These are architectural drawing sheets for the Calverton National Cemetery Columbarium Improvements project, specifically documenting existing conditions and restoration elevations for Columbarium L. The documents are part of Bid Documents for the U.S. Department of Veterans Affairs project number 805CM3048, issued on March 25, 2025, located in Suffolk County, New York. The drawings include detailed elevation views of multiple columbarium walls (Walls 2-10), showing existing concrete panel structures with grid-like niches, and include restoration notes indicating required cleaning and repair procedures for the walls. The drawings are prepared by The LA Group from Saratoga Springs, NY, and are part of a set of 99 total sheets, specifically sheets CS186 and CS187, which provide comprehensive visual documentation of the current state of the columbarium walls prior to planned improvements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS186
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM L EXISTING CONDITIONS
/ RESTORATION ELEVATIONS - SHEET 6
CS186
64 of 99LTM BMD
COLUMBARIUM L - WALL 8E ELEVATION8 COLUMBARIUM L - WALL 8F ELEVATION9Scale: 1" = 5'
COLUMBARIUM L KEY1 COLUMBARIUM L - WALL S8/9 ELEVATION10
COLUMBARIUM L - WALL 8B ELEVATION5 COLUMBARIUM L - WALL 8C ELEVATION6 COLUMBARIUM L - WALL 8D ELEVATION7
COLUMBARIUM L - WALL 7G ELEVATION2 COLUMBARIUM L - WALL S9/8 ELEVATION3 COLUMBARIUM L - WALL 8A ELEVATION4
CS186
CS186
CS186
W
ALL 1
WALL 1
W
ALL 1
W
ALL 2
WALL 2
WALL 3
W
ALL 7
W
ALL 4
W
ALL 6
W
ALL 5
WALL 5
WALL 7
WALL 6
WALL 7
WALL 8
WALL 9
WALL 11
WALL 10
W
ALL 11
W
ALL 10
W
ALL 8
W
ALL 9
W
ALL 18
WALL 18
CS186
CS186
CS186
CS186
CS186
A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND
SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL
PANELS TO BE CLEANED. SEE SPECIFICATIONS.
B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN
PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE
SPECIFICATIONS.
C. NOT APPLICABLE IN COLUMBARIUM L
D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.
SEE SPECIFICATIONS.
E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER
WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT
PER SPECIFICATIONS.
F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501
G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE
DETAIL 10/CS500
H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500
I. REPAIR STONE VENEER
RESTORATION NOTES:
1. FAILING PANEL JOINT SEALANT, TYP.
2. FAILING COPING JOINT SEALANT, TYP.
3. CRACKED PRECAST CONCRETE CAP, TYP.
4. STAINED PRECAST CONCRETE PANELS, TYP.
5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.
6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.
7. FAILING STONE VENEER AND / OR STONE CAP
8. PITTED AND SPALLING CONCRETE FLATWORK
9. WALL FOUNDATION EXPOSED ALONG BERM
EXISTING CONDITIONS NOTES:
NOTE: ALL WALLS ON THIS SHEET TO
RECEIVE CLEANING (E)
LEGEND:
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
CS501
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM L EXISTING CONDITIONS
/ RESTORATION ELEVATIONS - SHEET 7
CS187
65 of 99LTM BMD
COLUMBARIUM L - WALL 10A ELEVATION8 COLUMBARIUM L - WALL 10B ELEVATION9Scale: 1" = 5'
COLUMBARIUM L KEY1 COLUMBARIUM L - WALL 10C ELEVATION10
COLUMBARIUM L - WALL 9D ELEVATION5 COLUMBARIUM L - WALL 9E ELEVATION6 COLUMBARIUM L - WALL S11/10 ELEVATION7
COLUMBARIUM L - WALL 9A ELEVATION2 COLUMBARIUM L - WALL 9B ELEVATION3 COLUMBARIUM L - WALL 9C ELEVATION4
CS187
W
ALL 1
WALL 1
W
ALL 1
W
ALL 2
WALL 2
WALL 3
W
ALL 7
W
ALL 4
W
ALL 6
W
ALL 5
WALL 5
WALL 7
WALL 6
WALL 7
WALL 8
WALL 9
WALL 11
WALL 10
W
ALL 11
W
ALL 10
W
ALL 8
W
ALL 9
W
ALL 18
WALL 18
CS187
CS187
CS187
CS187
CS187
CS187
CS187
CS187
A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND
SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL
PANELS TO BE CLEANED. SEE SPECIFICATIONS.
B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN
PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE
SPECIFICATIONS.
C. NOT APPLICABLE IN COLUMBARIUM L
D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.
SEE SPECIFICATIONS.
E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER
WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT
PER SPECIFICATIONS.
F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501
G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE
DETAIL 10/CS500
H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500
I. REPAIR STONE VENEER
RESTORATION NOTES:
1. FAILING PANEL JOINT SEALANT, TYP.
2. FAILING COPING JOINT SEALANT, TYP.
3. CRACKED PRECAST CONCRETE CAP, TYP.
4. STAINED PRECAST CONCRETE PANELS, TYP.
5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.
6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.
7. FAILING STONE VENEER AND / OR STONE CAP
8. PITTED AND SPALLING CONCRETE FLATWORK
9. WALL FOUNDATION EXPOSED ALONG BERM
EXISTING CONDITIONS NOTES:
NOTE: ALL WALLS ON THIS SHEET TO
RECEIVE CLEANING (E)
LEGEND:
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
CS501
| 64_CS186_COLUMBARIUM L RESTORATION-L-6 |
| Sheets and Views |
| L-6 |
| 65_CS187_COLUMBARIUM L RESTORATION-L-7 |
| Sheets and Views |
| L-7 |
File details come from the government source that posted it. Updated .