These are technical engineering drawings for the Calverton National Cemetery Columbarium Improvements project, specifically detailing existing conditions and restoration elevations for Columbarium I and J sections. The documents, part of Bid Documents for the U.S. Department of Veterans Affairs, show comprehensive site plans and elevation views of multiple columbarium walls, with detailed notes on restoration requirements including:
Key restoration work includes removing and replacing cracked precast concrete panels, reinstalling loose wall panels and wall caps, replacing joint sealants, removing existing plantings, adding gravel strips, and performing general concrete pavement repairs. The project covers multiple walls across sections I and J, with specific instructions for cleaning, protecting existing pavement, replacing stone mulch, and installing new landscaping elements. The drawings are dated March 25, 2025, and are part of the larger contract number 805CM3048 for improvements at the Calverton National Cemetery in Suffolk County, New York.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL 9
W
ALL 10
WALL 10
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM I EXISTING CONDITIONS
/ RESTORATION ELEVATIONS - SHEET 14
CS134
29 of 99LTM BMD
COLUMBARIUM I - WALL 10G ELEVATION2 COLUMBARIUM I - WALL S10 ELEVATION3
COLUMBARIUM I - WALL E2 ELEVATION4 COLUMBARIUM I - WALL E2 ELEVATION5Scale: 1" = 5'
COLUMBARIUM I KEY1
W
ALL 10
CS134
CS134
2 / D
2 / D
A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND
SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL
PANELS TO BE CLEANED. SEE SPECIFICATIONS.
B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN
PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE
SPECIFICATIONS.
C. NOT APPLICABLE IN COLUMBARIUM I
D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.
SEE SPECIFICATIONS.
E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER
WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT
PER SPECIFICATIONS.
F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501
G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE
DETAIL 10/CS500
H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500
I. REPAIR STONE VENEER
RESTORATION NOTES:
1. FAILING PANEL JOINT SEALANT, TYP.
2. FAILING COPING JOINT SEALANT, TYP.
3. CRACKED PRECAST CONCRETE CAP, TYP.
4. STAINED PRECAST CONCRETE PANELS, TYP.
5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.
6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.
7. FAILING STONE VENEER AND / OR STONE CAP
8. PITTED AND SPALLING CONCRETE FLATWORK
EXISTING CONDITIONS NOTES:
A
5 / G
1 / B (ALL JOINTS
IN ELEVATION)
A
5 / G
7 / I
6 / A
(ALL PANELS)
NOTE: ALL WALLS ON THIS SHEET TO
RECEIVE CLEANING (E)
H
PROTECT
EXISTING
PAVEMENT TO
REMAIN, TYP.
H
CS134
CS134
LEGEND:
REMOVE AND REPLACE CONCRETE FLATWORK
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
CS500
CS501
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM J EXISTING CONDITIONS
OVERALL KEY PLAN
CS140
30 of 99LTM BMD
WALL SECTION KEY
WALL # SECTIONS
1 A(1-7), B(8-21), C(22-28)
2 A(1-7), B(8-19), C(20-26), D(27-33)
3 A(1-7), B(8-14), C(15-21), D(22-27), E(28-33), F(34-39), G(40-45), H(46-51)
4 A(1-7), B(8-13), C(14-21)
5 A(1-6), B(7-12), C(13-19)
6 A(1-7), B(8-14), C(15-21)
7 A(1-7), B(8-14), C(15-21), D(22-28), E(29-34), F(35-40), G(41-46)
8 A(1-7), B(8-14), C(15-21), D(22-28), E(29-35), F(36-46)
9 A(1-8), B(9-16), C(17-24), D(25-32), E(33-40)
10 A(1-7), B(8-14), C(15-21), D(22-28)
