6. 578-26-016 CLIN1 Specifications Book R1.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25226B0028
About this file
This is a Specifications Book for the Edward Hines Jr. VA Medical Center Building 217 Renovations project (Station Project No. 578-26-016, VA Contract No. 36C25223C0071). The document serves as the 100% construction documents and provides comprehensive technical specifications and requirements for the renovation work.
The specifications encompass multiple construction divisions including general requirements, demolition, metals, thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical, communications, and electronic safety systems. Key contractor responsibilities include developing and submitting a Logistics Plan before work commences, establishing security procedures with badge requirements and controlled access, maintaining infection control barriers, implementing phasing plans to minimize disruption to the operating medical center, protecting existing utilities and structures, conducting required testing and inspections, providing as-built drawings, and managing warranty obligations through a comprehensive warranty management plan. The contractor must obtain prior approval for a Submittal Registry covering all materials, fixtures, equipment, doors, hardware, and finishes; maintain existing utility services with required advance notice for any interruptions; coordinate with the Contracting Officer's Representative (COR) on site surveys, material protection, and cutting/patching work; and provide operations and maintenance manuals with factory-trained personnel for equipment instruction. Additional requirements include maintaining site security 24/7, managing construction waste, complying with temporary environmental controls, and completing a pre-warranty conference with detailed documentation of all warranted equipment and extended warranty items before project acceptance.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Edward Hines Jr. VA Medical Center
5000 5th Ave, Hines, IL 60141| Hines, IL 60141
Renovations to Building 217
CLIN 1
VA Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
100% Construction Documents
Volume 1 of 1
Divisions 00-02, 05, 07-10, 12, 21-28
06/10/2024
DIVISION 00
amurray Text Box
SPECIAL SECTIONS
Hines, IL 60141
Renovations to Building 217
Bancroft Architects + Engineers
01-01-23
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 09-22
01 35 26 Safety Requirements 10-22
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21
07 14 21 Latex Mastic Deck Covering 01-21
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 72 00 Roof Accessories 01-21
07 76 00 Pedestal System
07 84 00 Firestopping 01-21
Renovations to Building 217
Bancroft Architects + Engineers
01-01-23
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
07 92 00 Joint Sealants 04-22
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 17 10 Integrated Door Assemblies 01-21
08 31 13 Access Doors and Frames 04-22
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 43 33 Folding Glass Doors
08 71 00 Door Hardware 05-22
08 71 13 Automatic Door Operators 01-21
08 71 13.11 Low Energy Power Assist Door Operators 01-21
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 54 23 Linear Metal Ceilings 01-21
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 06-22
09 65 19 Resilient Tile Flooring 05-18
09 72 16 Vinyl-Coated Fabric Wall Covering 01-21
09 84 33 Sound-Absorbing Wall Units 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 01-21
