65-Sec 03 11 00 - CONCRETE FORMWORK.pdf

PDF 68 KB Posted

Attached to
2201256.01 - Whistlestop Park
Solicitation number
US.160528
Issued by
Montgomery County, Pennsylvania

About this file

This is a technical specification document for concrete formwork work prepared for Montgomery Township, Pennsylvania in connection with the Whistlestop Park rehabilitation project. The specification details requirements for formwork design, materials, and installation for cast-in-place concrete elements including sidewalks, curb ramps, driveway aprons, and curbs. The work must conform to ACI 301, ACI 318, and ACI 347 standards, with forms constructed from wood or steel profiled to suit site conditions. Key execution requirements include verification of lines, levels, and dimensions prior to formwork erection; removal and replacement of unsuitable subgrade material with compacted PADOT 2A stone; prohibition of earth forms; proper bracing and assembly to permit safe dismantling; application of colorless mineral oil form release agent; and careful form cleaning prior to concrete placement. Formwork tolerances must comply with ACI 301 standards, and forms may not be removed until concrete has gained sufficient strength to carry its own weight and imposed loads.

The specification establishes product standards requiring forms to be straight, free from warp, and of sufficient strength to resist concrete pressure without springing, with worn, bent, warped, or broken forms prohibited from use. Form release agents must be colorless mineral oil that will not stain concrete, absorb moisture, or impair natural bonding or coating characteristics. During cold weather conditions, ice and snow must be removed from forms without using de-icing salts or water unless work proceeds within a heated enclosure. The specification references related sections addressing concrete reinforcement and Portland cement concrete paving, and requires field inspection and quality control in accordance with Section 01 40 00 to ensure formwork construction meets design specifications and maintains structural integrity.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
8-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCRETE FORMWORK

03 11 00-1

SECTION 03 11 00

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Formwork for cast-in-place concrete for sidewalks, curb ramps, driveway aprons, and curbs.

B. Form stripping.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere.

1. Section 03 20 00: Concrete Reinforcement

2. Section 32 13 13: Portland Cement Concrete Paving

1.03 REFERENCES

A. ACI 301 - Structural Concrete for Buildings.

B. ACI 318 - Building Code Requirements for Reinforced Concrete.

C. ACI 347 - Recommended Practice for Concrete Formwork.

1.04 DESIGN REQUIREMENTS

A. Design and construct formwork, to conform to code requirements; resultant concrete to conform to required shape, line and dimension.

1.05 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 347, 301, and 318.

PART 2 PRODUCTS

2.01 FORM MATERIALS

A. Forms shall be straight, free from warp and of sufficient strength to resist the pressure of concrete without springing. Forms and template which are worn, bent, warped or broken shall not be used.

1. For sidewalks and driveway aprons, use forms of wood or steel profiled to suit conditions.

2.02 FORMWORK ACCESSORIES

A. Form Release Agent: Colorless mineral oil which will not stain concrete, or absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify lines, levels and centers before proceeding with formwork. Ensure that dimensions agree with drawings.

1. Soft, loose, wet or otherwise unsuitable material shall be removed from the subgrade and replaced with PADOT 2A Stone compacted to 95% ASTM D698.

2. Replace subbase stone as required.

3.02 EARTH FORMS

03 11 00-2

A. Earth forms are not permitted.

3.03 ERECTION - FORMWORK

A. Erect formwork to achieve design requirements, in accordance with requirements of ACI 301.

B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to over stressing by construction loads.

C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores.

D. Place pre-molded expansion joint filler in all joints between sidewalk slabs, between sidewalk and driveway apron, and between driveway apron and 6” concrete curb backer.

3.04 APPLICATION - FORM RELEASE AGENT

A. Apply form release agent on formwork in accordance with manufacturer’s recommendations.

B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.

C. Soak inside surfaces of untreated forms with clean water. Keep surfaces coated prior to placement of concrete.

3.05 FORM CLEANING

A. Clean forms as erection proceeds, to remove foreign matter within forms.

B. Clean formed cavities of debris prior to placing concrete.

C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out ports.

D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure. Use compressed air or other means to remove foreign matter.

3.06 FORMWORK TOLERANCES

A. Construct formwork to maintain tolerances required by ACI 301.

3.07 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Control: Field inspection and testing.

B. Inspect erected formwork to ensure that work is in accordance with formwork design.

3.08 FORM REMOVAL

A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads.

B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.

C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms.

END OF SECTION

File details come from the government source that posted it. Updated .