This is a technical specification document for storm drainage infrastructure components issued by a Pennsylvania jurisdiction for the Whistlestop Park project. The specification section 33 44 14 details the installation requirements for storm inlets, catch basins, endwalls, end sections, and outlet control structures as part of the park's stormwater management system. The work includes precast concrete units, cast-in-place construction, and associated drainage components that must comply with Pennsylvania Department of Transportation Publication 408 Specifications and Publication #72 standards. Acceptable manufacturers for precast structures include Monarch Precast Concrete Corporation and Modern Concrete Septic Tank Company, while frames and grates must be sourced from Neenah Foundry Company, E.A. Quirin Machine Shop, Inc., or East Jordan Iron Works, Inc., or approved equivalents. Detailed shop drawings showing inlet units, endwalls, end sections, and reinforcing steel details must be submitted for approval prior to fabrication and delivery.

Construction requirements specify that precast units must be placed on a 12-inch coarse aggregate subbase compacted to 95 percent of dry weight density, while cast-in-place units are constructed on undisturbed earth. Materials must comply with American Society for Testing and Materials standards for structural steel, malleable and ductile iron castings, brick, and concrete specifications detailed in Section 03 30 53. Pipe projections into inlets are limited to a maximum of 2 inches, and pipe ends must not be exposed through endwall faces. All excavation, backfilling, and compaction work must be performed in accordance with related sections 31 23 33 and 31 37 16, with the Resident Project Representative required to examine structures prior to backfill operations. The specification ties directly to the broader Whistlestop Park project with a bid submission deadline of April 30, 2026, and requires performance, payment, and maintenance bonds upon contract award.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
8-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM INLETS, CATCH BASINS, ENDWALLS, END SECTIONS

33 44 14-1

SECTION 33 44 14

PART 1 - GENERAL

1.01. SECTION DESCRIPTION

A. The Work of This Section Includes, but is not limited to:

1. Storm drainage curb inlets

2. Storm drainage catch basins

3. Storm drainage pipe endwalls

4. Pipe culvert end sections

5. Storm drainage Outlet Control Structures

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 23 33: Excavation, Backfill and Compaction

3. Section 31 37 16: Energy Dissipator

4. Section 32 92 00: Finish Grading, Seeding and Sodding

5. Section 32 93 02: Exterior Planting

6. Section 33 41 00: Storm Drain Pipe

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. American Society for Testing and Materials (ASTM):

A36 Specification for Structural Steel A47 Specification for Malleable Iron Castings A536 Specification for Ductile Iron Castings C32 Specification for Sewer and Manhole Brick C270 Specification for Mortar for Unit Masonry

2. Pennsylvania Department of Transportation

Publication 408 Specifications Publication #72 Standards for Roadway Construction

B. Acceptable Manufacturer:

1. Precast structures, and frames and covers shall be provided by a firm regularly engaged in the manufacture of such products of the types, materials and sizes required, whose products have been in satisfactory use in similar service for not less than five (5) years.

2. Precast structures shall be provided by one of the following manufacturers or approved equal.

33 44 14-2

• Monarch Precast Concrete Corporation

• Modern Concrete Septic Tank Company

3. Frames and grates shall be provided by one of the following manufacturers or approved equal.

• Neenah Foundry Company

• E.A. Quirin Machine Ship, Inc.

• East Jordan Iron Works, Inc.

1.04 SUBMITTALS

A. Shop Drawings:

1. Submit detailed shop drawings of inlet units, end walls, and end sections including reinforcing steel details.

1.05 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Precast Concrete Units:

1. After fabrication and curing, transport the units to the job site. Protect until required for installation.

2. Handle to avoid damage to surfaces, edges and corners and to avoid creation of stresses within the units.

B. Other Requirements:

1. Section 01 60 00 also addresses transportation and handling along with storage and protection of materials and equipment.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Coarse Aggregate Subbase:

1. PADOT Number 2A, Type C, Section 703.2, Publication 408 Specifications.

B. Brick: ASTM C32, grade SS, solid

C. Masonry Mortar: ASTM C270, Type S

D. Malleable Iron Castings: ASTM A47, Grade 35018. Domestic

E. Ductile Iron Castings: ASTM A536, Grade 60-40-18. Domestic

F. Structural Grade Carbon Steel: ASTM A36

G. Concrete: Section 03 30 53

2.02 FABRICATIONS

A. Precast Cement Concrete Units:

33 44 14-3

1. Comply with the requirements of Section 713.2(d), Publication 408 Specifications

B. Inlets and Catch Basins:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-45 & 46) for precast units.

C. End Walls:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-31) for precast units.

D. Pipe Culvert End Sections:

1. Comply with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-33).

PART 3 - EXECUTION

3.01 EXCAVATION

A. Perform excavation in conjunction with storm pipe installation, Section 33 41 00 and as specified in Section 31 23 33.

B. Locate inlets, catch basins, endwalls, end sections, and outlet control structures as indicated on the Drawings.

3.02 CONSTRUCTION

A. Construct inlets and catch basins and manholes of either precast sections or of cast-in-place construction in compliance with the type, design and dimensions shown on the Drawings and in accordance with Publication #72 (RC-34).

l. Place precast units on a 12" coarse aggregate subbase placed in 4" layers compacted to 95% of dry weight density.

2. Construct cast-in-place units on undisturbed earth.

3. Shape bottom of inlet boxes to channel flow of water to the outlet pipe and to prevent water from standing in box.

4. Unless units are cast-in-place, use precast concrete sections or brick to adjust to grade. Mortar in place.

B. Construct endwalls of either precast units of cast-in-place construction in compliance with the type, design and dimensions shown on the Drawings and in accordance with Publication #72

(RC-31).

1. Cast-in-place endwalls shall be monolithically cast reinforced concrete units.

C. Do not permit pipes to project more than 2" into inlets. Do not expose end of pipe through faces of endwalls.

D. Where indicated on the Drawings, provide pipe culvert end sections in compliance with the design and dimensions shown on the Drawings and in accordance with Publication #72

(RC-33).

33 44 14-4

E. Where indicated, construct energy dissipator in accordance with Section 31 37 16.

3.03 BACKFILLING

A. Backfill structures only after examination by the Resident Project Representative.

B. Perform backfilling and compaction as specified in Section 31 23 33.

END OF SECTION