1.8 Dig Permit SOP Form.pdf

PDF 248 KB Posted

Attached to
Z1DA--578-26-016 Donation Renovations Building 217 Phase 2 CON
Solicitation number
36C25226B0028
Issued by

About this file

This is a Standard Operating Procedure (SOP) document for the Dig Permit Program at Edward Hines VA Hospital in Hines, Illinois, effective May 6, 2015.

The SOP establishes a mandatory approval process for all excavation, withdrawal, insertion, or ground-level penetration work at the facility. The program aims to minimize risk of damage to critical infrastructure and underground utilities by requiring proactive utility identification before work begins. Key responsibilities are distributed among the Engineering Service Chief (annual process review and violation reporting), Project Planning Chief (official program manager assignment and violation reporting to contracting agencies), Dig Permit Program Manager (personnel compliance and violation reporting to Safety Service and Project Planning), and Execution Agents (contractors or personnel performing the work who must adhere to all program requirements). The program workflow requires the Execution Agent to request a Dig Permit (Hines Form 1532) from the Program Manager, provide preliminary information including excavation date and work area, prepare a sketch of excavation boundaries, engage a professional utility locator vendor to mark all utilities within the immediate area and at least 6 feet beyond the excavation zone (no earlier than 24 hours before excavation), complete the permit form, and notify the Program Manager for inspection. The Program Manager verifies utility markings against existing drawings, signs the completed permit, maintains a copy, and closes the permit after work completion with backfill and compaction. Permits must be retained digitally for a minimum of 2 years. The program references Hines Form 1532, OSHA 1926.651 (Specific Excavation Requirements), and USACE EM 385-1-1 (Safety and Health Requirements Manual).

View the file

Other files

File Type Posted
S06 Amendment 0002 Solicitation 36C25226B0028.docx DOCX document
P09 - SOW BNOE_Nurse Call.docx DOCX document
S06 Amendment 0001 Solicitation 36C25226B0028.docx DOCX document
FINAL RFI QUESTIONS AND ANSWERS FOR PROJECT 578-26-016.docx DOCX document
57826016_Addendumnumber2_08202026.pdf PDF
Pre-Bid Site Visit Sign-in.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2_.pdf PDF
11. Building 217 _ Exterior Rooms.pdf PDF
8. 578-26-016 Building 217 Abatement Drawings.pdf PDF
7c. 578-20-002 Basis of Design -BOD Part 3.pdf PDF
5b. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 2.pdf PDF
2. VHA PCRA-1.1 -May 21 2024- 578-26-016.pdf PDF
1.15 Hines COVID-19 Guidelines.pdf PDF
1.14 OIT Horizontal Cable Requirements.pdf PDF
1.12 Cutting Welding and Other Hot Work.pdf PDF
1.10 Fire Protection Code Reviews.pdf PDF
1.9 Above Ceiling Permits.pdf PDF
1.2 HINES VA SITE PLAN 5-1-2025.pdf PDF
9. 578-26-016 Building 217 Abatement Specifications.pdf PDF
5c. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 3.pdf PDF
4. VHA ICRA-1.3 -Dec 9 2024- 578-26-016.pdf PDF
3. Interim Life Safety Measures -ILSM 578-26-016.pdf PDF
1.17 Emergency Contact List - Template.pdf PDF
1.11 No Smoking Policy 10-1-19.pdf PDF
1.7 Infection Control Barrier Sample.pdf PDF
1.5 Safety and Health During Construction Activities.pdf PDF
1.1 Hines Underground Utility Plan.pdf PDF
P09 578-26-016 Donation Renovations Phase 2 Construction SOW 7-27-26.docx DOCX document
12. Hines VA Lock Hardware Standards.docx DOCX document
6. 578-26-016 CLIN1 Specifications Book R1.pdf PDF
1.16 VHA Supplemental COVID-19 Requirements.pdf PDF
1.13 Asbestos Survey Glossary.pdf PDF
P07 WAGE DETERMINATION IL20260009 05-18-2026.pdf PDF
13. Hines AC Shop HVAC Controls Requirements.docx DOCX document
10. Building 217 Colored Space Drawings.pdf PDF
7d. 578-20-002 Basis of Design -BOD Part 4.pdf PDF
7b. 578-20-002 Basis of Design -BOD Part 2.pdf PDF
7a. 578-20-002 Basis of Design -BOD Part 1.pdf PDF
5a. 578-26-016 CLIN1 100 Percent Bid Drawings -Part 1.pdf PDF
1.6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
1.4 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1.3 Parking Designations 08042025.pdf PDF
36C25226B0028.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Hospital Engineering Service SOP Dig Permit Hines, IL 60141 May 6, 2015

