61-Sec 32 01 16.71 Asphalt Milling.pdf

PDF 69 KB Posted

Attached to
2201256.01 - Whistlestop Park
Solicitation number
US.160528
Issued by
Montgomery County, Pennsylvania

About this file

This is a technical specification document for asphalt milling work issued by the Pennsylvania Department of Transportation (PennDOT) for use in state and local roadway construction projects, including the Whistlestop Park project in Montgomery Township, Pennsylvania. The specification covers the milling of existing asphalt pavement surfaces to specified depths using specialized equipment with automatic grade and slope control systems. The work requires contractors to mill surfaces to eliminate gouges, grooves, and ridges while maintaining specified surface tolerances, control dust through water application, and manage utility facility protection. Milled material must be picked up immediately and separated if oversize or chunky materials are present. Critical project timelines require that traffic be restricted from milled surfaces for no more than six calendar days, with overlay asphalt wearing course installation mandated within seven calendar days from the start of milling operations. Site conditions and specifications must comply with PennDOT Publication 408, the reference standard for all milling operations.

The specification requires contractors to perform all milling work in accordance with the latest edition of PennDOT Publication 408 standards and to satisfactorily dispose of all milled material. Contractors are responsible for using care around existing utility facilities and for repairing or replacing any damaged utilities to the satisfaction of utility owners. The specification does not establish specific pricing terms, set-asides, or funding sources within this technical section alone, as these elements are typically detailed in separate bid documents, contract conditions, and instructions to bidders provided through the PennBid online platform for individual Montgomery Township projects.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROADWAY MILLING

32 01 16.71-1

SECTION 32 01 16.71

ASPHALT MILLING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Milling of Asphalt Paving

1.02 DESCRIPTION OF WORK

A. This work is the milling of an existing asphalt pavement surface, with specified equipment, to the specified depth.

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Transportation: Publication 408 Specifications

B. Perform Work in accordance with the latest edition of PennDOT Publication 408.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 EQUIPMENT

A. Use a milling machine designed and built for this type of work. Provide a machine with an effective automatic grade and slope control system and having the capacity to taper mill and mill concrete patches.

3.02 MILLING OPERATION

A. Mill so the finished surface is free from gouges, grooves, and ridges and is in accordance with the specified surface tolerance requirements, or as directed.

B. To facilitate traffic control, pick up and move milled material, as specified, immediately after the milling operations.

C. Use care to remove the existing asphalt material around all utility facilities within the work areas.

D. Repair or replace, to the satisfaction of the utility owner, utility facilities which are damaged by the milling operation.

E. Control the rate of milling to avoid tearing of the mat, resulting in chunky and non-uniformly milled material.

F. Separate oversize and chunky milled material as directed.

G. Apply water for dust control during milling operations and keep milled pavement surface free of all loose materials and dust.

H. Do not allow traffic to drive on any milled surface for more than 6 calendar days. Install the overlay asphalt wearing course within 7 calendar days from the start of the milling operation.

3.03 DISPOSITION OF MILLED MATERIAL

A. Contractor shall satisfactorily dispose of the milled material.

END OF SECTION