGERS AND SUPPORTS

SUPPORT HORIZONTAL STEEL AND COPPER PIPING AS FOLLOWS:

NOMINAL PIPE SIZE

1/2"

3/4 TO 1-1/2"

2" TO 2-1/2"

3" AND 4"

6" TO 12"

14" TO 18"

DISTANCE BETWEEN SUPPORTS HANGER ROD DIAMETERS

3/8"

1/2"

1/2"

5/8"

7/8"

1"

6'

6'

10'

12'

14'

20'

HEAVY-DUTY

BEAM CLAMP

STRUCTURAL STEEL

BEAM

ADJUSTABLE

STEEL U-SUPPORT

WOOD JOIST OR

BEAM

HEAVY-DUTY CONCRETE STEEL

INSERT W/ELONGATED SLOT.

BENT STRAP 1 1/2" x 3/16" OVER VERTICAL

LEGS OF ANGLES.

ONE ANGLE EACH SIDE OF WEB MEMBERS. REST ON TOP OF

BOTTOM CHORD OF O.W.S.J. BETWEEN PANEL POINTS. SIZE

FOR LOAD.

HANGER ROD

BOTTOM CHORD OF

O.W.S.J.

PLACE HANGER WITHIN 1 FOOT OF EACH HORIZ. ELBOW. SUPPORT HORIZ. SOIL WASTE AND STORM PIPE NEAR EACH HUB, WITH 5 FEET MAXIMUM SPACING BETWEEN HANGERS. VERTICAL PIPING:

1. SUPPORT VERTICAL WATER PIPING AT EVERY FLOOR.

2. SUPPORT VERTICAL SOIL PIPE AT EACH FLOOR AT HUB.

WHERE SEVERAL PIPES CAN BE INSTALLED IN PARALLEL AND AT SAME ELEVATION PROVIDE MULTIPLE OR TRAPEZE HANGERS. WHERE PRACTICAL, SUPPORT RISER PIPING INDEPENDENTLY OF CONNECTED HORIZ. PIPING.

NTS

NTS

TYPICAL MANUAL AIR VENT

TYPICAL CHILLED AND HOT WATER

PIPING DRAIN VALVE CONNECTIONS

ELEVATION THREADED PIPING ELEVATION WELDED PIPING

REDUCER, IF REQUIRED

3/4" BALL VALVE

ADAPTER TO 3/4" HOSE

THREAD-PROVIDE HOSE CAP NUT

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

AIR VENT

1/2"

BALL VALVE

1/4"

COPPER TUBING

1/2" x 4"

NIPPLE

CIRCULATING WATER PIPING

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC

SYSTEMS)

MV

OR

AV

NTS

DUCTWORK FLEXIBLE CONNECTION DETAIL

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION

ON FAN SIDE

1-1/2" MIN. TO 3"

MAX. INSTALLED. 6"

NOMINAL WITH MATERIAL TAUT

1"x1/8" DRAW BAND

DUCT

SHEET METAL SCREWS ON

12" CENTERS

RIVET ON 4"

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

DUCT

1/2" 1/2" 1 1/2"

WASHER

WASHER

NON CANVAS TYPE

FLEXIBLE MATERIAL

NTS

END OF STEAM LINE DRIP TRAP

CONDENSATE

STEAM PIPE

1 1/2" MIN. TO 3" MAX.

INSTALLED. 6"

NOMINAL WITH

MATERIAL TAUT

FLANGED

CONNECTION

ON FAN

SIDE

ALTERNATE

POSITION OF

BOLT

1" FLANGE & HEM

BOLT ON 4" CENTERS

1"x1/8" BAND IRON

NON CANVAS

TYPE FLEXIBLE

MATERIAL

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1 1/2" POCKET SLIP

5/16" FLANGE

BOLT ON 4" CENTERS

1"x1/8" BAND IRON

CONCRETE EQUIPMENT BASES

NTS

SECTION A-A (BASE NOT POURED WITH SLAB)

SECTION A-A (BASE POURED WITH FLOOR SLAB)

PLAN SECTION B-B

FLOOR

L

W

A

A

D

16"

L /1

L

/1

5D

5D

5" M

IN

5" M

IN

PROVIDE #3 BARS 12" O.C.

EACH WAY IN THE BASE &

DOWEL BASE TO FLOOR

NOTE:

L & W DIMENSIONS

SHALL BE 6" GREATER

THAN THE EQUIPMENT

BASE PLATE.

WELD HEAD TO PLATE

OR BEND OVER END 5D

PIPE SLEEVE

(5D, 3" MIN.)

ANCHOR

BOLT (TYP)

CONCRETE BASE

TYPICAL ANCHOR

BOLT NUT & WASHER

EQUIPMENT BASE PLATE

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

TYPICAL ANCHOR

BOLT NUT & WASHER

EQUIPMENT BASE PLATE

B B

TO DRAIN

MV

MANUAL

AIR VENT

TO BUILDING

LOAD

INVERTED BUCKET

TRAP ASSEMBLY

WELDED

TEE

12"

6"

SCHEDULE 80 STEEL PIPE

1" GATE VALVE

9 7 56

CENTRIFUGAL ROOF EXHAUSTER DETAIL

NTS

EQUALIZING LINE

CONTROL WIRING IN CONDUIT

STRAINER

PITCH IN DIRECTION

OF FLOW.

NOTES:

REFRIGERANT PIPING AS SHOWN IS TO ILLUSTRATE GENERAL REQUIREMENTS.

PIPING SHALL BE SIZED, PITCHED, AND ARRANGED PER CONDENSING UNIT

MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS.

1.

POWER WIRING IN CONDUIT

FLOOR DRAIN

PIPE TO INDIRECT

NOTE:

REFRIGERANT SPECIALTIES, TXVs, SIGHT GLASSES, EQUALIZING LINES, ETC. ARE SHOWN FOR INTENDED OPERATION OF TYPICAL DX SYSTEMS

REQUIREMENTS. LOCATIONS AND DEVICES MAY NOT BE APPLICABLE FOR

SMALL TONNAGE SPLIT SYSTEMS AND MANY MAY BE INTERNAL TO THE

SCHEDULED COMPONENTS. PROVIDE FULLY OPERATIONAL SYSTEMS WITH

REFIGERANT SPECIALTIES AND DEVICES REQUIRED. PROVIDE ADDITIONAL

SERVICE VALVES FOR SUCTION AND LIQUID LINES AT EVAPORATOR AND

ACCU SECTIONS.

OUTDOOR

CONDENSING

UNIT

VIBRATION ISOLATORS

ROOF MOUNTED

EQUIPMENT RAIL

SERVICE VALVES (TYPICAL)

ROOF

PIPING CURB

OIL TRAP (INSTALL PER

MANUFACTURER'S RECOMMENDATIONS)

LIQUID LINE

SUCTION LINE

OIL TRAP (INSTALL PER

MANUFACTURER'S RECOMMENDATIONS)

CHARGING VALVE

FILTER/DRYER

SIGHT GLASS/MOISTURE INDICATOR

SOLENOID VALVE

THERMAL EXPANSION VALVE

FACTORY CONDENSATE PUMP

WITH BUILT-IN AIR GAP

INDOOR

"DX" COOLING COIL

SERVICE VALVES (TYPICAL)7'-0" AFF WHERE

CONDITIONS

ALLOW (TYPICAL)

INSULATED

DRIP PAN

SENSING BULB

RUNNING TRAP W/CLEANOUTS

DFSS UNIT REFRIGERANT PIPING DETAIL (ROOF)

STEAM SAFETY VALVE

PROVIDE UNION UNLESS SAFETY

VALVE HAS FLANGED OUTLET

SAFETY VALVE

OPEN DRAIN (NOTE 3)

CONNECTION TO

PRESSURE VESSEL OR PIPE

VENT PIPE THROUGH ROOF SUPPORT AS

INDICATED ON DWGS. (NOTES 1, 2)

PIPE THREADED INTO ELBOW (SAME SIZE AS

ELBOW)

DRIP PAN ELBOW (SECTIONAL VIEW)

3/4" DRAIN TO FLOOR DRAIN OR OPEN SIGHT

DRAIN (NOTE 4)

1" M

IN

24" MAX

3"

ELEVATION

NOTES:

1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI B31.1.

POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A TOTAL OR 180 DEGREES IN

DIRECTIONAL CHANGES MADE WITH 45 DEG. ELBOWS.

2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF OR GRADE.

3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHERE

PERSONNEL MAY OCCUPY.

4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.

