This is an Agreement Form for the Azusa Unified School District in Los Angeles County, California, establishing contract terms between the District and a Class B General Building Contractor for the installation of a walk-in refrigerator at Victor Hodge Elementary School located at 700 W. 11th Street, Azusa, CA 91702. The District may issue a Notice to Proceed within ninety days of bid award, after which the Contractor must achieve Substantial Completion within a specified number of calendar days, with time designated as essential to the contract. The contract consists of multiple component documents including the Notice Inviting Bids, Instructions to Bidders, Bid Form, Agreement Form, Performance and Payment Bonds, General Conditions, Supplementary and Special Conditions, Specifications, Addenda, and Drawings/Plans. Bidders must submit mandatory documentation including designation of subcontractors, non-collusion declarations, bid guarantees, worker's compensation certificates, and DVBE participation statements, along with a list of completed projects demonstrating experience with K-12 public school district modernization projects within the last ten years.
The contract price is established as the total amount stipulated in the Contractor's bid submission, with payment made according to the General Conditions. Liquidated damages are assessed at a specified daily rate for delays beyond the Contract Time, which may be deducted from amounts due to the Contractor. The Contractor must maintain current Class Contractor's License from the State of California throughout the project and comply with prevailing wage requirements as determined by the Director of the Department of Industrial Relations. The Contractor shall provide comprehensive indemnification and hold harmless provisions protecting the District, Architect, Inspector, and the State of California from all liabilities, claims, and damages arising from the work. Insurance requirements include General Liability with minimum limits of $2,000,000 aggregate and $1,000,000 each occurrence, along with Automobile Liability, Workers' Compensation, and Pollution Liability coverage. Records are subject to audit examination for five years after final retention payment or recording of Notice of Completion, whichever occurs first.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agreement Azusa USD
AGREEMENT FORM
THIS AGREEMENT, entered into this day of , 20 in the County of Los Angeles of the State of California, by and between the Azusa Unified School District, hereinafter called the “District”, and , hereinafter called the “Contractor”.
WITNESSETH that the District and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1 - SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with (“Project”) in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents, that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Contractor from fully complying with the Contract Documents.
ARTICLE 2 - TIME OF COMPLETION: The District may give notice to proceed within ninety
(90) days of the award of the bid by the District. Once the Contractor has received a notice to proceed, the Contractor shall reach Substantial Completion (See Article 1.1.46) of the Work within ( ) calendar days from receipt of the Notice to Proceed. This shall be called Contract Time. (See Article 8.1.1).
It is expressly understood that time is of the essence.
Contractor has thoroughly studied the Project and has satisfied itself that the time period for this Project was adequate for the timely and proper completion of the Project within each milestone and within the Contract time. Further, Contractor has included in the analysis of the time required for this Project, items set forth in General Conditions Article 8.3.2.1, Submittal Schedules, Rain Day Float, and Governmental Delay Float.
In the event that the District desires to postpone giving the notice to proceed beyond this ninety
(90) day period, it is expressly understood that with reasonable notice to the Contractor, giving the notice to proceed may be postponed by the District. It is further expressly understood by the Contractor, that the Contractor shall not be entitled to any claim of additional compensation as a result of the District’s postponement of giving the notice to proceed.
If the Contractor believes that a postponement will cause hardship to it, the Contractor may terminate the Contract with written notice to the District within ten (10) days after receipt by the Contractor of the District’s notice of postponement. It is further understood by the Contractor that in the event that the Contractor terminates the Contract as a result of postponement by the District, the District shall only be obligated to pay the Contractor for the work performed by the Contractor at the time of notification of postponement. Should the Contractor terminate the Contract as a result of a notice of postponement, the District shall have the authority to award the Contract to the next lowest responsible bidder.
Azusa USD
ARTICLE 3 - LIQUIDATED DAMAGES: It being impracticable and infeasible to determine the amount of actual damage, it is agreed that the Contractor will pay the District the sum of ($ ) per calendar day for each and every day of delay beyond the Contract Time set forth in Article 2 of this Agreement (inclusive of Milestones that are critical on the critical path or noted as critical to the District) as liquidated damages and not as a penalty or forfeiture. In the event Liquidated Damages are not paid, the Contractor further agrees that the District may deduct such amount thereof from any money due or that may become due the Contractor under the Contract (See Article 9.6 and 2.2 of the General Conditions).
