28-Sec 01 11 13 - SUMMARY OF WORK.pdf
PDF 72 KB Posted
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a Summary of Work document for Montgomery Township's Whistlestop Park rehabilitation project located in Montgomery County, Pennsylvania. The work encompasses the rehabilitation of an existing softball field, construction of perimeter fencing for a new playground (to be installed by others), construction of pickleball courts, a loop trail, stormwater basins, rehabilitation of an existing basin, and installation of associated landscaping and site features. The contractor must coordinate with the playground equipment installer regarding rough grading, fencing, and asphalt path construction at playground entrances. Montgomery Township will remove and repurpose three existing bleachers prior to the contractor's demolition activities. The contractor must submit a complete construction schedule prior to commencing work and contact underground utility owners, the owner, and engineer at least 72 hours before beginning construction. All work must be conducted while existing roadways and utilities remain in operation, with the contractor responsible for protecting all existing water, gas, electric, communications, sanitary sewer, storm sewer, and other facilities. The contractor must notify property owners and residents at least seven days prior to construction activities and must repair or replace any existing features or facilities damaged during construction execution.
The contractor bears full responsibility for establishing the exact location of underground utilities in accordance with Pennsylvania Act 287 (1974) as amended by Act 50 (2017), with a Utility User's List available upon request. Three picnic tables and three benches will be supplied by the Township for placement within the picnic grove area. All work must comply with OSHA Construction Workplace Safety Standards. The contractor must schedule work to accommodate the owner's continued site occupancy and normal operations throughout the construction period. No future work is proposed as part of this contract, and all proposed work is located on lands owned by Montgomery Township.
View the file
Other files
Show 40 more
Latest 50 of 154 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF WORK
01 11 13-1
SECTION 01 11 13
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Description of Work.
2. Work by Owner.
3. Work by other parties.
4. Owner supplied Products.
5. Contractor use of site [and premises].
6. Future work.
7. Work sequence of construction.
8. Owner occupancy.
1.02 DESCRIPTION OF WORK
A. The Work to be completed under this contract consists of all labor, equipment and materials to rehabilitate a softball field, construct perimeter fencing for a new playground (to be constructed by others), pickleball courts, a loop trail, stormwater basins, rehabilitate an existing basin, and install associated landscaping and other features at Whistlestop Park as depicted in the project drawings.
1.03 WORK BY OWNER
A. No work by Owner is anticipated in the immediate vicinity during construction of the Work under this contract. Three sets of existing bleachers are to be removed and repurposed by Montgomery Township prior to demolition.
1.04 WORK BY OTHER PARTIES
A. Playground equipment, benches and safety surfacing associated with the playground are to be installed by others. Contractor must coordinate rough grading, fencing, and construction of playground entrances to asphalt path with the playground contractor.
1.05 OWNER SUPPLIED PRODUCTS
A. Three (3) picnic tables and three (3) benches will be provided by the Township for location within the picnic grove area.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. The Work under this contract must be accomplished while the existing roadway and utilities are in use. The work that is involved with the existing roadway and utilities must be done so that system operations will not be jeopardized.
B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. It is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 50 (2017). A Utility User's List can be made available by request.
01 11 13-2
C. Repair and/or replacement of any existing features and facilities damaged in the execution of the Work under this Contract, including but not limited to sidewalk, curb, water, gas, electric, communication, sanitary sewer, storm sewer, and mail boxes, shall be the responsibility of the Contractor.
C. Contractor will be responsible to notify all property owners and residents at least seven (7) days prior to the start of construction on or near their properties.
D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace
Safety Standards.
1.07 FUTURE WORK
A. No future work is proposed as part of this contract.
1.08 WORK SEQUENCE OF CONSTRUCTION
A. Contact all underground utility owners, OWNER and ENGINEER at least seventy-two (72) hours prior to beginning construction.
B. The contractor shall submit a complete construction schedule prior to the start of construction.
1.09 OWNER OCCUPANCY
A. Owner will occupy the site and premises during the entire period of construction for the conduct of normal operations.
B. Cooperate with Owner to minimize conflict and to facilitate Owner’s operations.
C. Schedule the Work to accommodate Owner occupancy.
1.10 AVAILABILITY OF LANDS
A. All proposed work is located within lands owned by Montgomery Township.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION