3. Interim Life Safety Measures -ILSM 578-26-016.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25226B0028
About this file
This is a Standard Operating Procedure (SOP) document from Edward Hines Jr. VA Hospital establishing procedures for implementing interim life safety measures (ILSM) during construction projects and Life Safety Code deficiencies.
The SOP outlines eleven administrative measures to temporarily compensate for significant life safety hazards: ensuring free and unobstructed exits with additional personnel training; maintaining emergency services access; ensuring fire alarm, detection, and suppression systems are operational with temporary equivalents when impaired; constructing smoke-tight temporary partitions from noncombustible materials; providing additional firefighting equipment and personnel training; prohibiting smoking throughout the facility and construction areas; implementing strict storage, housekeeping, and debris removal practices; conducting minimum two fire drills per shift per quarter; increasing hazard surveillance with special attention to construction areas; training personnel to compensate for impaired structural features; and conducting organization-wide safety education programs. The Safety Section holds overall responsibility for developing, implementing, enforcing, and evaluating ILSM effectiveness, while service and section chiefs responsible for construction projects must ensure accurate preparation and timely submission of ILSM Construction Project Evaluation Worksheets at least two weeks before construction begins. Safety personnel conduct daily site inspections during construction, documented on ILSM High Hazard Inspection Reports, with Police Service conducting weekend and holiday inspections. Fire watches are implemented on a case-by-case basis using a decision grid. The SOP was effective October 20, 2020, with recertification scheduled for October 31, 2025, and is governed by NFPA Life Safety Code 101 and Joint Commission Environment of Care Standards.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERIM LIFE SAFETY MEASURES
SOP-578-21-21-606
Edward Hines Jr. VA Hospital Hines, IL 60141 Signatory Authority:
Chief of Occupational Safety & Health Responsible Owner:
Fire Inspector
Service Line(s):
Occupational Safety & Health Services
Effective Date:
October 20, 2020
Recertification Date:
October 31, 2025
1. PURPOSE AND AUTHORITY
To establish specific procedures for implementing those provisions of the Hospital Fire Safety Management Plan pertaining to the use of interim life safety measures (ILSM).
2. PROCEDURES
a. The eleven interim life safety measures are a series of administrative actions required to temporarily compensate for significant hazards posed by existing Life Safety Code (LSC) deficiencies or construction activities.
b. The ILSM assessment will be completed before any constructions project is initiated.
c. Interim life safety measures will apply to appropriate personnel, including construction workers, will be implemented upon project development, and will be continuously enforced through project completion.
d. A fire watch is implemented on a "case-by-case" basis as determined by the fire watch decision grid. (Attachment E)
3. ASSIGNMENT OF RESPONSIBILITIES
a. The Safety Section is assigned overall responsibility for developing, implementing, enforcing and evaluating the effectiveness of the complete Interim Life Safety Measures Policy.
b. The Safety Section is responsible for:
(1) Evaluating specific LSC deficiencies and construction hazards to determine when and to what extent one or more of the listed ILSMs are applicable,
(2) Maintaining required ILSM records and for conducting required ILSM inspections, testing, training, and monitoring as required,
(3) The day to day enforcement of the ILSM plan, and
(4) For advising the Chief, Engineering, as to the effectiveness of the plan, and recommending plan improvements as necessary.
(5) Provide the appropriate training for all affected personnel if it is determined that
ILSM measures are to be implemented, and
(6) If appropriate based on the ILSM to be implemented, conduct addition fire drills.
c. The Chief, Project/Planning Section Engineering, the Chief, Maintenance and Operations Section Engineering, the Chief, Office of Information and Technology, and all other service/section chiefs who have program responsibility for construction projects and/or activities, including work/projects involving penetrations of walls and/or ceilings are responsible for:
October 20, 2020 SOP 578-21-21-606
(1) Ensuring the accurate preparation and timely submission of the ILSM Construction Project Evaluation Worksheet (Attachment B),
(2) Ensuring that an amended ILSM Construction Project Evaluation Worksheet for the project is promptly submitted to Safety if changes impacting ILSM occur after the construction phase of a project or construction activities begins, and
(3) Ensuring that the members of their respective staffs assigned project coordination duties know and understand the provisions of this plan, and monitor plan compliance within their respective work groups.
d. Police Service is responsible for:
(1) Conducting daily inspections of sites under ILSM during weekends and holidays.
(2) Documenting findings of daily inspections (Attachment D).
4. Other Paragraphs
a. The Chief of a service or section initiating a construction project to be accomplished by a contractor will ensure that requirements for full compliance with all applicable NFPA LSC Codes and Hines Hospital fire and safety policies are communicated to all parties involved.
b. A minimum of two weeks before the start of the construction phase of a project, the chief of the service or section responsible for the project will ensure that an ILSM Construction Project Evaluation Worksheet, describing the project and its potential impact on life safety, is accurately completed and submitted to Safety through the Chief, FMS. After the construction phase of a project begins, the responsible service or section chief will ensure that an amended ILSM Construction Project Evaluation Worksheet for the project is promptly submitted to Safety if changes impacting ILSM occur.
c. Safety staff will review the ILSM Construction Project Evaluation Worksheet submitted for each project, inspect the job site as necessary, obtain additional information as required, and complete an ILSM Occupant Impact Evaluation Worksheet (Attachment C).
d. If it is determined based on the evaluations conducted that ILSMs are not required for a project, Safety personnel will advise the responsible service/section chief accordingly.
e. Should it be determined that one or more ILSMs are required to be used during a given project, Safety personnel will explain the actions necessary to the responsible service/section chief and will ensure implementation of the ILSMs as appropriate.
ILSMs required for a project will be discussed in detail and noted in the minutes of each pre-construction meeting pertaining to that project.
f. When the construction phase of a project with required ILSMs begins, Safety will initiate daily inspection of the site to ensure that ILSMs are in effect, and for compliance with established safety codes and policies. These inspections will continue through project completion. Findings will be documented on the ILSM High Hazard Inspection Report (Attachment D).
g. Police Service will conduct daily inspections on weekends and holidays.