ARTICLE 4 - CONTRACT PRICE: The District shall pay to the Contractor as full consideration for the faithful performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, the sum of DOLLARS ($ ), said sum being the total amount stipulated in the Bid Contractor submitted.
Payment shall be made as set forth in the General Conditions.
Should any Change Order result in an increase in the Contract Price, the cost of such Change Order shall be agreed to in advance by the Contractor and the District, subject to the monetary limitations set forth in Public Contract Code section 20118.4. In the event that the Contractor proceeds with a Change in work without an agreement between the District and Contractor regarding the cost of a Change Order, the Contractor waives any Claim of additional compensation for such additional work.
ARTICLE 5 - HOLD HARMLESS AGREEMENT: Contractor shall defend, indemnify and hold harmless District, Architect, Inspector, the State of California and their officers, employees, agents and independent contractors from all liabilities, claims, actions, liens, judgments, demands, damages, losses, costs or expenses of any kind arising from death, personal injury, property damage or other cause based or asserted upon any act, omission, or breach connected with or arising from the progress of Work or performance of service under this Agreement or the Contract Documents. As part of this indemnity, Contractor shall protect and defend, at its own expense, District, Architect, Construction Manager, Inspector, the State of California and their officers, employees, agents and independent contractors from any legal action including attorney’s fees or other proceeding based upon such act, omission, breach or as otherwise required by this Article.
Furthermore, Contractor agrees to and does hereby defend, indemnify and hold harmless District, Architect, Construction Manager, Inspector, the State of California and their officers, employees, agents and independent contractors from every claim or demand made, and every liability, loss, damage, expense or attorney’s fees of any nature whatsoever, which may be incurred by reason of:
(a) Liability for (1) death or bodily injury to persons; (2) damage or injury to, loss (including theft), or loss of use of, any property; (3) any failure or alleged failure to comply with any provision of law or the Contract Documents; or (4) any other loss, damage or expense, sustained by any person, firm or corporation or in connection with the Work called for in this Agreement or the Contract Documents, except for liability resulting from the sole or active negligence, or the willful misconduct of the District.
(b) Any bodily injury to or death of persons or damage to property caused by any act, omission or breach of Contractor or any person, firm or corporation employed by Contractor, either directly or by independent contract, including all damages or injury to or death of persons, loss (including theft) or loss of use of any property, sustained by any person, firm or corporation, including the District, arising out of or in any way connected with Work covered by this Agreement or the Contract Documents, whether said injury or damage occurs either on or off District property, but not for any loss, injury, death or damages caused by the sole or active negligence or willful misconduct of the District.
Azusa USD
(c) Any dispute between Contractor and Contractor’s subcontractors/supplies/ Sureties, including, but not limited to, any failure or alleged failure of the Contractor (or any person hired or employed directly or indirectly by the Contractor) to pay any Subcontractor or Materialman of any tier or any other person employed in connection with the Work and/or filing of any stop notice or mechanic’s lien claims.
(d) Any claims, allegations, penalties, assessments, or liabilities to the extent caused by the Contractor’s failure or the failure of any Subcontractor of any tier, to fully comply with the DIR registration requirements under Labor Code section 1725.5 at all times during the performance of any Work on the Project and shall reimburse the District for any penalties assessed against the District arising from any failure by the Contractor or any Subcontractor of any tier from complying with Labor Code sections 1725.5 and 1771.1. Nothing in this paragraph, however, shall require the Contractor or any Subcontractor to be liable to the District or indemnify the District for any penalties caused by the District in accordance with Labor Code section 1773.3 (g).
Contractor, at its own expense, cost, and risk, shall defend any and all claims, actions, suits, or other proceedings that may be brought or instituted against the District, its officers, agents or employees, on account of or founded upon any cause, damage, or injury identified herein Article 5 and shall pay or satisfy any judgment that may be rendered against the District, its officers, agents or employees in any action, suit or other proceedings as a result thereof.
The Contractor’s and Subcontractors’ obligation to defend, indemnify and hold harmless the Owner, Architect, Inspector, the State of California and their officers, employees, agents and independent contractors hereunder shall include, without limitation, any and all claims, damages, and costs for the following: (1) any damages or injury to or death of any person, and damage or injury to, loss (including theft), or loss of use of, any property; (2) breach of any warranty, express or implied; (3) failure of the Contractor or Subcontractors to comply with any applicable governmental law, rule, regulation, or other requirement; (4) products installed in or used in connection with the Work; and (5) any claims of violation of the Americans with Disabilities Act (“ADA”).