5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

FLEXIBLE CONNECTOR

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL DETAILS RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M503

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

ISSUE FOR CONSTRUCTION 11/25/2025

100% CONSTRUCTION DOCUMENTS 06/10/2026

T

AIRFLOW

STEAM

HUMIDIFER

NOTES:

1. TRANSITION WELDED STAINLESS STEEL 4' UPSTREAM OF HUMIDIFIER AND 8' DOWNSTREAM OF HUMIDIFIER.

2. DETAIL ONLY APPLICABLE TO AHU'S WITHOUT AFTER FILTER DOWNSTREAM OF THE SUPPLY AIR FAN.

3. INTEGRAL STAINLESS STEEL DRAIN PAN SLOPE FROM ALL DIRECTIONS TO DRAIN CONNECTION. SLOPE .125" PER 1'-0".

4. PROVIDE MIN. 18" WIDE ACCESS DOOR, DIRECTLY UPSTREAM AND DOWNSTREAM OF HUMIDIFIER.

AIR HANDLING UNIT

NOTE 1

4'-0" 8'-0"

LPS

ACCESS DOOR

NOTE 4 ACCESS DOOR

NOTE 4

ROUTE TO

FLOOR SINK

NOTE 3

LPR

42" MAX

NTS

DUCT MOUNTED HUMIDIFIER

HWS

HWR

HWS

HWR

HWS

HWR

HWS

HWR

D

FLOW

" M

IN

6" M

IN

4 D2 MIN.

20 D2 MIN.10 D1 MIN.

DU

CT

H

EI

G

HT

H1/

H 1/

H

SE

E

NO

TE

SEE NOTE 3

SEE NOTE 2

SEE NOTE 1

N.O. VAV BOX

BY CONTRACTOR

24V. N.O. MODULATING CONTROL VALVE FURNISHED

WIRED BY CONTRACTOR OF RESPONSIBLE TRADE (TYPICAL)

24V. POWER WIRING

VELOCITY SENSOR BY VAV BOX MANUFACTURER

VAV BOX INTEGRAL HOT WATER HEATING

COIL BY VAV MANUFACTURER

VAV BOX

CONTROLLER

BOX LOCATION NOTE: VAV BOXES SHALL BE

LOCATED NO HIGHER THAN 12" ABOVE

CEILING.

MAX. 3FT. OF 1" THICK

FACTORY INSULATED MED.

PRESS. FLEXIBLE DUCTWORK

W/ VAPOR BARRIER JACKET

3/4" DRAIN VALVE WITH HOSE THREAD

OUTLET

CEILING BY PRIME

CONTRACTOR

SUPPLY DIFFUSER (SEE

INSTALLATION DETAIL)

1" EXTERNALLY INSULATED

MEDIUM PRESS. SUPPLY

DUCTWORK MAIN

RIGID DUCT CONNECTION TO

BOX INLET. MIN 1.5 TIMES BOX

INLET DIAMETER BUT NOT LESS

THAN 12"

SPIRAL RIGID ROUND

DUCTWORK (WHERE

SHOWN ON FLOOR

PLANS)

SAME SIZE AS BOX INLET

DIA. SEE VAV BOX

SCHEDULE

CONICAL "SPIN-IN"

FITTING

BALL VALVE AT TAKE-OFF FROM MAIN

WHERE SHOWN ON PLANS

INTEGRAL HOT WATER REHEAT COIL

(WHERE SHOWN ON FLOOR PLANS)

LOW PRESS. RECTANGULAR SUPPLY AIR

DUCT WITH 1-1/2" THICK FLEXIBLE

FIBERGLASS WITH VAPOR BARRIER JACKET

DOWNSTREAM FROM DISCHARGE OF ALL

VAV BOXES

SPIN-IN COLLAR WITH

DAMPER

MANUAL AIR VENT(TYP.)

CIRCUIT BALANCING VALVE

UNION

REDUCER/INCREASER (TYP.)

NOTE:

PROVIDE STAINLESS STEEL BRAIDED LINES FOR CONNECTIONS TO

TERMINAL UNIT REHEAT COILS.

3-WAY MODULATING CONTROL VALVE

VAV BOX

CONTROLLER

BOX LOCATION NOTE: VAV BOXES SHALL BE

LOCATED NO HIGHER THAN 12" ABOVE

CEILING.

MAX. 3FT. OF 1" THICK

FACTORY INSULATED MED.

PRESS. FLEXIBLE DUCTWORK

W/ VAPOR BARRIER JACKET

3/4" DRAIN VALVE WITH HOSE THREAD

OUTLET

CEILING BY PRIME

CONTRACTOR

SUPPLY DIFFUSER (SEE

INSTALLATION DETAIL)

1" EXTERNALLY INSULATED

MEDIUM PRESS. SUPPLY

DUCTWORK MAIN

RIGID DUCT CONNECTION TO

BOX INLET. MIN 1.5 TIMES BOX

INLET DIAMETER BUT NOT LESS

THAN 12"

SPIRAL RIGID ROUND

DUCTWORK (WHERE

SHOWN ON FLOOR

PLANS)

SAME SIZE AS BOX INLET

DIA. SEE VAV BOX

SCHEDULE

CONICAL "SPIN-IN"

FITTING

BALL VALVE AT TAKE-OFF FROM MAIN

WHERE SHOWN ON PLANS

INTEGRAL HOT WATER REHEAT COIL

(WHERE SHOWN ON FLOOR PLANS)

LOW PRESS. RECTANGULAR SUPPLY AIR

DUCT WITH 1-1/2" THICK FLEXIBLE

FIBERGLASS WITH VAPOR BARRIER JACKET

DOWNSTREAM FROM DISCHARGE OF ALL

VAV BOXES

SPIN-IN COLLAR WITH

DAMPER

MANUAL AIR VENT(TYP.)

CIRCUIT BALANCING VALVE

UNION

REDUCER/INCREASER (TYP.)

NOTE:

PROVIDE STAINLESS STEEL BRAIDED LINES FOR CONNECTIONS TO

TERMINAL UNIT REHEAT COILS.

TI

STEAM PRESSURE REDUCING STATION VALVE SINGLE STAGE

1.

2.

2-WAY MODULATING CONTROL VALVE

F&T TRAP

NOTE: SEE MANUFACTURER'S PIPING RECOMMENDATIONS FOR FINAL LAYOUT

NTS

STEAM CONDENSATE

RETURN

TEMPERATURE SWITCH

SCALE POCKET

HUMIDIFIER

CONTROL VALVE

TO HUMIDISTAT

MANIFOLD PIPE ADAPTERS

STEAM SUPPLY

ON-OFF CONTROL VALVE AHU/DUCT CROSS

SECTION

6" M

IN

STEAM HUMIDIFIER - PIPING CONNECTIONS

NTS

NOTE:

1.

2.

3.

4.

5.

DUCT CONNECTIONS - AIR TERMINAL UNITS

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3 TIMES THE DIAMETER OF INLET

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM

LENGTH 3'-0".

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET . FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO

MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.08"/100'.

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 3'-0". USE RIGID

ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

AIR TERMINAL UNIT (CV

OR VAV)

REHEAT COIL

FLEXIBLE AIR DUCT

CONNECTOR. SEE DETAIL

DIFFUSER (TYP.)

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

SEE NOTE 5

V

NOTES:

ALL WORK SHOWN ABOVE SHALL BE BY THE TC CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.

VAV BOX SHALL BE COMPLETE WITH BOX MANUFACTURER'S STANDARD AIRFLOW VELOCITY PRESSURE SENSOR.

1.

2.

VAV BOX CONTROL SCHEMATIC

NO SCALE

MULTI-POINT CENTER AVERAGING PNEUMATIC INLET

SECONDARY NETWORK CONTROL WIRING

ROOM THERMOSTAT

120V. POWER WIRING FROM AVAILABLE

24V. PLENUM RATED POWER WIRING

120/24 VAC CLASS II TRANSFORMER

CIRCUIT IN NEAREST POWER PANEL

TO OTHER VAV BOXES

AND CONTROL VALVES

DISCONNECT SWITCH, TERMINAL STRIP, AND NEMA

CONTROL PANEL BY VAV BOX MANUFACTURER

DDC VAV BOX CONTROLLER FURNISHED BY

TC CONTRACTOR TO HEATING CONTRACTOR FOR MOUNTING AT

THE FACTORY TO THE SIDE OF THE VAV BOX

24V. DAMPER ACTUATOR FURNISHED BY TC CONTRACTOR

TO HEATING CONTRACTOR FOR MOUNTING AT THE FACTORY INSIDE

THE VAV BOX CONTROL PANEL

DISCHARGE AIR TEMPERATURE SENSOR

NTS

VAV

NTS

TERMINAL UNIT PIPING DETAIL (3-WAY VALVE) (VAV-400)

SUPPORTED FROM STRUCTURE WITH

STRAPS PER SMACNA STANDARDS

(TYP.)

PROVIDE MINIMUM STRAIGHT LENGTH OF

RIGID DUCT AS RECOMMENDED BY MFG.

FOR PROPER AIR FLOW MEASUREMENT.

NOTES:

1. VERIFY RIGHT OR LEFT HAND CLEARANCE REQUIREMENTS WITH PLANS.

VAV

UNIT

VAV CONTROL PANEL

(MAINTAIN MIN. 36"

CLEARANCE

REQUIREMENTS)

FLEXIBLE SUPPLY DUCT

(ONLY WHERE CONCEALED

BY ACCESSIBLE CEILINGS)

VAV BOX INSTALLATION

NTS

SUPPLY, RETURN, OR

EXHAUST

REHEAT COIL SUPPLY VAV

BOXES ONLY

NTS

TERMINAL UNIT PIPING DETAIL (2-WAY VALVE)

FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

NTS

NOTE:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG

FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET

BELOW TRAP

INLET.

TO RETURN MAIN

PIPE SIZE SHALL BE SAME SIZE AS TRAP

FLOAT AND THERMOSTATIC TRAP.

SEE PLANS, AND SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL

WITH TRAP OR IN VERTICAL PLANE & BELOW TRAP

PROVIDE BYPASS PIPING FOR ALL TRAPS 1" AND

LARGER.

DRIP LEG OR EQUIPMENT CONNECTION.