11 A(1-9), B(10-17), C(18-24), D(25-32)
12 A(1-5), B(6-12), C(13-19), D(20-24)
13 A(1-8), B(9-14), C(15-20), D(21-26), E(27-35)
14 A(1-6), B(7-12)
15 A(1-8), B(9-15), C(16-23)
16 A(1-8), B(9-15), C(16-23), D(24-34)
17 A(1-7), B(8-14), C(15-21), D(22-28)
18 A(1-8), B(9-16), C(17-24), D(25-30), E(31-37), F(38-43), G(44-50)
S 18 S 1
A
1 B
C
S 1/2
A
2 B
C
D
3 A 3 B 3 C
D
E
F
G
H
S 3S 7/4
C
B
A
5 A5 B
C
S 5/6
6 A
6 B6 C
S 6/
7 A 7 B 7 C 7 D
E
F
G
S 9/
8 A8 B8 C8 D8 E
F
S 8/9
E
9 D 9 C 9 B 9 A
S 11/10
C
B
A
S
/1
11 A
B
C
D
S 13/12
A
12 B12 C
D
S 12/13
13 E
13 D 13 C 13 B
A
S 14
B
A
15 A15 B15 C
S
16 A 16 B 16 C
D
17 A 17 B 17 C 17 D
C
B
A
18 D 18 E 18 F
18 G
W
ALL 1
WALL 1
W
ALL 1
W
ALL 2
WALL 2
WALL 3
W
ALL 2
W
ALL 3
W
ALL 4
W
ALL 7
WALL 5
WALL 7
WALL 6
WALL 7
W
ALL 6
W
ALL 5
WALL 8
WALL 9
W
ALL 8
W
ALL 9
W
ALL 11
W
ALL 10
WALL 11
WALL 10
10 D
WALL 12
WALL 13
W
ALL 12
W
ALL 13
W
ALL 13
W
ALL 12
W
ALL 14
WALL 15
WALL 16
WALL 17
WALL 18
W
ALL 16
W
ALL 18
W
ALL 18
1. THERE ARE CURRENTLY NO BURIALS IN SECTION J
NOTE:
1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL ARRANGE
PRE-CONSTRUCTION MEETING WITH RE/COR TO REVIEW ALL
APPLICABLE PERMIT CONDITIONS, THE CONSTRUCTIONS PLANS AND
GENERAL CONSTRUCTION SCHEDULE
2. NO WORK SHALL COMMENCE UNTIL UNDERGROUND UTILITIES WITHIN
THE WORK AREA HAVE BEEN IDENTIFIED, LOCATED AND MARKED.
THIS SHALL INCLUDE ALL CEMETERY INFRASTRUCTURE WITHIN THE
PROPOSED WORK AREA WITHIN THE PROPOSED WORK AREA THAT
MAY NOT BE PART OF TRADITIONAL UTILITY PLANS SUCH AS STORM
SEWERS, IRRIGATION, CONTROL WIRES, ETC.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
WITH THE RE/COR ON ALL CONSTRUCTION WASTE MATERIALS TO BE
REMOVED AND RECYCLED / DISPOSED OF OFF SITE. ALL HANDLING
OF CONSTRUCTION WASTE MATERIALS TO BE REMOVED, RECYCLED
OR DISPOSED OF MUST BE DONE SO IN A SAFE, LEGAL MANNER IN
ACCORDANCE WITH ALL LOCAL, COUNTY, STATE, FEDERAL AND ANY
OTHER APPLICABLE REGULATIONS.
4. ALL ITEMS REQUIRING REMOVAL SHALL BE REMOVED TO FULL
DEPTH, INCLUDING BASE MATERIAL AND FOOTINGS OR
FOUNDATIONS AS APPLICABLE UNLESS OTHERWISE NOTED.
EXCAVATED MATERIALS UNSUITABLE FOR REUSE SHALL BE
REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE
CONTRACTOR.
5. EXISTING ITEMS INDICATED TO BE SALVAGED SHOULD BE
CAREFULLY REMOVED AND STORED AS DIRECTED BY THE RE/COR.
SITE PREPARATION AND DEMOLITION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE INSIDE OR
OUTSIDE THE LIMIT OF WORK DUE TO THEIR CONTRACT
OPERATIONS.
2. THE CONTRACTOR SHALL PROTECT AND SUSTAIN IN NORMAL
SERVICE ALL EXISTING UTILITIES, STRUCTURES, EQUIPMENT,
ROADWAYS AND DRIVEWAYS .
3. THE CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN
NECESSARY TRAFFIC CONTROL DEVICES, DRUMS, DELINEATORS,
SIGNS, FENCES AND BARRICADES IN ACCORDANCE WITH THE LATEST
EDITION OF THE NATIONAL MUTCD WITH NEW YORK STATE
SUPPLEMENT TO PROPERLY PROTECT WORK, EQUIPMENT, PERSONS
AND PROPERTY FROM DAMAGE.
4. REPAIR AND/OR RESTORE ALL DAMAGED EXISTING AREAS,
GOVERNMENT FURNISHED PROPERTY, STRUCTURES, ROADS,
UTILITIES AND OTHER ITEMS USED FOR AND/OR DURING
CONSTRUCTION TO THEIR ORIGINAL CONDITION OR BETTER.
PROTECTION AND RESTORATION NOTES:
NOTE: WALL SECTION KEY CORRESPONDS TO PHOTOGRAPHED
WALL ELEVATIONS AND NICHE COLUMN NUMBERS
EX: WALL #1 SECTION A(1-7) CORRESPONDS TO WALL 1,
ELEVATION A, NICHE COLUMNS 1 THROUGH 7
TEMPORARY CONSTRUCTION
FENCE EXTENDED TO WOOD LINE
PROPOSED
GRAVEL STRIP
PROPOSED
GRAVEL STRIP
PROPOSED
GRAVEL STRIP
REMOVE AND REPLACE
CONCRETE PAVEMENT, TYP.
