4-25-26-02-20 - BID FORM.pdf

PDF 375 KB Posted

Attached to
HODGE ELEMENTARY REFRIGERATOR
Solicitation number
25-26-02-20
Issued by
Los Angeles County, Anaheim City, California

About this file

This is a bid form document issued by the Azusa Unified School District for the replacement of a walk-in refrigerator at Victor Hodge Elementary School located at 700 West 11th Street, Azusa, California 91702. The project, identified as Bid No. 25-26-02-20 and LGM Design Project No. 25_1020, seeks a qualified Class B General Building Contractor to provide installation and completion of the refrigeration system. Bidders are required to submit a comprehensive bid package that includes a completed bid form, cost breakdown, list of designated subcontractors, non-collusion declaration, proof of California contractor licensing, a list of completed similar projects from the past five years, references from K-12 public school districts, and documentation of current and past modernization projects as prime contractor. The District reserves the right to award the contract within ninety days of bid opening, at which point the District may issue a notice to proceed. The contractor shall complete all work within the timeframe specified in the contract documents, with the understanding that the contractor has accounted for rain days, governmental delays, and punch list completion in their schedule analysis.

Bidders must submit bid security in the amount of not less than ten percent of the total bid amount in the form of a bid bond, certified check, or cashier's check. The successful contractor must execute a contract and provide performance and payment bonds within five calendar days of award notification. The bid must remain open for sixty days following the bid opening date, and any bidder who withdraws prior to this period or fails to execute the required documents and bonds within five days of award may have their bid deposit forfeited as damages. The District requires builders' risk insurance with minimum aggregate coverage of $2,000,000 per occurrence and $1,000,000 in pollution liability coverage. Additional mandatory requirements include compliance with prevailing wage rates, workers' compensation insurance, Americans with Disabilities Act compliance, and Department of Industrial Relations registration. The bid form does not specify the total project cost, contract duration, or funding source in the sections provided.

View the file

Other files

File Type Posted
13-25-26-02-20 - NOTICE INVITING BIDDERS.pdf PDF
12-25-26-02-20 - LIST OF CURRENT MODERNIZATION PROJECTS AS PRIME CONTRACTOR.pdf PDF
16-25-26-02-20 CONTRACTOR CERTIFICATION OF BACKGROUND CHECKS.pdf PDF
3-25-26-02-20 - BID BOND.pdf PDF
14-25-26-02-20 - PAYMENT BOND.pdf PDF
19-Pre-Qualification Questionnaire Blank.pdf PDF
22-25-26-02-20 CHECKLIST OF MANDATORY BID FORMS.pdf PDF
11-25-26-02-20 - INSURANCE DOCUMENTS ENDORSEMENTS.pdf PDF
2-25-26-02-20 - AGREEMENT FORM.pdf PDF
7-25-26-02-20 - DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION STATEMENT.pdf PDF
15-25-26-02-20 - PERFORMANCE BOND.pdf PDF
24-HODGE ELEMENTARY WRITTEN SPECIFICATIONS.pdf PDF
27-25-26-02-20 Hodge Walk-In Refrigerator Project Manual.pdf PDF
26-Bidders Acknowledgement of Project Manual 04.10.pdf PDF
10-25-26-02-20 - GUARANTEE.pdf PDF
18-25-26-02-20 NON-COLLUSION DECLARATION.pdf PDF
5-25-26-02-20 - CASHIERS CHECK.pdf PDF
25-HODGE ELEMENTARY REFRIGERATOR DIAGRAMS.pdf PDF
1-25-26-02-20 - INSTRUCTION TO BIDDERS.pdf PDF
23-WALLS AND FLOORS SPECIFICATIONS.docx DOCX document
17-25-26-02-20 LIST OF K-12 REFERENCES.pdf PDF
20-25-26-02-20 CERTIFICATION OF NON-DEBARMENT OR SUSPENSION.pdf PDF
8-25-26-02-20 - DVBE CONTRACTOR CLOSE OUT.pdf PDF
21-25-26-02-20 SUBSTITUTION REQUEST FORM.pdf PDF
6-25-26-02-20 - DESIGNATION OF SUB-CONTRACTORS.pdf PDF
9-25-26-02-20 - ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Forms Azusa USD

BID FORM

FOR

REPLACEMENT WALK IN

REFRIGERATOR

VICTOR HODGE ELEMENTARY SCHOOL

700 W 11TH St, Azusa, CA 91702

LGM Design Project No.