5. DEFINITIONS
None
6. REFERENCES
a. The Joint Commission (TJC), Environment of Care Standards.
b. NFPA Life Safety Code 101
7. REVIEW
This SOP will be reviewed upon change of positions included in SOP, at minimum at recertification, when there are changes to the governing document (for example, national policy or a health care accreditation body mandate), and any regulatory requirement for more frequent review
8. RECERTIFICATION
This SOP is scheduled for recertification on or before the last working day of October 2025. In the event of contradiction with national policy, the national policy supersedes and controls.
9. SIGNATORY AUTHORITY
Afif Marouf, M.D., M.P.H.
Chief of Occupational Safety & Health Date Approved:
NOTE: The signature remains valid until rescinded by an appropriate administrative action.
DISTRIBUTION: Hines Intranet Website and Service Chiefs/Service Line Managers via E-mail SOPs are available at http://vaww.hines.med.va.gov/hines/Policy/files.asp http://vaww.hines.med.va.gov/hines/Policy/files.asp
Attachment A
1. Ensuring free and unobstructed exits. Personnel in affected areas receive additional training when alternative exits are designated. Buildings or areas under construction must always maintain escape routes for construction workers. Means of exiting construction areas are inspected daily.
2. Ensuring free and unobstructed access to emergency services and for fire, police, and other emergency forces.
3. Ensuring fire alarm, detection, and suppression systems are in good working order. A temporary but equivalent system shall be provided when any fire system is impaired. Temporary systems must be inspected and tested monthly.
4. Ensuring temporary construction partitions are smoke-tight and built of noncombustible or limited combustible materials that will not contribute to the development or spread of fire.
5. Providing additional firefighting equipment and training personnel in its use.
6. Prohibiting smoking, according to the Joint Commission Environment of Care standards, throughout all buildings on the station as well as in and adjacent to construction areas.
7. Developing and enforcing storage, housekeeping, and debris removal practices that reduce the building’s flammable and combustible fire load to the lowest feasible level.
8. Conducting a minimum of two fire drills per shift per quarter.
9. Increasing hazard surveillance of buildings, grounds, and equipment with special attention to excavations, construction areas, construction storage, and field offices.
10. Training personnel to compensate for impaired structural or compartmentalization features of fire safety.
11. Conducting organization-wide safety education programs to promote awareness of Life
Safety Code deficiencies, construction hazards, and Interim Life Safety Measures.
Attachment B
EDWARD HINES JR. VA HOSPITAL
Engineering Service
CONSTRUCTION PROJECT EVALUATION WORKSHEET
PROJECT TITLE/NUMBER: 578-26-016 Donation Renovations Building 217 - Phase 2
BUILDING/ROOM NUMBER: Building 217
SERVICE/SECTION RESPONSIBLE: Engineering Service/Project Planning
EFFECTS ON LIFE SAFETY
Provide a brief description of the project and any effects it is likely to have on life safety. Examples include closing of an exit; use or storage of flammable materials on-site; installation of a dust barrier; blocking streets, driveways or access roads; impairment of fire detection and/or suppression systems; and removal of doors.
This project has 9 separate requirements broken up into multiple phases, each of which will renovate different locations in Building 217. Of these 9 requirements, only 2 will have a potential impact on egress: CLIN1 – Dementia Unit, and CLIN2 – New Flooring.
Dementia Unit – During construction, the entire East half of 1st floor B-section will be vacated.
Access to the stairwell exit and common corridors will be unavailable, but all rooms within the proximity will be unoccupied.
New Flooring – During CLIN 3 construction, the entire building will receive new flooring. The phasing is intended to keep all corridors open, however there may be periods with a corridor is temporarily closed and an alternate route is identified. Patients will be relocated whenever the rooms or corridors outside of the rooms are being worked on.
See attached FP drawings for changes to the FP system and smoke and fire rated walls.
VHAHINWalshA Cross-Out
VHAHINWalshA Cross-Out
VHAHINWalshA Text Box Updated 7-27-26: CLIN2 and CLIN3 have been descoped from project; only the Dementia Unit will impact egress.
SPECIFIC SAFETY CONCERNS
Will any of the work to be performed during this project as currently planned compromise or impair the use of the critical elements of fire protection listed below?
1. FIRE ALARM SYSTEMS: YES ☒ NO ☐
If YES is checked above, provide additional details, including number of devices affected and length of time systems will be impaired, on a separate sheet.
2. AUTOMATIC FIRE SPRINKLER SYSTEMS: YES ☒ NO ☐
If YES is checked above, provide additional information including the size and occupancy of the area affected, and the anticipated duration of the impairment.
3. EXITS (STAIRWELLS, CORRIDORS & DOORS): YES ☒ NO ☐
If YES is checked above, provide additional information including the type, number, and location of exits, which will be obstructed, and the anticipated duration of the impairment.
Exit to the stairs will be closed temporarily. Appropriate signs will be posted to direct the people to nearest alternate exits.
4. ACCESS TO EMERGENCY VEHICLES & PERSONNEL: YES ☐ NO ☒
If YES is checked above, provide additional information including location of blockage, how access will be obstructed, and the anticipated duration of the impairment.
5. INTEGRITY OF SMOKE &/OR FIRE COMPARTMENTS: YES ☒ NO ☐
If YES is checked above, provide additional information including size, location, number, and purpose of penetrations, which will be made.
Person responsible for construction projects
And/or activities, including work/projects
Service/Section Chief
Attachment C
OCCUPANT IMPACT EVALUATION WORKSHEET
DESCRIPTION OF LSC DEFICIENCY OR CONSTRUCTION PROJECT:
SIGNAGE
1. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively implementing RESCUE?