CS500
CS500
CS500
CS500
COLUMBARIUM J OVERALL KEY PLAN1
GRAPHICAL SCALE: 1"=5'
5 2.5 0 5 10 15
E
E
· REMOVE CRACKED PRECAST CONCRETE PANELS AND REPLACE WITH
NEW PANELS
· REMOVE AND REINSTALL LOOSE PRECAST PANELS
· REMOVE AND REINSTALL LOOSE PRECAST WALL CAPS
· REMOVE AND REINSTALL STONE WALL CAPS OVER FLASHING MATERIAL
· REPLACE ALL WALL CAP JOINT SEALANT AS INDICATED ON DRAWINGS
· REPLACE ALL WALL PANEL JOINT SEALANT AS INDICATED ON DRAWINGS
· REMOVE AND REPLACE DAMAGED CONCRETE FLATWORK
· ADD GRAVEL STRIP AT OUTSIDE PERIMETER
· REMOVE ALL EXISTING PLANTING AND MULCH FROM PLANT BEDS WITHIN
COURT, REPLACE WITH PEA GRAVEL AND DECORATIVE STONES
· SEALING WORK AT CONCRETE PAVEMENT INCLUDES REMOVAL AND
REPLACEMENT OF EXPANSION JOINT SEALANT. PROVIDE NEW SEALANT
PER SPECIFICATIONS. EXPANSION JOINTS AS SHOWN ON 15'X15' GRIDS
AND WHERE PAVEMENT ABUTS WALLS. CONTRACTOR TO FIELD VERIFY
EXPANSION JOINT LOCATIONS
GENERAL CONSTRUCTION NOTES:
LEGEND:
REMOVE AND REPLACE CONCRETE FLATWORK
ALL STONE MULCH IN GRAVEL
STRIPS TO BE REPLACED, TYP.
REMOVE AND RESET PRECAST CONCRETE CAP
REMOVE AND RESET
PRECAST CONCRETE
CAP, TYP.
TEMPORARY CONSTRUCTION
FENCE EXTENDED TO WOOD LINE
CS500
TEMPORARY CONSTRUCTION FENCE
PERIMETER SAFETY RAILING
PERIMETER
SAFETY RAILING
CS505
PLANT LIST
SYM. QTY. BOTANICAL NAME COMMON NAME SIZE H x W (75%)
SHRUBS
TO Thuja occidentalis 'Anna van Vloten' Anna's Magic Ball Arborvitae 2.25' x 2.25'
BT Berberis thunbergii 'Orange Rocket' Orange Rocket Barberry 3.75' x 2.25'
CO Chamaecyparis obtusa 'Nana Gracilis' Dwarf Hinoki Cypress 4.5' x 3'
CO
TO
BT
CO
BT
CO
CO
TO
BT
CO
BT
CO
BT
CO
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
CS500
1 & 3
CS501
CS501
PROPOSED BENCH, TYP.
EDGE OF NEW AND
EXISTING PAVEMENT
CS500
EXPANSION
JOINT, TYP.
CONTROL
JOINT, TYP.
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM J EXISTING CONDITIONS
/ RESTORATION ELEVATIONS - SHEET 1
CS141
31 of 99LTM BMD
COLUMBARIUM J - WALL S1/2 ELEVATION8 COLUMBARIUM J - WALL 2A ELEVATION9Scale: 1" = 5'
COLUMBARIUM J KEY1
W
ALL 1
WALL 1
W
ALL 1
W
ALL 2
WALL 2
WALL 3
W
ALL 2
W
ALL 6
W
ALL 5
COLUMBARIUM J - WALL 2B ELEVATION10
COLUMBARIUM J - WALL 1A ELEVATION5 COLUMBARIUM J - WALL 1B ELEVATION6 COLUMBARIUM J - WALL 1C ELEVATION7
COLUMBARIUM J - WALL E1 ELEVATION2 COLUMBARIUM J - WALL E1 ELEVATION3 COLUMBARIUM J - WALL S1 ELEVATION4
CS141
CS141
CS141
CS141
CS141
CS141
CS141
CS141
CS141
2 / D
5 / G,B
A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND
SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL
PANELS TO BE CLEANED. SEE SPECIFICATIONS.
B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN
PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE
SPECIFICATIONS.
C. NOT APPLICABLE IN COLUMBARIUM J
D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.
SEE SPECIFICATIONS.
E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER
WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT
PER SPECIFICATIONS.