25_1020 Hodge

Bid No. 25-26-02-20 rebid

FOR

AZUSA UNIFIED SCHOOL DISTRICT

CONTRACTOR

NAME:

ADDRESS:

TELEPHONE: ( )

FAX: ( )

EMAIL

Azusa USD

TO: Azusa Unified School District, acting by and through its Governing Board, herein called “District”.

1. Pursuant to and in compliance with your Notice Inviting Bids and other documents relating thereto, the undersigned bidder, having familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract, the cost of the work at the place where the work is to be done, with the Drawings and Specifications, and other Contract Documents, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts, and everything required to be performed, including its acceptance by the District, and to provide and furnish any and all labor, materials, tools, expendable equipment, and utility and transportation services necessary to perform the Contract and complete all of the Work in a workmanlike manner required in connection with the construction of:

BID SCHEDULE NO. 25-26-02-20

in the District described above, all in strict conformance with the drawings and other Contract Documents on file at the Purchasing Office of said District for amounts set forth herein.

2. BIDDER ACKNOWLEDGES THE FOLLOWING ADDENDUM:

Number Number Number Number Number Number Number Number

Acknowledge the inclusion of all addenda issued prior to bid in the blanks provided above. Your failure to do so may render your bid non-responsive.

3. TOTAL CASH PURCHASE PRICE IN WORDS & NUMBERS (BASE CONTRACT):

DOLLARS

This base bid includes the Control Access documents incorporated by the district into this bid package.

4. TIME FOR COMPLETION: The District may give a notice to proceed within ninety (90) days of the award of the bid by the District. Once the Contractor has received the notice to proceed, the Contractor shall complete the work in the time specified in the Agreement. By submitting this bid, Contractor has thoroughly studied this Project and agrees that the Contract Time for this Project is adequate for the timely and proper completion of the Project. Further, Contractor has included in the analysis of the time required for this Project, Rain Days, Governmental Delays, and the requisite time to complete Punch List.

In the event that the District desires to postpone giving the notice to proceed beyond this ninety

(90) day period, it is expressly understood that with reasonable notice to the Contractor, giving the notice to proceed may be postponed by the District. It is further expressly understood by the Contractor, that the Contractor shall not be entitled to any claim of additional compensation as a result of the postponement of giving the notice to proceed.

If the Contractor believes that a postponement will cause a hardship to it, the Contractor may terminate the contract with written notice to the District within ten (10) days after receipt by the Contractor of the District’s notice of postponement. Should the Contractor terminate the Contract as a result of a notice

Azusa USD of postponement, the District shall have the authority to award the Contract to the next lowest responsible bidder, if applicable.

It is understood that the District reserves the right to reject any or all bids and/or waive any irregularities or informalities in this bid or in the bid process. The Contractor understands that it may not withdraw this bid for a period of sixty (60) days after the date set for the opening of bids.

5. Attached is bid security in the amount of not less than ten percent (10%) of the bid: Bid bond

(10% of the Bid), certified check, or cashier’s check (circle one)

6. The required List of Designated Subcontractors is attached hereto.

7. The required Non-Collusion Declaration is attached hereto.

8. The Substitution Request Form, if applicable, is attached hereto.

9. It is understood and agreed that if written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned after the opening of the bid, and within the time this bid is required to remain open, or at any time thereafter before this bid is withdrawn, the undersigned will execute and deliver to the District a Contract in the form attached hereto in accordance with the bid as accepted, and that he or she will also furnish and deliver to the District the Performance Bond and Payment Bond, all within five (5) calendar days after award of Contract, and that the work under the Contract shall be commenced by the undersigned bidder, if awarded the Contract, by the start date provided in the District’s Notice to Proceed, and shall be completed by the Contractor in the time specified in the Contract Documents.

