This is a Summary of Work document for Montgomery Township's Whistlestop Park rehabilitation project located in Montgomery County, Pennsylvania. The work encompasses the rehabilitation of an existing softball field, construction of perimeter fencing for a new playground (to be installed by others), construction of pickleball courts, a loop trail, stormwater basins, rehabilitation of an existing basin, and installation of associated landscaping and site features. The contractor must coordinate with the playground equipment installer regarding rough grading, fencing, and asphalt path construction at playground entrances. Montgomery Township will remove and repurpose three existing bleachers prior to the contractor's demolition activities. The contractor must submit a complete construction schedule prior to commencing work and contact underground utility owners, the owner, and engineer at least 72 hours before beginning construction. All work must be conducted while existing roadways and utilities remain in operation, with the contractor responsible for protecting all existing water, gas, electric, communications, sanitary sewer, storm sewer, and other facilities. The contractor must notify property owners and residents at least seven days prior to construction activities and must repair or replace any existing features or facilities damaged during construction execution.

The contractor bears full responsibility for establishing the exact location of underground utilities in accordance with Pennsylvania Act 287 (1974) as amended by Act 50 (2017), with a Utility User's List available upon request. Three picnic tables and three benches will be supplied by the Township for placement within the picnic grove area. All work must comply with OSHA Construction Workplace Safety Standards. The contractor must schedule work to accommodate the owner's continued site occupancy and normal operations throughout the construction period. No future work is proposed as part of this contract, and all proposed work is located on lands owned by Montgomery Township.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
8-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF WORK

01 11 13-1

SECTION 01 11 13

PART 1 GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Description of Work.

2. Work by Owner.

3. Work by other parties.

4. Owner supplied Products.

5. Contractor use of site [and premises].

6. Future work.

7. Work sequence of construction.

8. Owner occupancy.

1.02 DESCRIPTION OF WORK

A. The Work to be completed under this contract consists of all labor, equipment and materials to rehabilitate a softball field, construct perimeter fencing for a new playground (to be constructed by others), pickleball courts, a loop trail, stormwater basins, rehabilitate an existing basin, and install associated landscaping and other features at Whistlestop Park as depicted in the project drawings.

1.03 WORK BY OWNER

A. No work by Owner is anticipated in the immediate vicinity during construction of the Work under this contract. Three sets of existing bleachers are to be removed and repurposed by Montgomery Township prior to demolition.

1.04 WORK BY OTHER PARTIES

A. Playground equipment, benches and safety surfacing associated with the playground are to be installed by others. Contractor must coordinate rough grading, fencing, and construction of playground entrances to asphalt path with the playground contractor.

1.05 OWNER SUPPLIED PRODUCTS

A. Three (3) picnic tables and three (3) benches will be provided by the Township for location within the picnic grove area.

1.06 CONTRACTOR USE OF SITE AND PREMISES

A. The Work under this contract must be accomplished while the existing roadway and utilities are in use. The work that is involved with the existing roadway and utilities must be done so that system operations will not be jeopardized.

B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. It is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 50 (2017). A Utility User's List can be made available by request.

01 11 13-2

C. Repair and/or replacement of any existing features and facilities damaged in the execution of the Work under this Contract, including but not limited to sidewalk, curb, water, gas, electric, communication, sanitary sewer, storm sewer, and mail boxes, shall be the responsibility of the Contractor.

C. Contractor will be responsible to notify all property owners and residents at least seven (7) days prior to the start of construction on or near their properties.

D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace

Safety Standards.

1.07 FUTURE WORK

A. No future work is proposed as part of this contract.

1.08 WORK SEQUENCE OF CONSTRUCTION

A. Contact all underground utility owners, OWNER and ENGINEER at least seventy-two (72) hours prior to beginning construction.

B. The contractor shall submit a complete construction schedule prior to the start of construction.

1.09 OWNER OCCUPANCY

A. Owner will occupy the site and premises during the entire period of construction for the conduct of normal operations.

B. Cooperate with Owner to minimize conflict and to facilitate Owner’s operations.

C. Schedule the Work to accommodate Owner occupancy.

1.10 AVAILABILITY OF LANDS

A. All proposed work is located within lands owned by Montgomery Township.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

File details come from the government source that posted it. Updated .