F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501
G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE
DETAIL 10/CS500
H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500
I. REPAIR STONE VENEER
J. REGRADE BERM AT FOUNDATION
RESTORATION NOTES:
1. FAILING PANEL JOINT SEALANT, TYP.
2. FAILING COPING JOINT SEALANT, TYP.
3. CRACKED PRECAST CONCRETE CAP, TYP.
4. STAINED PRECAST CONCRETE PANELS, TYP.
5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.
6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.
7. FAILING STONE VENEER AND / OR STONE CAP
8. PITTED AND SPALLING CONCRETE FLATWORK
9. WALL FOUNDATION EXPOSED ALONG BERM
EXISTING CONDITIONS NOTES:
7 / I
NOTE: ALL WALLS ON THIS SHEET TO
RECEIVE CLEANING (E)
6 / A,B
(ALL PANELS)
H
PROTECT EXISTING
PAVEMENT TO REMAIN, TYP.
H
A,B
ALL STONE MULCH IN GRAVEL
STRIPS TO BE REPLACED, TYP.
LEGEND:
REMOVE AND REPLACE CONCRETE FLATWORK
A,B
RAILINGS TO BE REMOVED
AND REPLACED, TYP.
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
CS500
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
SUFFOLK COUNTY, NEW YORK
805CM3048
MARCH 25, 2025
U.S. Department of Veterans Affairs
STAMP
Revisions: Date:
Drawing Title
Approved:
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
CALVERTON NATIONAL CEMETERY
COLUMBARIUM IMPROVEMENTS
ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management
BID DOCUMENTS
INTEGRITY FEDERAL SERVICES /
THE LA GROUP JOINT VENTURE
Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg
WV 25401
(304)-725-8456
The LA Group 40 Long Alley Saratoga Springs
NY 12866
(518)-587-8100
COLUMBARIUM J EXISTING CONDITIONS
/ RESTORATION ELEVATIONS - SHEET 2
CS142
32 of 99LTM BMD
COLUMBARIUM J - WALL 3E ELEVATION8 COLUMBARIUM J - WALL 3F ELEVATION9Scale: 1" = 5'
COLUMBARIUM J KEY1 COLUMBARIUM J - WALL 3G ELEVATION10
COLUMBARIUM J - WALL 3B ELEVATION5 COLUMBARIUM J - WALL 3C ELEVATION6 COLUMBARIUM J - WALL 3D ELEVATION7
COLUMBARIUM J - WALL 2C ELEVATION2 COLUMBARIUM J - WALL 2D ELEVATION3 COLUMBARIUM J - WALL 3A ELEVATION4
CS142
CS142
W
ALL 1
W
ALL 2
WALL 2
WALL 3
W
ALL 2
W
ALL 3
W
ALL 4
W
ALL 7
WALL 5
WALL 7
W
ALL 6
W
ALL 5
WALL 8
WALL 9
CS142
CS142
CS142
CS142
CS142
CS142
CS142
A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND
SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL
PANELS TO BE CLEANED. SEE SPECIFICATIONS.
B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN
PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE
SPECIFICATIONS.
C. NOT APPLICABLE IN COLUMBARIUM J
D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.
SEE SPECIFICATIONS.
E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER
WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT
PER SPECIFICATIONS.
F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501
G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE
DETAIL 10/CS500
H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500
I. REPAIR STONE VENEER
J. REGRADE BERM AT FOUNDATION
RESTORATION NOTES:
1. FAILING PANEL JOINT SEALANT, TYP.
2. FAILING COPING JOINT SEALANT, TYP.
3. CRACKED PRECAST CONCRETE CAP, TYP.
4. STAINED PRECAST CONCRETE PANELS, TYP.
5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.
6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.
7. FAILING STONE VENEER AND / OR STONE CAP
8. PITTED AND SPALLING CONCRETE FLATWORK
9. WALL FOUNDATION EXPOSED ALONG BERM
EXISTING CONDITIONS NOTES:
NOTE: ALL WALLS ON THIS SHEET TO
RECEIVE CLEANING (E)
LEGEND:
REMOVE EX. VEGETATION & MULCH. NEW GRAVEL
& DECORATIVE STONE PER SPECIFICATIONS
| 29_CS134_COLUMBARIUM I RESTORATION-I-14 |
| Sheets and Views |
| I-14 |
| 30_CS140_COLUMBARIUM J RESTORATION-COL. J KEY |
| Sheets and Views |
| COL. J KEY |
| 31_CS141_COLUMBARIUM J RESTORATION-J-1 |
| Sheets and Views |
| J-1 |
| 32_CS142_COLUMBARIUM J RESTORATION-J-2 |
| Sheets and Views |
| J-2 |