10 14 00 Signage 01-21
10 21 23 Cubicle Curtain Tracks 01-21
10 22 26.13 Accordion Folding Partitions 01-21
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
12 24 21 Lightproof Shades 01-21
12 32 00 Manufactured Wood Casework 01-21
Renovations to Building 217
Bancroft Architects + Engineers
01-01-23
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
12 36 00 Countertops 12-18
12 93 33 Manufactured Planters
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 12-22
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 04-22
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 04-22
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 10-22
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 64 00 Packaged Water Chillers 03-20
23 72 00 Air-to-Air Energy Recovery Equipment 03-20
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION
Renovations to Building 217
Bancroft Architects + Engineers
01-01-23
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 10-4
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 09 23 Lighting Controls 11-22
26 22 00 Low-Voltage Transformers 11-22
26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 41 00 Facility Lightning Protection 11-22
26 51 00 Interior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 12-22
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 05 36 Cable Tray for Communications Systems 12-22
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 12-22
27 11 00 Communications Equipment Room Fittings 06-15
27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22
27 15 13 Communications Copper Horizontal Cabling 12-22
27 52 23 Nurse Call System 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
Renovations to Building 217
Bancroft Architects + Engineers
01-01-23
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 10-5
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
G001 GENERAL – COVER SHEET
G002 GENERAL – DRAWING INDEX
G003 GENERAL – CODE AND BUILDING INFORMATION
GI001 GENERAL – GENERAL PROJECT NOTES
GI002 GENERAL – DEMOLITION NOTES
GIOO3 GENERAL - GENERAL CONSTRUCTION NOTES
GI103 GENERAL – LIFE SAFETY PLAN – DINING 2A18
GI104 GENERAL – LIFE SAFETY PLAN – DEMENTIA UNIT
GC201 GENERAL – PHASING PLAN – FIRST FLOOR
GC202 GENERAL – PHASING PLAN – SECOND FLOOR
GC400 GENERAL – INFECTION CONTROL GENERAL NOTES
GC403 GENERAL – INFECTION CONTROL PLAN – DINING ROOM
2A18
GC404 GENERAL – INFECTION CONTROL PLAN – LIBRARY 2A12
GC405 GENERAL – INFECTION CONTROL PLAN – BARIATRIC
ROOMS
GC406 GENERAL – INFECTION CONTROL PLAN – SECOND FLOOR
PATIO
GC407 GENERAL – INFECTION CONTROL PLAN – DEMENTIA
UNIT
GC408 GENERAL – INFECTION CONTROL PLAN – HIGH FALL
RISK ROOMS
GC409 GENERAL – INFECTION CONTROL PLAN – EQUIPMENT
STORAGE
GC501 GENERAL – INFECTION CONTROL TYPICAL CLASS IV
GC502 GENERAL – INFECTION CONTROL – SAMPLE ICRA FORMS
AND PERMITS
GC503 GENERAL – INFECTION CONTROL – SAMPLE PCRA FORMS
AND PERMITS
STRUCTURAL
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 2
S001 STRUCTURAL – GENERAL NOTES
SF101 STRUCTURAL – FRAMING PLAN AND DETAILS –
BARIATRIC ROOMS
SF102 STRUCTURAL – ROOF FRAMING PLAN AND DETAILS –
FOLDING PARTITIONS
ARCHITECTURAL
A001 ARCHITECTURAL – SYMBOLS, ABBREVIATIONS, AND
LEGENDS
A002 ARCHITECTURAL – SHEET NOTES
A003 ARCHITECTURAL – STANDARD MOUNTING HEIGHTS
AD101 ARCHITECTURAL – FIRST FLOOR – OVERALL
DEMOLITION PLAN
AD102 ARCHITECTURAL – SECOND FLOOR – OVERALL
DEMOLITION PLAN
AD403 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
