This is Amendment 0004 to Solicitation 36C25026B0011, a federal construction solicitation issued by the Department of Veterans Affairs, Network Contracting Office (NCO) 10, for the "Replace Roof Building 1A" project at the VA Central Ohio Health Care System, Chalmers P. Wylie Veteran Outpatient Clinic in Columbus, Ohio (Project 757-21-101). The amendment extends the bid due date and time to May 14, 2026, at 1:00 PM EDT and incorporates Addendum 01 (dated 4-27-2026) with updated drawings and specifications, plus a site visit sign-in sheet from April 14, 2026.

The addendum includes five major scope modifications: (1) addition of an infrared moisture survey requirement to validate moisture conditions beneath the existing roof membrane; (2) removal of Modified Bitumen roofing references with replacement language specifying removal of existing roof system and installation of fluid-applied waterproofing and pave roof system; (3) modification of General Note A to clarify maintenance of existing R-value and insulation thickness with tapered insulation to direct water to roof drains; (4) revision of General Note C to include replacement of missing drain baskets in addition to broken or plastic baskets; and (5) clarification that insulation at Roofs 5, 5A, and 5B will be 3.5" and will not slope. Drawing sheets GI001, AE101-AE111, and AE143 have been updated accordingly. The specification section 07 52 16.11 (Cold Adhesive SBS Modified Bituminous Membrane Roofing) has been removed entirely. Additionally, the document includes 21 Questions and Answers addressing contractor inquiries regarding equipment coordination, drain baskets, storage sheds, waterproofing material chemistry approval (PMMA alternative to PUMA), wall flashing, condensation lines, equipment curbs, damaged areas, core cuts, moisture surveys, inspection requirements, staging areas, counterflashing, working hours, drain replacement, existing roof system types, and asbestos testing.

View the file

Other files

File Type Posted
36C25026B0011 0005_1.docx DOCX document
36C25026B0011 0005.pdf PDF
36C25026B0011 0004_1.docx DOCX document
07.08_AE108 - ENLARGED ROOF PLAN - ROOF 17A.pdf PDF
07.01_AE101 - ENLARGED ROOF PLAN - ROOF 1A.pdf PDF
07 60 00 - FLASHING AND SHEET METAL.pdf PDF
07.13_AE111 - ENLARGED ROOF PLAN - ROOF 14B.pdf PDF
07.04_AE104 - ENLARGED ROOF PLAN - ROOF 1D.pdf PDF
07.03_AE103 - ENLARGED ROOF PLAN - ROOF 1C.pdf PDF
07 22 00 - ROOF AND DECK INSULATION.pdf PDF
07 01 50.19 - PREPARATION FOR RE-ROOFING and ROOFING REHABILITATION.pdf PDF
00.02_GI100 - OVERALL ROOF PLAN and 3D ROOF VIEW.pdf PDF
00.01_GI001 - COVER SHEET.pdf PDF
36C25026B0011 0003.pdf PDF
07.43_AE143 - ROOF 5, 5A and 5B DETAILS - DEMOLITION AND NEW WORK.pdf PDF
07.07_AE107 - ENLARGED ROOF PLAN - ROOFS 5 and 7.pdf PDF
07.05_AE105 - ENLARGED ROOF PLAN - ROOF 3A.pdf PDF
00 01 15 - LIST OF DRAWING SHEETS.pdf PDF
07.12_AE110 - ENLARGED ROOF PLAN - ROOF 14A.pdf PDF
07.09_AE109 - ENLARGED ROOF PLAN - ROOF 17B.pdf PDF
07.06_AE106 - ENLARGED ROOF PLAN - ROOF 3B.pdf PDF
07.02_AE102 - ENLARGED ROOF PLAN - ROOF 1B.pdf PDF
01 00 00 - GENERAL REQUIREMENTS.pdf PDF
2025-0506 JV-COVA Replace Roof 1A_BID DWGS - REVISED.pdf PDF
36C25026B0011 0002_1.docx DOCX document
36C25026B0011 0001_1.docx DOCX document
36C25026B0011 0001.pdf PDF
Attachment - VA Columbus Engineering Map Parking Directions.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Project Manual.pdf PDF
Attachment - Wage Determinations - Franklin County.pdf PDF
Attachment - 852.219-75 VA Notice of Limitations on Subcontracting.pdf PDF
36C25026B0011_2.docx DOCX document
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Specs.pdf PDF
Attachment - 2025-0506 JV-COVA Replace Roof 1A_Bid Dwgs.pdf PDF
36C25026B0011 - Solicitation - Replace Roof Building 1A.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0004 05-04-2026