DIG PERMIT PROGRAM SOP

1. PURPOSE: The purpose of this plan is to clearly define the process to obtain installation approval to excavate, withdraw from, insert into, or otherwise penetrate any ground-level surfaces within the area of responsibility at Edward Hines, VA Hospital and areas under our purview.

As underground work is carried out through the installation, the risk of damaging critical infrastructure and utilities is significant. The process defined herein seeks to minimize these risks by proactively identifying the existence of utilities in the area of excavation and affording an opportunity to develop adequate precautions to safeguard said utilities.

2. RESPONSIBILITIES:

a. Engineering Service Chief :

The Engineering Service Chief shall support the Dig Permit Program and ensure the process is kept up to date by reviewing the process and analyzing the impact on utilities throughout an execution year. Documentation is not required for this review. However, this SOP must be reviewed and dated once per year. The Service Chief shall report all program violations to the assigned PENTAD member for accountability.

b. Project Planning Chief :

The Project Planning Chief shall officially assign an official Dig Permit Program Manager. The Chief will report the impact of the program and any violations of the program requirements to the Engineering Service Chief. Should the project generating the violation be managed by the Hines Project Planning Section, the Chief shall report this violation to the appropriate contracting agency for contractor enforcement.

c. Dig Permit Program Manager:

The Dig Permit Manager shall ensure personnel involved in any work requiring participation in this permit program adhere to the requirements of the program. The Program Manager shall report any violations to the permit to the Safety Service Chief and the Project Planning Chief.

d. Execution Agent:

The Execution Agent is defined as any party partaking on actions that require this permit.

The Agent shall adhere to all requirements of the permit program and actively participate in method resolution to support the protection of underground utilities and infrastructure.

VA Hospital Engineering Service SOP Dig Permit Hines, IL 60141 May 6, 2015

3. PROGRAM REQUIREMENTS:

a. The Execution Agent shall contact the Program Manager and request a Dig Permit.

b. The Program Manager shall issue a blank permit in the form of a Hines Form 1532.

c. The Program Manager shall explain the process to the Execution Agent, and collect preliminary information from the Agent to include,

a. Expected excavation date

b. General area of work

c. Approximate duration of work.

d. Execution Agent shall prepare a sketch depicting the general area of excavation and its boundaries.

e. Execution Agent shall secure a professional utility locator vendor and locate all utilities in the immediate area of excavation and no less than 6 feet beyond the excavation area.

Utilities shall not be marked more than 24 hours prior to the planned excavation date.

f. Execution Agent shall complete the Hines Form 1532 with the exception of the Engineering signature.

g. Execution Agent will notify the Program Manager

h. The Program Manager shall inspect the markings and compare to existing utility drawings.

i. The Program Manager shall sign Hines Form 1532 confirming that utilities have been located to the maximum extent possible.

j. The program Manager shall retain a copy of the completed permit.

k. The Execution Agent shall notify the Program Manager when all excavation work is completed, backfilled and compacted (if applicable).

l. The Program Manager shall close the permit and maintain a digital copy of the permit for no less than 2 years after completion of the excavation.