YES ☐ NO ☐
If YES is checked above, will the condition described exist for more than one working day?
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the compromise of safety and directing a higher level of awareness of fire hazards.
SIGNS POSTED BY: DATE:
2. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively activating a pull station fire ALARM?
If YES is checked above after question 2, will the condition described exist for more than one working day?
informing the occupants that the fire alarm pull station is out of service and instructing the occupants to call the Hines Police Department by telephone at extension 22323 to report a fire.
3. Will the above described LSC deficiency or construction project hinder the ability of the occupants in the immediate area to CONFINE a fire?
informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated.
4. Will the above described LSC deficiency or construction project reduce or hinder the ability of the occupants in the immediate area or the community Fire Department to EXTINGUISH a fire?
informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated. Additionally, the community Fire Department will develop a contingency firefighting tactical plan for the area. In the case of construction projects, that contingency plan must be approved and in place prior to permitting any work to start at the job site.
5. Will the above described LSC deficiency or construction project hinder the occupants’ ability to EVACUATE the building or area?
advising the occupants of the condition and describing alternate routes of egress.
TRAINING
6. Does the ILSM signage pertaining to RESCUE provide enough information and instruction to ensure proper occupant response during an emergency incident?
If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
7. Does the ILSM signage pertaining to ALARM provide enough information and instruction to ensure proper occupant response during an emergency incident?
provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
8. Does the ILSM signage pertaining to CONFINE provide enough information and instruction to ensure proper occupant response during an emergency?
provide the personnel affected with additional instruction and training as necessary.
9. Does the ILSM signage pertaining to EVACUATE provide enough information and instruction to ensure proper occupant response during an emergency?
If the signage is determined to be inadequate to ensure proper occupant response, Project/Planning will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
FIRE DRILLS
10. Will the above described LSC deficiency or construction project necessitate altering staff response to RESCUE, ALARM, CONFINEMENT, EXTINGUISHMENT and/or
EVACUATION?
If YES is checked above, will condition exist for more than sixty days?
If staff response to Rescue, Alarm, Confinement, Extinguishment and/or Evacuation will be altered for more than sixty days, the Safety Section will increase the frequency of scheduled fire drills in the area affected to two per shift per quarter.
ADDITIONAL FIRE DRILLS SCHEDULED BY: DATE:
INSPECTION
If evaluation indicates that one or more ILSMs must be used for this deficiency or project, daily inspection of the site by Safety personnel will be required. Each inspection must be documented on the ILSM High Hazard Inspection Report.
INSPECTION REQUIRED: YES ☐ NO ☐
INSPECTION SCHEDULED BY: DATE:
EVALUATION COMPLETED BY:
SIGNATURE OF SAFETY STAFF DATE
Attachment D
HIGH HAZARD INSPECTION REPORT
LOCATION:
DESCRIPTION OF DEFICIENCY OR PROJECT:
ILSMs REQUIRED:
YES NO
1. Is the ability of the occupants to perform rescue impaired?
2. Is the ability of the occupants to activate an alarm impaired?
3. Is the ability of the occupants to confine a fire impaired?
4. Is the ability of the occupants to extinguish a fire impaired?
5. Is the ability of the occupant to perform evacuation impaired?
6. Is access to emergency vehicles/personnel impaired?
7. Is the automatic fire sprinkler system in operation?
8. Are the smoke detectors operating?
9. Are flammable or combustible materials stored in the area?
10. Is the area clear of storage, trash, waste and debris?
REMARKS/CORRECTION ACTION REQUIRED:
SIGNATURE OF INSPECTOR DATE
Attachment E
Fire Watch Decision Grid
Service Situation Fire Watch
Required?
ILSM Evaluation
Required?
A. Putting a shield over one smoke detector to prevent dust/false alarms for more than 4 hours
Rationale: Other features of fire protection are not compromised during the event, such as additional smoke detectors or sprinkler heads in the affected area.
B. Covering all smoke detectors during a controlled event, such as only during the time contractors are working in an affected area, although after hours the entire area is fully operational
Rationale: During a controlled event, the organization would be managing the deficiency. The area would be continually monitored, and ILSM should be implemented as per policy
C. Shutting off a zone valve to the sprinkler system or disabling a fire alarm zone for more than 4 hours
• Scheduled event (that is, working on, servicing, or upgrading fire alarm system or sprinkler system)
Rationale: During a controlled event, the organization would be managing the deficiency. The area would be continually monitored, and ILSM would be implemented as per policy.
