VA WCHCS Bldg 9 Oneline Report 23.pdf
PDF 50 KB Posted
- Attached to
- H263--Fire Protection Services Federal contract opportunity
- Solicitation number
- 36C25925Q0190
About this file
This is a fire protection device testing report from ALARMSpecialists, Inc. documenting the annual testing of fire safety devices at VA Hospital WCHCS Building 9 conducted on March 21, 2023. The report includes test results for multiple device types as required by standards EC.02.03.05 EP 3 and EP 4.
The testing covered 6 pull stations (manual fire alarm boxes), 2 smoke detectors, and 17 audible/visual notification devices (horn/strobes, speaker/strobes, and strobes) throughout Building 9 including the chiller room, boiler room, basement, temperature control trailer, and various corridors. All devices were tested and passed inspection, with specific device locations and identification numbers documented. The devices are located on Node 3, Loop 1 of the fire alarm system. The report demonstrates compliance with the requirement to test duct detectors, heat detectors, manual fire alarm boxes, smoke detectors, visual and audible fire alarms, speakers and door-releasing devices every 12 months.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by ALARMSpecialists, Inc
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 1 of 3
Date Tested Device Location No de Lo op Device Status Comments March 21, 2023 Pull Station CHILLER ROOM WEST EXIT BLDG 9 N 3 L 1 M 1 Pass March 21, 2023 Pull Station CHILLER ROOM EAST EXIT N 3 L 1 M 2 Pass March 21, 2023 Pull Station BOILER ROOM MAIN ENTRY N 3 L 1 M 3 Pass March 21, 2023 Pull Station BASEMENT WEST BUILDING 9 N 3 L 1 M 5 Pass
March 21, 2023 Pull Station TEMP CONTROL TRAILER EAST OF BLDG 9 N 3 L 1 M 25 Pass
March 21, 2023 Pull Station TEMP CONTROL TRAILER EAST OF BLDG 9 N 3 L 1 M 26 Pass
EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are documented.
VA Hospital - WCHCS - Bldg 9 - Device List - March 23
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 2 of 3
Date Tested Device Location No de Lo op Device Status Comments March 21, 2023 Smoke Detector ABOVE FIRE PANEL CHILLER ROOM N 3 L 1 D 3 Pass March 21, 2023 Smoke Detector TEMP CONTROL TRAILER EAST OF BLDG 9 N 3 L 1 D 25 Pass
VA Hospital - WCHCS - Bldg 9 - Device List - March 23 EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are documented.
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 3 of 3
Date Tested Device Floor Room # / Corridor Location / Description No de Lo op Device Label Status Comments March 21, 2023 Horn/Strobe Bottom Of Stairs Building 9 N 3 L 1 x x 49799065 Pass March 21, 2023 Strobe Zone BUILDING 9 HORNS CHILLER ROOM Building 9 N 3 L 1 M 15 Pass March 21, 2023 Strobe Zone BLDG 9 FCPS CHILLER ROOM Building 9 N 3 L 1 M 70 Pass March 21, 2023 Horn/Strobe By Stairs And Eye wash Building 9 N 3 L 1 x x 49798373 Pass March 21, 2023 Horn/Strobe Top Of Stairs Chiller Side Building 9 N 3 L 1 x x 49799045 Pass March 21, 2023 Horn/Strobe Chiller arm Exit Building 9 N 3 L 1 x x 49798368 Pass March 21, 2023 Horn/Strobe Chiller Rm Exit Double Doors Building 9 N 3 L 1 x x 49798369 Pass March 21, 2023 Horn/Strobe Entrance To Chiller rm Building 9 N 3 L 1 x x 49798372 Pass March 21, 2023 Horn/Strobe Boiler Rm Building 9 N 3 L 1 x x 49799061 Pass March 21, 2023 Horn/Strobe Under stairs Building 9 N 3 L 1 x x 49799062 Pass March 21, 2023 Speaker/Strobe Chiller Side Control Rm Building 9 N 3 L 1 x x 49798355 Pass March 21, 2023 Horn/Strobe By Rm 105 Building 9 N 3 L 1 x x 49798371 Pass March 21, 2023 Horn/Strobe By Restroom Building 9 N 3 L 1 x x 49799064 Pass March 21, 2023 Strobe Restroom Building 9 N 3 L 1 x x 49799063 Pass March 21, 2023 Speaker/Strobe Control Trailer Building 9 N 3 L 1 x x Pass March 21, 2023 Strobe Control Trailer Kitchen Building 9 N 3 L 1 x x Pass March 21, 2023 Strobe Control Trailer Restroom Building 9 N 3 L 1 x x Pass
VA WCHCS - Bldg 9 - Audibles - Device List - March 23
EC.02.03.05 EP 4 Every 12 months, the hospital tests visual and audible fire alarms, including speakers and door-releasing devices on the inventory. The results and completion dates are documented.
File details come from the government source that posted it. Updated .