DINING ROOM 2A18
AD404 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
LIBRARY 2A12
AD405 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
BARIATRIC ROOMS
AD406 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
SECOND FLOOR PATIO
AD407 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
DEMENTIA UNIT
AD408 ARCHITECTURAL – ENLARGED DEMOLITION PLAN – HIGH
FALL RISK ROOMS
AD409 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
EQUIPMENT STORAGE
AD412 ARCHITECTURAL – ENLARGED DEMOLITION PLAN –
PLAYGROUND
ACD403 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – DINING ROOM 2A26
ACD404 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – LIBRARY 2A12
ACD405 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – BARIATRIC ROOMS
ACD406 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – DEMENTIA UNITS
ACD407 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – HIGH FALL RISK ROOMS
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 3
ACD409 ARCHITECTURAL – REFLECTED CEILING DEMOLITION
PLAN – EQUIPMENT STORAGE
AE101 ARCHITECTURAL – FIRST FLOOR – FLOOR PLAN
AE102 ARCHITECTURAL – SECOND FLOOR – FLOOR PLAN
AE403 ARCHITECTURAL – ENLARGED PLAN – DINING ROOM
2A18
AE403.1 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM
2A18
AE404 ARCHITECTURAL – ENLARGED PLAN – LIBRARY 2A12
AE404.1 ARCHITECTURAL - ELEVATIONS - LIBRARY 2A12
AE405 ARCHITECTURAL – ENLARGED PLAN – BARIATRIC ROOMS
AE405.1 ARCHITECTURAL - ENLARGED PLAN - BARIATRIC ROOMS
AE406 ARCHITECTURAL – ENLARGED PLAN – SECOND FLOOR
PATIO
AE407 ARCHITECTURAL – ENLARGED PLAN – DEMENTIA UNIT
AE407.1 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT
AE407.2 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT
AE407.3 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT
AE407.4 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT
AE407.5 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT
AE407.6 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT
AE408 ARCHITECTURAL – ENLARGED PLAN – HIGH FALL RISK
ROOMS
AE408.1 ARCHITECTURAL -ENLARGED PLAN - HIGH FALL RISK
ROOMS
AE409 ARCHITECTURAL – ENLARGED PLAN - EQUIPMENT
STORAGE
AE409.1 ARCHITECTURAL - ENLARGED PLAN - EQUIPMENT
STORAGE
AE411 ARCHITECTURAL – ENLARGED PLAN – PLAYGROUND
AC403 ARCHITECTURAL – REFLECTED CEILING PLAN – DINING
ROOM 2A26
AC404 ARCHITECTURAL – REFLECTED CEILING PLAN –
LIBRARY 2A12
AC405 ARCHITECTURAL – REFLECTED CEILING PLAN –
BARIATRIC ROOMS
AC406 ARCHITECTURAL – REFLECTED CEILING PLAN –
DEMENTIA UNIT
AC407 ARCHITECTURAL – REFLECTED CEILING PLAN – HIGH
FALL RISK ROOMS
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 4
AC409 ARCHITECTURAL – REFLECTED CEILING PLAN –
EQUIPMENT STORAGE
AE501 ARCHITECTURAL – PARITITION TYPES
AE521 ARCHITECTURAL - EXTERIOR DETAILS
AE531 ARCHITECTURAL – CEILING DETAILS
AE541 ARCHITECTURAL – CASEWORK DETAILS
AE542 ARCHITECTURAL - CASEWORK DETAILS
AE551 ARCHITECTURAL – FINISH DETAILS
AE552 ARCHITECTURAL – FINISH DETAILS
AE561 ARCHITECTURAL – MOUNTING DETAILS
AE601 ARCHITECTURAL – DOOR SCHEDULE AND DETAILS
AE611 ARCHITECTURAL - WINDOW SCHEDULE AND DETAILS
AF103 ARCHITECTURAL – FINISH PLAN – DINING 2A18
AF104 ARCHITECTURAL – FINISH PLAN – LIBRARY 2A12
AF105 ARCHITECTURAL – FINISH PLAN – BARIATRIC ROOMS
AF106 ARCHITECTURAL – FINISH PLAN – SECOND FLOOR
PATIO
AF107 ARCHITECTURAL – FINISH PLAN – DEMENTIA UNIT
AF108 ARCHITECTURAL – FINISH PLAN – HIGH FALL RISK
ROOMS
AF109 ARCHITECTURAL – FINISH PLAN – EQUIPMENT STORAGE
AW403 ARCHITECTURAL - WAYFINDING PLAN - DINING ROOM