MAKE THE SAME SIZE AS THE SUPPLY

MAIN OR EQUIPMENT CONNECTION. SEE

NOTE 1

SCHEDULE 80 STEEL PIPE

SEE DRAWINGS FOR PIPE SIZES

1" GATE

VALVE

CHILLED WATER COILS - PIPING CONNECTIONS

NTS

SINGLE COIL

WATER COIL

AIR VENT

WHEN COIL

IS NOT

SELF-VENTING

DRAIN WHEN

COIL IS NOT

SELF-DRAINING

TEST PLUG

(TYP.)

PIPE HANGER SHALL

SUPPORT

PIPING INDEPENDENT

OF COIL

REDUCER, IF REQUIRED

DRAIN

NOTES:

1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2

2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR

USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS,

VALES, OR EQUIPMENT.

MV

MV

MV

TEMPERATURE

INDICATION TO

ECC SEE CONTROL DIAGRAM

CALIBRATED

BALANCING VALVE

(TYP.)

HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" FOR 4"∅ PIPE &

SMALLER. TYPE "H-P" FOR 5" PIPE & LARGER.

3. ALL VALVES TO BE INSTALLED IN MECHANICAL ROOM IN AN ACCESSIBLE LOCATION FOR MAINTANCE.

NTS

NOTE:

1.

2.

3.

4.

VENT TO ATMOSPHERE

SEE FLOOR PLANS FOR PIPE SIZES.

SEE EQUIPMENT SCHEDULES FOR VALVE DATA AND PIPE SIZES D1 AND D2.

INSTALL VALVES AS RECOMMENDED BY

MANUFACTURER.

MAKE BYPASS VALVE DISCHARGE PIPE THE SAME SIZE AS D2 FOR THE LARGEST

PRV.

PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH SCREWED

CONNECTIONS.

SIPHON (TYP.)

PILOT CONTROL LINE

REDUCER (TYP.) IF REQUIRED.

NOTE 1

D1

N.C.

D2

NOTE 1

NOTE 3

INVERTER

BUCKET TRAP

ASSEMBLY

TYP.

PSV

1/4" COPPER TUBE (TYP.)

DISCHARGE

TEMPERATURE SENSOR

PROVIDE PIPE HANGER

EACH SIDE OF PUMP

TRIPLE DUTY VALVE

PIPE INCREASER OR

BALL OR BUTTERFLY VALVE

STRAINER

IN-LINE CIRCULATING PUMP

WATER FLOW SWITCH HYDRONIC INDICATOR

W/TRUMPET VALVES

BLOW-DOWN PIPE & GATE VALVE WITH

SUCTION

PIPING CONTRACTOR SHALL FURNISH

AND INSTALL ALL PIPE WELLS

NOTES:

PIPING CONTRACTOR SHALL FURNISH/INSTALL WELL FOR TEMPERATURE SENSOR AND TAP FOR

BY T.C. CONTRACTOR

(WHEN REQUIRED)

BY T.C. CONTRACTOR

THREADED HOSE CONNECTION

REDUCER (TYPICAL)

REQUIRED BY T.C. CONTRACTOR.

SWITCH AS SHOWN FOR FUTURE USE EVEN IF SENSOR OR FLOW SWITCH ARE NOT PROVIDED

UNDER THIS PROJECT.

FOR PUMPS 1/2 HP OR SMALLER, CONTRACTOR MAY PROVIDE INDIVIDUAL PRESSURE/TEMPERATURE

PLUGS IN LIEU OF HYDRONIC INDICATOR AND TUBING SHOWN.

NTS

IN-LINE PUMP DETAIL

ISOLATION VALVE

VAV BOX CONTROL SCHEMATIC DIAGRAM

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL DETAILS RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M504

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

~ AIR HANDLING UNIT

NTS1

POSITION # MODULE

RETURN FAN SECTION

FILTER SECTION

SERIES HEAT PIPE COIL

AIR MIXING SECTION

STEAM PREHEAT COIL SECTION

COOLING COIL SECTION7

STEAM REHEAT COIL SECTION

SERIES HEAT PIPE COIL

AIR COOLED CHILLER - PIPING CONNECTIONS

NTS

THERMOMETER

FLOW SWITCH

FLEXIBLE

CONNECTORS

IF REQUIRED

TEST PLUGS

CHS

EVAPORATOR

CHR

DDC

TEMPERATURE

SENSOR TO ECC

PRESSURE

GAUGE

UNDER CANOPY

FS

TT TT

DESIGNER NOTE:

1.

2.

3.

PROVIDE HEAT TRACING WHEN THE EXPOSED PIPING CARRYING CHILLED

WATER IS NOT MIXED WITH PROPYLENE CLYCOL. ALL VALVES, STRAINER,

FLOW SWITCH, FLEXIBLE CONNECTORS, ETC., SHALL BE WRAPPED WITH

ELECTRIC HEAT TRACE CABLE UNDER

INSULATION.

VERIFY NEED FOR FLEXIBLE CONNECTOR.

PROVIDE ALUMINUM JACKETING ON ALL EXPOSED, INSULATED PIPING.

1. PROVIDE QUANTITY OF DUCT SUPPORTS AS REQUIRED SUCH

THAT INSTALLED WEIGHT DOES NOT EXCEED 300 LBS. PER DUCT

SUPPORT OR 150 LBS. ON EACH

BASE.

2. SPACING NOT TO EXCEED 6'-0" CENTERS.

3. CROSSBRACE TWO PIPESTANDS EVERY FOURTH (4TH) PIPESTAND

FOR ELEVATIONS 24" AND

HIGHER.

4. IT IS NOT ACCEPTABLE FOR DUCT SUPPORT TO PENETRATE

VENTURE CLAD

JACKET.

3.0 PCF RIGID BOARD

INSULATION

SHEET METAL DUCTWORK

VENTURE CLAD 1577CW WHITE 5-PLY

LAMINATED FOIL/FILM JACKET

INSTALLED STRICTLY PER

MANUFACTURER'S INSTRUCTIONS.

CROWN TOP OF DUCT

FOR WATER DISPERSION

MIN 2'-0"

ROOF

ROOF GUARD PAD

1/2" THICK RUBBER ROOF GUARD PAD BY MIRO OR

HUMANE EQUIPMENT CO. (OR VA APPROVED

EQUAL) MINIMUM SIZE SHALL BE 4" LARGER THAN

DUCT SUPPORT BASE ASSEMBLY IN ALL

DIRECTIONS.

HOT-DIP GALVANIZED STEEL

BASE ASSEMBLY

ATTACH BASE ASSEMBLY

TO ROOF PAD USING 1/4"

DEEP LAYER OF MASTIC

BRACED STRUT

ASSEMBLY WITH

FIELD ADJUSTABLE

HEIGHT

12" WIDE SHEET ALUMINUM

BENEATH VENTURE CLAD

1577CW JACKET (OR VA

APPROVED EQUAL) AT ALL DUCT

SUPPORTS

MIRO 8-DS-HDG DUCT SUPPORT.

(OR VA APPROVED EQUAL)

NOTES:

NTS

EXTERIOR DUCT SUPPORT DETAIL

NTS

HOUSING FILTER

HOUSING FILTER

ACCESS DOOR

ENERGY RECOVERY COIL IN AIR HANDLING UNIT

ENERGY RECOVERY COIL - PASSIVE HEAT PIPE (REFRIGERANT)

CONTROLVALVE

(TYP. OF 3)

1. MAXIMUM 120 FT. PIPE LENGTH.

2. ELEVATE SUPPLY COIL (AHU) HEIGHT TO BE AT LEAST +25% OF EXHAUST COIL (DUCT

MOUNTED) HEIGHT. COORDINATE ROOF CURBS, RAILS AND AHU COIL STAND TO ACHIEVE

THE NECESSARY HEIGHT

REQUIREMENT.

NOTES:

ACCESS SECTION

CONTROL SECTION

SUPPLY FAN SECTION

ACCESS SECTION13

ACCESS SECTION

12345678

34567891011

RASA

SA

RA

RA

OA

ACCESS DOOR

(TYPICAL FOR 2)

STATIC PRESSURE TAPS

(TYPICAL FOR 2)

TOP VIEW

END VIEW

LIFTING LUGS

(TYPICAL FOR 2)

ACCESS DOOR

HINGES (TYPICAL 2

PER DOOR)

EASY GRIP KNOBS

(TYP. 2 PER DOOR)

SIDE VIEW

1. UNIT SHALL BE CONSTRUCTED OF 16 GA. GALVANIZED STEEL.

2. UNIT SHALL BE POP RIVITED, BOLTED, AND SEALED AIRTIGHT

WITH RTV

CAULKING.

3. RECOMMENDED STATIC PRESSURE FOR STANDARD HOUSING

IS -4" TO +3"

W.G.

4. ACCESS DOORS WITH NEOPRENE GASKET SHALL BE

PROVIDED ON BOTH SIDES OF

UNIT.

5. A MINIMUM OF 27 INCH CLEARANCE IS REQUIRED FOR FILTER

CHANGED

OUT.

