23-WALLS AND FLOORS SPECIFICATIONS.docx

DOCX document 16 KB Posted

Attached to
HODGE ELEMENTARY REFRIGERATOR
Solicitation number
25-26-02-20
Issued by
Los Angeles County, Anaheim City, California

About this file

This is an Addendum 1 specification document for the Hodge Elementary Refrigerator project, a walk-in refrigerator unit replacement at Victor Hodge Elementary School located at 700 W. 11th Street, Azusa, California. The document outlines the general contractor's responsibilities for restoring all affected surrounding walls and floor areas following the complete removal of the existing walk-in unit. The restoration work must be completed prior to installation of the new walk-in unit and must achieve code-compliant conditions suitable for a commercial food-service environment in accordance with applicable local, state, and health and sanitation codes. The scope includes evaluation and repair of the concrete slab to address surface deterioration, cracks, joints, voids, existing penetrations, floor slope, and drainage conditions. Upon completion of floor repairs, the general contractor must seal the concrete floor with a health department code-compliant epoxy coating that is continuous, non-porous, and suitable for food-service sanitation requirements.

The contractor is responsible for repairing or replacing all damaged wall materials, including drywall, resulting from the demolition and removal of the existing walk-in unit, restoring wall surfaces to a smooth, durable condition appropriate for food-service use. The general contractor shall provide all labor, materials, equipment, and coordination necessary to complete both wall and floor restoration work. Any deficiencies identified prior to installation of the new walk-in unit must be corrected at no additional cost to the district. The contractor is required to provide signed and sealed drawings as needed to obtain appropriate permits from the building department. All restoration work must comply with applicable health, safety, sanitation, building, and health department codes regarding cleanability, durability, and moisture resistance.

View the file

Other files

File Type Posted
13-25-26-02-20 - NOTICE INVITING BIDDERS.pdf PDF
12-25-26-02-20 - LIST OF CURRENT MODERNIZATION PROJECTS AS PRIME CONTRACTOR.pdf PDF
16-25-26-02-20 CONTRACTOR CERTIFICATION OF BACKGROUND CHECKS.pdf PDF
3-25-26-02-20 - BID BOND.pdf PDF
14-25-26-02-20 - PAYMENT BOND.pdf PDF
19-Pre-Qualification Questionnaire Blank.pdf PDF
22-25-26-02-20 CHECKLIST OF MANDATORY BID FORMS.pdf PDF
11-25-26-02-20 - INSURANCE DOCUMENTS ENDORSEMENTS.pdf PDF
4-25-26-02-20 - BID FORM.pdf PDF
2-25-26-02-20 - AGREEMENT FORM.pdf PDF
7-25-26-02-20 - DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION STATEMENT.pdf PDF
15-25-26-02-20 - PERFORMANCE BOND.pdf PDF
24-HODGE ELEMENTARY WRITTEN SPECIFICATIONS.pdf PDF
27-25-26-02-20 Hodge Walk-In Refrigerator Project Manual.pdf PDF
26-Bidders Acknowledgement of Project Manual 04.10.pdf PDF
10-25-26-02-20 - GUARANTEE.pdf PDF
18-25-26-02-20 NON-COLLUSION DECLARATION.pdf PDF
5-25-26-02-20 - CASHIERS CHECK.pdf PDF
25-HODGE ELEMENTARY REFRIGERATOR DIAGRAMS.pdf PDF
1-25-26-02-20 - INSTRUCTION TO BIDDERS.pdf PDF
17-25-26-02-20 LIST OF K-12 REFERENCES.pdf PDF
20-25-26-02-20 CERTIFICATION OF NON-DEBARMENT OR SUSPENSION.pdf PDF
8-25-26-02-20 - DVBE CONTRACTOR CLOSE OUT.pdf PDF
21-25-26-02-20 SUBSTITUTION REQUEST FORM.pdf PDF
6-25-26-02-20 - DESIGNATION OF SUB-CONTRACTORS.pdf PDF
9-25-26-02-20 - ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 Walls and Floor Restoration Specification Project Scope: Victor Hodge Walk-In Unit Replacement General Requirements Following the complete removal of the existing walk-in unit, the general contractor shall be fully responsible for restoring all affected surrounding walls and floor areas to a code-compliant condition suitable for a commercial food-service environment. All restoration work should be completed prior to installation of the new walk-in unit.

All work shall comply with applicable local, state, and health and sanitation codes.

Floor Restoration Scope of Work The general contractor shall repair and restore the existing concrete floor surface as required to achieve a durable, smooth, sanitary, and code-compliant condition appropriate for a commercial food-service installation.

Specific Requirements

· The general contractor shall evaluate and repair the concrete slab to address, at a minimum:

· Surface deterioration

· Cracks, joints, and voids

· Existing penetration

· Floor slope and drainage conditions

· The general contractor is fully responsible for ensuring the finished floor provides proper slope and drainage as required by applicable health and building codes.

· All concrete repairs shall be performed using materials and methods suitable for commercial kitchen environments.

· Upon completion of repairs, the general contractor shall seal the concrete floor with a health department code-compliant epoxy coating prior to installation of the new walk-in unit.

· The epoxy finish shall be continuous, non-porous, and suitable for food-service sanitation requirements.

Compliance All floor restoration work shall comply with applicable health, safety, and sanitation codes, including requirements for cleanability, durability, and moisture resistance.

Wall Restoration Scope of Work The Contractor shall repair and restore all affected wall surfaces to achieve a code-compliant condition suitable for a commercial food-service installation.

Specific Requirements

· The Contractor shall repair or replace damaged wall materials, including drywall, resulting from the demolition and removal of the existing walk-in unit.

· Wall surfaces shall be restored to a smooth, durable condition appropriate for food-service use.

· All repairs shall be performed in accordance with applicable building codes and health department requirements.

Compliance All wall restoration work shall comply with applicable health, safety, and sanitation codes.

general contractor Responsibility The general contractor shall include all labor, materials, equipment, and coordination necessary to complete the wall and floor restoration as specified. Any deficiencies identified prior to installation of the new walk-in unit shall be corrected at no additional cost to the district.

The general contractor shall provide sign and sealed drawings as needed to pull the appropriate permits that may be needed by the building department.