ARTICLE 6 - PROVISIONS REQUIRED BY LAW: Each and every provision of law and clause required to be inserted in this Contract shall be deemed to be inserted herein, and this Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted or is not inserted correctly, then upon application of either party the Contract shall forthwith be physically amended to make such insertion or correction.
ARTICLE 7 - COMPONENT PARTS OF THE CONTRACT: The Contract entered into by this Agreement consists of the following Contract Documents, all of which are component parts of the Contract as if herein set out in full or attached hereto:
Notice Inviting Bids Instructions to Bidders Designation of Subcontractors Non-Collusion Declaration Bid Guarantee Form Bid Bond Bid Form Contractor’s Certificate Regarding Worker’s Compensation DVBE Participation Statement and Close-Out Forms Agreement Form
Azusa USD
Payment Bond Performance Bond Guarantee Escrow Agreement for Security Deposit In Lieu of Retention Workers’ Compensation/Employers Liability Endorsement General Liability Endorsement Automobile Liability Endorsement Contractor’s Certificate Regarding Drug-Free Workplace Contractor’s Certificate Regarding Alcohol and Tobacco Contractor’s Certificate Regarding Background Checks General Conditions Supplementary and Special Conditions Specifications All Addenda as Issued Drawings/Plans Substitution Request Form Requirements, Reports and/or Documents in the Project Manual or Other Documents Issued to Bidders
All of the above named Contract Documents are intended to be complementary. Work required by one of the above named Contract Documents and not by others shall be done as if required by all.
ARTICLE 8 - PREVAILING WAGES: Wage rates for this Project shall be in accordance with the general prevailing rate of holiday and overtime work in the locality in which the work is to be performed for each craft, classification, or type of work needed to execute the Contract as determined by the Director of the Department of Industrial Relations. Copies of schedules of rates so determined by the Director of the Department of Industrial Relations are on file at the administrative office of the District and are also available from the Director of the Department of Industrial Relations. Unless specifically exempted by the Labor Commissioner for this Project, monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement
(DLSE).
The following are hereby referenced and made a part of this Agreement and Contractor stipulates to the provisions contained therein.
1. Chapter 1 of Part 7 of Division 2 of the Labor Code (Section 1720 et seq.)
2. California Code of Regulations, Title 8, Chapter 8, Subchapters 3 through 6 (Section 16000 et seq.)
ARTICLE 9 - RECORD AUDIT: In accordance with Government Code section 8546.7(and Davis Bacon, if applicable) and Article 13.11 of the General Conditions, records of both the District and the Contractor shall be subject to examination and audit for a period of five (5) years after a Final Retention Payment or the Recording of a Notice of Completion, whichever occurs first.
ARTICLE 10 - CONTRACTOR’S LICENSE: The Contractor must possess throughout the Project a Class Contractor’s License, issued by the State of California, which must be current and in good standing.
IN WITNESS WHEREOF, this Agreement has been duly executed by the above named parties, Azusa USD on the day and year first above written.