2A18
AW404 ARCHITECTURAL - WAYFINDING PLAN - LIBRARY 2A12
AW405 ARCHITECTURAL - WAYFINDING PLAN - BARIATRIC
ROOMS
AW406 ARCHITECTURAL - WAYFINDING PLAN - DEMENTIA UNIT
AW407 ARCHITECTURAL - WAYFINDING PLAN - HIGH FALL
RISK ROOMS
AW408 ARCHITECTURAL - WAYFINDING PLAN - EQUIPMENT
STORAGE
AW601 ARCHITECTURAL - WAYFINDING TYPES
AW611 ARCHITECTURAL - WAYFINDING SCHEDULE
QH403 ARCHITECTURAL – EQUIPMENT PLAN – DINING 2A18
QH404 ARCHITECTURAL – EQUIPMENT PLAN – LIBRARY 2A12
QH405 ARCHITECTURAL – EQUIPMENT PLAN – BARIATRIC
ROOMS
QH406 ARCHITECTURAL – EQUIPMENT PLAN – SECOND FLOOR
PATIO
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 5
QH407 ARCHITECTURAL – EQUIPMENT PLAN – DEMENTIA UNIT
QH408 ARCHITECTURAL – EQUIPMENT PLAN – HIGH FALL RISK
ROOMS
QH409 ARCHITECTURAL – EQUIPMENT PLAN – EQUIPMENT
STORAGE
QH601 ARCHITECTURAL – EQUIPMENT SCHEDULE
QH602 ARCHITECTURAL – EQUIPMENT SCHEDULE
FIRE PROTECTION
FX001 FIRE PROTECTION – GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
FX002 FIRE PROTECTION – FIRST FLOOR OVERALL
DEMOLITION PLAN
FX003 FIRE PROTECTION – SECOND FLOOR OVERALL
DEMOLITION PLAN
FXD401.3 FIRE PROTECTION – ENLARGED DEMOLITION PLAN –
DINING ROOM 2A18
FXD401.4 FIRE PROTECTION – ENLARGED DEMOLTION PLAN –
LIBRARY 2A12
FXD401.5 FIRE PROTECTION – ENLARGED DEMOLITION PLAN –
BARIATRIC ROOMS
FXD401.6 FIRE PROTECTION – ENLARGED DEMOLITION PLAN –
DEMENTIA UNITS
FXD401.7 FIRE PROTECTION – ENLARGED DEMOLITION PLAN –
HIGH FALL RISK ROOMS
FXD401.8 FIRE PROTECTION – ENLARGED DEMOLITION PLAN –
EQUIPMENT STORAGE
FX401.3 FIRE PROTECTION - ENLARGED NEW PLAN - DINING
ROOM 2A18
FX401.4 FIRE PROTECTION - ENLARGED NEW PLAN - LIBRARY
2A12
FX401.5 FIRE PROTECTION - ENLARGED NEW PLAN - BARIATRIC
ROOMS
FX401.6 FIRE PROTECTION - ENLARGED NEW PLAN – DEMENTIA
UNIT
FX401.7 FIRE PROTECTION - ENLARGED NEW PLAN – HIGH FALL
RISK ROOMS
FX401.8 FIRE PROTECTION - ENLARGED NEW PLAN – EQUIPMENT
STORAGE
FX500 FIRE PROTECTION – DETAILS
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 6
PLUMBING
P001 PLUMBING – GENERAL NOTES, SYBMOLS AND
ABBREVIATIONS
P002 PLUMBING – FIRST FLOOR OVERALL PLANS
P003 PLUMBING – SECOND FLOOR OVERALL PLANS
P004 PLUMBING NEW WORK - FIRST FLOOR OVERALL PLAN
P005 PLUMBING NEW WORK - SECOND FLOOR OVERALL PLAN
PSD401.3 PLUMBING – SAN & VENT – ENLARGED DEMOLITION
PLAN – BARIATRIC ROOMS
PSD401.5 PLUMBING – SAN & VENT – ENLARGED DEMOLITION
PLAN – DEMENTIA UNIT
PSD401.6 PLUMBING – SAN & VENT – ENLARGED DEMOLITION
PLAN – HIGH FALL RISK ROOMS
PSD401.7 PLUMBING – SAN & VENT – ENLARGED DEMOLITION
PLAN – EQUIPMENT STORAGE
PWD401.3 PLUMBING – DOMESTIC WATER – ENLARGED DEMOLITION
PLAN – BARIATRIC ROOMS
PWD401.4 PLUMBING – DOMESTIC WATER – ENLARGED DEMOLITION
PLAN – DEMENTIA UNIT
PWD401.5 PLUMBING – DOMESTIC WATER – ENLARGED DEMOLITION
PLAN – HIGH FALL RISK ROOMS
PWD401.6 PLUMBING – DOMESTIC WATER – ENLARGED DEMOLITION
PLAN – EQUIPMENT STORAGE
PS401.3 PLUMBING – SAN & VENT – ENLARGED PLAN –
BARIATRIC ROOMS
PS401.4 PLUMBING – SAN & VENT – ENLARGED PLAN – SECOND
FLOOR PATIO
PS401.5 PLUMBING - SAN & VENT - ENLARGED PLAN - LIBRARY
2A12
PS401.6 PLUMBING – SAN & VENT – ENLARGED PLAN –
DEMENTIA UNIT
PS401.7 PLUMBING – SAN & VENT – ENLARGED PLAN – HIGH
FALL RISK ROOMS
PS401.8 PLUMBING – SAN & VENT – ENLARGED PLAN –
EQUIPMENT STORAGE
PW401.3 PLUMBING – DOMESTIC WATER – ENLARGED PLAN –
BARIATRIC ROOMS
PW401.4 PLUMBING – DOMESTIC WATER – ENLARGED PLAN –
DEMENTIA UNIT
PW401.5 PLUMBING - DOMESTIC WATER - ENLARGED PLAN -
LIBRARY 2A12