6. ENTINER UNIT SHALL BE DOUBLE WALL INSULATED.

7. UNIT SHALL BE EQUIPPED WITH LIFTING LUGS.

4 NTS

OUTSIDE AIR ENERGY RECOVERY COIL FILTER HOUSING DETAIL

MERV 8 FILTERS

PROVIDE BASE TO ENSURE PROPER HEIGHT REQUIREMENTS

RETURN DUCTWORK

ENERGY RECOVERY COIL IN DUCTWORK

RETURN DUCTWORK

F-1

FABRICATE A FULL ENCLOUSRE TO SUPPOR THE

COIL AND A STAINLESS STEEL DRAIN PAN

ROUTE

CONDENSATE DRAIN

TO NEARBY ROOF

DRAIN

DRAIN PAN

RL

RS

DIRECTION OF RETURN AIR

RL

RS

RL

RS

ISOLATION VALVE (TYP.)

MANUAL AIR VENT (TYP.)

CALIBRATED BALANCE VALVE

STRUCTURAL STEEL

PRESSURE GAUGE (TYP.)

THEMOMETER (TYP.)

SPRING ISOLATORS

HOUSED/RESTRAINED

FLEXIBLE CONNECTION (TYP.)

AIR COOLED CHILLER

(TYPICAL)

NTS

AIR COOLED CHILLER DETAIL

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL DETAILS RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M505

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

CW

PS

BUFFER

TANK

AV

PRESSURE

REDUCING VALVEN.C.

SET PRESSURE RELIEF AT 75 (FIELD

ADJ.) PSI

EXPANSION TANK

PUMP

PUMP (STANDBY)

3" GCR

PACKAGED GLYCOL AIR-COOLED

CHILLER

ON/OFF CONTROL VALVE (TYP.)

1" MU

3" GCR

AHU-1

GLYCOL FILL SYSTEM

ROUTE 3/4" PIPE TO

NEARBY FLOOR DRAIN

NTS

GLYCOL CHILLED WATER FLOW DIAGRAM FOR ACCU-1/AHU-1

ACCU-1

1" MU

1" M U

1" G

CR

1" G

CS

3" GCS

REFER TO SIDE STREAM FILTER

AND BY-PASS CHEMICAL FEEDER

DETAIL.

FROM DOMESTIC

COLD WATER

FROM DOMESTIC

COLD WATER

SIDE STREAM FILTER WITH

INLET AND OUTLET GAUGESFLOW METER

THREAD OUTLET

WITH HOSE

DRAIN VALVE

3/4" 3/4"

3/4"

UNION (TYP.)

GASKETED

1/4" MANUAL

CHECK VALVE (TYP.)

CHEMICAL POT

FEEDER WALL MOUNTED

DRAIN VALVE

WITH HOSE

THREAD OUTLET

BALL VALVE (TYP.)

PUMP

FROM

SYSTEM

TO SYSTEM

NOTE:

INSTALL FEEDER ACROSS POINTS OF ADEQUATE PRESSURE

DIFFERENTIAL TO OBTAIN FLOW THRU FEEDER.

AIR VENT

FILL CAP

NEAR PUMP.

3/4"

3/4"

SIDE STREAM FILTER AND BY-PASS CHEMICAL FEEDER DETAIL

NTS 2

NTS

NOTES:

1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW WATER LEVEL AT

ECC. RELIEF VALVE DRAIN SHALL RETURN TO TANK AS SHOWN ON THIS

DETAIL.

2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE AT 15 PSIG

ABOVE HIGHEST SYSTEM PRV SETTING.

3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.

4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.

1"

INDIRECT GLYCOL MAKE-UP SYSTEM (PIPING AND CONTROLS)

3" THICK CONCRETE PAD

BACK PRESSURE REGULATING

VALVE SEE NOTE NO. 2

GLYCOL-WATER MAKE-UP

PUMP 5 GPM @ 30 PSIG

1"

55 GALLON GLYCOL-WATER

STORAGE TANK

WALL MOUNTED "ON-OFF"

MOTOR CONTROL-SEE

NOTE NO. 4

LOW WATER LEVEL

ALARM SEE NOTE NO. 1

PUMP SUCTION

BUFFER TANK

FLOOR

TO EXPANSION TANK

RESERVOIR TANK

INTEGRAL CONTROL PANEL

FACTORY LOW WATER LEVEL SENSOR

1 1/4" BY HVAC CONTRACTOR

EXPANSION TANK

SELF PRIMING PUMP

PRESSURE SWITCH

BALL VALVE (TYP.)

STRAINER

UNION (TYP.)

TRIPLE DUTY VALVE

PRESSURE GAUGE

DRAIN VALVE WITH HOSE CONNECTION

PRESSURE REDUCING VALVE

SEE FLOOR PLANS

1 1/4" BY PLUMBING CONTRACTOR

LOCAL BALL VALVE WITHIN 12" OF PIPE OUTLET

FOR MANUALLY FILLING TANK.

CODE AIR GAP HINGED COVER WITH 2"∅ HOLE FOR MAKE-UP

4" CONCRETE PAD

FLOOR

BY MANUFACTURER

BY HVAC CONTRACTOR

GLYCOL FILL SYSTEM DETAIL

NTS

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL DETAILS RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M506

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

NTS

SEISMIC BRACING FOR PIPES AND ROUND AND RECTANGULAR DUCTS

3/16" (0.47 CM)

2 (MAX)

1 (MIN)

1/4" (0.63 CM) MIN

TYP.

SEE PLANS FOR

DUCT SIZE

2 (MAX)

1 (MIN)

1" (2.5 CM)

2 (MAX)

1 (MIN)

2 (MAX)

1 (MIN)

1 5/8" (4.1 CM)

6" (15.25 CM)

2 (MAX)

1 (MIN)

1 2

TRANSVERSE BRACING FOR PIPES

NO SCALE

LONGITUDINAL BRACING FOR PIPES

NO SCALE

BRACING FOR RECTANGULAR DUCTS

NO SCALE

BRACING FOR ROUND DUCTS

NO SCALE

SEISMIC BRACING NOTES

10'-0" (3 M) MAX TO STRUCTURAL

SUPPORTING MEMBER

1/2" (1.25 CM)

MIN

1/2" (1.25 CM)

MAX

8'-0" (2.4 M) MAX TO STRUCTURAL

SUPPORTING MEMBER

SEE PLANS FOR

DUCT SIZE

GENERAL

1. NO BRACING IS REQUIRED IF THE TOP OF THE DUCT OR PIPE IS SUSPENDED 12 INCHES OR LESS FROM THE SUPPORTING

STRUCTURAL MEMBER.

2. WALLS, INCLUDING DRYWALL PARTITIONS, MAY REPLACE REQUIRED TRANSVERSE OR VERTICAL

BRACING FOR DUCTWORK OR PIPING.

3. ALL SEISMIC RESTRAINTS SHALL MEET OR EXCEED REQUIREMENTS OF SMACNA PUBLICATION

"SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS" 1991 EDITION.

DUCTWORK

4. BRACE ALL RECTANGULAR DUCTS OF 6 SQ. FT. CROSS SECTIONAL AREA AND LARGER.

BRACE ALL ROUND/OVAL DUCTS 28 INCHES IN DIAMETER AND LARGER.

5. TRANSVERSE AND VERTICAL BRACING SHALL OCCUR AT 30 FOOT INTERVALS, MAXIMUM. LONGITUDINAL BRACING SHALL OCCUR

AT 60 FOOT INTERVALS, MAXIMUM.

PIPING

6. BRACE ALL PIPES 2 1/2 INCHES IN DIAMETER AND LARGER. IN MECHANICAL ROOMS ALSO BRACE 1 1/4", 1 1/2" AND 2 INCH PIPING AS FOR 2 1/2" PIPING. BRACE ALL FUEL GAS AND COMPRESSED AIR PIPING 1" AND LARGER.

7. TRANSVERSE AND VERTICAL BRACING SHALL OCCUR AT 40 FOOT INTERVALS, MAXIMUM UNLESS NOTED OTHERWISE.

LONGITUDINAL BRACING SHALL OCCUR AT 80 FOOT INTERVALS, MAXIMUM. WHEN THERMAL EXPANSION OR CONTRACTION IS INVOLVED, PROVIDE LONGITUDINAL BRACING AT ANCHOR POINTS. THE LONGITUDINAL BRACES AND THE CONNECTIONS MUST

BE CAPABLE OF RESISTING THE FORCE INDUCED BY EXPANSION AND CONTRACTION.

8. AT PIPE RISERS, WHEREVER POSSIBLE, SUPPORT THE WEIGHT OF THE RISER AT A POINT OR POINTS ABOVE THE CENTER OF

GRAVITY OF THE RISER.

9. DO NOT FASTEN ONE RIGID PIPING SYSTEM TO DISSIMILAR PARTS OF THE BUILDING THAT MAY RESPOND IN A DIFFERENT MODE

DURING AN EARTHQUAKE; FOR EXAMPLE, A WALL AND A ROOF.

10. DO NOT USE BRANCH LINES TO BRACE MAIN LINES.

EQUIPMENT

11. FLOOR OR PAD MOUNTED EQUIPMENT, WITHOUT VIBRATION ISOLATORS, SHALL BE BOLTED TO THE OTHER SUPPORT.

12. FLOOR MOUNTED EQUIPMENT, WITH VIBRATION ISOLATORS, SHALL BE PROVIDED WITH LATERAL AND VERTICAL RESTRAINING

DEVICES ON ALL SIDES OF THE BASE TO RESTRICT DISPLACEMENT OF THE EQUIPMENT.

13. ON ALL SIDES OF SUSPENDED EQUIPMENT, PROVIDE BRACING FOR RIGID SUPPORTS AND PROVIDE RESTRAINTS FOR

RESILIENTLY SUPPORTED EQUIPMENT.