Azusa Unified School District CONTRACTOR:
By:
Typed or Printed Name
By:
Purchasing and Contracts Director
Dated:
Title
Signature
Type or Printed Name
Title (Authorized Officers or Agents)
Signature
(CORPORATE SEAL)
| NOTICE INVITING BIDS |
| Class B – General Building Contractor |
| INSTRUCTIONS TO BIDDERS |
| Azusa Unified School District Business Department |
| ATTN: Purchasing Supervisor |
| CHECKLIST OF MANDATORY BID FORMS |
| BID FORM |
| 17. LIST OF COMPLETED PROJECTS (MANDATORY TO BE SUBMITTED WITH THE BID). |
| DESIGNATION OF SUBCONTRACTORS |
| DESIGNATION OF SUBCONTRACTORS FORM |
| INFORMATION REQUIRED OF BIDDER |
| List of References K-12 Public School Districts |
| List of Current Modernization Projects as Prime Contractor |
| List of Completed Modernization Projects as Prime Contractor |
| in the Last Ten (10) Years |
| (Use only when not using a Bid Bond) |
| DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) PARTICIPATION STATEMENT |
| AGREEMENT FORM |
| PAYMENT BOND |
| PERFORMANCE BOND |
| GUARANTEE |
| ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION |
| INSURANCE DOCUMENTS & ENDORSEMENTS |
| DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) CONTRACTOR CLOSE-OUT STATEMENT |
| CONTRACTOR CERTIFICATION REGARDING BACKGROUND CHECKS |
| ATTACHMENT A: |
| CONTRACTOR CERTIFICATION REGARDING BACKGROUND CHECKS |
| ARTICLE 1 DEFINITIONS |
| 1.1 BASIC DEFINITIONS |
| 1.2 EXECUTION, CORRELATION AND INTENT |
| 1.3 OWNERSHIP AND USE OF ARCHITECT’S DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS |
| ARTICLE 2 DISTRICT |
| 2.1 INFORMATION AND SERVICES REQUIRED OF THE DISTRICT |
| WARNING: DISTRICT DOES NOT WARRANT THE SOILS AT THE PROJECT SITE. CONTRACTOR HAS REVIEWED AND IS FAMILIAR WITH THE REQUIREMENTS OF THE SOILS INVESTIGATION REPORT. CONTRACTOR UNDERSTANDS THAT PLANS, DRAWINGS AND SPECIFICATIONS SUPERSEDE THE SOILS REPOR... |
| 2.2 DISTRICT’S RIGHT TO CARRY OUT THE WORK DUE TO PARTIAL DEFAULT IN A SPECIFIC SEGREGATED AREA OF WORK (48 HOUR NOTICE TO CURE AND CORRECT) |
| 3.2 SUPERVISION |
| 3.3 LABOR AND MATERIALS |
| 3.4 WARRANTY |
| 3.5 TAXES |
| 3.6 PERMITS, FEES AND NOTICES |
| 3.7 SUBMITTALS REQUIRED AT THE COMMENCEMENT OF THE PROJECT |
| 3.8 DOCUMENTS, SAMPLES, AND COMPUTER AT THE SITE |
| 3.9 SUBMITTALS INCLUDING SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES |
| 3.10 SUBSTITUTIONS |
| 3.11 INTEGRATION OF WORK |
| 3.12 CLEANING UP |
| 3.13 ACCESS TO WORK |
| 3.14 ROYALTIES AND PATENTS |
| 3.15 INDEMNIFICATION |
| 3.16 SUBMISSION OF DAILY REPORTS |
| 3.17 AS-BUILT DRAWINGS AND ANNOTATED SPECIFICATIONS |
| 3.18 EQUIPMENT MANUALS |
| 3.19 DIR REGISTRATION |
| 4.2 ARCHITECT’S ADMINISTRATION OF THE CONTRACT |
| 4.3 PROJECT INSPECTOR |
| 4.4 STOP WORK ORDER |
| 4.5 RESPONSIBILITY FOR ADDITIONAL CHARGES INCURRED BY THE DISTRICT FOR PROFESSIONAL SERVICES |
| 4.6 DISPUTES AND CLAIMS |
| ARTICLE 5 SUBCONTRACTORS |