757-26-2-758-0002

757-21-101

701 B

Department of Veterans Affairs ATTN: Terence James Network Contracting Office (NCO) 10 6100 Oak Tree Blvd., Suite 490 Independence OH 44131

701 B

Department of Veterans Affairs ATTN: Terence James Network Contracting Office (NCO) 10 6100 Oak Tree Blvd., Suite 490 Independence OH 44131

To all Offerors/Bidders

36C25026B0011

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 05-14-2026 13:00 EDT

X 1

The purpose of amendment 0004 are listed below:

1. 2026-0427 ADDENDUM 1r

2. Site Visit Sign In Sheet

3. (EXTEND) Bid due date & time to May 14, 2026, 1:00pm / submitted via mail to Terence James address list in block

Solicitation# 36C25026B0011 Amendment 0004

(Continuation of Block 14. DESCRIPTION OF AMENDMENT MODIFICATION)

See attached document: 2026-0427 ADDENDUM 1r.

See attached document: Site Visit Sign In Shett - Replace Roof Building 1A.

“REPLACE ROOF BUILDING 1A” PROJECT FOR THE

VA CENTRAL OHIO HEALTH CARE SYSTEM

CHALMERS P. WYLIE VETERAN OUTPATIENT CLINIC

COLUMBUS, OHIO

PROJECT NUMBER: 757-21-101

UPDATED DRAWINGS, SPECIFICATIONS AND EXPLANATION OF REVISIONS

ADDENDUM NUMBER 01

4-27-2026

SUMMARY OF UPDATES

Item 1. ADDED INFRARED MOISTURE SURVEY o Added Note Q on sheet GI001: “Include in Contractor’s bid an infrared moisture survey of full scope area to validate any changes of moisture beneath existing roof membrane.”

Item 2. REMOVED REFERENCE TO NEW MODIFIED BITUMEN ROOFING o All Legends on Roof Plan drawings have been revised to remove reference to Modified

Bitumen roofing. The new description for the “Replacement Scope” hatch now reads, “Remove existing roof system down to the structural deck. Install fluid-applied waterproofing and pave roof system.”

o Modified Bitumen specification section has been removed from the scope.

Item 3. MODIFIED GENERAL NOTE ‘A’ ON ROOF PLAN DRAWINGS o General Note A is modified to read, “Maintain existing R-value and insulation thickness to match existing in isolated replacement areas as identified on Drawings, unless noted otherwise. Provide tapered insulation to direct water to roof drains. Match elevation where tying into existing.”

Item 4. ADDED REPLACEMENT OF MISSING DRAIN BASKETS o General Note C on all Roof Plan drawings has been revised to include replacement of

“missing” drain baskets in addition to the plastic and broken drain baskets.

Item 5. CLARIFY INSULATION AT ROOFS 5, 5A, AND 5B o Modify detail notes to clarify the insulation will not slope. Insulation is to be 3.5” to match the specifications. Graphic representation on details shall not be understood to be sloping tapered insulation.

o Arrangement of notes have been adjusted to correct overlapping text.

DRAWING MODIFICATIONS

GI001

1. General Note Q added to sheet regarding including a moisture survey in the scope.

AE101, AE102, AE103, AE104, AE105, AE106, AE107, AE108, AE109, AE110, AE111

1. Legend updated for “Replacement Scope” to remove modified bitumen reference and include the fluid-applied waterproofing and paver roof system.

2. General Note A modified to clarify thickness of insulation is to match existing.

3. General Note C modified to replace missing drain baskets in addition to the broken and/or plastic drain baskets.

AE143

1. Modify detail notes to clarify the insulation will not slope.

SPECIFICATION MODIFICATIONS

00 01 15 – LIST OF DRAWINGS:

1. Revision name of sheet AE143 to be “ROOF 5, 5A & 5B DETAILS – DEMOLITION

AND NEW WORK”.

01 00 00 – GENERAL REQUIREMENTS:

1. Modified Part 1.3.B to replace reference to “modified bitumen” with “fluid-applied waterproofing and paver” roofing system.

07 52 16.11 – COLD ADHESIVE SBS MODIFIED BITUMINOUS MEMBRANE

ROOFING:

1. Remove specification in its entirety.

2. All reference to specification section 07 52 16.11 shall be removed.

RFIs 4-22-2026 - 757-21-101 Replace Roof Building 1A

1. Drawings call to move and put back radio frequency equipment. During work on these areas, is this equipment going to functioning? If so, What happens when we are moving it perform our work. When putting back, is positioning critical for receiving a signal? This should take someone from the VA to position as required. Will the VA be provide coordination with the required technicians?