LONGITUDINAL BRACE AS

REQUIRED (ONE EACH SIDE)

12 GAUGE STRAP

WASHER

LONGITUDINAL BRACE

VERTICAL HANGER

TRANSVERSE BRACE

MACHINE BOLT

(TYP.)

L 3 x 3 x 1/4 0'-3"

12 GAUGE STRAP

VERTICAL HANGER

TRANSVERSE BRACE

TRANSVERSE BRACE

PIPE

PIPE HANGER

PIPE HANGER ROD

CLIP CONNECTION

ROD AND VERTICAL

HANGER

PIPE SLEEVE TO HAVE

INNER DIAMETER 1/4"

GREATER THAN DIAMETER

OF BOLT

PIPEPIPE HEAVY PIPE CLAMPHEAVY PIPE CLAMP

LONGITUDINAL BRACELONGITUDINAL

BRACE

LONGITUDINAL BRACE

(EACH ONE SIDE)

TRANSVERSE BRACE

VERTICAL HANGER

SELF-TAPPING SHEET METAL

SCREWS EQUALLY SPACED

VERTICAL HANGER

(WHERE REQUIRED)

WELDED BEAM ATTACHMENT

WASHER TO

CONCEAL WELD

HORIZONTAL

BRACE

REQUIRED (TYP.)

NTS

NOTE:

NOT REQUIRED FOR AIR

TERMINAL UNITS.

EQUIPMENT WEIGHT 250 LBS.

OR LESS

SEISMIC BRACING FOR LIGHT SUSPENDED

EQUIPMENT

FLOOR MOUNT EQUIPMENT RESTRAINED BY

RESILIENT PADS (TYPE DS)

FLOOR

EQUIPMENT

BASE ANCHOR BOLT

NEOPRENE WASHER &

SLEEVE

BONDED STEEL

PLATE

RESILIENT PAD

HANGER ROD

(TYP)

CROSS BRACING RODS ALL

FOUR SIDES

LOCK NUTS

(TYP)

CLAMP

SEISMIC BRACING FOR EQUIPMENT

NTS

TYPICAL SEISMIC PIPE BRACING (2 1/2" Ø AND LARGER PIPING)

REFER TO DETAILS SHEETS

DIAGONAL ANGLE

BOLT TO ANGLE

"EL CEN" HANGER ROD CLIP

ROD

LONGITUDINAL

DIAGONAL ANGLE

AS REQUIRED

(SHOWN DOTTED)

(SLOPE 1 TO 1)

ADD VERTICAL ANGLE WHEN "L"

IS GREATER THAN MAX.

LENGTH.

ADD PIPE SLEEVE THAT HAS AN

I.D. 4" +/- LARGER THAN O.D.

BOLT

WHEN THERMAL INSULATED

PIPING IS USED DO NOT

CONNECT PIPING OR HANGER

DIRECTLY TO PIPE

NON SPRINKLER PIPING

"L

6' -0

" M

AX

CONNECTION TO STRUCTURAL SUPPORTING MEMBER TO

BE SAME FOR VERTICAL DIAGONAL, AND LONGITUDINAL

EQUIPMENT

5/8"∅ ANCHOR BOLT

CONCRETE FLOOR

NEOPRENE PAD

STEEL SPRING VIBRATION

ISOLATOR FOR SEISMIC AREA

NEOPRENE PAD

NTS

VIBRATION ISOLATOR DETAIL

NOTE TO CONTRACTOR:

NTS

ALL DIRECTIONAL SEISMIC SNUBBER

STEEL BUSHING

ALL-DIRECTIONALL BRIDGE

BEARING QUALITY NEOPRENE

BUSHING

RESTRAINING ANGLE

SNUBBER BOLT AND WASHER

EQUIPMENT BASE ANCHOR BOLT

NTS

SEISMIC SWAY BRACE DETAIL (INSULATED NON SPRINKLER PIPIPNG)

TYPE 4 OR TYPE 8 PIPE CLAMP PIPE INSULATION UPPER HALF

OF PIPE

SEISMIC SWAY BRACING

HIGH DENSITY INSULATION

INSERT-LOWER HALF OF PIPE

TYPE 40 PROTECTION SHIELD HOT PIPE - ALL SIZES

COLD PIPE - ALL SIZES

NTS

ALL DIRECTIONAL SEISMIC SNUBBER

REPLACEABLE 0.75" THICK

ALL-DIRECTIONAL BRIDGE

BEARING QUALITY NEOPRENE

UPPER BRACKET TO EQUIPMENT

THRU-BOLT

LOCKNUT

AIRGAP

LOWER BRACKET TO

STRUCTURE

THESE DETAILS ARE DIAGRAMMATIC. ALL FINAL SEISMIC

RESTRAINTS SHALL BE IN ACCORDANCE WITH

SPECIFICATIONS SECTION 13 05 41 AND VA HANDBOOK

H-18-8. NON STRUCTURAL SEISMIC RESTRAINT SYSTEMS

SHALL BE DESIGNED BY A PROFESSIONAL STRUCTURAL

ENGINEER AS DELEGATED BY THE CONTRACTOR. ALL

SEISMIC RESTRAINTS SHALL MEET REQUIREMENTS OF RISK

CATEGORY IV SEISMIC DESIGN CATEGORY D.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL DETAILS RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M507

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

EF-08 GREENHECK G-140-VG ROOF-UNIT B

DEMENTIA

WING

CENTRIFUGAL

DOWN BLAST

DIRECT 63 2,400 0.75 15.1 1,558 0.77 1 1725 1 115 BAS 1,2,3,4,5,6

EF-09 GREENHECK G-160-VG ROOF-UNIT B

DEMENTIA

WING

CENTRIFUGAL

DOWN BLAST

DIRECT 63 1,750 0.63 10.3 963 0.33 1 1200 1 115 BAS 1,2,3,4,5,6

EF-11 GREENHECK G-120-VG ROOF-UNIT B

DEMENTIA

WING

CENTRIFUGAL

DOWN BLAST

DIRECT 49 1,250 0.62 11.2 1,358 0.24 1/2 1725 1 115 BAS 1,2,3,4,5,6

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUALS

2. PROVIDE THE FOLLOWING OPTIONS: MOTORIZED DAMPER, NEMA 3R DISCONNECT SWITCH, AND SPEED CONTROLLER

3. PROVIDE ALUMINUM BIRDSCREEN.

4. PROVIDE PRE-FABRICATED 18" TALL INSULATED ROOF CURB.

5. FAN SHALL COME IN STANDARD ENAMEL GREY COLOR.

6. MOTORIZED DAMPER POWER SHALL BE FROM FAN CIRCUIT VIA INTEGRAL TRANSFORMER.

EQUIPMENT TAG

BASIS OF DESIGN

LOCATION

AREA

SERVED

TYPE DRIVE WEIGHT

(LBS)

CFM SP

(IN.)

MAXIMUM

SONES

FAN

RPM

BHP

MOTOR CONTROL

TYPE

NOTES

MANUFACTURER MODEL HP RPM PHASE VOLT

EXHAUST FAN SCHEDULE

ACCU-1 ROOF AHU-1 TRANE CGAM 52 6,423 4 18 R454B 57 42 81.12 48.06 PROPYLENE GLYCOL 30% DUAL HIGH HEAD 12.8 113 150 3 460 1 to 14

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL 6. DUAL HIGH HEAD PUMPS, VFD, EXPANSION VESSELS, DRAINAGE VALVES, SHUT-OFF AT EW AND LW CONN; 140 GAL BUFFER TANK 11. FREEZE PROTECTION TO -20F AMBIENT; FACTORY HEAT TRACING

2. HOT GAS BYPASS. 7. SINGLE POINT POWER CONNECTION WITH 65KA HIGH FAULT CIRCUIT BREAKER 12. LEAD/LAG COMPONENT OPERATION AND PHASE REVERSAL PROTECTION

3. SPRING VIBRATION ISOLATORS. 8. INSTALL AIR COOLED CHILLER ON RAILS. 13. FACTORY PUMP PACKAGE

4.LOW AMBIENT CONTROL. 9. N+1 REDUNDANT PARALLEL PUMPS; LEAD LAG AND FAILURE RECOVERY FUNCTIONALITY 14. FACTORY INSTALLED REFRIGERANT ISOLATION VALVES

5. CRANKCASE HEATER. 10. BUFFER TANK WITH FACTORY INSULATION AND -20F FREEZE PROTECTION

EQUIPMENT

TAG

LOCATION

UNIT

SERVED

MANUFACTURER MODEL

HEAT

REJECTION

(TONS)

WEIGHT

(LBS)

COMPRESSORS WATERT SIDE ELECTRICAL DATA

NOTES

QUANTITY SIZE EACH

(TONS)

REF.

TYPE EWT (°F) LWT (°F) GPM COOLING

CAPACITY (TONS)

FLUID TYPE

FLUID

CONCENTRATION

PUMP TYPE PRESSURE DROP (FT) MCA MOCP PHASE VOLT

AIR COOLED CHILLER SCHEDULE

DFSS-108A TR-402 CARRIER 24,000 40MAHBQ24XA3

HIGH

WALL

15 45 11 720 75° 67° CLEANABLE CU-108A 38MARBQ24AA3 ROOF 2 R-410A 95 21.5 25 35 1 208 1,2,3

NOTES:

1. ACCEPTABLE MANUFACTURERS: VA APPROVED EQUALS

2. INDOOR UNIT SHALL BE INTERLOCKED TO OUTDOOR UNIT FOR POWER AND CONTROL WIRING.

3. WALL MOUNTED TEMPERATURE SENSOR.

EQUIPMENT

TAG

LOCATION

BASIS OF

DESIGN

COOLING

CAPACITY

(BTUH)

INDOOR UNIT OUTDOOR UNIT

NOTES

MODEL TYPE

DIMENSIONS

(IN.)