10. The names of all persons interested in the foregoing proposal as principals are as follows:

(IMPORTANT NOTICE: If bidder or other interested person is a corporation, state the legal name of such corporation, as well as the names of the president, secretary, treasurer, and manager thereof; if a co- partnership, state the true names of the firm, as well as the names of all individual co-partners comprising the firm; if bidder or other interested person is an individual, state the first and last names in full.)

11. PROTEST PROCEDURES. If there is a bid protest, the grounds shall be submitted as set forth in the Instructions to Bidders.

12. The undersigned bidder shall be licensed and shall provide the following California Contractor’s license information:

License Number

Azusa USD

License Expiration Date

Name on License:

Class of License:

DIR Registration Number:

If the bidder is a joint venture, each member of the joint venture must include the above information.

13. Time is of the essence regarding this Contract, therefore, in the event the bidder to whom the Contract is awarded fails or refuses to post the required bonds and return executed copies of the Agreement form within five (5) calendar days from the date of receiving the Notice of Award, the District may declare the bidder’s bid deposit or bond forfeited as damages.

14. The bidder declares that he/she has carefully examined the location of the proposed Project, that he/she has examined the Contract Documents, including the Plans, General Conditions, Supplemental Conditions, Addenda, and Specifications, all others documents and requirements that are attached to and/or contained in the Project Manual, all other documents issued to bidders and read the accompanying instructions to bidders, and hereby proposes and agrees, if this proposal is accepted, to furnish all materials and do all work required to complete the said work in accordance with the Contract Documents, in the time and manner therein prescribed for the unit cost and lump sum amounts set forth in this Bid Form.

15. DEBARMENT. In addition to seeking remedies for False Claims under Government Code section 12650 et seq. and Penal Code section 72, the District may debar a Contractor pursuant to Article 15 of the General Conditions if the Board, or the Board may designate a hearing officer who, in his or her discretion, finds the Contractor has done any of the following:

a. Intentionally or with reckless disregard, violated any term of a contract with the District;

b. Committed an act or omission which reflects on the Contractor’s quality, fitness or capacity to perform work for the District;

c. Committed an act or offense which indicates a lack of business integrity or business honesty; or

d. Made or submitted a false claim against the District or any other public entity. (See Government Code section 12650, et seq., and Penal Code section 72)

16. DESIGNATION OF SUBCONTRACTORS. In compliance with the Subletting and Subcontracting Fair Practices Act (California Public Contract Code section 4100 et seq.) and any amendments thereof, each bidder shall list subcontractors on the District’s form Subcontractor list. This subcontractor list shall be submitted with the bid and is a required form.

17. LIST OF COMPLETED PROJECTS (MANDATORY TO BE SUBMITTED WITH THE BID).

List only those projects which are similar enough to demonstrate Bidder’s ability to perform the require Work that you have worked on within the last five (5) years. Include any additional non-public works contracts, with specifications/complexity and cost comparable to this project, also completed within the last five (5) years. If bidder has not worked on a public works project within the last five (5) years, bidder shall indicate by writing “NONE”.

This form is included in the bid package and must be included in the bid response.

Azusa USD

Furthermore, Bidder hereby certifies to the District that all representations, certifications, and statements made by Bidder, as set forth in this bid form, are true and correct and are made under penalty of perjury.

Dated this __________________ day of __________________________________________ , 20__

Name of Bidder __________________________________________________________________

Type of Organization ______________________________________________________________

Signature _______________________________________________________________________

Signed by _______________________________________________________________________

Title of Signer ___________________________________________________________________

Address of Bidder ________________________________________________________________

Bidder’s Taxpayer Identification No. _________________________________________________

Telephone Number _______________________________________________________________

Fax Number ____________________________________________________________________

E-mail Website _____________________________

If Bidder is a corporation, affix corporate seal.

