About this file

This is a fire protection device testing report prepared by ALARMSpecialists, Inc. for Building 5 at VA WCHCS (Veterans Affairs Western Colorado Health Care System) conducted in March 2023. The report documents the testing of various fire protection devices in accordance with standard EC.02.03.05 requirements.

The testing covered multiple device types across three floors (basement, 1st, and 2nd floors) including: pull stations, smoke detectors, heat detectors, duct detectors, water flow switches, tamper switches, and speaker/strobe devices. All devices passed inspection except for one tamper switch on the post indicator valve. The report provides detailed documentation of each device's location, identification numbers, and test results. Testing included verification of 4 strobe zones, 4 speaker zones, and 21 individual speaker/strobe devices throughout the building. The water flow switch was tested with a response time of 41 seconds, and tamper switches were tested at 2 turns. The comprehensive testing fulfilled multiple EC.02.03.05 requirements for 6-month and 12-month testing cycles of fire protection system components.

View the file

Other files for this federal contract opportunity

Other files attached to H263--Fire Protection Services, newest first.
File Type Posted
VA WCHCS Off-Premises Monitoring EP5 Report 23.pdf PDF
VA WCHCS Bldg 12 Oneline Report 23.pdf PDF
VA WCHCS Bldg 9 Oneline Report 23.pdf PDF
VA WCHCS Bldg 8 Oneline Report 23.pdf PDF
36C25925Q0190 0002_1.docx DOCX document
VA WCHCS Bldg 45 Oneline Report 23.pdf PDF
VA WCHCS Bldg 33 Oneline Report 23.pdf PDF
VA WCHCS Bldg 20 Oneline Report 23.pdf PDF
VA WCHCS Bldg 14 Oneline Report 23.pdf PDF
VA WCHCS Bldg 7 Oneline Report 23.pdf PDF
VA WCHCS Bldg 6 Oneline Report 23.pdf PDF
VA WCHCS Device List 23.pdf PDF
VA WCHCS Bldg 46 Oneline Report 23.pdf PDF
VA WCHCS Bldg 36 Oneline Report 23.pdf PDF
VA WCHCS Bldg 35 Oneline Report 23.pdf PDF
VA WCHCS Bldg 22 Oneline Report 23.pdf PDF
VA WCHCS Bldg 1 Oneline Report 23.pdf PDF
VA WCHCS Bldg 37 Oneline Report 23.pdf PDF
VA WCHCS Bldg 34 Oneline Report 23.pdf PDF
VA WCHCS Bldg 13 Oneline Report 23.pdf PDF
36C25925Q0190 0002.docx DOCX document
36C25925Q0190 0001_1.docx DOCX document
36C25925Q0190 0001.docx DOCX document
Table 1 Task list by TJC EPs and Frequency 112624.xlsx XLSX spreadsheet
Previous Solicitation Questions and Answers.docx DOCX document
36C25925Q0190_1.docx DOCX document
36C25925Q0190.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared by ALARMSpecialists, Inc

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 1 of 7

Date Tested Device Location No de Lo op Device Status Comments Building 5, Floor 0 N 0 L 0 M 0

March 21, 2023 Pull Station Corridor by FACP Bldg 5 Bsmt N 9 L 1 M 1 Pass Building 5, Floor 1 N 0 L 0 M 0

March 21, 2023 Pull Station FLOOR 1 NORTH EXIT BUILDING 5 N 9 L 1 M 15 Pass March 21, 2023 Pull Station FLOOR 1 STAIR EXIT BUILDING 5 N 9 L 1 M 18 Pass

Building 5, Floor 2 N 0 L 0 M 0 March 21, 2023 Pull Station FLOOR 2 STAIR EXIT BUILDING 5 N 9 L 1 M 20 Pass

EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are documented.

VA WCHCS - Bldg 5 - Devices - Device List - March 23

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 2 of 7

Date Tested Device Location No de Lo op Device Status Comments Building 5, Floor 0 N 0 L 0 M 0

March 23, 2023 Smoke Detector ELEVATOR EQUIP ROOM BUILDING 5 N 9 L 1 D 1 Pass March 23, 2023 Smoke Detector SMOKE ABOVE FACP BUILDING 5 BSMT N 9 L 1 D 2 Pass

Building 5, Floor 1 N 0 L 0 M 0 March 23, 2023 Smoke Detector ELEVATOR LOBBY FLR 1 BUILDING 5 N 9 L 1 D 5 Pass

Building 5, Floor 2 N 0 L 0 M 0 March 23, 2023 Smoke Detector ELEVATOR LOBBY FLR 2 BUILDING 5 N 9 L 1 D 7 Pass March 23, 2023 Smoke Detector ELEVATOR HOISTWAY BUILDING 5 N 9 L 1 D 14 Pass

VA WCHCS - Bldg 5 - Devices - Device List - March 23 EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 3 of 7

Date Tested Device Location No de Lo op Device Status Comments Building 5, Floor 0 N 0 L 0 M 0

March 23, 2023 Heat Detector ELEVATOR EQUIP ROOM BUILDING 5 BSMT N 9 L 1 D 3 Pass March 23, 2023 Heat Detector ELEVATOR EQUIP ROOM BUILDING 5 N 9 L 1 D 10 Pass

Building 5, Floor 2 N 0 L 0 M 0 March 23, 2023 Heat Detector ELEVATOR HOISTWAY BUILDING 5 N 9 L 1 D 13 Pass

VA WCHCS - Bldg 5 - Devices - Device List - March 23 EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 4 of 7

Date Tested DEVICE LOCATION No de Lo op DeviceSHUTDOWN STATUS COMMENTS March 21, 2023 Duct Detector BASEMENT DUCT SUPPLY BUILDING 5 N 9 L 1 D 4 Yes Pass March 21, 2023 Duct Detector BASEMENT DUCT RETURN BUILDING 5 N 9 L 1 D 12 Yes Pass

EC.02.03.05 EP 3 Every 12 months, the hospital tests duct detectors, heat detectors, manual fire alarm boxes, and smoke detectors on the inventory. The results and completion dates are documented.