The radio antennas can be moved and will still operate with no issues. The only item that the positioning is critical for receiving a signal is a small microwave receiver that is for the VA base radio system. If it gets moved it has to be set back up by the company. -VA provided answer.

2. General Note C states to remove and replace plastic drain basket strainers. Detail on AE142 show cast iron baskets. Is there a mix of plastic and cast basket strainers?

General Note C modified to replace missing drain baskets in addition to the broken and/or plastic drain baskets. Replace broken drain baskets with material in kind. - A/E provided answer.

3. There are storage sheds on the roof that it is noted to be temporarily moved and put back? Will the VA remove the contents of these sheds? If not, what are the contents?

The VA will take care of moving and putting back the storage sheds. -VA provided answer.

4. We respectfully request the design team to consider/approve PMMA (Polymethyl methacrylate) as a comparable chemistry to the PUMA (Polyurethane methacrylate) waterproofing as specified in specification section 071500 – fluid-applied waterproofing, concrete deck. The chemistries are very similar and applied in the same applications. Attached is a letter from SOPREMA (PMMA manufacturer) along with product/chemistry information for review.

The performance characteristics specified for this project were intended to minimize all odors at the facility. As the product submitted is only a slight deviation from the specification parameters in 071500, product may be proposed for use on-site at Roofs 5, 5A, and 5B, with the understanding that if odors from the product are noticeable during installation, the VA can request an alternative product meeting the specification characteristics provided in 071500 Part 2.1.

5. Where the current wall flashing runs behind the metal wall panels on Roof 5, should we retain the current flashing to avoid disturbing the panels, or should we account for replacing those wall panel areas?

{FFE} Install the fluid applied system from the concrete deck up the wall as high as possible and provide new counterflashing under and behind the existing flashing to remain otherwise undisturbed.

6. Some mechanical units do not appear to have PVC lines drawing condensation to the drain areas. Should we install these lines or leave them as is?

{FFE} Provide splash pans and leave condensation lines as-is.

7. Should we install new curbs for mini-split units that are currently sitting on slip sheets?

{FFE} No. Lift and reset existing materials onto new fluid applied system.

8. Should we remove abandoned curbs or unused cap penetrations?

{FFE} Not at this time.

9. More damage appears to exist in certain roof areas than specified in the drawings.

How does the VA want to address these areas prior to coating?

{FFE} Bid the project as specified at this time.

10. Have any core cuts been taken from the building?

{FFE} Roof cuts were taken during design to validate roof composition and confirm wet/dry locations beneath the membrane.

11. Will an updated IR scan be provided before the bid due date, or should we account for that in our pricing?

{FFE} Contractor to include updated roof moisture survey costs in their bid.

12. Should we provide line-item replacement pricing in the event that more of the roof is saturated than initially specified?

{FFE} Bid the project as specified at this time. If additional wet insulation replacement is needed it will be identified in the updated survey and discussed at that time.

13. Can the VA confirm how often a manufacturer's representative needs to be onsite for inspections?

{FFE} Project Bid Documents call for daily inspections by the proposed roof rehabilitation system manufacturer.

14. How does the VA wish for the awarded contractor to handle daily inspections?

{FFE} Include inspection costs in the bid as required in the Bid Documents.

15. Are there any proposed lay-down and staging areas for the project?

{FFE} Laydown and staging areas will be agreed upon with the awarded contractor. VA to confirm.

16. The specifications call for reusing counter flashings and only replacing them where damaged. Should we provide a line-item cost per linear foot for these replacements?

{FFE} Bid the project as specified at this time.

17. Are the areas being replaced with modified bitumen membrane excluded from coating during restoration?

{FFE} No modified bitumen roof system materials are specified. This spec section and references to any new modified bitumen roof system install are hereby removed from the Bid Documents.

18. What are the specified working hours for this project?

{FFE} Work is scheduled to be performed during the normal daytime business hours of the medical center excluding federal holidays and as noted in drawing note 2.17 on sheet AE109 above the Sterile Processing Services.

19. Should we provide new drains or only new drain hardware?

{FFE} Intention is for existing roof drains to remain except as noted in drawings. Replace any broken, missing or plastic drain components as part of the base bid.

20. Is it listed anywhere where it states what the existing roof system is for the areas that have the wet insulation?

{FFE} See next sheet for construction type of each roof. Quantities are the responsibility of the Bidders.

21. Has there been asbestos testing done?

{FFE} No ACM is anticipated. Any post-bid testing that is requested by the VA that confirms the presence of asbestos will be addressed and handled at that time.