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 7
PW401.6 PLUMBING – DOMESTIC WATER – ENLARGED PLAN –
HIGH FALL RISK ROOMS
PW401.7 PLUMBING – DOMESTIC WATER – ENLARGED PLAN –
EQUIPMENT STORAGE
P501 PLUMBING – DETAILS
P502 PLUMBING – DETAILS
P601 PLUMBING - RISER DIAGRAMS
P602 PLUMBING - RISER DIAGRAMS
P603 PLUMBING - RISER DIAGRAMS
P604 PLUMBING - RISER DIAGRAMS
P605 PLUMBING - RISER DIAGRAMS
P701 PLUMBING – SCHEDULES
MECHANICAL
M001 MECHANICAL – GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
MVD401.3 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – DINING ROOM 2A26
MVD401.4 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – LIBRARY 2A12
MVD401.5 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – BARIATRIC ROOMS
MVD401.6 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – DEMENTIA UNIT
MVD401.7 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – HIGH FALL RISK ROOMS
MVD401.8 MECHANICAL – ENLARGED VENTILATION DEMOLITION
PLAN – EQUIPMENT STORAGE
MVD401.10 MECHANICAL - EXHAUST FAN VENTILATION DEMOLITION
PLAN - ROOF
MPD402.3 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
DINING ROOM 2A26
MPD402.4 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
LIBRARY 2A12
MPD402.5 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
BARIATRIC ROOMS
MPD402.6 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
DEMENTIA UNIT
MPD402.7 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
HIGH FALL RISK ROOMS
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 8
MPD402.8 MECHANICAL – ENLARGED PIPING DEMOLITION PLAN –
EQUIPMENT STORAGE
MV401.3 MECHANICAL – ENLARGED VENTILATION PLAN – DINING
ROOM 2A26
MV401.4 MECHANICAL – ENLARGED VENTILATION PLAN –
LIBRARY 2A12
MV401.5 MECHANICAL – ENLARGED VENTILATION PLAN –
BARIATRIC ROOMS
MV401.6 MECHANICAL – ENLARGED VENTILATION PLAN –
DEMENTIA UNIT
MV401.7 MECHANICAL – ENLARGED VENTILATION PLAN – HIGH
FALL RISK ROOMS
MV401.8 MECHANICAL – ENLARGED VENTILATION PLAN –
EQUIPMENT STORAGE
MV401.10 MECHANICAL – ENLARGED VENTILATION PLAN – EASY
STREET ROOF
MP402.3 MECHANICAL – ENLARGED PIPING PLAN – DINING ROOM
2A26
MP402.4 MECHANICAL – ENLARGED PIPING PLAN – LIBRARY
2A12
MP402.5 MECHANICAL – ENLARGED PIPING PLAN – BARIATRIC
ROOMS
MP402.6 MECHANICAL – ENLARGED PIPING PLAN – DEMENTIA
UNIT
MP402.7 MECHANICAL – ENLARGED PIPING PLAN – HIGH FALL
RISK ROOMS
MP402.8 MECHANICAL – ENLARGED PIPING PLAN – EQUIPMENT
STORAGE
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M505 MECHANICAL DETAILS
M601 MECHANICAL - SCHEDULES
M602 MECHANICAL – SCHEDULES
M701 MECHANICAL - CONTROLS
M702 MECHANICAL - CONTROLS
M703 MECHANICAL - CONTROLS
ELECTRICAL
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 9
E001 ELECTRICAL – GENERAL NOTES
E002 ELECTRICAL – SYMBOLS AND ABBREVIATIONS
EPD101 ELECTRICAL – OVERALL DEMO PLAN, FIRST FLOOR
EPD102 ELECTRICAL – OVERALL DEMO PLAN, SECOND FLOOR
EPD401.3 ELECTRICAL – DEMOLITION PLAN, DINING ROOM
EPD401.4 ELECTRICAL – DEMOLITION PLAN, SECOND FLOOR
CONFERENCE ROOMS
EPD401.5 ELECTRICAL – DEMOLITION PLAN, BARIATRIC ROOMS
EPD401.6 ELECTRICAL – POWER DEMOLITION PLAN, DEMENTIA
UNIT
EPD401.7 ELECTRICAL – LIGHTING DEMOLITION PLAN, DEMENTIA
UNIT
EPD401.8 ELECTRICAL – DEMOLITION PLAN, HIGH FALL-RISK
PATIENT ROOMS
EPD401.9 ELECTRICAL – DEMOLITION PLAN, EQUIPMENT STORAGE
EPD401.11 ELECTRICAL – POWER DEMOLITION PLAN – ELECTRICAL
ROOMS
EP101 ELECTRICAL – OVERALL PLAN, FIRST FLOOR
EP102 ELECTRICAL – OVERALL PLAN, SECOND FLOOR
EP401.3 ELECTRICAL – PLANS, DINING ROOMS 2A26
EP401.4 ELECTRICAL – PLANS, LIBRARY