• Unscheduled event (that is, shutting off a zone valve to the sprinkler system or disabling a smoke zone for more than 4 hours in response to a system failure)
FE
C
FE
C
FEC
EXAM
1A109
EXAM
1A108
EXAM
1A107
EXAM
1A106
EXAM
1A105
WAITING
ROOM/LIBRARY
1A104
VITALS
1A142
SOCIAL
WORKER
1A111
TOILET
1A112
WORK
ROOM
1A141
RECEPTION
1A104A
SPECIMEN
COLLECTION
ALCOVE
1A143
0'
-4
8'
1 HOUR FIRE & SMOKE SEPERATION
1 HOUR SMOKE BARRIER
2 HOUR FIRE & SMOKE SEPERATION
PATH OF EGRESS
COMMON PATH OF TRAVEL
1 HOUR FIRE / SMOKE SEPARATION
FIRE EXTINGUISHER CABINET
FIRE ALARM PULL STATION
EXIT SIGN
DISTANCE
LIFE SAFETY PLAN LEGEND
BUILDING 217
ORIGINAL CONSTRUCTION: 1977
CONSTRUCTION TYPE: II (222)
*AUTOMATIC SPRINKLER SYSTEM*
NFPA OCCUPANCY: HEALTHCARE: GROSS 240 SF/ PERSON
MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 48 INCHES
MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 48 INCHES
MAXIMUM TRAVEL DISTANCE: 200 FEET
MAXIMUM DEAD END CORRIDOR: 30 FEET
COMMON PATH OF EGRESS TRAVEL: 100 FEET
MAXIMUM DISTANCE OF TRAVEL TO FEC 75 FEET
NFPA 101 (2021)
IBC, IEBC (2021)
BUILDING OCCUPANCY CALCULATIONS (NFPA 101, 2021):
FIRST FLOOR OCCUPANCY CALCULATION:
FIRST FLOOR: 64,003 GSF @ 240 SF/PERSON 266 PERSONS
SECOND FLOOR OCCUPANCY CALCULATION:
SECOND FLOOR: 59,200 GSF @ 240 SF/PERSON 246 PERSONS
GENERAL NOTES LIFE SAFETY
AREA OCCUPANCY CALCULATIONS (NFPA 101, 2021):
PRIMARY CARE CLINIC OCCUPANCY CALCULATION:
FIRST FLOOR: 5,383 GSF @ 240 SF/PERSON 22 PERSONS
DINING 1A118 OCCUPANCY CALCULATION:
FIRST FLOOR: 2,089 GSF @ 240 SF/PERSON 8 PERSONS
DINING 2A18 OCCUPANCY CALCULATION:
SECOND FLOOR: 2,246 GSF @ 240 SF/PERSON 9 PERSONS
DEMENTIA UNIT OCCUPANCY CALCULATION:
FIRST FLOOR: 7,686 GSF @ 240 SF/PERSON 32 PERSONS
EASY STREET OCCUPANCY CALCULATION:
FIRST FLOOR: 2,102 GSF @ 240 SF/PERSON 8 PERSONS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - LIFE SAFETY PLAN - PRIMARY
CARE CLINIC & ENTRANCE LOBBY
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GI101
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - LIFE SAFETY PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
FECFEC
FEC
MULTIPURPOSE
ROOM -
EASY
STREET
1A43
DINING
ROOM
1A118
KITCHEN
SUPPORT
1A127A
187 SF
RECEPTION
1A104A
3'
-2
5'
-1 0"
OCCUPANT LOAD:
1584 GSF @ 240SF/PERSON - 6 PERSONS
1 HOUR FIRE & SMOKE SEPERATION
1 HOUR SMOKE BARRIER
2 HOUR FIRE & SMOKE SEPERATION
PATH OF EGRESS
COMMON PATH OF TRAVEL
1 HOUR FIRE / SMOKE SEPARATION
FIRE EXTINGUISHER CABINET
FIRE ALARM PULL STATION
EXIT SIGN
DISTANCE
LIFE SAFETY PLAN LEGEND
BUILDING 217
ORIGINAL CONSTRUCTION: 1977
CONSTRUCTION TYPE: II (222)
*AUTOMATIC SPRINKLER SYSTEM*
NFPA OCCUPANCY: HEALTHCARE: GROSS 240 SF/ PERSON
MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 48 INCHES
MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 48 INCHES
MAXIMUM TRAVEL DISTANCE: 200 FEET
MAXIMUM DEAD END CORRIDOR: 30 FEET
COMMON PATH OF EGRESS TRAVEL: 100 FEET
MAXIMUM DISTANCE OF TRAVEL TO FEC 75 FEET
NFPA 101 (2021)
IBC, IEBC (2021)
BUILDING OCCUPANCY CALCULATIONS (NFPA 101, 2021):
FIRST FLOOR OCCUPANCY CALCULATION:
FIRST FLOOR: 64,003 GSF @ 240 SF/PERSON 266 PERSONS
SECOND FLOOR OCCUPANCY CALCULATION:
SECOND FLOOR: 59,200 GSF @ 240 SF/PERSON 246 PERSONS
GENERAL NOTES LIFE SAFETY
AREA OCCUPANCY CALCULATIONS (NFPA 101, 2021):
PRIMARY CARE CLINIC OCCUPANCY CALCULATION:
FIRST FLOOR: 5,383 GSF @ 240 SF/PERSON 22 PERSONS
DINING 1A118 OCCUPANCY CALCULATION:
FIRST FLOOR: 2,089 GSF @ 240 SF/PERSON 8 PERSONS
DINING 2A18 OCCUPANCY CALCULATION:
SECOND FLOOR: 2,246 GSF @ 240 SF/PERSON 9 PERSONS
DEMENTIA UNIT OCCUPANCY CALCULATION:
FIRST FLOOR: 7,686 GSF @ 240 SF/PERSON 32 PERSONS
EASY STREET OCCUPANCY CALCULATION:
FIRST FLOOR: 2,102 GSF @ 240 SF/PERSON 8 PERSONS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - LIFE SAFETY PLAN - DINING 1A118 RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GI102
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - LIFE SAFETY PLAN - DINING 1A118
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
FEC
FECFEC
DINING
ROOM
2A18
179'-7"