| CONTRACTOR IS AWARE THAT THIS CONTRACT MAY BE SPLIT INTO SEVERAL PHASES BASED ON DOCUMENTATION PROVIDED WITH THIS BID OR DISCUSSED AT THE JOB WALK. CONTRACTOR HAS MADE ALLOWANCE FOR ANY DELAYS OR DAMAGES WHICH MAY ARISE FROM COORDINATION WITH CONTRACT... |
| 6.2 CONSTRUCTIVE OWNERSHIP OF PROJECT SITE AND MATERIAL |
| 6.3 DISTRICT’S RIGHT TO CLEAN UP |
| ARTICLE 7 CHANGES IN THE WORK |
| CONTRACTOR UNDERSTANDS, ACKNOWLEDGES, AND AGREES THAT THE REASON FOR THIS NOTICE REQUIREMENT IS SO THAT DISTRICT MAY HAVE AN OPPORTUNITY TO ANALYZE THE WORK AND DECIDE WHETHER THE DISTRICT SHALL PROCEED WITH THE CHANGE ORDER OR ALTER THE PROJECT SO TH... |
| 7.2 CHANGE ORDERS (“CO”) |
| 7.3 CONSTRUCTION CHANGE DOCUMENT (CCD Category A, and CCD Category B) and IMMEDIATE CHANGE DIRECTIVE (ICD) |
| 7.4 REQUEST FOR INFORMATION (“RFI”) |
| 7.5 REQUEST FOR PROPOSAL (“RFP”) |
| 7.6 CHANGE ORDER REQUEST (“COR”) |
| 7.7 COST OF CHANGE ORDERS |
| 8.2 HOURS OF WORK |
| 8.3 PROGRESS AND COMPLETION |
| 8.4 EXTENSIONS OF TIME - LIQUIDATED DAMAGES |
| ARTICLE 9 PAYMENTS AND COMPLETION |
| 9.2 COST BREAKDOWN |
| 9.3 PROGRESS PAYMENTS |
| 9.4 APPLICATIONS FOR PROGRESS PAYMENTS |
| 9.5 STOP NOTICE CLAIMS AND WARRANTY OF TITLE |
| 9.6 DECISIONS TO WITHHOLD PAYMENT |
| 9.7 NONCONFORMING WORK |
| 9.8 SUBCONTRACTOR PAYMENTS |
| 9.9 COMPLETION OF THE WORK |
| 9.10 PARTIAL OCCUPANCY OR USE |
| 9.11 COMPLETION AND FINAL PAYMENT |
| 9.12 SUBSTITUTION OF SECURITIES |
| 10.2 SAFETY OF PERSONS AND PROPERTY |
| 10.3 EMERGENCIES |
| 10.4 HAZARDOUS MATERIALS |
| 11.2 WORKERS’ COMPENSATION INSURANCE |
| 11.3 BUILDER’S RISK/ “ALL RISK” INSURANCE |
| 11.4 FIRE INSURANCE |
| 11.5 AUTOMOBILE LIABILITY |
| 11.6 OTHER INSURANCE |
| 11.7 PROOF OF INSURANCE |
| 11.8 COMPLIANCE |
| 11.9 WAIVER OF SUBROGATION |
| 11.10 PERFORMANCE AND PAYMENT BONDS |
| 4-343. Duties of the Contractor. |
| 12.2 SPECIAL NOTICE OF AMERICAN’S WITH DISABILITIES ACT |
| 12.3 UNCOVERING OF WORK |
| 12.4 CORRECTION OF WORK |
| ARTICLE 13 MISCELLANEOUS PROVISIONS |
| 13.2 SUCCESSORS AND ASSIGNS |
| 13.3 WRITTEN NOTICE |
| 13.4 RIGHTS AND REMEDIES |
| 13.5 TESTS AND INSPECTIONS |
| 13.6 TRENCH EXCAVATION |
| 13.7 WAGE RATES, TRAVEL, AND SUBSISTENCE |
| 13.8 RECORDS OF WAGES PAID |
| 13.9 APPRENTICES |
| 13.10 ASSIGNMENT OF ANTITRUST CLAIMS |
| 13.11 STATE AND DISTRICT CONDUCTED AUDITS |
| 13.12 STORM WATER POLLUTION PREVENTION |
| 13.13 PROJECT LABOR AGREEMENT |
| 14.2 TERMINATION BY THE DISTRICT FOR CAUSE |
| 14.3 TERMINATION OF CONTRACT BY DISTRICT (CONTRACTOR NOT AT FAULT) |
| 14.4 REMEDIES OTHER THAN TERMINATION |
| ARTICLE 15 DEBARMENT |
| 15.2 BOARD FINDING |
| 15.3 HEARING AND PRESENTATION OF EVIDENCE |
| ARTICLE 3 – THE CONTRACTOR |
| ARTICLE 8 – TIME |
| ARTICLE 11 – INSURANCE AND BONDS |
| ARTICLE 13.13 – PROJECT LABOR AGREEMENT |
| IMMEDIATE CONSTRUCTION CHANGE DIRECTIVE NO. |
| CERTIFICATE OF SUBSTANTIAL COMPLETION |
| Aggregate |
| Each Occurrence |
| $2,000,000 |
| $1,000,000 |
| Pollution Liability |
| INSURANCE SUBMITTALS FORM |
| 11.1.1 Specific Insurance Requirements |
File details come from the government source that posted it. Updated .