4. REFERENCES:

• Hines Form 1532

• OSHA 1926.651, Specific Excavation Requirements

• USACE EM 385-1-1, Safety and Health Requirements Manual

Russell Thomason Chief, Engineering Service

DATE PREPARED

1. Clearance requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF WORK INVOLVED

A. PAVEMENTS D. FIRE PROTECTION & DETECTION SYSTEMS G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

B. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND H. SECURITY

C. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND I. OTHER

3. DATE CLEARANCE REQUIRED (NO LESS THAN 72 HOURS) 4. DATE CLEARANCE APPROVED (FOR P2 USE ONLY)

5. SIGNATURE OF REQUESTOR (INSTALLATION POC) 6. POC TELEPHONE NUMBER 7. POC ORGANIZATION

SAFETY

FIRE PROTECTION

GEMS

POLICE

OI&T

PAVEMENTS AND GROUNDS

ENGINEERING- HTM

ENGINEERING- PROJECT PLANNING

ENGINEERING- M&O

OTHER

11. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

WATER

12. OTHER (SPECIFY)

14. APPROVING OFFICIAL 15. DATE SIGNED

(NAME AND SIGNATURE OF CHIEF OF PROJECT PLANNING OR ENGINEERING SERVICE CHIEF)

HINES FORM 1532, MAY 2015 VERSION

HINES ENGINEERING- DIG PERMIT

(SEE INSTRUCTIONS ON REVERSE)

9. REMARKS (USE REVERSE FOR ADDITIONAL COMMENTS)8. SERVICE/SECTION 10. REVIEWER NAME

13. PERMIT APPROVAL APPROVED DISAPPROVED

HINES FORM 1532, MAY 2015 VERSION (REVERSE)

INSTRUCTIONS

The Hine Engineering- Dig Permit is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, installation utility services, protection provided by fire or intrusion alarm systems, or routine activities of the installation. This form is used to coordinate the required work with key installation activities and keep customer inconvenience to a minimum. It is also used to identify hazardous work conditions in an attempt to prevent accidents. The Dig Permit request is processed just prior to starting work. If delays are encountered and the conditions at the job site change (or may have changed) this permit must be reprocessed.

16. REMARKS (This section must describe the specific measures to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, must be included.)

Dig Permit SOP 2015
DIG PERMIT FORM
Sheet1
Chief, Engineering Service:
DATE 1:
1 Clearance requested to proceed with work at:
Contract No:
involving excavation or utility disturbance:
has: Off
has not been staked or clearly marked: Off
2 TYPE OF WORK INVOLVED:
D FIRE PROTECTION DETECTION SYSTEMS:
G AIRCRAFT OR VEHICULAR TRAFFIC FLOW:
E UTILITY:
OVERHEAD:
UNDERGROUND:
H SECURITY:
F COMM:
OVERHEAD_2:
UNDERGROUND_2:
I OTHER:
DATE 2:
DATE 3:
5 SIGNATURE OF REQUESTOR INSTALLATION POC:
6 POC TELEPHONE NUMBER:
7 POC ORGANIZATION:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSSAFETY:
10 REVIEWER NAMESAFETY:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSFIRE PROTECTION:
10 REVIEWER NAMEFIRE PROTECTION:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSGEMS:
10 REVIEWER NAMEGEMS:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSPOLICE:
10 REVIEWER NAMEPOLICE:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSOIT:
10 REVIEWER NAMEOIT:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSPAVEMENTS AND GROUNDS:
10 REVIEWER NAMEPAVEMENTS AND GROUNDS:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSENGINEERING HTM:
10 REVIEWER NAMEENGINEERING HTM:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSENGINEERING PROJECT PLANNING:
10 REVIEWER NAMEENGINEERING PROJECT PLANNING:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSENGINEERING MO:
10 REVIEWER NAMEENGINEERING MO:
9 REMARKS USE REVERSE FOR ADDITIONAL COMMENTSOTHER:
10 REVIEWER NAMEOTHER:
11 COMMERCIAL UTILITY COMPANY:
TELEPHONE: Off
GAS: Off
ELECTRIC: Off
WATER: Off
TELEPHONE GAS ELECTRIC WATER:
12 OTHER SPECIFY:
13 PERMIT APPROVAL APPROVED DISAPPROVED:
APPROVED:
DISAPPROVED:
14 APPROVING OFFICIAL NAME AND SIGNATURE OF CHIEF OF PROJECT PLANNING OR ENGINEERING SERVICE CHIEF:
15 DATE SIGNED:
16 REMARKS This section must describe the specific measures to be taken before and during work accomplishment Specific comments concerning the approved method of excavation hand or powered equipment must be included:
2015-05-07T10:04:08-0500
RUSSELL C. THOMASON 904978

File details come from the government source that posted it. Updated .