0'
-0
1 HOUR FIRE & SMOKE SEPERATION
1 HOUR SMOKE BARRIER
2 HOUR FIRE & SMOKE SEPERATION
PATH OF EGRESS
COMMON PATH OF TRAVEL
1 HOUR FIRE / SMOKE SEPARATION
FIRE EXTINGUISHER CABINET
FIRE ALARM PULL STATION
EXIT SIGN
DISTANCE
LIFE SAFETY PLAN LEGEND
BUILDING 217
ORIGINAL CONSTRUCTION: 1977
CONSTRUCTION TYPE: II (222)
*AUTOMATIC SPRINKLER SYSTEM*
NFPA OCCUPANCY: HEALTHCARE: GROSS 240 SF/ PERSON
MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 48 INCHES
MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 48 INCHES
MAXIMUM TRAVEL DISTANCE: 200 FEET
MAXIMUM DEAD END CORRIDOR: 30 FEET
COMMON PATH OF EGRESS TRAVEL: 100 FEET
MAXIMUM DISTANCE OF TRAVEL TO FEC 75 FEET
NFPA 101 (2021)
IBC, IEBC (2021)
BUILDING OCCUPANCY CALCULATIONS (NFPA 101, 2021):
FIRST FLOOR OCCUPANCY CALCULATION:
FIRST FLOOR: 64,003 GSF @ 240 SF/PERSON 266 PERSONS
SECOND FLOOR OCCUPANCY CALCULATION:
SECOND FLOOR: 59,200 GSF @ 240 SF/PERSON 246 PERSONS
GENERAL NOTES LIFE SAFETY
AREA OCCUPANCY CALCULATIONS (NFPA 101, 2021):
PRIMARY CARE CLINIC OCCUPANCY CALCULATION:
FIRST FLOOR: 5,383 GSF @ 240 SF/PERSON 22 PERSONS
DINING 1A118 OCCUPANCY CALCULATION:
FIRST FLOOR: 2,089 GSF @ 240 SF/PERSON 8 PERSONS
DINING 2A18 OCCUPANCY CALCULATION:
SECOND FLOOR: 2,246 GSF @ 240 SF/PERSON 9 PERSONS
DEMENTIA UNIT OCCUPANCY CALCULATION:
FIRST FLOOR: 7,686 GSF @ 240 SF/PERSON 32 PERSONS
EASY STREET OCCUPANCY CALCULATION:
FIRST FLOOR: 2,102 GSF @ 240 SF/PERSON 8 PERSONS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - LIFE SAFETY PLAN - DINING 2A18 RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GI103
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - LIFE SAFETY PLAN - DINING 2A26
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
C
FEC
FEC
CLEAN
UTILITY
1B152
DEMENTIA
PATIENT
ROOM
1B155
DEMENTIA
PATIENT
ROOM
1B156
DEMENTIA
PATIENT
ROOM
1B159
DEMENTIA
PATIENT
ROOM
1B162
MULTIPURPOSE
ROOM
1B160
DEMENTIA
PATIENT
ROOM
1B164
DEMENTIA
PATIENT
ROOM
1B167
DEMENTIA
PATIENT
ROOM
1B168
DEMENTIA
PATIENT
ROOM
1B171
DEMENTIA
PATIENT
ROOM
1B172
DEMENTIA
PATIENT
ROOM
1B175
EQUIPMENT
STORAGE
1B178A
DEMENTIA
PATIENT
ROOM
1B176
BATHROOM
1B165
BATHROOM
1B166
BATHROOM
1B169
BATHROOM
1B170
BATHROOM
1B173
BATHROOM
1B174
BATHROOM
1B177
BATHROOM
1B154
BATHROOM
1B157
BATHROOM
1B158
PUBLIC
TOILET
1B161
BATHROOM
1B163
CLEAN
LINEN
1B151
SOILED
UTILITY
1B153
TOILET
ROOM
1B179
WOUND
CARE
STORAGE
1B178B
SHOWER
ROOM
1B135
STAFF
WORK
AREA
1B142
STAFF
TOILET
1B135A
6'
-6
1'-
7"
OCCUPANT LOAD:
148 GSF @ 240 SF/PERSON - 1 PERSON
1 HOUR FIRE & SMOKE SEPERATION
1 HOUR SMOKE BARRIER
2 HOUR FIRE & SMOKE SEPERATION
PATH OF EGRESS
COMMON PATH OF TRAVEL
1 HOUR FIRE / SMOKE SEPARATION
FIRE EXTINGUISHER CABINET
FIRE ALARM PULL STATION
EXIT SIGN
DISTANCE
LIFE SAFETY PLAN LEGEND
BUILDING 217
ORIGINAL CONSTRUCTION: 1977
CONSTRUCTION TYPE: II (222)
*AUTOMATIC SPRINKLER SYSTEM*
NFPA OCCUPANCY: HEALTHCARE: GROSS 240 SF/ PERSON
MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 48 INCHES
MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 48 INCHES
MAXIMUM TRAVEL DISTANCE: 200 FEET
MAXIMUM DEAD END CORRIDOR: 30 FEET
COMMON PATH OF EGRESS TRAVEL: 100 FEET
MAXIMUM DISTANCE OF TRAVEL TO FEC 75 FEET
NFPA 101 (2021)
IBC, IEBC (2021)
BUILDING OCCUPANCY CALCULATIONS (NFPA 101, 2021):
FIRST FLOOR OCCUPANCY CALCULATION:
FIRST FLOOR: 64,003 GSF @ 240 SF/PERSON 266 PERSONS
SECOND FLOOR OCCUPANCY CALCULATION:
SECOND FLOOR: 59,200 GSF @ 240 SF/PERSON 246 PERSONS
GENERAL NOTES LIFE SAFETY
AREA OCCUPANCY CALCULATIONS (NFPA 101, 2021):
PRIMARY CARE CLINIC OCCUPANCY CALCULATION:
FIRST FLOOR: 5,383 GSF @ 240 SF/PERSON 22 PERSONS
DINING 1A118 OCCUPANCY CALCULATION:
FIRST FLOOR: 2,089 GSF @ 240 SF/PERSON 8 PERSONS
DINING 2A18 OCCUPANCY CALCULATION:
SECOND FLOOR: 2,246 GSF @ 240 SF/PERSON 9 PERSONS
DEMENTIA UNIT OCCUPANCY CALCULATION:
FIRST FLOOR: 7,686 GSF @ 240 SF/PERSON 32 PERSONS
EASY STREET OCCUPANCY CALCULATION:
FIRST FLOOR: 2,102 GSF @ 240 SF/PERSON 8 PERSONS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - LIFE SAFETY PLAN - DEMENTIA
UNIT