Name of Corporation: _____________________________________

President: _________________________________________________

Secretary: _________________________________________________

Treasurer: ________________________________________________

Manager: _________________________________________________

NOTICE INVITING BIDS
Class B – General Building Contractor
INSTRUCTIONS TO BIDDERS
Azusa Unified School District Business Department
ATTN: Purchasing Supervisor
CHECKLIST OF MANDATORY BID FORMS
BID FORM
17. LIST OF COMPLETED PROJECTS (MANDATORY TO BE SUBMITTED WITH THE BID).
DESIGNATION OF SUBCONTRACTORS
DESIGNATION OF SUBCONTRACTORS FORM
INFORMATION REQUIRED OF BIDDER
List of References K-12 Public School Districts
List of Current Modernization Projects as Prime Contractor
List of Completed Modernization Projects as Prime Contractor
in the Last Ten (10) Years
(Use only when not using a Bid Bond)
DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) PARTICIPATION STATEMENT
AGREEMENT FORM
PAYMENT BOND
PERFORMANCE BOND
GUARANTEE
ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION
INSURANCE DOCUMENTS & ENDORSEMENTS
DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) CONTRACTOR CLOSE-OUT STATEMENT
CONTRACTOR CERTIFICATION REGARDING BACKGROUND CHECKS
ATTACHMENT A:
CONTRACTOR CERTIFICATION REGARDING BACKGROUND CHECKS
ARTICLE 1 DEFINITIONS
1.1 BASIC DEFINITIONS
1.2 EXECUTION, CORRELATION AND INTENT
1.3 OWNERSHIP AND USE OF ARCHITECT’S DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS
ARTICLE 2 DISTRICT
2.1 INFORMATION AND SERVICES REQUIRED OF THE DISTRICT
WARNING: DISTRICT DOES NOT WARRANT THE SOILS AT THE PROJECT SITE. CONTRACTOR HAS REVIEWED AND IS FAMILIAR WITH THE REQUIREMENTS OF THE SOILS INVESTIGATION REPORT. CONTRACTOR UNDERSTANDS THAT PLANS, DRAWINGS AND SPECIFICATIONS SUPERSEDE THE SOILS REPOR...
2.2 DISTRICT’S RIGHT TO CARRY OUT THE WORK DUE TO PARTIAL DEFAULT IN A SPECIFIC SEGREGATED AREA OF WORK (48 HOUR NOTICE TO CURE AND CORRECT)
3.2 SUPERVISION
3.3 LABOR AND MATERIALS
3.4 WARRANTY
3.5 TAXES
3.6 PERMITS, FEES AND NOTICES
3.7 SUBMITTALS REQUIRED AT THE COMMENCEMENT OF THE PROJECT
3.8 DOCUMENTS, SAMPLES, AND COMPUTER AT THE SITE
3.9 SUBMITTALS INCLUDING SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
3.10 SUBSTITUTIONS
3.11 INTEGRATION OF WORK
3.12 CLEANING UP
3.13 ACCESS TO WORK
3.14 ROYALTIES AND PATENTS
3.15 INDEMNIFICATION
3.16 SUBMISSION OF DAILY REPORTS
3.17 AS-BUILT DRAWINGS AND ANNOTATED SPECIFICATIONS
3.18 EQUIPMENT MANUALS
3.19 DIR REGISTRATION
4.2 ARCHITECT’S ADMINISTRATION OF THE CONTRACT
4.3 PROJECT INSPECTOR
4.4 STOP WORK ORDER
4.5 RESPONSIBILITY FOR ADDITIONAL CHARGES INCURRED BY THE DISTRICT FOR PROFESSIONAL SERVICES
4.6 DISPUTES AND CLAIMS
ARTICLE 5 SUBCONTRACTORS
