55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf

PDF 34 KB Posted

Attached to
2201256.01 - Whistlestop Park
Solicitation number
US.160528
Issued by
Montgomery County, Pennsylvania

About this file

This is a Prevailing Wages Project Rates document issued by the Pennsylvania Department of Labor & Industry on February 2, 2026, for the Whistlestop Park project (Serial Number 26-00920) located in Hatfield Township, Montgomery County. The project involves rehabilitating a softball field, constructing perimeter fencing for a new playground, constructing pickleball courts and a loop trail, installing stormwater basins, rehabilitating an existing basin, and installing associated landscaping and other features at Whistlestop Park. Montgomery Township is the awarding agency with a contract award date of May 1, 2026. The project is classified as a Highway project and was assigned to the Philadelphia Field Office. The document provides comprehensive prevailing wage rates applicable to both Building and Heavy/Highway work classifications, establishing the minimum hourly wages and fringe benefits that must be paid to workers on this project.

The prevailing wage rates document establishes labor cost requirements across numerous trade classifications with effective dates ranging from 2022 to 2026. For Building work, rates vary from $36.60 to $117.62 per hour in total compensation (hourly rate plus fringe benefits), with examples including Carpenters at $76.49, Cement Masons at $81.16, Electricians at $105.91, and Plumbers at $109.99 (all effective May 1, 2025). Heavy/Highway rates similarly range across multiple labor classifications, with Operators Class 07A at $108.21 total compensation and Steamfitters in gas distribution at $113.62 (effective May 1, 2025). The document specifies that the project is subject to the Pennsylvania Prevailing Wage Act (Act No. 442) and requires compliance with applicable prevailing minimum wage rates issued by the Pennsylvania Department of Labor & Industry. The rates apply to all contractors and subcontractors performing work on the Whistlestop Park project through the contract term beginning May 1, 2026.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
8-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Whistlestop Park

General Description: rehabilitate a softball field, construct perimeter fencing for a new playground, pickleball courts, a loop trail, stormwater basins, rehabilitate an existing basin, and install associated landscaping and other features at Whistlestop Park

Project Locality Hatfield Township

Awarding Agency: Montgomery Township

Contract Award Date: 5/1/2026

Serial Number: 26-00920

Project Classification: Highway

Determination Date: 2/2/2026

Assigned Field Office: Philadelphia

Field Office Phone Number: (215)560-1858

Toll Free Phone Number:

Project County: Montgomery County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 2/2/2026 Page 1 of 7

Project: 26-00920 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Bricklayer 5/1/2023 $47.50 $31.42 $78.92

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36

Carpenters 5/1/2024 $45.72 $29.02 $74.74

Carpenters 5/1/2025 $47.47 $29.02 $76.49

Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96

Cement Masons 5/1/2024 $46.70 $32.46 $79.16

Cement Masons 5/1/2025 $48.70 $32.46 $81.16

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49

Electricians 4/29/2024 $56.67 $46.24 $102.91

Electricians 5/1/2025 $58.63 $47.28 $105.91

Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62

Floor Coverer 5/1/2025 $51.67 $31.69 $83.36

Floor Coverer 5/1/2026 $52.84 $32.86 $85.70

Glazier 5/1/2024 $48.00 $37.50 $85.50

Glazier 5/1/2025 $49.96 $38.34 $88.30

Interior Finish 5/1/2023 $34.60 $25.80 $60.40

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2024 $44.64 $34.39 $79.03

Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04

Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47

Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45

Laborers (Class 01 - See notes) 5/1/2024 $35.85 $26.00 $61.85

Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Laborers (Class 02 - See notes) 5/1/2024 $39.40 $27.55 $66.95

Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70

Laborers (Class 03 - See notes) 5/1/2024 $36.27 $26.18 $62.45

Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 04 - See notes) 5/1/2024 $36.27 $26.18 $62.45

Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 05 - See notes) 5/1/2024 $35.85 $26.00 $61.85

Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 2 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45

Marble Finisher 5/1/2023 $39.52 $29.30 $68.82

Marble Finisher 5/1/2025 $41.17 $30.75 $71.92

Marble Mason 5/1/2023 $47.20 $31.95 $79.15

Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators (Building, Class 01 - See Notes) 5/1/2024 $53.36 $33.65 $87.01

Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01

Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01

Operators (Building, Class 01A - See Notes) 5/1/2024 $56.37 $34.53 $90.90

Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90

Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90

Operators (Building, Class 02 - See Notes) 5/1/2024 $53.11 $33.58 $86.69

Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69

Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69

Operators (Building, Class 02A - See Notes) 5/1/2024 $56.13 $34.45 $90.58

Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58

Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58

Operators (Building, Class 03 - See Notes) 5/1/2024 $49.03 $32.37 $81.40

Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40

Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40

Operators (Building, Class 04 - See Notes) 5/1/2024 $48.73 $32.28 $81.01

Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01

Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01

Operators (Building, Class 05 - See Notes) 5/1/2024 $47.00 $31.78 $78.78

Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78

Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78

Operators (Building, Class 06 - See Notes) 5/1/2024 $46.02 $31.48 $77.50

Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50

Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50

Operators (Building, Class 07A- See Notes) 5/1/2024 $64.80 $38.61 $103.41

Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81

Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21

Operators (Building, Class 07B- See Notes) 5/1/2024 $64.50 $38.53 $103.03

Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43

Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83

Painters Class 1 (see notes) 5/1/2024 $42.97 $34.11 $77.08

Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 4 (see notes) 5/1/2024 $45.06 $34.11 $79.17

Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02

Plasterers 5/1/2024 $39.88 $33.08 $72.96

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 3 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total plumber 5/1/2024 $67.53 $38.31 $105.84 plumber 5/1/2025 $70.53 $39.46 $109.99

Pointers, Caulkers, Cleaners 5/1/2023 $48.80 $30.70 $79.50

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Shingle) 5/1/2023 $32.85 $22.10 $54.95

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2023 $35.85 $22.10 $57.95

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 5/1/2024 $59.22 $50.56 $109.78

Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22

Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22

Steamfitters 5/1/2024 $70.32 $43.09 $113.41

Steamfitters 5/1/2025 $72.52 $44.89 $117.41

Stone Masons 5/1/2023 $47.20 $31.95 $79.15

Stone Masons 5/1/2025 $50.00 $32.80 $82.80

Terrazzo Finisher 5/1/2023 $43.75 $27.86 $71.61

Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02

Terrazzo Grinder 5/1/2023 $44.02 $27.86 $71.88

Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29

Terrazzo Mechanics 5/1/2023 $50.26 $29.56 $79.82

Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47

Tile Finisher 5/1/2023 $39.52 $29.30 $68.82

Tile Finisher 5/1/2025 $41.17 $30.75 $71.92

Tile Setter 5/1/2023 $50.26 $29.56 $79.82

Tile Setter 5/1/2025 $52.21 $31.26 $83.47

Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33

Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43

Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 4 of 7

Project: 26-00920 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51

Carpenter 5/1/2025 $57.36 $30.09 $87.45

Carpenter 5/1/2026 $58.71 $30.44 $89.15

Cement Masons 5/1/2023 $43.20 $32.91 $76.11

Cement Masons 5/1/2025 $46.55 $32.66 $79.21

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/ Pile driver diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/ Pile driver diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $62.07 $33.96 $96.03

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67

Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47

Laborers (Class 01 - See notes) 5/1/2024 $38.80 $27.65 $66.45

Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00

Laborers (Class 02 - See notes) 5/1/2024 $39.00 $27.65 $66.65

Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 03 - See notes) 5/1/2024 $39.00 $27.65 $66.65

Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 04 - See notes) 5/1/2024 $33.60 $27.65 $61.25

Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80

Laborers (Class 05 - See notes) 5/1/2024 $39.65 $27.65 $67.30

Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85

Laborers (Class 06 - See notes) 5/1/2024 $39.70 $27.65 $67.35

Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90

Laborers (Class 07 - See notes) 5/1/2024 $39.55 $27.65 $67.20

Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75

Laborers (Class 08 - See notes) 5/1/2024 $39.30 $27.65 $66.95

Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 09 - See notes) 5/1/2024 $39.15 $27.65 $66.80

Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35

Laborers (Class 10- See notes) 5/1/2024 $39.30 $27.65 $66.95

Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 11 -See Notes) 5/1/2024 $39.20 $27.65 $66.85

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 5 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40

Laborers (Class 12 -See Notes) 5/1/2024 $40.90 $27.65 $68.55

Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10

Laborers (Class 13 -See Notes) 5/1/2024 $42.93 $27.65 $70.58

Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13

Laborers (Class 14 -See Notes) 5/1/2024 $39.50 $27.65 $67.15

Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2024 $32.67 $19.63 $52.30

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80

Laborers Utility (PGW ONLY) 5/1/2024 $39.70 $19.63 $59.33

Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83

Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33

Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2024 $53.36 $33.65 $87.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.52 $34.49 $89.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.67 $35.34 $91.01

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2024 $56.37 $34.53 $90.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.52 $35.38 $92.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.68 $36.22 $94.90

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2024 $53.11 $33.58 $86.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.27 $34.42 $88.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.43 $35.26 $90.69

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2024 $56.13 $34.45 $90.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.29 $35.29 $92.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.44 $36.14 $94.58

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2024 $49.03 $32.37 $81.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2025 $50.18 $33.22 $83.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.34 $34.06 $85.40

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2024 $48.73 $32.28 $81.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2025 $49.88 $33.13 $83.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.04 $33.97 $85.01

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 6 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2024 $47.00 $31.78 $78.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2025 $48.16 $32.62 $80.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2026 $49.32 $33.46 $82.78

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2024 $46.02 $31.48 $77.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2025 $47.17 $32.33 $79.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2026 $48.34 $33.16 $81.50

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2024 $64.80 $38.61 $103.41

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2025 $66.26 $39.55 $105.81

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.73 $40.48 $108.21

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2024 $64.50 $38.53 $103.03

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2025 $65.97 $39.46 $105.43

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.44 $40.39 $107.83

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76

Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61

Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76

Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62

Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18

Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/2/2026 Page 7 of 7