EP401.5 ELECTRICAL – PLANS, BARIATRIC ROOMS
EP401.6 ELECTRICAL – POWER PLANS, DEMENTIA UNIT
ET401.7 ELECTRICAL – TELECOM PLAN, DEMENTIA UNIT
EL401.8 ELECTRICAL – LIGHTING PLAN, DEMENTIA UNIT
EP401.9 ELECTRICAL – PLANS, HIGH FALL-RISK ROOMS
EP401.10 ELECTRIAL – PLANS, EQUIPMENT STORAGE
EP401.11 ELECTRICAL – POWER PLAN, ELECTRICAL ROOMS
EP401.13 ELECTRICAL - POWER PLAN, ROOF
E501 ELECTRICAL – DETAILS
E502 ELECTRICAL – DETAILS
E503 ELECTRICAL – DETAILS
E504 ELECTRICAL – DETAILS
E505 ELECTRICAL – DETAILS
E601 ELECTRICAL – LUMINAIR AND CONTROLS SCHEDULES
E602 ELECTRICAL – SCHEDULES
E701 ELECTRICAL – DEMOLITION NORMAL POWER SINGLE
LINE DIAGRAM
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 10
E702 ELECTRICAL – DEMOLITION EMERGENCY POWER SINGLE
LINE DIAGRAM
E703 ELECTRICAL – NEW WORK NORAL POWER SINGLE LINE
DIAGRAM
E704 ELECTRICAL – NEW WORK EMERGENCY POWER SINGLE
LINE DIAGRAM
E801 ELECTRICAL – PANEL SCHEDULES
E802 ELECTRICAL – PANEL SCHEDULES
E803 ELECTRICAL – PANEL SCHEDULES
E804 ELECTRICAL – PANEL SCHEDULES
E805 ELECTRICAL – PANEL SCHEDULES
E806 ELECTRICAL – PANEL SCHEDULES
- - - END - - -
Renovations to Building 217
Bancroft Architects + Engineers
05-01-20
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009 06/10/2026
00 01 15 - 11
- - - E N D - - -
DIVISION 01
GENERAL REQUIREMENTS
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the renovation of areas throughout Building 217 as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer’s Representative
(COR) and through coordination with the Contracting
Specialist (CS) assigned to the project by the Contracting
Officer (CO).
C. Offices of Bancroft Architects & Engineers, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -2
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans
Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Refer to the Contractor PIV Instructions included with the Statement of Work (SOW).
1.3 STATEMENT OF BID ITEM(S)
A. To avoid any potential confusion all work, services, testing, materials, labor, supervision, safety, security, manuals, and instructions necessary to complete this project as indicated in the procurement package, Statement of Work, Drawings, and/or specifications shall be the responsibility of the Contractor to provide unless expressly state otherwise.
B. GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, walks, grading, drainage, and trade work necessary removal of existing structures and construction and certain other items.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -3
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings, contract documents, attachments, and reference documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 LOGISTICS PLAN REQUIREMENTS
Before any work is started, the Contractor shall submit and receive approval for an accepted Logistics Plan. The Logistics
Plan will include (but is not limited to) the following:
A. An Organizational Chart of all Key Personnel including:
a. The General contractor’s management personnel.
b. The competent person identified with their corresponding credentials.
c. The Quality Control person.
d. The Site Safety Health Officer.
e. Contact information for all key personnel.
f. Listing of the subcontractors by name and trade.
B. Hourly Rates of the General Contractor and all their subcontractor’s personnel assigned to this project.
a. Total rate = base labor rate + fringes.
b. Fringes = Union dues + FICA +_Public Liability
Insurance + Workman’s Compensation.