CONTRACTOR IS AWARE THAT THIS CONTRACT MAY BE SPLIT INTO SEVERAL PHASES BASED ON DOCUMENTATION PROVIDED WITH THIS BID OR DISCUSSED AT THE JOB WALK. CONTRACTOR HAS MADE ALLOWANCE FOR ANY DELAYS OR DAMAGES WHICH MAY ARISE FROM COORDINATION WITH CONTRACT...
6.2 CONSTRUCTIVE OWNERSHIP OF PROJECT SITE AND MATERIAL
6.3 DISTRICT’S RIGHT TO CLEAN UP
ARTICLE 7 CHANGES IN THE WORK
CONTRACTOR UNDERSTANDS, ACKNOWLEDGES, AND AGREES THAT THE REASON FOR THIS NOTICE REQUIREMENT IS SO THAT DISTRICT MAY HAVE AN OPPORTUNITY TO ANALYZE THE WORK AND DECIDE WHETHER THE DISTRICT SHALL PROCEED WITH THE CHANGE ORDER OR ALTER THE PROJECT SO TH...
7.2 CHANGE ORDERS (“CO”)
7.3 CONSTRUCTION CHANGE DOCUMENT (CCD Category A, and CCD Category B) and IMMEDIATE CHANGE DIRECTIVE (ICD)
7.4 REQUEST FOR INFORMATION (“RFI”)
7.5 REQUEST FOR PROPOSAL (“RFP”)
7.6 CHANGE ORDER REQUEST (“COR”)
7.7 COST OF CHANGE ORDERS
8.2 HOURS OF WORK
8.3 PROGRESS AND COMPLETION
8.4 EXTENSIONS OF TIME - LIQUIDATED DAMAGES
ARTICLE 9 PAYMENTS AND COMPLETION
9.2 COST BREAKDOWN
9.3 PROGRESS PAYMENTS
9.4 APPLICATIONS FOR PROGRESS PAYMENTS
9.5 STOP NOTICE CLAIMS AND WARRANTY OF TITLE
9.6 DECISIONS TO WITHHOLD PAYMENT
9.7 NONCONFORMING WORK
9.8 SUBCONTRACTOR PAYMENTS
9.9 COMPLETION OF THE WORK
9.10 PARTIAL OCCUPANCY OR USE
9.11 COMPLETION AND FINAL PAYMENT
9.12 SUBSTITUTION OF SECURITIES
10.2 SAFETY OF PERSONS AND PROPERTY
10.3 EMERGENCIES
10.4 HAZARDOUS MATERIALS
11.2 WORKERS’ COMPENSATION INSURANCE
11.3 BUILDER’S RISK/ “ALL RISK” INSURANCE
11.4 FIRE INSURANCE
11.5 AUTOMOBILE LIABILITY
11.6 OTHER INSURANCE
11.7 PROOF OF INSURANCE
11.8 COMPLIANCE
11.9 WAIVER OF SUBROGATION
11.10 PERFORMANCE AND PAYMENT BONDS
4-343. Duties of the Contractor.
12.2 SPECIAL NOTICE OF AMERICAN’S WITH DISABILITIES ACT
12.3 UNCOVERING OF WORK
12.4 CORRECTION OF WORK
ARTICLE 13 MISCELLANEOUS PROVISIONS
13.2 SUCCESSORS AND ASSIGNS
13.3 WRITTEN NOTICE
13.4 RIGHTS AND REMEDIES
13.5 TESTS AND INSPECTIONS
13.6 TRENCH EXCAVATION
13.7 WAGE RATES, TRAVEL, AND SUBSISTENCE
13.8 RECORDS OF WAGES PAID
13.9 APPRENTICES
13.10 ASSIGNMENT OF ANTITRUST CLAIMS
13.11 STATE AND DISTRICT CONDUCTED AUDITS
13.12 STORM WATER POLLUTION PREVENTION
13.13 PROJECT LABOR AGREEMENT
14.2 TERMINATION BY THE DISTRICT FOR CAUSE
14.3 TERMINATION OF CONTRACT BY DISTRICT (CONTRACTOR NOT AT FAULT)
14.4 REMEDIES OTHER THAN TERMINATION
ARTICLE 15 DEBARMENT
15.2 BOARD FINDING
15.3 HEARING AND PRESENTATION OF EVIDENCE
ARTICLE 3 – THE CONTRACTOR
ARTICLE 8 – TIME
ARTICLE 11 – INSURANCE AND BONDS
ARTICLE 13.13 – PROJECT LABOR AGREEMENT
IMMEDIATE CONSTRUCTION CHANGE DIRECTIVE NO.
CERTIFICATE OF SUBSTANTIAL COMPLETION
Aggregate
Each Occurrence
$2,000,000
$1,000,000
Pollution Liability
INSURANCE SUBMITTALS FORM
11.1.1 Specific Insurance Requirements

File details come from the government source that posted it. Updated .