AIRFLOW FILTERS

EQUIPMENT

TAG

MODEL LOCATION

COMPRESSOR ELECTRICAL DATA

H W D

TOTAL

CFM

EAT. D.B.

(°F)

EAT. W.B.

(°F)

TYPE SIZE

(TONS)

REF.

TYPE

EAT

(°F)

SEER MCA MOCP PHASE VOLTS

DUCT FREE SPLIT SYSTEM SCHEDULE

ERC-1 ROOF

HEAT PIPE

TECHNOLOGY

HRM 7,000 R134A 47.25 54 22 13.89 3 / 2 6 / 12 474.0 47.25 54 22 13.89 3 / 2 6 / 12 474.0 504 32.4

91.5 / 76.4

87.3 / 75.3

0.86 70.0 / 58.43 74.2 / 60.0 0.83 19.3 0 7.1 504 214.4

0.2 / -1.2

28.5 / 20.5

0.76 70.0 / 52.9 41.9 / 39.7 0.81 40.6 0 31.8 1,2,3,4,5

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUALS

2. PROVIDE NEMA 4 RATED 120V CONTROL PANEL. INSTALL CONTROL VALVE ON LIQUID PIPING.

3. REFER TO MANUFACTURERS MAXIMUM DISTANCES BETWEEN COILS.

4. PROVIDE A FULL ENCLOSURE FOR THE EXHAUST COIL TO INCLUDE DRAIN PAN. FIELD FABRICATE AS REQUIRED, ROUTE DRAIN PIPING TO NEARBY ROOF DRAIN.

5. COORIDNATE SUPPLY SIDE RECOVERY COIL SECTION WITH AHU MANUFACTURER.

EQUIPMENT

TAG

LOCATION

BASIS OF DESIGN CFM

(WHEN

RUNNING

100% OA)

REFRIGERANT

TYPE

SUPPLY SIDE (AHU)

APPROX. OVERALL

DIMENSIONS (IN.)

EXHAUST SIDE (DUCT MOUNTED)

APPROX. OVERALL

DIMENSIONS (IN.)

ENERGY RECOVERY (WHEN RUNNING 100% OA)

NOTES

SUMMER CONDITIONS WINTER CONDITIONS

AIR

VELOCITY

(FPM)

HEAT

TRANSFERED

(MBH)

SUPPLY SIDE (AHU) EXHAUST SIDE (DUCT MOUNTED) EFFECTIVENESS

AIR

VELOCITY

(FPM)

HEAT

TRANSFERED

(MBH)

SUPPLY SIDE (AHU) EXHAUST SIDE (DUCT MOUNTED) EFFECTIVENESS

MANUFACTURER MODEL H W L

FACE

AREA

(FT2)

# CIRCUITS /

ROWS PER

CIRCUIT

# ROWS /

FINS PER

INCH

WEIGHT

(LBS)

H W L

FACE

AREA

(FT2)

# CIRCUITS /

ROWS PER

CIRCUIT

# ROWS /

FINS PER

INCH

WEIGHT

(LBS)

EAT

DB /

WB (°F)

LAT

DB /

WB (°F)

PD

(IN.

WG)

EAT

DB / WB (°F)

LAT

DB / WB (°F)

PD

(IN. WG)

SENSIBLE

LATENT

TOTAL

EAT

DB /

WB (°F)

LAT

DB /

WB (°F)

PD

(IN.

WG)

EAT

DB / WB

(°F)

LAT

DB / WB

(°F)

PD

(IN. WG)

SENSIBLE

LATENT

TOTAL

ENERGY RECOVERY COILS SCHEDULE

PRV-1 BUILDING 217 HOFFMAN AHU-1 25 15 1,650 1,2

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL

2. INSTALL CONTROL PRESSURE RANGE, AND PLATE.

EQUIPMENT

TAG

LOCATION MANUFACTURER SERVES

1ST STAGE

FLOW

(LBS / HR)

NOTESINLET PRESSURE

(PSI)

OUTLET PRESSURE

(PSI)

SINGLE STAGE STEAM PRESSURE REGULATOR VALVE SCHEDULE

AIR HANDLING UNIT SCHEDULE

STEAM RE-HEAT COIL RETURN FAN

PRE

FILTERS

TYPE

NOTES# OF

COILS

EAT

DB

(°F)

LAT

DB

(°F)

STEAM

PRESSURE

(PSI)

STEAM FLOW

(LBS/HR)

TOTAL

MBH

AIR

P.D.

(IN)

ROWS/

FPI

RETURN

CFM

TSP

(IN. WG)

ESP

(IN.)

TYPE FAN RPM

MOTOR

# OF

FANS

BHP HP FLA PH VOLT

2.0 80.0 107.8 15 219.9 208 0.07 1/6 7,000 1.8700 1.5 PLENUM 2,439 2.00 4.00 6.0 4.80 3 460

MERV 8 /

MERV 13

1-14

AIR HANDLING UNIT SCHEDULE

"EQUIPMENT

TAG"

BASIS OF DESIGN

LOCATION

DIMENSIONS

(IN.) WEIGHT

(LBS)

MIN.

O.A.

"100%

O.A."

SUPPLY FAN CHW COOLING COIL STEAM PRE-HEAT COIL

SUPPLY

CFM

TSP

(IN. WG)

ESP

(IN. WG)

TYPE

FAN

RPM

MOTOR

EAT

DB/WB (°F)

LAT

DB/WB

(°F)

EWT

(°F)

LWT

(°F)

AIR

P.D.

(IN)

AIR

VELOCITY

(FPM)

TOTAL

MBH

SENS.

MBH

ROWS/

FPI

# OF

COILS

FLUID

TYPE

FLUID

P.D.

(FT)

FLUID

VELOCITY

(FT/SEC)

GPM

EAT

DB

(°F)

LAT

DB

(°F)

STEAM

PRESSURE

(PSI)

STEAM FLOW

(LBS/HR)

TOTAL

MBH

AIR

P.D.

(IN)

ROWS/

FPIMANUFACTURER MODEL H W L

# OF

FANS

TOTAL

BHP

TOTAL

HP

FLA PH VOLT

AHU-1 TRANE CSAA017 ROOF 82 142 338 14,100 3,500 7,000 7,000 6.4 3.0 PLENUM 3,265 2 11 15 11 3 460 91.5/76.4 52/51.9 42 56 1.00 402 553 292 12 / 11 2.0

40% PROP.

GLYCOL

8.1 2.1 86.6 -10 80 15 718.6000 679.6000 0.45 2 / 14

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL SCHEDULES RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M601

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

A TITUS OMNI SQUARE PANEL FACE 24"x24" STEEL 30 1,2,3

B TITUS 45F EGG CRATE VARIES ALUMINUM 30 1,2,3,4

C TITUS OMNI-AA SQUARE PANEL FACE 12"x12" ALUMINUM 30 1,2,3

D TITUS TBDI-80

LINEAR INSULATED

BOOT

VARIES STEEL 30 1,2,3,5,6

E TITUS 350F

35 DEG. DEFLECTION

REGISTER

VARIES ALUMINUM 30 1,2,3

COORDINATE FRAME TYPE WITH CEILING/WALL TYPE AND

ARCHITECT.

(2) -1" WIDE SLOTS

6. INSULATED PLENUM

EQUIPMENT

TAG

MANUFACTURER MODEL TYPE

NOMINAL

FACE SIZE

MATERIAL

MAX.

N.C.

NOTES

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUALS.

2.

3. FINISH AS SELECTED BY ARCHITECT.

4. 1/2"x1/2"x1" GRID.

5.

