49-Sec 01 71 13 Mobilization.pdf

PDF 74 KB Posted

Attached to
2201256.01 - Whistlestop Park
Solicitation number
US.160528
Issued by
Montgomery County, Pennsylvania

About this file

This is a Mobilization section document for Montgomery Township's Contract 2022-01256.01 – Whistlestop Park project located in Pennsylvania. The project encompasses comprehensive site improvements including rehabilitation of a softball field, construction of perimeter fencing for a new playground (to be constructed by others), installation of pickleball courts, a loop trail, stormwater basins, rehabilitation of an existing basin, and associated landscaping and site features as depicted in project drawings. Sealed bids are being accepted online via PennBid until April 30, 2026 at 10:00 AM, with public bid opening and reading at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, PA 18936. A pre-bid meeting has not been specified. The contract term and any renewal options are not detailed in this mobilization section.

Mobilization payments are structured as a lump sum with 50% due upon contract execution and the remaining 50% upon completion of 50% of the total original contract amount. No additional mobilization compensation will be awarded for scheduling conflicts, holidays, weather, or other circumstances. A Bid Bond equal to 10% of the maximum bid amount is required with submission. Upon award, the successful bidder must provide Performance and Payment Bonds each in the amount of 100% of the contract amount and a Maintenance Bond equal to 15% of the contract award price. The project is subject to Pennsylvania Prevailing Wage Act (Act 422) and Pennsylvania Public Works Employment Verification Act (Act 127) requirements. All bids remain subject to acceptance for 60 days following bid opening, and may be withdrawn within two business days after opening. A nominal PennBid fee of 0.33% of the bid amount (minimum $150, maximum $6,000 plus tax) applies only to awarded bidders.

View the file

Other files

File Type Posted
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
41-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
26-Doc 00 91 13 - 01 Appendix I - Cover.pdf PDF
29-Doc 00 73 00 06 - Appendix C - Cover.pdf PDF
38-Doc 00 73 00 12- Appendix F - Cover.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
69-Doc 00 73 00 15 - Appendix G - Other DCED Requirements.pdf PDF
55-Doc 00 73 00 03 - Appendix A 2026-02-02 - prevailing wages whistlestop SN26-00920.pdf PDF
7-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
67-Sec 32 93 02 Exterior Planting.pdf PDF
77-Sec 33 44 15 Boxes and Endwalls.pdf PDF
28-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
78-06 FINAL Site Drawings - Gilmore 2026-03-12.pdf PDF
47-Sec 01 57 14 Erosion Control Blanket.pdf PDF
17-Doc 00 62 76 - C-620 Appl for Payment 2007.pdf PDF
19-Sec 31 20 00 Earthwork.pdf PDF
21-Doc 00 61 13.16 - Payment Bond.pdf PDF
76-Doc 00 73 00 17 - Appendix H - DCNR Signage Policy.pdf PDF
40-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
46-Sec 01 33 00 - Submittals.pdf PDF
12-Doc 00 73 00 13 - Appendix F - Nondiscrimination-Sexual Harassment Provisions.pdf PDF
43-Doc 00 45 10 - BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
9-Doc 00 73 00 08 - Appendix D - Cover.pdf PDF
51-Sec 31 23 16.26 Rock Removal.pdf PDF
75-Sec 32 92 00 Finish Grading Seeding and Sodding.pdf PDF
27-Sec 33 44 14 Storm Inlets Catch Basins Endwalls End Sections.pdf PDF
56-Sec 31 11 00 Clearing and Grubbing.pdf PDF
35-Doc 00 73 00 11- Appendix E - Americans with Disabilities Act.pdf PDF
62-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
65-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
34-Doc 00 65 19.13 - Contractors Affidavit.pdf PDF
58-Sec 32 18 23.53-Acrylic Color Coat - Generic.pdf PDF
3-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
57-Sec 32 12 00 - Asphalt Paving.pdf PDF
20-Doc 00 73 00 09 - Appendix D - Architectural Barriers Act.pdf PDF
10-Doc 00 61 19 - Maintenance Bond.pdf PDF
71-Doc 00 73 00 07 - Appendix C - State Contractor Responsibility Program.pdf PDF
52-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
2-Doc 00 41 00 - Bid Form.pdf PDF
14-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
22-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT - 2024.pdf PDF
25-Doc 01 01 01 - Appendix J Technical Specs Cover Sheet.pdf PDF
59-Doc 00 41 00 - BID FORM - EBID.pdf PDF
30-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
36-Doc 00 73 00 10- Appendix E - Cover.pdf PDF
45-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
60-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOBILIZATION

01 71 13-1

SECTION 01 71 13

MOBILIZATION

PART 1 - GENERAL

1.01 Description of Work

A. The Work to be completed under this contract consists of all labor, equipment, and materials to rehabilitate a softball field, construct perimeter fencing for a new playground (to be constructed by others), pickleball courts, a loop trail, stormwater basins, rehabilitate an existing basin, and install associated landscaping and other features at Whistlestop Park as depicted in the project drawings.

PART 2 - PRODUCTS

2.01 Material

A. Furnish adequate material, equipment, and furnishings required. These material and furnishings will not be considered a part of the other completed contract items.

PART 3 - EXECUTION

3.01 Construction

A. Construct the necessary facilities to maintain proper site conditions.

3.02 Measurement and Payment

A. Mobilization will be paid as follows:

Payment 1 = 50% of contract lump sum amount

Payment 2 = Remaining 50% contract lump sum amount will be paid upon completion of 50% of the total original contract amount

B. No additional mobilization will be awarded for any reason including but not limited to scheduling conflicts, holidays, weather, etc.

END OF SECTION