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GI104
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - LIFE SAFETY PLAN - DEMENTIA UNIT
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
FECFEC
FEC
MULTIPURPOSE
ROOM -
EASY
STREET
1A43
1585 SF
DINING
ROOM
1A118
504 SF
KITCHEN
SUPPORT
1A127A
187 SF
RECEPTION
1A104A
A/V 1A108A
1585 SF
DINING
ROOM
1A118
504 SF
KITCHEN
SUPPORT
1A127A
187 SF
RECEPTION
1A104A
3'
-8
0'
-0
THERAPY
STORAGE
1A108B
1 HOUR FIRE & SMOKE SEPERATION
1 HOUR SMOKE BARRIER
2 HOUR FIRE & SMOKE SEPERATION
PATH OF EGRESS
COMMON PATH OF TRAVEL
1 HOUR FIRE / SMOKE SEPARATION
FIRE EXTINGUISHER CABINET
FIRE ALARM PULL STATION
EXIT SIGN
DISTANCE
LIFE SAFETY PLAN LEGEND
BUILDING 217
ORIGINAL CONSTRUCTION: 1977
CONSTRUCTION TYPE: II (222)
*AUTOMATIC SPRINKLER SYSTEM*
NFPA OCCUPANCY: HEALTHCARE: GROSS 240 SF/ PERSON
MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 48 INCHES
MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 48 INCHES
MAXIMUM TRAVEL DISTANCE: 200 FEET
MAXIMUM DEAD END CORRIDOR: 30 FEET
COMMON PATH OF EGRESS TRAVEL: 100 FEET
MAXIMUM DISTANCE OF TRAVEL TO FEC 75 FEET
NFPA 101 (2021)
IBC, IEBC (2021)
BUILDING OCCUPANCY CALCULATIONS (NFPA 101, 2021):
FIRST FLOOR OCCUPANCY CALCULATION:
FIRST FLOOR: 64,003 GSF @ 240 SF/PERSON 266 PERSONS
SECOND FLOOR OCCUPANCY CALCULATION:
SECOND FLOOR: 59,200 GSF @ 240 SF/PERSON 246 PERSONS
GENERAL NOTES LIFE SAFETY
AREA OCCUPANCY CALCULATIONS (NFPA 101, 2021):
PRIMARY CARE CLINIC OCCUPANCY CALCULATION:
FIRST FLOOR: 5,383 GSF @ 240 SF/PERSON 22 PERSONS
DINING 1A118 OCCUPANCY CALCULATION:
FIRST FLOOR: 2,089 GSF @ 240 SF/PERSON 8 PERSONS
DINING 2A18 OCCUPANCY CALCULATION:
SECOND FLOOR: 2,246 GSF @ 240 SF/PERSON 9 PERSONS
DEMENTIA UNIT OCCUPANCY CALCULATION:
FIRST FLOOR: 7,686 GSF @ 240 SF/PERSON 32 PERSONS
EASY STREET OCCUPANCY CALCULATION:
FIRST FLOOR: 2,102 GSF @ 240 SF/PERSON 8 PERSONS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - LIFE SAFETY PLAN - EASY
STREET
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GI105
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - LIFE SAFETY PLAN - EASY STREET
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
C
FEC
FE
C
FE
C
FECFEC
FEC
P H
A S
E
P H
A S
E
PHASE 3
PHASE 4
P H
A S
E
PHASE 7
PHASE 7
P H
A S
E
PHASE 8
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO. 12/06/2024
GENERAL - PHASING PLAN - FIRST FLOOR RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC201
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/16" = 1'-0"
GENERAL - PHASING PLAN - FIRST FLOOR
A. CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND
COORDINATION OF CONSTRUCTION PHASING WITH THE VA'S
SCHEDULE, INFECTION CONTROL, AND INTERIM LIFE SAFETY
REQUIREMENTS. REFER TO SPECIFICATIONS FOR PROJECT GENERAL
CONDITIONS, INFECTION CONTROL, SPECIAL NOTES, PROJECT
SCHEDULE, ETC. FOR ALL PROJECT REQUIREMENTS.
B. CONTRACTOR SHALL PROVIDE ALL SUB-PHASING AS REQUIRED FOR
WORK OCCURRING BETWEEN VARIOUS PHASES.
C. THE PHASING PLAN IS NOT TO BE TAKEN AS AN ALL INCLUSIVE LIST
OF ALL ITEMS TO BE COMPLETED WITHIN A SPECIFIC OUTLINED
PHASE. PLEASE REFER TO ALL DISCIPLINES AND CONTRACT
DOCUMENTS FOR ALL WORK ASSOCIATED IN THESE AREAS.
D. THE PHASING PLAN IS SUBJECT TO THE CONTRACTORS MEANS AND
METHODS, SCHEDULING AND TO EXISTING CONDITIONS AND TIME
RESTRAINTS.
E. CONTRACTOR SHALL REFER TO ALL DEMOLITION AND
CONSTRUCTION DRAWINGS FOR COMPLETE UNDERSTANDING OF
THE SPECIFIED SCOPE OF WORK.
F. CONTRACTOR SHALL MAINTAIN EGRESS PASSAGE WAYS MAIN
CORRIDOR, ELEVATOR LOBBY AND STAIR EXITS DURING COMPLETE
PROJECT DURATION. ALSO, MAINTAIN ALL EGRESS/EXIT DOORS OF
THE FACILITY.
G. CONTRACTOR SHALL REFER TO DRAWING GC400 FOR INFECTION
CONTROL NOTES AND DRAWINGS GC401-GC410 FOR SUGGESTED
LOCATION OF CONSTRUCTION BARRIERS AND ENTRANCES.
H. CONTRACTOR SHALL NOTE ALL EXISTING PLUMBING, MECHANICAL
AND ELECTRICAL SERVICES AND SYSTEMS THAT ARE SCHEDULED TO
REMAIN FULLY OPERATIONAL AND FUNCTIONAL FOR DURATION OF
SPECIFIC PHASES.
I. CONTRACTOR SHALL NOTE THAT BUILDING 217 SHALL BE OCCUPIED
DURING CONSTRUCTION.
J. HOURS OF OPERATION FOR NOISE AND VIBRATION OPERATIONS ARE
DURING NORMAL HOSPITAL OPERATION HOURS (6:00PM TO 6:00AM).
SERVICE INTERRUPTIONS DURING OFF NORMAL WORK HOURS AND
SCHEDULED MINIMIUM (3) WEEK ADVANCED NOTICE.
K. WHERE TWO OR MORE SEQUENCES MEET, IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO COORDINATE THE TRANSITION WORK
BETWEEN SEQUENCES.
L. CONTRACTOR TO HAVE ALL MATERIALS AND EQUIPMENT ON SITE
FOR THE COMPLETION OF ANY WORK THAT IS DESIGNATED FOR OFF
HOURS PRIOR TO THE START OF OF HOURS WORK.
M. PHASES TO BE PERORMED IN ORDER AS APPROVED BY COR.
PHASE 1
DURING PHASE 1, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.1. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 2
DURING PHASE 2, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.9. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 3
DURING PHASE 3, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.7. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 4
DURING PHASE 4, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.2. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 5
DURING PHASE 5, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.3. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 6
DURING PHASE 6, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.10. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 7
DURING PHASE 7, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.5. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 8
DURING PHASE 8, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.8. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 9
DURING PHASE 9, AREA INDICATED ON PLAN WILL BE VACATED BY VA STAFF
AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.9. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASE 10
DURING PHASE 10, AREA INDICATED ON PLAN WILL BE VACATED BY VA
STAFF AND ENCLOSED FOR CONSTRUCTION AS INDICATED ON INFECTION
CONTROL PLAN GC401.6. THIS SEQUENCE INCLUDES ALL WORK INDICATED
FOR AREA HIGHLIGHTED ON PLAN.
PHASING PLAN GENERAL NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
DN
DN
FEC
FECFEC
PHASE 5
P H
A S
E
PHASE 8
P H
A S
E
PHASE 9
P H
A S
E
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO. 12/06/2024
GENERAL - PHASING PLAN - SECOND FLOOR RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC202
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/16" = 1'-0"
GENERAL - PHASING PLAN - SECOND FLOOR
A. CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND
COORDINATION OF CONSTRUCTION PHASING WITH THE VA'S
SCHEDULE, INFECTION CONTROL, AND INTERIM LIFE SAFETY
REQUIREMENTS. REFER TO SPECIFICATIONS FOR PROJECT GENERAL
CONDITIONS, INFECTION CONTROL, SPECIAL NOTES, PROJECT
SCHEDULE, ETC. FOR ALL PROJECT REQUIREMENTS.
B. CONTRACTOR SHALL PROVIDE ALL SUB-PHASING AS REQUIRED FOR
WORK OCCURRING BETWEEN VARIOUS PHASES.
C. THE PHASING PLAN IS NOT TO BE TAKEN AS AN ALL INCLUSIVE LIST
OF ALL ITEMS TO BE COMPLETED WITHIN A SPECIFIC OUTLINED
PHASE. PLEASE REFER TO ALL DISCIPLINES AND CONTRACT
DOCUMENTS FOR ALL WORK ASSOCIATED IN THESE AREAS.
D. THE PHASING PLAN IS SUBJECT TO THE CONTRACTORS MEANS AND
METHODS, SCHEDULING AND TO EXISTING CONDITIONS AND TIME
RESTRAINTS.
E. CONTRACTOR SHALL REFER TO ALL DEMOLITION AND
CONSTRUCTION DRAWINGS FOR COMPLETE UNDERSTANDING OF
THE SPECIFIED SCOPE OF WORK.
F. CONTRACTOR SHALL MAINTAIN EGRESS PASSAGE WAYS MAIN
CORRIDOR, ELEVATOR LOBBY AND STAIR EXITS DURING COMPLETE
PROJECT DURATION. ALSO, MAINTAIN ALL EGRESS/EXIT DOORS OF
THE FACILITY.
G. CONTRACTOR SHALL REFER TO DRAWING GC400 FOR INFECTION
CONTROL NOTES AND DRAWINGS GC401.1-GC401.10 FOR SUGGESTED
LOCATION OF CONSTRUCTION BARRIERS AND ENTRANCES.
H. CONTRACTOR SHALL NOTE ALL EXISTING PLUMBING, MECHANICAL
AND ELECTRICAL SERVICES AND SYSTEMS THAT ARE SCHEDULED TO
REMAIN FULLY OPERATIONAL AND FUNCTIONAL FOR DURATION OF
SPECIFIC PHASES.
I. CONTRACTOR SHALL NOTE THAT BUILDING 217 SHALL BE OCCUPIED
DURING CONSTRUCTION.
J. HOURS OF OPERATION FOR NOISE AND VIBRATION OPERATIONS ARE
DURING NORMAL HOSPITAL OPERATION HOURS (6:00AM TO 6:00PM).
SERVICE INTERRUPTIONS DURING OFF NORMAL WORK HOURS AND
SCHEDULED MINIMIUM (2) WEEK ADVANCED NOTICE.
K. WHERE TWO OR MORE SEQUENCES MEET, IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO COORDINATE THE TRANSITION WORK
BETWEEN SEQUENCES.
L. CONTRACTOR TO HAVE ALL MATERIALS AND EQUIPMENT ON SITE
FOR THE COMPLETION OF ANY WORK THAT IS DESIGNATED FOR OFF
HOURS PRIOR TO THE START OF OF HOURS WORK.
M. PHASES TO BE PERFORMED IN SEQUENCE.
PHASING PLAN GENERAL NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
MAINTAIN 6'-0" MIN
ICP.1
ICP.1
ICP.3
ICP.3
ICP.1
ICP.2
MAINTAIN 6' MIN.
MA
IN
TA
IN
6' M
IN
PATIO
2APATIO
OFFICE
2A25
DINING
2A26
NOURISHMENT
KITCHEN
2A31
H.A.C.