DIFFUSER, GRILLE, AND REGISTER SCHEDULE

SEE PLANS TITUS DESV 260 260 06 12x8 8.0 15.5 12.0 260 5.6 55 75 180 0.7 2 16 24 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 170 170 08 12x10 10.0 15.5 12.0 170 3.2 55 72 180 0.8 1 - 24 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 165 165 06 12x8 8.0 15.5 12.0 165 5.6 55 86 180 0.5 1 11 19 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 170 170 06 12x8 8.0 15.5 12.0 170 6.5 55 90 180 0.6 1 11 19 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 155 155 06 12x8 8.0 15.5 12.0 155 5.5 55 88 180 0.5 1 11 18 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 165 165 08 12x10 10.0 15.5 12.0 165 5.7 55 87 180 0.7 1 - 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 165 165 08 12x10 10.0 15.5 12.0 165 3.8 55 76 180 0.7 1 - 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 115 115 06 12x8 8.0 15.5 12.0 115 2.5 55 75 180 0.5 1 - 15 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 1450 1450 14 20x17.5 17.5 15.5 20.0 1450 31.3 55 75 180 3.3 2 20 19 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 475 475 08 12x10 10.0 15.5 12.0 475 10.3 55 75 180 1.1 2 18 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 135 135 06 12x8 8.0 15.5 12.0 135 2.9 55 75 180 0.9 1 10 17 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 130 130 06 12x8 8.0 15.5 12.0 130 2.8 55 75 180 0.8 1 - 17 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 425 425 8 12x10 10.0 15.5 12.0 425 9.2 55 75 180 1.0 2 18 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 285 285 6 12x8 8.0 15.5 12.0 285 6.2 55 75 180 0.8 2 17 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 1025 1025 12 16x15 15.0 15.5 16.0 1025 22.2 55 75 180 2.6 2 19 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 1025 1025 12 16x15 15.0 15.5 16.0 1025 22.2 55 75 180 2.6 2 19 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 250 250 6 12x8 8.0 15.5 12.0 250 5.4 55 75 180 0.6 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 310 310 06 12x8 8.0 15.5 12.0 310 9.4 55 83 180 0.9 2 18 22 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 165 165 6 12x8 8.0 15.5 12.0 165 7.9 55 99 180 0.7 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 245 245 6 12x8 8.0 15.5 12.0 245 7.5 55 83 180 0.7 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 245 245 6 12x8 8.0 15.5 12.0 245 7.5 55 83 180 0.7 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 250 250 6 12x8 8.0 15.5 12.0 250 7.6 55 83 180 0.7 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 190 190 6 12x8 8.0 15.5 12.0 190 5.9 55 84 180 0.6 2 13 20 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 240 240 6 12x8 8.0 15.5 12.0 240 8.8 55 89 180 0.7 2 15 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 255 255 06 12x8 8.0 15.5 12.0 255 7.5 55 82 180 0.7 2 16 24 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 230 230 06 12x8 8.0 15.5 12.0 230 7.5 55 85 180 0.6 2 15 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 245 245 06 12x8 8.0 15.5 12.0 245 7.6 55 84 180 0.6 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 245 245 06 12x8 8.0 15.5 12.0 245 7.6 55 84 180 0.6 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 245 245 06 12x8 8.0 15.5 12.0 245 7.6 55 84 180 0.6 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 270 270 6 12x8 8.0 15.5 12.0 270 7.5 55 81 180 0.6 2 15 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 250 250 06 12x8 8.0 15.5 12.0 250 7.7 55 84 180 0.6 2 16 23 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 400 400 8 12x10 10.0 15.5 12.0 400 10.3 55 79 180 0.9 2 17 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 585 585 10 14x12.5 12.5 15.5 14.0 585 16.2 55 81 180 1.4 2 22 24 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 400 400 8 12x10 10.0 15.5 12.0 400 11.4 55 81 180 0.9 2 17 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 1200 1200 16 24x18 18.0 15.5 24.0 1200 52.3 55 95 180 1.9 2 12 11 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 420 420 08 12x10 10.0 15.5 12.0 420 12.2 55 82 180 1.0 2 18 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 500 500 08 12x10 10.0 15.5 12.0 500 10.8 55 75 180 1.4 2 30 36 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 945 945 14 20x17.5 17.5 15.5 20.0 945 20.4 55 75 180 1.6 2 17 18 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 305 305 6 12x8 8.0 15.5 12.0 305 9.3 55 83 180 0.9 2 18 22 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 595 595 10 14x12.5 12.5 15.5 14.0 595 11.5 55 73 180 1.4 2 20 24 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 810 810 12 16x15 15.0 15.5 16.0 810 17.5 55 75 180 1.6 2 18 22 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 440 440 8 12x10 10.0 15.5 12.0 440 12.6 55 82 180 1.0 2 18 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 420 420 8 12x10 10.0 15.5 12.0 420 12.2 55 82 180 1.0 2 18 25 NO 1,2,3,4,5,6,7,8

SEE PLANS TITUS DESV 430 430 8 12x10 10.0 15.5 12.0 430 12.4 55 82 180 1.0 2 18 25 NO 1,2,3,4,5,6,7,8

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL 5. HOT WATER COIL WATER PRESSURE DROP SHALL NOT EXCEED 5' AND AIR PRESSURE DROP SHALL NOT EXCEED 0.3" WG.

2. PROVIDE WITH ACCESS DOORS FOR REHEAT COIL AND FACTORY MOUNTED DISCONNECT. 6. VAV MANUFACTURER TO MOUNT IN FACTORY THE DDC CARD/CONTROLLER AND DAMPER ACTUATOR

3. SOUND LEVELS (NC) AST FULL AIR FLOW WITH 0.75" INLET STATIC PRESSURE AND 0.5" FURNISHED BY THE T.C. CONTRACTOR. BOXES SHALL NOT BE RELEASED FOR PRODUCTION UNTIL BOX

4. DISCHARGE PRESSURE. NOISE CRITERIA (NC) SOUND INFORMATION IS BASED ON ARI-880-98. MANUFACTURER HAS COORDINATED WITH T.C. CONTRACTOR.

5. REGARDLESS OF HOT WATER COIL AIR PRESSURE DROP, AVAILABLE DISCHARGE STATIC 7. COORDINATE LEFT HANDED/RIGHT HANDED COIL CONNECTIONS WITH DESIGN DRAWINGS AND EXISTING FIELD CONDITIONS

PRESSURE SHALL NOT BE LESS THAN 0.25" AT AIR FLOW RATE SCHEDULED. 8. PROVIDE NECESSARY 120V / 24V POWER SUPPLY FOR CONTROLLER POWER. COORDINATE WITH ELECTRICAL DRAWINGS

FOR QUANTITY AND LOCATION.

EQUIPMENT

TAG

LOCATION MANUFACTURER MODEL

AIRFLOW (CFM) APPROX. DIMENSIONS (IN.) HOT WATER COIL NOISE LEVEL(NC) INTEGRAL

SOUND

ATTENUATOR

NOTES

MIN. MAX.

INLET

SIZE

OUTLET

SIZE

H L WHEATING CFMCAPACITY

(MBH)

EAT (°F) LAT (°F) EWT (°F) GPMROWSRADIATED DISCHARGE

VAV BOX WITH HOT WATER REHEAT SCHEDULE

VAV-1A104

VAV-1A104A

VAV-1A105

VAV-1A106

VAV-1A107

VAV-1A108

VAV-1A109

VAV-1A111

VAV-1A118

VAV-1A127A

VAV-1A141

VAV-1A142

VAV-2A12A

VAV-2A12B

VAV-2A18A

VAV-2A18B

VAV-1B142

VAV-1B149

VAV-1B153

VAV-1B155

VAV-1B156

VAV-1B159

VAV-1B160

VAV-1B162

VAV-1B164

VAV-1B167

VAV-1B168

VAV-1B171

VAV-1B172

VAV-1B175

VAV-1B176

VAV-1B178

VAV-1B100

VAV-2B78

VAV-1C100W

VAV-1C104

VAV-1C104B

VAV-1C104A

VAV-1C149

VAV-1C150N

VAV-1C150S

VAV-1C178

VAV-2C204

VAV-2C278

F-1 ERC-1

EASY

STREET

ROOF

FLANDERS 7,000

FILTER

ENCLOSURE,

PLEATED

FILTERS

35% / MERV-8 24 24 2 4 2 2 0.19 1.00 1 1,2,3,4,5,6,7,8

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL.

2. PROVIDE STATIC PRESSURE TAPS AND WEATHER PROOF MAGNEHELIC GAGES TO READ ACROSS FILTER BANK.

3. PROVIDE ACCESS DOORS WITH NEOPRENE GASKET ON BOTH SIDES FOR FILTER REPLACEMENT. A MINIMUM OF 27" CLEARANCE IS REQUIRED FOR FILTER CHANGE OUT.

4. ENTIRE UNIT SHALL BE DOUBLE WALL INSULATED.

5. PROVIDE STATIC PRESSURE TAPS AND PROVIDE WEATHER COVER.

6. PROVIDE 2" CHANNEL BASE WELDED TO BOTTOM OF HOUSING. INSTALL ON ROOF RAIL, COORDINATE FINAL ELEVATIONS WITH DUCTWORK.

7. PROVIDE LIFTING LUGS.

8. SEE SPECIFICATIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS

TAG SERVICE LOCATION MANUFACTURER

CFM

MAX

CAPACITY

TYPE

% Efficiency

ASHRAE

STANDARDS

52.1 / 52.2

FILTER MODULE

NOMINAL SIZE

FILTER MODULE ARRANGEMENT MAXIMUM PRESSURE

DROP (IN WG)

TOTAL

HOUSING

FINAL

PRESSURE

DROP

(IN WG)

REMARKS

H (IN) W (IN) D (IN)

TOTAL

NUMBER

OF UNITS

NUMBER

UNITS

HIGH

NUMBER

UNITS

WIDE

CLEAN DIRTY

FILTER HOUSING SCHEDULE

GFS-1 ROOF ACCU-1 50 GAL. SIMPLEX 1.8 GPM AT 70 PSI 1/3 120 1 WESSELS GMP-15050 1,2

NOTES:

1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL.

2. PACKAGED SYSTEM SHALL INCLUDE 1/2 HP PUMP, 50 GAL. GLYCOL DRUM, EXPANSION TANK, LOW WATER CUT OFF SWITCH, PRESSURE SWITCH/STARTER, Y-STRAINER, TRIPLE DUTY VALVE, PRESSURE GAUGE, AND THREADED OUTLET.