C. Staging Plan. (Include all that apply)
a. Location of Site Office.
b. Material Storage
c. Dumpster Location
d. Site security (fence) and Access Points.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -4
e. Equipment Locations.
f. Infection Control Barrier. (refer to the Infection
Control Risk Assessment)
g. Interior construction and safety signage and placement.
h. Fire extinguisher location and other safety devices.
i. Contractor Parking
j. Travel routes for delivery and removal
k. Closure routes and directional signage for VA vehicular and pedestrian traffic.
D. Description of Means and Method Activities
a. Management, supervision, and security.
b. Demolition
c. Construction
d. Material storage
e. Inspections and punch list.
E. Hours of Work
a. Normal working hours.
i. The competent person is always present whenever any work is being performed by either the subcontractor or the General Contractor’s own workforce.
b. Any planned off-hours work.
c. Hours for delivery and disposal.
d. Hours to transport materials to the site and/or through a building.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -5
1.6 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Site Perimeter:
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -6
1. The General Contractor shall be responsible for the site security for the project 24 hours a day, 7 days a week.
2. The general Contractor will be responsible for all material and tools stored within the jobsite area and remotely including those of their subcontractor.
D. Key Control:
1. The General Contractor shall obtain Construction cores for all locking devices used temporarily during the course of this project. The Construction Cores shall be provide by the Station. The General Contractor shall request the Construction Cores in writing to the COR and will include the number of cores requested, their location to be installed, and the keys requested.
2. Keys for the Construction Cores shall only be assigned to key personnel of the General Contractor including the competent person, the Quality Control person, the Site
Safety Health Officer, and other management staff. No keys are to be assigned to subcontractors. All keys are to be returned to the COR at the conclusion of the project. Lost keys are to be reported to the COR immediately.
3. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -7 installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of
“sensitive information”.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -8
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. All requested information of this section shall be included with the Logistics Plan of Section 1.5.
2. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
Access shall be restricted to picking up and dropping off materials and supplies.
A limited number of (2 to 5) permits shall be issued for
General Contractor and its employees for parking in designated areas only.
1.7 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. All requested information of this section shall be included with the Logistics Plan of Section 1.5.
B. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -9 and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
C. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the
Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
D. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
E. Working space and space available for storing materials shall be as shown on the drawings.
F. Workers are subject to rules of Medical Center applicable to their conduct.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -10
G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
H. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of
Contractor's materials and equipment will be permitted subject to fire and safety requirements.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -11
I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
J. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
The work to be outlined shall include, but not be limited to:
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -12
1. Unless specified elsewhere in the Statement of Work, the project is to be completed in one singular, uninterrupted phase.
2. When more than one phase is required to complete the project the Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR 45 calendar days in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to the
Medical Center Director, COR, and Contractor.
3. The Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Medica Center personnel and patients through other construction areas which serve as routes wither access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by the Medical Center
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -13 so that Medical Center operations will continue during the construction period.
4. To ensure such executions, Contractor shall furnish the
COR with a schedule of approximate phasing on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing to ensure accomplishment of this work in successive phases mutually agreeable COR and Contractor, as follows:
Phase I:
Phase II:
K. Part of Bldg. 217 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to
Contractor.
L. Building(s) No.(s) 217 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -14 used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
M. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade.
Remove the fence when directed by COR.
N. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -15
1. Contractor shall maintain a minimum temperature of (50 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or
Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
O. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -16 without a detailed work plan, the Medical Center
Director’s prior knowledge and written approval.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 3 weeks in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical
Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 3 weeks prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
P. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -17 supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
Consult with COR for if any questions exist regarding identification and treatment of abandoned lines.
Q. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
R. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -18
1.8 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of building 217 in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building 217.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, window blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply
Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -19
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.
They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
2. Where damage as a result of the Contractor’s means and methods has been determined it shall be the responsibility of the contractor to repair subsurfaces in kind and to match finish surfaces with adjacent materials. Such repairs shall be coordinated with the
COR.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
Renovations to Building 217
Bancroft Architects + Engineers
11-01-21
Contract No. 36C25223C0071
Station Project No. 578-26-016
Bancroft-AE Project No. 23-009
06/10/2026
01 00 00 -20
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
E. Cutting and Patching: Provide the following measures:
1. Cutting: Cut in-place constructing by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original
Installer; comply with original…