EC.02.03.05 EP 19 Every 12 months, the hospital tests automatic smoke-detection shutdown devices for air-handling equipment. The results and completion dates are documented.

VA WCHCS - Bldg 5 - Ducts - Device List - March 23

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 5 of 7

Date Tested DEVICE LOCATION STATUS COMMENTS March 21, 2023 Water Flow Switch WATERFLOW BUILDING 5 N 9 L 1 M 7 Pass 41 SEC

VA WCHCS - Bldg 5 - W&T - Device List - March 23 EC.02.03.05 EP 2 Every 6 months, the hospital tests vane-type and pressure-type water flow devices and valve tamper switches on the inventory. The results and completion dates are documented.

Note 2: Mechanical water-flow devices (including, but not limited to, water motor gongs) should be tested quarterly. The results and completion dates are documented.

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 6 of 7

Date Tested DEVICE LOCATION STATUS COMMENTS March 23, 2023 Tamper Switch TAMPER CONTROL #1 BUILDING 5 N 9 L 1 M 8 Pass 2 Turns March 23, 2023 Tamper Switch TAMPER CONTROL #2 BUILDING 5 N 9 L 1 M 9 Pass 2 Turns March 23, 2023 Tamper Switch POST INDICATOR VALVE BUILDING 5 N 9 L 1 M 21 Fail 2 Turns

VA WCHCS - Bldg 5 - W&T - Device List - March 23 EC.02.03.05 EP 2 Every 6 months, the hospital tests vane-type and pressure-type water flow devices and valve tamper switches on the inventory. The results and completion dates are documented.

Note: Mechanical water-flow devices (including, but not limited to, water motor gongs) should be tested quarterly. The results and completion dates are documented.

6786 S Revere Pkwy. Suite 110 Centennial CO 80112 Phone: 303 986-5900 Fax: 866 974-9299 Page 7 of 7

Date Tested Device Floor Room # / Corridor Location / Description No de Lo op Device Label Status Comments March 23, 2023 Strobe Zone BSMT STROBE CIRCUIT N-1 IN FACP CAB Building 5 N 9 L 1 M 71 Pass March 23, 2023 Strobe Zone BSMT STROBE CIRCUIT N-2 IN FACP CAB Building 5 N 9 L 1 M 72 Pass March 23, 2023 Strobe Zone BSMT STROBE CIRCUIT N-3 IN FACP CAB Building 5 N 9 L 1 M 73 Pass March 23, 2023 Strobe Zone BSMT STROBE CIRCUIT N-4 IN FACP CAB Building 5 N 9 L 1 M 74 Pass March 23, 2023 Speaker Zone BSMT BUILDING 5 SPEAKERS IN FACP CAB Building 5 N 9 L 1 M 92 Pass March 23, 2023 Speaker Zone BSMT BUILDING 5 SPEAKERS IN FACP CAB Building 5 N 9 L 1 M 93 Pass March 23, 2023 Speaker Zone BSMT BUILDING 5 SPEAKERS IN FACP CAB Building 5 N 9 L 1 M 94 Pass March 23, 2023 Speaker Zone BSMT BUILDING 5 SPEAKERS IN FACP CAB Building 5 N 9 L 1 M 95 Pass March 23, 2023 Speaker/Strobe BSMT Bottom Of Stairs Building 5 N 9 L 1 x x 49798308 Pass March 23, 2023 Speaker/Strobe BSMT By AHU Rm Building 5 N 9 L 1 x x 49798319 Pass March 23, 2023 Speaker/Strobe 1st By Credit Union Building 5 N 9 L 1 x x 49798212 Pass March 23, 2023 Speaker/Strobe 1st By Water Fountain Building 5 N 9 L 1 x x 49798213 Pass March 23, 2023 Speaker/Strobe 1st Main Entrance Building 5 N 9 L 1 x x 49798215 Pass March 23, 2023 Speaker/Strobe 1st By Rm 105 Building 5 N 9 L 1 x x 49798214 Pass March 23, 2023 Speaker/Strobe 2nd Hallway Building 5 N 9 L 1 x x 49798205 Pass March 23, 2023 Speaker/Strobe 2nd By Elevator Building 5 N 9 L 1 x x 49798206 Pass March 23, 2023 Strobe 2nd women's Restroom Building 5 N 9 L 1 x x 49798201 Pass March 23, 2023 Strobe 2nd Men's Restroom Building 5 N 9 L 1 x x 49798202 Pass March 23, 2023 Speaker/Strobe 2nd By Rm 205 Building 5 N 9 L 1 x x 49798200 Pass March 23, 2023 Speaker/Strobe 2nd By Rm 207 Building 5 N 9 L 1 x x 49798204 Pass March 23, 2023 Speaker/Strobe 2nd Rm 210 Building 5 N 9 L 1 x x 49798203 Pass

VA WCHCS - Bldg 5 - Audibles - Device List - March 23

EC.02.03.05 EP 4 Every 12 months, the hospital tests visual and audible fire alarms, including speakers and door-releasing devices on the inventory. The results and completion dates are documented.

File details come from the government source that posted it. Updated .