SYMBOL LOCATION CHILLER SERVED TYPE CAPACITY / SIZE

MOTOR BASIS OF DESIGN

NOTESHP VOLT PHASE MANUFACTURER MODEL

GLYCOL FILL STATION

SYMBOL

UH-101 AHU VESTIBULE 3 10.3 350 1600 1 / 100 14.5 208 1 16" x 14" x 8 1/2" 24.0000 QMARK HUHAA320 1 AND 2

UH-102 AHU VESTIBULE 3 10.3 350 1600 1 / 100 14.5 208 1 16" x 14" x 8 1/2" 24.0000 QMARK HUHAA320 1 AND 2

SERVICE

HEATING CAPACITY FAN / MOTOR DATA ELECTRICAL DIMENSIONS

( H x W x D)

UNIT

WEIGHT

(lbs)

MANUFACTURER MODEL REMARKS

KW MBH CFM RPM HP AMPS VOLT PHASE

HUM-1 AHU-1 7000 24 48 x 24 8 15 190 0.36 120 1 48 x 33 x 24.5 578 NEPTRONIC SKS4190SLPA 1, 2, 3, 4, 5, 6

NOTES:

1. PROVIDE NECESSARY STAND TO AHU MANIFOLD TO ACHIEVE DRAIN HEIGHT. FOLLOW ALL MANUFACTURER'S RECOMMENDATION.

2. PROVIDE ON/OFF DIGITAL DUCT HUMIDISTAT, AIR PROVING SWITCH, REMOTE WALL HUMIDITY SENSOR c/w DIGITAL DISPLAY,

3. PROVIDE HEADER, 304 STAINLESS STEEL STEAM TUBE, MOUNTING FRAME, AND INLET KIT.

4. PROVIDE FULLY MODULATING, BUILT-IN FLOAT & THERMOSTATIC STEAM TRAP, ELECTRIC ACTUATOR, AND BACnet COMPATIBLE.

5. PROVIDE WITH MANUFACTURER'S SUPPORT STAND.

6. REFER TO SPECIFICATION SECTION 23 22 13 STEAM AND CONDENSATE HEATING PIPING.

REMARKS:

1. PROVIDE DISCONNECT SWITCH, FAN DELAY SWITCH, AND BUILT-IN UNIT MOUNTED THERMOSTAT.

2. PROVIDE MOUNTING KIT TO MATCH MOUNTING REQUIREMENT.

SYMBOL SERVICE AIRFLOW

(CFM)

ABSORPTION

DISTANCE MAX.

(IN)

MANIFOLD

DIMENSIONS

(W x H)

NO. OF

DISPERSION

TUBES

STEAM

PRESSURE

(PSIG)

CAPACITY

(lbs/hr)

ELECTRICAL

DIMENSIONS

( H x W x D)

UNIT

WEIGHT

(lbs)

BASIS OF DESIGN

REMARKS

RATED POWER

(kW)

VOLT PHASE MANUFACTURER MODEL

UNIT HEATER SCHEDULE (ELECTRIC)

HUMIDIFIER SCHEDULE

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

Bancroft Project No. VA CONTRACT NO.

MECHANICAL - SCHEDULES RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

06/10/2026 RH RBB

578-26-016

M602

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

AIR HANDLING UNIT POINT LIST (AHU-1)

HARDWARE POINTS SOFTWARE POINTS

POINT NAME AI AO BI BO AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

RETURN AIR HUMIDITY (H-1) X X X

SUPPLY AIR HUMDITY (H-2) X X X

OUTSIDE AIR DAMPER, POSITION (D-1) X X X

RETURN AIR DAMPER, POSITION (D-2) X X X

RELIEF AIR DAMPER, POSITION (D-3) X X X

MIXED AIR FILTER DIFFERENTIAL PRESSURE (MERV 8) X X X

MIXED AIR FILTER DIFFERENTIAL PRESSURE (MERV 13) X X X

RETURN AIR FILTER DIFFERENTIAL PRESSURE X X X

SUPPLY DUCT STATIC PRESSURE, SPS-1 X X X X

SUPPLY AIR TEMPERATURE, T-1 X X X X

ENERGY RECOVERY RETURN AIR TEMPERATURE, T-2 X X X X

MIXED AIR TEMPERATURE, T-3 X X X X

CHILLED AIR TEMPERATURE, T-4 X X X X

OUTSIDE AIR DEWPOINT TEMPERATURE, T-5 X X X X

HEATED AIR TEMPERATURE, T-6 X X X X

RETURN AIR TEMPERATURE, T-7 X X X X

SUPPLY FAN VFD SPEED CONTROL X X X

RETURN FAN VFD SPEED CONTROL X X X

OUTSIDE AIR DAMPER, ACTUATOR (D-1) X X X

RETURN AIR DAMPER, ACTUATOR (D-2) X X X

RELIEF AIR DAMPER, ACTUATOR (D-3) X X X

COOLING VALVE, V-2 X X X

SUPPLY DUCT HUMIDIFIER VALVE, V-3 X X X

SUPPLY FAN STATUS X X X

RETURN FAN STATUS X X X

STEAM HEATING VALVE STATUS, V-1 X X X

SUPPLY FAN VFD FAULT X X

RETURN FAN VFD FAULT X X

FREEZE PROTECTION, FZ X X

HIGH STATIC PRESSURE, SPS-2 X X X X

SUPPLY DUCT SMOKE DETECTOR, DSD-1 X X X X

STEAM HEATING VALVE, V-1 X X X

SUPPLY DUCT HUMIDIFIER VALVE ENABLE, V-3 X X X

SUPPLY FAN START/STOP X X X X X

RETURN FAN START/STOP X X X X X

ALARM

FREEZESTAT (FZ) X X X

HIGH SUPPLY AIR STATIC PRESSURE X

HIGH SUPPLY AIR TEMPERATURE (T-1) X

HIGH SUPPLY AIR HUMIDITY (H-2) X

HIGH MIXED AIR TEMPERATURE (T-3) X

HIGH RETURN AIR TEMPERATURE (T-7) X

HIGH RETURN AIR HUMIDITY (H-1) X

LOW SUPPLY AIR STATIC PRESSURE X

LOW SUPPLY AIR TEMPERATURE (T-1) X

LOW SUPPLY AIR HUMIDITY (H-2) X

LOW MIXED AIR TEMPERATURE (T-3) X

LOW RETURN AIR TEMPERATURE (T-7) X

LOW RETURN AIR HUMIDITY (H-1) X

SUPPLY FAN FAILURE X

RETURN FAN FAILURE X

SUPPLY FAN IN HAND X

RETURN FAN IN HAND X

PREFILTER CHANGE REQUIRED X

CONTROLS SYMBOLS

AI ANALOG INPUT

AO ANALOG OUTPUT

BI BINARY INPUT

BO BINARY OUTPUT

AV ANALOG VALUE

BV BINARY VALUE

SYMBOL DESCRIPTION

SYMBOL DESCRIPTION

CONTROL SYMBOL LIST

ADJ ADJUSTABLE

AFMS AIRFLOW MEASURING STATION

DP DIFFERENTIAL PRESSURE

DSD DUCT SMOKE DETECTOR

H HUMIDITY SENSOR

HOA HAND-OFF-AUTO

BAS BUILDING AUTOMATION SYSTEM

N.O. NORMALLY OPEN

N.C. NORMALLY CLOSED

SPS STATIC PRESSURE SENSOR

T TEMPERATURE SENSOR

VFD VARIABLE FREQUENCY DRIVE

EP POWER WIRING

CT CONTROLLER

SYMBOL DESCRIPTION

COOLING COIL

M

M

MOTORIZED DAMPER (SPRING RETURN)

MOTOR (FAN)

TRANSMITTER

TRANSMITTER, AVERAGING ELEMENT

PUMP

CONTROL VALVE

FZ FREEZESTAT

TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)

STEAM HEATING COIL

M MOTORIZED DAMPER

DDC DIRECT DIGITAL CONTROL

RH RELATIVE HUMIDITY

ENERGY RECOVERY COIL

RELIEF

AIR

M

M

VFD

RETURN AIR

INDOORS OUTDOORS

DP

AI

M

OUTSIDE

AIR

M

T-3

AI

M

VFD

T-1

AI

SUPPLY AIR

H-1 AI

D-3

D-1

SPS-2

DSD-1

B1 TO FIRE ALARM

T-2

AI

T-5 AI

AO - RELIEF DAMPER

(OPEN/CLOSE)

AI - RELIEF DAMPER

(POSITION)

D-2

AO - OUTSIDE AIR DAMPER

(OPEN/CLOSE)

AI - OUTSIDE AIR DAMPER

(POSITION)

AI - FILTER STATUS

AI - FILTER STATUS

FZ

BI-TEMPERATURE TSL

T-4 AI

BI - FAN STATUS

C

X

AO - RETURN AIR DAMPER

(OPEN/CLOSE)

AI - RETURN AIR DAMPER

(POSITION)

LOCATED AT THE NORTH FACE OF BUILDING

WALL COORDINATE EXACT LOCATION WITH

COR/BUILDING ENGINEER.

LOCATED IN FIRST FLOOR

CORRIDOR. FIELD VERIFY EXACT

LOCATION

R

X

AO - ISOLATION VALVE

V-2

SEQUENCE OF OPERATION

CONSTANT AIR HANDLING UNIT

1. GENERAL

A. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE DDC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION.

"HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-1, D-2, & D-3, SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, & D-3 SHALL BE OPEN TO ITS MINIMUM POSITION. DAMPER SHALL

MODULATE IN ACCORDANCE WITH THE FOLLOWING…