2A39
PRIOR TO ANY CONSTRUCTION
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA. SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT
AND INFECTION CONTROL.
POST CONSTRUCTION
1. OBTAIN APPROVAL BY COR TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
GENERAL INFECTION
CONTROL NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - INFECTION CONTROL PLAN -
DINING ROOM 2A18
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC403
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
GENERAL - INFECTION CONTROL PLAN - DINING 2A26
ICP.1 TEMPORARY 1-HR CONSTRUCTION BARRIER WALL. BASIS OF DESIGN:
STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.2 TEMPORARY 45MIN DOOR AND ASSOCIATED HARDWARE. BASIS OF
DESIGN: STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.3 SUPPLY AND INSTALL STICKY WALK OFF MAT(S).
INFECTION CONTROL KEY NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
ICP.1
ICP.1 ICP.2
ICP.3 ICP.3
TOILET
2A10
H.A.C.
2A11
SANCTUARY
ROOM
2A12
CONFERENCE
ROOM
2A13
OFFICE
2A25
PRIOR TO ANY CONSTRUCTION
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA. SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT
AND INFECTION CONTROL.
POST CONSTRUCTION
1. OBTAIN APPROVAL BY COR TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
GENERAL INFECTION
CONTROL NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - INFECTION CONTROL PLAN -
LIBRARY 2A12
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC404
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
GENERAL - INFECTION CONTROL PLAN - LIBRARY 2A12
ICP.1 TEMPORARY 1-HR CONSTRUCTION BARRIER WALL. BASIS OF DESIGN:
STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.2 TEMPORARY 45MIN DOOR AND ASSOCIATED HARDWARE. BASIS OF
DESIGN: STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.3 SUPPLY AND INSTALL STICKY WALK OFF MAT(S).
INFECTION CONTROL KEY NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
MA
IN
TA
IN
6' -0"
M
IN
ICP.1
ICP.3
ICP.3ICP.2MA
IN
TA
IN
6' -0"
M
IN
ICP.1
ICP.3
ICP.3ICP.2
TOILET
1B148
BEDROOM
1B149BEDROOM
1C149
TOILET
1C148
PRIOR TO ANY CONSTRUCTION
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA. SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT
AND INFECTION CONTROL.
POST CONSTRUCTION
1. OBTAIN APPROVAL BY COR TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
GENERAL INFECTION
CONTROL NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - INFECTION CONTROL PLAN -
BARIATRIC ROOMS
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC405
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
GENERAL - INFECTION CONTROL PLAN - BARIATRIC ROOM B149
N
1/4" = 1'-0"
GENERAL - INFECTION CONTROL PLAN - BARIATRIC ROOM C149
ICP.1 TEMPORARY 1-HR CONSTRUCTION BARRIER WALL. BASIS OF DESIGN:
STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.2 TEMPORARY 45MIN DOOR AND ASSOCIATED HARDWARE. BASIS OF
DESIGN: STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.3 SUPPLY AND INSTALL STICKY WALK OFF MAT(S).
INFECTION CONTROL KEY NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
ICP.1
ICP.1
ICP.3
ICP.3
ICP.2
ICP.2
ICP.1
ICP.1
MECHANICAL
1A114
PANTRY
1B136
SOILED
UTILITY
1B146
HAC
1B147
SHOWER
1B135
CONFERENCE
ROOM
1B133
TOILET
1B148
SOILED
UTILITY
1B151
BEDROOM
1B152
TOILET
1B153
BEDROOM
1B155
BEDROOM
1B156
TOILET
1B157
BEDROOM
1B159
TOILET
1B161
BEDROOM
1B160
BEDROOM
1B164
TOILET
1B165
BATH
1B166
BEDROOM
1B167
BEDROOM
1B168
TOILET
1B169
BEDROOM
1B171
BEDROOM
1B172
BEDROOM
1B175
BEDROOM
1B176
TOILET
1B177
BEDROOM
1B178
TOILET
1B179
TOILET
1B173
TOILET
1B174
TOILET
1B170
TOILET
1B158
TOILET
1B154
EQUIP.
ROOM
1B151A
OFFICE
1B139
OFFICE
1B141
ELECT.
1B143
SUPPLY
1B142
STORAGE
1B145 EMS
1B145A
LOUNGE
1B80
227 SF
BEDROOM
1B162
82 SF
BATH
1B163
313 SF
BEDROOM
1B149
PRIOR TO ANY CONSTRUCTION
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA. SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT
AND INFECTION CONTROL.
POST CONSTRUCTION
1. OBTAIN APPROVAL BY COR TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
GENERAL INFECTION
CONTROL NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
12/06/2024
GENERAL - INFECTION CONTROL PLAN -
DEMENTIA UNIT
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
GC407
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
GENERAL - INFECTION CONTROL PLAN - DEMENTIA UNIT
ICP.1 TEMPORARY 1-HR CONSTRUCTION BARRIER WALL. BASIS OF DESIGN:
STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.2 TEMPORARY 45MIN DOOR AND ASSOCIATED HARDWARE. BASIS OF
DESIGN: STARCWALL FIREBLOCKWALL OR APPROVED EQUAL.
ICP.3 SUPPLY AND INSTALL STICKY WALK OFF MAT(S).
INFECTION CONTROL KEY NOTES
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
ICP.1 ICP.2
ICP.3
ICP.1
ICP.3
ICP.1 ICP.3
ICP.2
ICP.3
ICP.1
ICP.3
ICP.1
ICP.3
ICP.1
ICP.2
ICP.3
TOILET
1C103
PATIENT
ROOM
1C104
TOILET
1C179
PATIENT
ROOM
1C178
PATIENT
ROOM
2C4
TOILET
2C3
TOILET
2C79
PATIENT
ROOM
2C78
PRIOR TO ANY CONSTRUCTION
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER…
This is the start of the file's text. The full file is on GovTribe.