This is a fire alarm testing and inspection report dated March 2023 for Building 7 at a VA Hospital (WCHCS) conducted by ALARMSpecialists, Inc. The report documents testing results for multiple fire safety devices in accordance with EC.02.03.05 requirements.
The testing covered three main categories: 1) Manual fire alarm pull stations (tested annually), 2) Water flow devices and valve tamper switches (tested semi-annually), and 3) Visual/audible alarms including strobes and speaker/strobes (tested annually). All devices tested passed inspection, including a pull station at the main exit, a water flow switch (28 second response time), a tamper switch on the control valve (1 turn test), and multiple strobes/speaker-strobes in the chiller room and dock area. The report includes specific device locations, node/loop identifiers, and device labels where applicable. This appears to be documentation required for compliance with hospital fire safety regulations.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by ALARMSpecialists, Inc
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 1 of 4
Date Tested Device Location No de Lo op Device Status Comments March 21, 2023 Pull Station MAIN EXIT BUILDING 7 N 3 L 3 M 2 Pass
EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are documented.
VA Hospital - WCHCS - Bldg 7 - Device List - March 23
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 2 of 4
Date Tested DEVICE LOCATION STATUS COMMENTS March 21, 2023 Water Flow Switch WATERFLOW BUILDING 7 N 3 L 3 M 3 Pass 28 SEC
VA WCHCS - Bldg 7 - Sprinkler - March 23 EC.02.03.05 EP 2 Every 6 months, the hospital tests vane-type and pressure-type water flow devices and valve tamper switches on the inventory. The results and completion dates are documented..
Note: Mechanical water-flow devices (including, but not limited to, water motor gongs) should be tested quarterly. The results and completion dates are documented.
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 3 of 4
Date Tested DEVICE LOCATION STATUS COMMENTS March 21, 2023 Tamper Switch TAMPER CONTROL VALVE BUILDING 7 N 3 L 3 M 2 Pass 1 TURN
VA WCHCS - Bldg 7 - Sprinkler - March 23 EC.02.03.05 EP 2 Every 6 months, the hospital tests vane-type and pressure-type water flow devices and valve tamper switches on the inventory. The results and completion dates are documented.
Note 2: Mechanical water-flow devices (including, but not limited to, water motor gongs) should be tested quarterly. The results and completion dates are documented.
6786 S Revere Pkwy Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 4 of 4
Date Tested Device Floor Room # / Corridor Location / Description No de Lo op Device Label Status Comments March 24, 2022 Strobe Zone BLDG 7 STROBES CHILLER ROOM Building 7 N 3 L 1 M 81 Pass March 24, 2022 Speaker/Strobe Above Dock Moving Shelves Building 7 N 3 L 3 x x 49798293 Pass March 24, 2022 Speaker/Strobe Above Dock Moving Shelves Building 7 N 3 L 3 x x 49798295 Pass
VA WCHCS - Bldg 7 - Audibles - Device List - March 23
EC.02.03.05 EP 4 Every 12 months, the hospital tests visual and audible fire alarms, including speakers and door-releasing devices on the inventory. The results and completion dates are documented.